Client: Project Project No.
GSI PUMP
MECHANICAL SPECIFICATION SHEET Rev. Date By Chkd App'd
CENTRIFUGAL PUMP (API 610 12TH EDITION) A SM
Doc # Sheet: 1 of 4
MR / PO No. Service: Aviation Gasoline Loading
REV Description: Tag No. NA
1 NUMBER REQUIRED: 2 SPEC NO.:
2 MANUFACTURER: AKAY INDUSTRIES PURCHASE ORDER NO.:
3 SIZE & TYPE: OH2 APIFLO-OH2 80-365-9 SERIAL NO.:
4 APPLICABLE TO: PROPOSALS PURCHASE AS BUILT
5 NOTES: INFORMATION BELOW TO BE COMPLETED: BY PURCHASER BY MANUFACTURER BY MANUFACTURER OR PURCHASER
6 OPERATING CONDITIONS (5.1.3) LIQUID (5.1.3)
7 CAPACITY, NORMAL (m3/hr) RATED 91 (m3/hr)) LIQUID TYPE OR NAME
8 OTHER HAZARDOUS FLAM MABLE (5.1.5)
9 SUCTION PRESSURE NOR./RATED / (barg) Min NOR Max
10 DISCHARGE PRESSURE (barg) PUMPING TEMP (°C) 20
11 DIFFERENTIAL PRESSURE (barg) VAPOR PRESS. (bar A)
12 DIFF. HEAD 48 (m) NPSHA Ample (m) RELATIVE DENSITY (SG): 0.74
13 PROCESS VARIATIONS (5.1.4) VISCOSITY (cst) 1
14 STARTING CONDITIONS (5.1.4) SPECIFIC HEAT, Cp . (kJ/kg K)
15 SERVICE: CONT. INTERMITTENT (STARTS/DAY) CHLORIDE CONCENTRATION (mg/lit)
16 PARALLEL OPERATION REQ'D (5.1.13) H2S CONCENTRATION (6.5.2.4) (PPM) WET (5.2.1.12c)
17 SITE DATA (5.1.3) CORROSIVE / EROSIVE AGENT (5.12.1.9)
18 LOCATION: (5.1.30) MATERIALS
19 INDOOR HEATED OUTDOOR UNHEATED ANNEX H CLASS (5.12.1.1) S-6
20 ELECTRICAL AREA CLASSIFICATION (5.1.24 / 6.1.4) MIN DESIGN METAL TEMP (5.12.4.1) (°C)
21 TEMP. CL GR Zone REDUCED HARDNESS MATERIALS REQ'D. (5.12.1.11)
22 WINTERIZATION REQ'D TROPICALIZATION REQ'D. BARREL/CASE A216 WCB IMPELLER A743 CA15
23 SITE DATA (5.1.30) CASE/IMPELLER WEAR RINGS A276 304
24 ALTITUDE (m) BAROMETER (mm HG) SHAFT A434 ClassBB
25 RANGE OF AMBIENT TEMPS: MIN/MAX. / (°C) SLEEVE A276 304
26 RELATIVE HUMIDITY: MIN / MAX / (%)
27 UNUSUAL CONDITIONS: (5.1.30) DUST FUMES PERFORMANCE
28 OTHER Dust PROPOSAL CURVE NO. RPM 1770
29 IMPELLER DIA. RATED 363 MAX. 409 MIN. 320 (mm)
30 IMPELLER TYPE CLOSED
31 DRIVER TYPE RATED POWER 17.8 (kW) EFFICIENCY 49.34 (%)
32 INDUCTION MOTOR STEAM TURBINE GEAR MINIMUM CONTINUOUS FLOW:
33 OTHER THERMAL (m3/h) STABLE 13.2 (m3/h)
34 PREFERRED OPER. REGION 58.52 TO 100.32 (m3/h) 84
35 MOTOR DRIVER (6.1.1 / 6.1.4) ALLOWABLE OPER. REGION 13.2 TO 100.32 (m3/h)
36 MANUFACTURER Out of AKAY scope MAX HEAD @ RATED IMPELLER 67.5 (m)
37 (kW) 1770 (RPM) MAX POWER @ RATED IMPELLER 19.2 (kW)
38 FRAME ENCLOSURE NPSHR AT RATED CAPACITY 8.7 (m) (5.1.10)
39 HORIZONTAL VERTICAL SERVICE FACTOR MAX SUCTION SPECIFIC SPEED (m3/h, m, r/min) (5.1.11)
40 VOLTS/PHASE/HERTZ / / 60
41 TYPE MAX. SOUND PRESS. LEVEL REQ'D 85 (dBA) (5.1.16)
42 MINIMUM STARTING VOLTAGE (6.1.5) EST MAX SOUND PRESS. LEVEL (dBA) (5.1.16)
43 INSULATION F TEMP. RISE UTILITY CONDITIONS
44 FULL LOAD AMPS ELECTRICITY VOLTAGE PHASE HERTZ
45 LOCKED ROTOR AMPS DRIVERS 440 3 60
46 STARTING METHOD D.O.L HEATING
47 LUBE Oil SYSTEM VOLTAGE DIP 80% OTHER (6.1.5)
49 BEARINGS (TYPE/NUMBER): STEAM MAX. PRESS. MAX. TEMP. MIN. PRESS. MIN. TEMP.
50 RADIAL / DRIVERS
51 THRUST / HEATING
52 VERTICAL THRUST CAPACITY COOLING WATER: (5.1.19) SOURCE
53 UP (N) DOWN (N) SUPPLY TEMP. (°C) MAX. RETURN TEMP. (°C)
54 DEGREE OF PROTECTION IP54 (IP55 FOR TERMINALS) NORM. PRESS. (bar) DESIGN PRESS. (bar)
55 COS Ф MIN. RET. PRESS. (bar) MAX. ALLOW. D.P. (bar)
56 EFFICIENCY CHLORIDE CONCENTRATION: (PPM)
57
58
59
59
60
61
62
Client: Project Project No.
GSI PUMP 0
MECHANICAL SPECIFICATION SHEET Rev. Date By Chkd App'd
CENTRIFUGAL PUMP (API 610 12TH EDITION) A SM
Doc # Sheet: 2 of 4
MR / PO No. Service: Aviation Gasoline Loading
REV Descrition: Tag No. NA
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
Client: Project Project No.
GSI PUMP 0
MECHANICAL SPECIFICATION SHEET Rev. Date By Chkd App'd
CENTRIFUGAL PUMP (API 610 12TH EDITION) A SM
Doc # Sheet: 3 of 4
MR / PO No. Service: Aviation Gasoline Loading
REV Descrition: Tag No. NA
1 CONSTRUCTION SURFACE PREPARATION AND PAINT
2 ROTATION: (VIEWED FROM COUPLING END) CW CCW MANUFACTURER'S STANDARD OTHER (SEE BELOW)
3 PUMP TYPE: (1.3) SPECIFICATION NO. Manufacture standard
4 OH1 OH2 OH3 OH6 PUMP:
5 CASING MOUNTING: PUMP SURFACE PREPARATION Manufacture standard
6 CENTERLINE NEAR CENTERLINE PRIMER
7 FOOT FINISH COAT
8 CASING SPLIT: BASEPLATE: (6.3.17)
9 AXIAL RADIAL BASEPLATE SURFACE PREPARATION Manufacture standard
10 CASING TYPE: PRIMER
11 SINGLE VOLUTE MULTIPLE VOLUTE DIFFUSER FINISH COAT
12 BETWEEN BEARINGS DETAILS OF LIFTING DEVICES(6.3.20)
13 CASE PRESSURE RATING: SHIPMENT: (7.4.1)
14 MAX ALLOWABLE WORKING PRESSURE 40 (bar) DOMESTIC EXPORT EXPORT BOXING REQUIRED
15 @ Amb (°C) OUTDOOR STORAGE MORE THAN 6 MONTHS
16 HYDROTEST PRESSURE 60 (bar) SPARE ROTOR ASSEMBLY PACKAGED FOR:
17 SUCTION PRESS. REGIONS MUST BE DESIGNED SHIPPING CONTAINER (8.2.8.3) VERTICAL STORAGE (8.2.8.2)
18 FOR MAWP (5.3.6) TYPE OF SHIPPING PREPARATION N2 PURGE (8.2.8.4)
19 NOZZLE CONNECTIONS: (5.4.2) HEATING AND COOLING
20 SIZE FLANGE FACING POSITION HEATING JACKET REQ'D. (5.8.9) COOLING REQ'D.
21 (DN) RATING COOLING WATER PIPING PLAN (6.5.4.1)
22 SUCTION DN 100 #300 RF END C.W. PIPING:
23 DISCHARGE DN 80 #300 RF TOP PIPE TUBING; FITTINGS
24 BALANCE DRUM C.W. PIPING MATERIALS:
25 PRESSURE CASING AUX. CONNECTIONS: (5.4.3) S. STEEL C. STEEL GALVANIZED
26 NO. SIZE (DN) TYPE COOLING WATER REQUIREMENTS:
27 DRAIN BEARING HOUSING (m3/h) @ (bar)
28 VENT HEAT EXCHANGER (m3/h) @ (bar)
29 PRESS. GAUGE STEAM PIPING: TUBING PIPE
30 TEMP GAUGE BEARINGS AND LUBRICATION
31 WARM-UP BEARING (TYPE/NUMBER) (5.10.1):
32 BALANCE / LEAK-OFF RADIAL Roller / 1 PC
33 MACHINED AND STUDDED CONNECTIONS (5.4.3.8) THRUST Ball / 2 Pc
34 CYLINDRICAL THREADS REQUIRED (5.4.3.3) LUBRICATION (5.11.3, 5.11.4):
35 ROTOR: RING OIL HYDRODYNAMIC PURGE OIL MIST PURE OIL MIST
36 COMPONENT BALANCE TO ISO 1940 G1.0 (5.9.4.4) CONSTANT LEVEL OILER PREFERENCE (5.10.2.2):
37 SHRINK FIT -LIMITED MOVEMENT IMPELLERS (8.2.2.3) PRESSURE LUBE SYS.ISO13709-3 ISO 13709-2 (8.2.6.1/8.2.6.5)
38 COUPLINGS:(6.2.2) OIL VISC. ISO GRADE
AKAY Choice
39 MANUFACTURER MODEL OIL PRESS. TO BE GREATER THAN COOLANT PRESSURE
40 RATING (kW/100 RPM) REVIEW AND APPROVE THRUST BEARING SIZE(8.2.5.2.4)
41 SPACER LENGTH 180 (mm) SERVICE FACTOR ≥1.5 OIL HEATER REQUIRED: STEAM ELECTRIC
42 DRIVER HALF COUPLING MOUNTED BY: INSTRUMENTATION (6.4.2)
43 PUMP MFR. DRIVER MFR. PURCHASER SEE ATTACHED API-670 DATA SHEET
44 COUPLING WITH HYDRAULIC FIT (6.2.9) ` ACCELEROMETER(S) (6.4.2.1)
45 COUPLING BALANCED TO ISO 1940-1 G6.3 (6.2.3) NONCONTACTING TRANSDUCERS (6.4.2.2)
46 COUPLING PER ISO 14691(6.2.3) RADIAL PER BRG. AXIAL PER BRG.
47 COUPLING PER ISO 10441(6.2.3) PROVISION FOR MOUNTING ONLY (5.10.2.10)
48 COUPLING PER API 671(6.2.3) FLAT SURFACE REQ'D (5.10.2.11)
49 NON SPARK COUPLING GUARD (6.2.13) RADIAL BEARING METAL TEMP. THRUST BRG METAL TEMP.
50 COUPLING GUARD STANDARD TEMP. GAUGES (WITH THERMOWELLS)
51 ASME B15.1 OTHER PRESSURE GAUGE TYPE
52 BASEPLATES: MONITORS AND CABLES SUPPLIED BY (6.4.3.3)
53 API BASEPLATE NUMBER (ANNEX C) REMARKS
54 NON-GROUT CONSTRUCTION (6.3.13)
55 OTHER Grouted
56 MECHANICAL SEAL:(5.8.1)
57 SEE ATTACHED ISO 21049/API 682 DATA SHEET
58 SEAL TYPE WEIGHTS (kg)
59 API SEAL CODE Plan 11+52 PUMP BASEPLATE
60 API CONFIGURATION DRIVER TOTAL
61 SEAL MANUFACTURE AKAY Choice GEAR
62
Client: Project Project No.
GSI PUMP 0
MECHANICAL SPECIFICATION SHEET Rev. Date By Chkd App'd
CENTRIFUGAL PUMP (API 610 12TH EDITION) A SM
Doc # Sheet: 4 of4
MR / PO No. Service: Aviation Gasoline Loading
REV Descrition: Tag No. NA
1 SPARE PARTS (TABLE 18) QA INSPECTION AND TESTING (CONT.)
2 START-UP NORMAL MAINTENANCE TEST (7.3.1.2) NON-WIT WIT OBSERVE
3 SPECIFY HYDROSTATIC (7.3.2)
4 OTHER PURCHASER REQUIREMENTS PERFORMANCE (7.3.3)
5 COORDINATION MEETING REQUIRED (9.1.3) NPSH (7.3.4.2)
6 MAXIMUM DISCHARGE PRESSURE TO INCLUDE (5.3.2) RETEST ON SEAL LEAKAGE (7.3.3.2d)
7 MAX RELATIVE DENSITY RETEST REQUIRED AFTER FINAL
8 MAX DIA. IMPELLERS AND/OR NO OF STAGES HEAD ADJUSTMENT (7.3.3.5b)
9 OPERATION TO TRIP SPEED COMPLETE UNIT TEST (7.3.4.3)
10 CONNECTION DESIGN APPROVAL (5.12.3.4/8.2.1.4) SOUND LEVEL TEST (7.3.4.4)
11 INERT GAS INHIBITED STORAGE OF SPARE CARTRIDGE (8.2.8.3) CLEANLINESS PRIOR TO
12 TORSIONAL ANALYSIS REQUIRED (5.9.2.1) FINAL ASSEMBLY (7.2.2.2)
13 TORSIONAL ANALYSIS REPORT (5.9.2.6) NOZZLE LOAD TEST (6.3.6)
14 PROGRESS REPORTS (9.3.3) CHECK FOR CO-PLANAR
15 OUTLINE OF PROCEDURES FOR OPTIONAL TESTS (9.3.5) MOUNTING PAD SURFACES (6.3.3)
16 ADDITIONAL DATA REQUIRING 20 YEARS RETENTION (7.2.2.1f) MECHANICAL RUN UNTIL OIL
17 PIPING AND APPURTENANCES TEMP. STABLE
18 MANIFOLD PIPING TO SINGLE CONNECTION (6.5.1.6) 4 HR. MECHANICAL RUN AFTER
19 VENT DRAIN COOLING WATER OIL TEMP. STABLE
20 MOUNT SEAL RESERVOIR OFF BASEPLATE (6.5.1.4) 4 HR. MECH. RUN TEST(7.3.4.7.2)
21 FLANGES REQUIRED IN PLACE OF SOCKET WELD UNIONS (6.5.2.8) TRUE PEAK VELOCITY
22 INSTALLATION LIST IN PROPOSAL (9.2.3L) DATA (7.3.3.4e)
23 CONNECTION BOLTING BRG HSG RESONANCE
24 PTFE COATING ASTM A153 GALVANIZED TEST (7.3.4.6)
25 PAINTED SS REMOVE / INSPECT
26 QA INSPECTION AND TESTING HYDRODYNAMIC BEARINGS
27 SHOP INSPECTION (7.1.4) AFTER TEST (8.2.7.5)
28 PERFORMANCE CURVE APPR. AUXILIARY EQUIPMENT
29 TEST WITH SUBSTITUTE SEAL (7.3.3.2) TEST (7.3.4.5)
30 MATERIAL CERTIFICATION REQUIRED (5.12.1.8) CHARPY TEST (EN 13445/ASME VIII)
31 CASING IMPELLER SHAFT FINAL INSPECTION (DIM. & VIS.)
32 OTHER
33 CASTING REPAIR PROCEDURE APPROVAL REQ'D (5.12.2.5)
34 INSPECTION REQUIRED FOR CONNECTION WELDS (5.12.1.5) VENDOR KEEP REPAIR AND HT RECORDS (7.2.1.1c)
35 MAG PARTICLE LIQUID PENETRANT VENDOR SUBMIT TEST PROCEDURES (7.3.1.2 / 9.2.5)
36 RADIOGRAPHIC ULTRASONIC VENDOR SUBMIT TEST DATA WITHIN 24 HOURS (7.3.3.3c)
37 INSPECTION REQUIRED FOR CASTINGS (7.2.1.3)(5.12.1.5) INCLUDE PLOTTED VIBRATION SPECTRA (5.9.3.3)
38 MAG PARTICLE LIQUID PENETRANT RECORD FINAL ASSEMBLY RUNNING CLEARANCES
39 RADIOGRAPHIC ULTRASONIC COMPLETION OF INSPECTION CHECK LIST (7.1.6)
40 HARDNESS TEST REQUIRED: (7.2.2.3)
41 ADDITIONAL SUBSURFACE EXAMINATION (7.2.1.1)
42 FOR SHAFT
43 METHOD ULTRASONIC
44
45 REMARKS
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62