Arun Kumar Project Head Operations BAAR - Q1
Arun Kumar Project Head Operations BAAR - Q1
S. No.
1
2
3
4
5
6
8
10
3
4
6
7
9
10
11
12
4
5
Goal Sheet Guidelines
Guidelines
All cells under "Personal Details" should be accurately filled
The final goals along with the targets should be for the entire year (1 April 2021 - 31 March 2022) or till the end o
The columns of Goals, Measure and Weightage are non-editable and are fixed as per the approval of the Head of
In the column "Description / Definition of measure", provide details of the work for which his/her performance w
In the column "Data Source", annexure needs to be mentioned from which the data of the achievement against th
The weightage has been fixed in the standard goal sheet provided to you and any changes will require HOD appro
The "Target" column has been populated with standard approved targets and any changes will require HOD and
(For Project Locations the Goal sheets have been standardized with description and targets, in case your role diff
For GURM & UDHO - the "Target" column needs to be filled within the defined timelines in discussion with the M
Once the sheet is finalised then the Manager and the Employee sign-off the sheet.
Target achieved till Q1 (or Q2 or Q3) – In this column, the employee needs to mention the cumulative achieveme
was expected for the period between start of the Financial Year and end of Q1 (or Q2 or Q3) - please write achieve
In Status (Q1/Q2/Q3) - Against each target select one of the three options given in the dropdown (On Track/ Add
Revised Targets (If Required) –If during the review conversation, it is agreed by both the manager and the emplo
mentioned in this column only. The original ‘Target 'column (column G) from the goal sheet should not be chang
Employee Feedback – Against each target, the employees should give their feedback on their achievement. The fe
support requirements if any. Avoid one-word remarks like good, okay, excellent or 100% achieved.
Manager Feedback - The remarks shared by the Manager during the review session should be captured by the em
Reviewer Feedback – If the reviewer is also a part of the review conversation, his/her feedback should be capture
Action Plan – This column needs to be filled mandatorily for those targets where the achievement ‘Status’ is ‘Red
Target achieved till date – Similar to the ‘Target achieved till Q1/Q2/Q3’ column in the quarterly feedback section
numeric form.
% Achieved till date – The ‘% Achieved till date’ is the ratio of the actual performance till date and the target expe
expected to be achieved till date
Weightage achievement till date – The value in this column is ‘% Achieved till date’ multiplied with ‘Weightage fo
Which GRIL values will it reflect - The employee needs to select one of the GRIL values from the dropdown which
Manager comments & Reviewer comments - Please capture the feedback given by the manager & reviewer agains
Persona
1 Material
1 Manpower
1 Client Queries
1
Hindrance free right of way
(ROW)
1
Project Delivery
No of Non-Conformance
Stakeholder Management
Report (NCR)
1
1
% Timely reports sent to
MIS & Reporting
relevant stakeholders
1
1 Grievances Management
People Management
1 Attrition
1
Personal Details
100%
FY 2022-23
SISA
Operations
Project Head
Vikas Agarwal Achievements till Quarter 1
0% Wastage
0% On Track - Continue
No Hinderance
Action
On Track - Continue
0% No Pending Permits
Action
0% On Track - Continue
No any External NCR issued in this FY
Action
Additional Action
Will be tracked to avoid further delay
Required
On Track - Continue
Achieved
Action
0%
Additional Action Revenue Bill shall be submitted on time
Required in the upcoming quarter
On Track - Continue Target Achieved
Action
0%
Manager Feedback
ent Feedback
Manager Feedback
SISA
Annexure-I
Monitoring and Ensuring the project profit As per
Month
Description
Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22
Revision No. R4
BOQ AMOUNT 1,677.56
Budgeted Profit Expenditure 1,607.84
(As per Budget)
Amount of Profit 69.71
Percentage 4.16%
Revenue 1,547.37
Expenditure 1,449.45
Actual Profit (As
per P&L) Amount of Profit 97.93
Percentage 6.33%
% Achievement 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,677.56
1,607.84
69.71
4.16%
1,547.37
1,449.45
97.93
6.33%
SISA
Annexure-II
Target Vs Acheivement (Financial
Month
Achieved Balance as
upto on Apr-22 May-22 Jun-22 Jul-22
Mar-22 01/Apr/22
Original Target (Rs. Cr.)
Work programme Revision number
Revised Target (Rs. Cr.)
Target for Review (Rs. Cr.) - - - -
CUMMULATIVE TARGET (Rs. Cr.) - - - - - -
Progress (Rs. Cr.) -
CUMMULATIVE PROGRESS (Rs. Cr.) - - - - -
Achievement (%) 0.00% 0.00% 0.00% 0.00% 0.00%
CUMMULATIVE ACHIEVEMENT (%) #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Note:
Figures considered for target set in the month of April 2022
SISA
Annexure-II
ivement (Financial Progress) (EPC)
Month
Total
Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Mar-23
-
- - - - - - - - -
- - - - - - - -
-
- - - - - - - -
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Remark
SISA
Annexure-III
Value Engineering
S.No. Department Description Cost Saving
100%
SISA
Annexure-IV
Control wastage - Reconcile material by comparing actual co
SI. Allowable Month wise % age wastage as per Production V
Item Description
No. wastage (%) Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22
1 GSB -2.00%
2 WMM -2.00%
3 DBM -0.50%
4 BC -0.50%
5 DLC -0.50%
6 PQC -0.50%
7 RCC (All Grades) -0.50%
8 Reinforcement -2.50%
Achievement
e-IV
omparing actual consumption vs RFI
age as per Production Vs RFI Avg Achievement
Nov-22 Dec-22 Jan-23 Feb-23 Mar-23 wastage
0.0% 100.00%
0.0% 100.00%
0.0% 100.00%
0.0% 100.00%
0.0% 100.00%
0.0% 100.00%
0.0% 100.00%
0.0% 100.00%
100.00%
Average
SISA
Annexure-V
Ensure the mobilization of machinery as per machinery planning
Month wise Machinery (only depreciation cost) Average
Remark
Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Mar-23 Total
1 Apr-22 0 0.00% 0
2 May-22 0 0.00% 0
3 Jun-22 0 0.00% 0
4 Jul-22 0 0.00% 0
5 Aug-22 0 0.00% 0
6 Sep-22 0 0.00% 0
7 Oct-22 0 0.00% 0
8 Nov-22 0 0.00% 0
9 Dec-22 0 0.00% 0
10 Jan-23 0 0.00% 0
11 Feb-23 0 0.00% 0
12 Mar-23 0 0.00% 0
Achievement (%)
y 10th of every month and ensure make
ork order condition)
100% certification bill before
15th
Achievement Remarks
Achievement %
100.00% 50.00%
100.00% 50.00%
100.00% 50.00%
100.00% 50.00%
100.00% 50.00%
100.00% 50.00%
100.00% 50.00%
100.00% 50.00%
100.00% 50.00%
100.00% 50.00%
100.00% 50.00%
100.00% 50.00%
50.00%
SISA
Annexure-VIII
To resolve the Client Queries within S
Year:2021-2022
Grievance Cumulative
Month
Raised Solved Pending Raised
Q1 0 0.00 0.00 0
Q2 0 0 0.00 0
Q3 0 0 0.00 0
Q4 0 0 0.00 0
Grievance Raised
S.No
Date Quarter Emp. ID Name
*Note: Kindly arrange to capture the data of grievance in the above format.
SISA
Annexure-VIII
solve the Client Queries within Stipulated Time
Year:2021-2022
Cumulative Score
Solved ≤ 10D
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
#DIV/0!
4/1/2021 6/30/2021
7/1/2021 9/30/2021
10/1/2021 12/31/2021
1/1/2022 3/31/2022
Month:
Grievance Solution Remarks
Date Status Duration Score
Total Project Length : 42.7 KM(MCW) Total land required (in HA):
Available Length : 42.7 KM(MCW) Available land (in HA):
To be Acquired : 0 KM(MCW) To be Acquired (in HA):
To be acquired in KM (Cumulative)
Achieved (in KM)
Achievement% #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
A
re-IX
e Free Land Month wise
NAME
FREE RIGHT OF WAY
0
0
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Mar-22
42.7
42.7
An
Ensure validity of all applic
Description of applicable permits/ Target date as per Actual Date of
S.No.
insurance covers/ BGs' contract permission acquired
Permission of the State Govt. for
1
extraction of boulders from quarry
Permission of Village Panchayat and
2 Pollution Control Board for installation of 3/1/2019 3/1/2019
crushers
3 Licence for use of explosives
0 N.A.
0 Sub Contracted
0 N. A.
0 Obtained
0 Obtained
0 Obtained
0
0 Obtained
0 Obtained
0 N. A.
0 Obtained
0 N. A.
0 N. A.
100%
Next Date of Renewal (if any) Remarks (Letter ref.)
1/4/2022
1/4/2022
1/4/2022
10/9/2022
10/9/2022
12/31/2022
To reduce the safety related incidents by organizing th
PROJECT : PURVANCHAL EXPRESSWAY
PROJECT MANAGER :
INCIDENT-ACCIDENT STATISTICS PERIOD-APRIL-2022 TO MARCH -2023
GOAL : High=0, Medium=5, Low=10
MONTH APRIL MAY JUNE JULY
CATEGORY L M H L M H L M H L M H
TOTAL 0 0 0 0 0 0 0 0 0 0 0 0
EMPLOYEE
AFFECTED- 0 0 0 0 0 0 0 0 0 0 0 0
COMPANY
EMPLOYEE
AFFECTED-
CONTRACTOR 0 0 0 0 0 0 0 0 0 0 0 0
LIFE AFFECTED -
OUTSIDE
(General Public) 0 0 0 0 0 0 0 0 0 0 0 0
* All accidents must be covered for 1. GRIL Employees / Labour. 2. Sub - Contractors employees / Labour and and Labour c
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 100.00%
0 0 0 0 0 0 0 0 0 100.00%
0 0 0 0 0 0 0 0 0 100.00%
Total 100.00%
Audit ID/Audit Name
Quarter Number of
Sl. No. (As per Report issued by Report Issuance Date
Observations
Internal Audit Department)
SISA
Annexure-XII
1. Ensure zero audit observations related to SOP's.
2. Compliance of Audit Queries
3. Ensure that no repetation of any audit query
Risk category of
observation Title of Observation
(Very High / High / (As per Report issued by Internal Audit Department)
Medium / Low)
e-XII
ations related to SOP's.
Audit Queries
on of any audit query
0%
SISA
AnnexurIe-XIII
By adopting the best construction practices/methodologies to reduce exte
Non-Conformance Reoprt
EXTERNAL NCR
Compliance By GRIL Letter
NCR No/ Letter No Date NCR Reason No/ & Date
1
2
3
4
5
6
7
8
9
Issued
0
A
Ie-XIII
methodologies to reduce external NCRs/
nce Reoprt
NCR
Complied in No of
days Complied Closure Date
0 0 100%
SI
Annex
By adopting the best construction practice
Non-Conform
INTERN
Level of risk
NCR Reason Compliance Date
(H / M / L)
Issued Closed
0 0
gies to reduce internal NCRs.
Status
No. of days Compliance By % of achievement
(Open / Closed)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
SISA
Annexure-XVI
To manage/resolve the grievances by forming the committee of 4/5 HO
Year:2022-2023
Grievance Cumulative
Month
Raised Solved Pending Raised
Q1 0 10.00 -10.00 0
Q2 0 0 0.00 0
Q3 0 6 -6.00 0
Q4 0 10 -10.00 0
Grievance Raised
S.No
Date Quarter Emp. ID Name
*Note: Kindly arrange to capture the data of grievance in the above format.
SISA
Annexure-XVI
y forming the committee of 4/5 HOD's and resolve the grievances well in time
Year:2022-2023
Cumulative Score
Solved ≤ 10D
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
#DIV/0!
4/1/2022 6/30/2022
7/1/2022 9/30/2022
10/1/2022 12/31/2022
1/1/2023 3/31/2023
Month:
Grievance Solution Remarks
Date Status Duration Score
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
SISA
Attrition Data
Average
Employee
2021-22
Total Employees
Target
Total Left
Actual
Achieved %
Annexure-XVII
54 9 1 65 89
0% Max. 5% Max. 5% 0%
0 0 0 0 0
0.00% 0.00% 0.00% 0.00% 0.00%
100% 100% 100% 100.00% 100%
70.00%
59 656
Max. 5%
0 0
0.00% 0.00%
100% 100.00%
10.00%