0% found this document useful (0 votes)
123 views1 page

L-196-22 NSH Hip Site Visit For SDGM-1236 CP & SDGM-1181 Cp-Ohpl

Uploaded by

Alok Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
123 views1 page

L-196-22 NSH Hip Site Visit For SDGM-1236 CP & SDGM-1181 Cp-Ohpl

Uploaded by

Alok Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 1
‘Onshore Maintain Potential Projects Department ‘Ghawar Gae Upetroam Projects PMT Office, Shedgum SAPMT Site (Bite: 572-9500 October 04, 2022 OMPPD/GGUPD/SGU/L-196/22 INSTALLATION OF CP & OHPL FOR SOGN-1181 INSTALLATION OF CP FOR SDGM.1236 Hazard Identification Plan (HIP) Supt, GPDIGGFOD, (Fax 876-4448) Superintendent, Communication (Fax 577-8542) Superintendent ABQQ POD, (eax 572.5710) ‘Supt, SA Loss Prevention Div. (Fax 872.3528) Supervisor, AALPDIP&P Unit (Fax 72.3528) General Supvr. GPDIGPOD (Fax 576-6442) Supenisor,IDISAPIDIRAPIU (ax 672-1094) Foreman, SOGM Kuff Gas Manifold (Gan 677-1249) Foreman, Abqaiq P's Unt, (Fax 872.5710) Foreman, Mubarraz Pipelines (Fax 877-2839) Pease be advised that we will have an H.LP. site visit on Wednesday October 05, 2022 at respectively for the above-mentioned projects ‘You a your repeesentatve(s) ara invited to altend the subject ste visit The Meating Point willbe at Shedgum PMT Office Parking Area, NOTE: 4-wheel drive vehicles are required to drive along the new FL Should you have any qucctione, fel free our Unit HSE Advicor Jahanzeb Abdul Malik at O85 051 9741, AHMED M. ABBAS, Project Engines ‘OMPPDIGGUPD/Shedgum Gas Unit Chan, NSH ‘Saudi Aramco: Company General Use

You might also like