‘Onshore Maintain Potential Projects Department
‘Ghawar Gae Upetroam Projects
PMT Office, Shedgum SAPMT Site
(Bite: 572-9500
October 04, 2022
OMPPD/GGUPD/SGU/L-196/22
INSTALLATION OF CP & OHPL FOR SOGN-1181
INSTALLATION OF CP FOR SDGM.1236
Hazard Identification Plan (HIP)
Supt, GPDIGGFOD, (Fax 876-4448)
Superintendent, Communication (Fax 577-8542)
Superintendent ABQQ POD, (eax 572.5710)
‘Supt, SA Loss Prevention Div. (Fax 872.3528)
Supervisor, AALPDIP&P Unit (Fax 72.3528)
General Supvr. GPDIGPOD (Fax 576-6442)
Supenisor,IDISAPIDIRAPIU (ax 672-1094)
Foreman, SOGM Kuff Gas Manifold (Gan 677-1249)
Foreman, Abqaiq P's Unt, (Fax 872.5710)
Foreman, Mubarraz Pipelines (Fax 877-2839)
Pease be advised that we will have an H.LP. site visit on Wednesday October 05, 2022 at
respectively for the above-mentioned projects
‘You a your repeesentatve(s) ara invited to altend the subject ste visit The Meating Point
willbe at Shedgum PMT Office Parking Area,
NOTE: 4-wheel drive vehicles are required to drive along the new FL
Should you have any qucctione, fel free our Unit HSE Advicor Jahanzeb Abdul Malik at O85
051 9741,
AHMED M. ABBAS, Project Engines
‘OMPPDIGGUPD/Shedgum Gas Unit
Chan, NSH
‘Saudi Aramco: Company General Use