Red Line of Sdgm-1227 CP

The document discusses the scope of work for a cathodic protection construction project for a gas well in Saudi Arabia. It outlines requirements for installing negative cables connecting to well heads, installing junction boxes to connect anode and bonding cables, installing cable markers, and pre-commissioning the entire cathodic protection system. The contractor must record pre-commissioning data and provide assistance during testing and commissioning.

Uploaded by

Alok Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
171 views2 pages

Red Line of Sdgm-1227 CP

The document discusses the scope of work for a cathodic protection construction project for a gas well in Saudi Arabia. It outlines requirements for installing negative cables connecting to well heads, installing junction boxes to connect anode and bonding cables, installing cable markers, and pre-commissioning the entire cathodic protection system. The contractor must record pre-commissioning data and provide assistance during testing and commissioning.

Uploaded by

Alok Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

SAUDI ARABIAN OIL COMPANY

205

Negative cables to well must be pre-measured and pre-cut before installation in the trench,
excessive length is acceptable to be kept in the trench.

4.5 CP NEGATIVE CABLE/ BONDING CABLE CONNECTION TO WELL HEAD

CONTRACTOR shall install and connect CP negative cables to well heads as per Saudi
Aramco standard drawing no. AA-036073 sheet-2 rev.04 and project drawing.

4.6 CP JUNCTION BOX INSTALLATION


DISCIPLINE
ENGINEER CONTRACTOR shall install two (2) 12-terminal positive (anode) junction box, one (1)
M.Alam
05/30/22
multipurpose positive junction box, one (1) splice box, and one (1) 3 terminal bond box in
DATE:
accordance with project drawing no. TA-603938 and refer to Standard Saudi Aramco
PROJECT
ENGINEER Drawing No. AB-036275 rev. 08, AA-036145 rev.02, AA-036350 rev.08 & AA-036349
Tarek Elsawy rev.00.
05/30/22
DATE:
CERTIFIED 4.7 CABLE MARKER INSTALLATION
Mahfouz M
05/30/22
DATE: CONTRACTOR shall install cable marker at every 30m along the length of the cable and
CONSTRUCTION at direction change of the cables as per standard Drawing No. AB-036351 sheet 001
AGENCY
CAH rev.09.
05/30/22
DATE:
OPERATIONS 4.8 CP SYSTEM PRE-COMMISSIONING
SRM
05/30/22 Pre-commissioning of all components of the cathodic protection system shall take place as
DATE:
and when each facility is installed. The pre-commissioning works shall be carried out in
accordance with the requirements defined in SAES-X-700, SABP-X-003 and SAEP-X-332.
The CONTRACTOR shall record pre-commissioning data on Saudi Aramco pre-
commission -001, 006, 007, 010 and pre-commissioning form for multi well
CP site (See Section 9 - Attachments).

CONTRACTOR shall provide pre-commissioning assistance including labor, tools, and


equipment for the performance of all necessary checks, tests, adjustments, repairs, and
modification for the final acceptance of the facilities.

CATHODIC PROTECTION CONSTRUCTION SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

SDGM-1227 GAS WELL TO SGP DOC 01


M24 X TE-603937 7
SDGM-1227 GAS WELL TO SGP OF 00
SHEDGUM SAUDI ARABIA JO/EWO: 11-22000-2789 21
MARL ROAD

NEW DEEP ANODE BED 1


12 TERMINAL JUNCTION BOX
N 2830682.990 ISSUED FOR CONSTRUCTION
E 337101.521
12

N 2830672.70
E 337102.390
AJB
A

MPJB
20
AJB
A

2
205M

N 2830663.310
E 337097.930

230

N 2830594.652
E 337317.557

01
TA-603938.001.dgn