List of Projects ASF

The document provides an update on the status of 11 DENR-ASF sub-projects in Calinog, Iloilo. It lists each sub-project, its description, amount, and completion status. It notes that other DENR-FMP projects for 2021-2022 are pending approval.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views

List of Projects ASF

The document provides an update on the status of 11 DENR-ASF sub-projects in Calinog, Iloilo. It lists each sub-project, its description, amount, and completion status. It notes that other DENR-FMP projects for 2021-2022 are pending approval.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Republic of the Philippines

Province of Iloilo
Municipality of Calinog

MUNICIPAL ENVIRONMENT AND NATURAL RESOURCES OFFICE

September 28, 2020

HON. FRANCISCO L. CALVO


Municipal Mayor
This Municipality

ATTN: RACHEL N. MANERO


Municipal Administrator

Dear Mayor Calvo,

Warm greetings.

This is to inform you the status of DENR – ASF (Department of Environment and
Natural Resources – Agro – forestry Support Facilities) sub – projects in the Municipality
of Calinog, Iloilo.

SUB – PROJECT AND


DESCRIPTION AMOUNT STATUS
LOCATION
1. HILWAN HANGING FOOT 1meter X 60 linear P 6,554,149.86 Completed as of
BRIDGE – Brgy. Hilwan meters, Hanging August 2020.
Steel Bridge
2. AGLONOK HANGING FOOT 1meter X 55 linear P 6,642,379.66 40%
BRIDGE – Brgy. Aglonok meters, Hanging accomplishment as
Steel Bridge of September 2020.
3. CONSTRUCTION OF 1meter X 40 linear P 5, 565,399.35 30%
SUPANGA HANGING meters, Hanging accomplishment as
BRIDGE – Brgy. Supanga, Sitio Steel Bridge of August 2020
Kawayanan
4. CONSTRUCTION OF 2 meters X 3.8 kms P 24,480,484.80 60%
CARATAGAN – MARANDIG concrete pathway accomplishment as
PATHWAY with overflow of August 2020.
culverts
5. CONSTRUCTION OF 1meter X 60 linear P 8,604,419.68 Just won by the
MARANDIG IRRIGATION meters, Hanging bidder, with notice
PIPELINE – Brgy. Marandig Steel Bridge to proceed already
this 2020.
6. CONSTRUCTION OF 1.64 kms pipeline P 8,499,178.02 10% work status as
MARANDIG HANGING of August 2020
BRIDGE – Brgy. Marandig
7. CONSTRUCTION OF 2 meters X 1.939 P 17,952,359.27 Approved. For
BINOLUSAN PEQ. concrete pathway Bidding, 2021
PATHWAY
8. HILWAN IRRIGATION 1.178 kms pipeline P 4,450,000.00 Approved. For
PIPELINE SYSTEM – Brgy. Bidding, 2021
Hilwan
9. GUINBONYUGAN 1.5 meters X 1.3 P 6,500,000.00 Approved. For
PATHWAY – Brgy. kms concrete Bidding, 2021
Guinbonyugan pathway
10. GUINBONYUGAN – 4 meters X 1.56 kms P 21,060,000.00 Approved. For
BINOLUSAN PEQUEÑO Road Bidding, 2021
ACCESS ROAD – Brgy.
Binolusan Peq. And
Guinbonyugan
11. CONCRETING OF 4 meters X 1.9 kms P 24,300,000.00 Approved. For
GARANGAN ACCESS ROAD concrete road Bidding, 2021
– Brgy. Garangan
12. MASAROY ACCESS ROAD – 4 meters X 1.5 kms P 20,250,000.00 Approved. For
Brgy. Masaroy concrete road Bidding, 2021
TOTAL : P 149,292,971.29

For 2021 Total : P94,512,359.27

Other Projects under the DENR – Forestland Management Program (FMP) for the year
2021 and 2022 are still pending for deliberation and approval.

Respectfully Yours,

ENGR. JOSE NOLITO C. TOMULTO


CAO III / MENRO Designate