PROPOSED STORAGE TANK + OPEN DocumentID KHSE/WGCC/05
SHED RevisionNo. 02
Welding and Gas Cutting Checklist
General Information
Company Name: Project Name:
Conducted By: Date &Time:
Location: Plot No. 2M-11A, 13A & 13B Phase I – Hamriyah Free Zone, Sharjah - UAE
Poor: Absence of major control measures(high risk),work to be stopped and risk assessment to be reviewed immediately.
Fair: Some minor controls are missing(medium risk),additional control measures to be implemented.
Good: All required controls are in place(low risk),only monitoring is required.
Description
Item Evaluation Remarks
Good Fair Poor N/A (insertyourobservation,andp
roposed corrective
actionplan)
General:
Valid & approved permit to work available all Permit to work are available
time & displayed in visible location.
Is the work being performed by 3rd party Operative are well trained
trained operative?
Working area properly contained & warning Warning signs are not well
signs displayed. displayed
All flammable / combustible materials have Removed and properly
been removed from the working area or protected from spark
properly protected from spark.
All possible health effects (acute Identified and adequately
and chronic) have been identified controlled
and proper control measures
implemented.
Sufficient ventilation has been provided. Ventilation is provided
Adequate / sufficient firefighting Available
equipment are available in the working
area during & after the work.(e.g. Fire
extinguisher,Fire blanket, water
arrangement setc.)
Trained Fire warden available Available
Suitable PPE provided and used all the time. Sufficient PPE
Welding leads and returns cables have the Have same length and properly
same length,properly installed & protected,& installed
free of damage.
Electrical cables are in good condition,free of All in good condition and free
damage, & Properly protected. of damage
Industrial plugs & sockets provided. Provided
Electrode holders are fully insulated & free Well insulated and free of
of damage. damage
All earth connection bolted or clamped to bolted or clamped
ensure a good electrical contact.
Welding machine frame effectively grounded. Effectively grounded
Has the welding machine been inspected Inspection is done before it is
use
and colour coded?
PROPOSED STORAGE TANK + OPEN DocumentID KHSE/WGCC/05
SHED RevisionNo. 02
Welding and Gas Cutting Checklist
Welding and Gas Cutting:
Different gas cylinders are clearly Clearly identified and mark
identified and marked.
Differen t types of Gas cylinders have been Stored upright and not
separated,stored upright,and not exposed to exposed to direct sun
direct sun.
Proper training on handling gas cylinders for Well trained on handling gas
all users (this will include clothing, moving cylinders
cylinders,hazards and precaution measure
etc.)
Are all gauges in good condition? All gauges are in good
condition
Cylinder attachments (regulators, hoses, non- Cylinder attachments are
return valves,flashback arrestors,blow pipes) maintained in good working
are maintained in good working order and free order and free of damage
of damage.
Are empty/unconnected cylinders Stored separately with safety
stored separately with safety caps? caps
OtherComments:
ApprovedBy:
Position Name Date Signature
Construction/Plant
Representative
HSE Representative