Weekly Report - 09.02.2018
Weekly Report - 09.02.2018
Mopower: 27A/6 (8/16), 28B/6 (5/16),29/4 (0/16), 30/2 (10/16), 30/4 Mopower: Ongoing: 27A/6 , 28B/6, 29/4, 30/2, 30/4
(9/16). mobilization: 27/1, 28/1, 28B/1, 28B/5, 29/3, 29/4, 30/1
EnCo: 38/1 (14/16), 38A/2 (1/16) EnCo: Ongoing: 38/1 , 38A/2
Mobilization: 38A/1, 38A/4
Bhai Bhai: 12/6 (0/16)
RSE : Ongoing: 37/1
RSE: 37/1 (3/16) Mobilization: 37/2, 36/1, 36A/1, 36A/2, 36A/4
2. Basic design
2. Basic design -4D1: FU approval
-4D1T: PGCB checking -4DT6: Submit to PGCB (05.12.2017)
-4D45: Approved (29.11.2017)
3. Stub & Foundation design
3. Stub & Foundation design -4D45 stub: Preppare for submission.
- 4D45 stub: Provide foundation reaction to designer.
4. P&P drawings
4. P&P drawings -AP7-8: Prepapre for Site Visit & resubmit
-AP7-8: Comments from PGCB
5. Tower Load Test
5. Tower Load Test - 4DL : Resubmit rigging chart as per PGCB
-4DL: Preparing rigging chart as per PGCB -4D25: FU approval loading tree
-4D25: FU approval
6. Technical Documents
6. Technical Documents -Conductor & Earthwire: FU approval
-Conductor & Earthwire: Submit grease GTP & QAP -Fitting : FU approval.
-OPGW: Approved (27.11.2017)
-Fitting: Submitted (26.11.2017). 7. Route Map(151.08 Km)
-Prepare River Crossing Root Map Finalize & Profile drawing
7. Route Map
-Approved 151.08km (except River Crossing Portion) 8. Pile Schedule(165 locations)
-P-15: FU approval
8. Pile Schedule -P-16:FU approval
-P-12: Approved
-P-14: Approved 9. Soil Test
-AP55 ~ 56A : Metro geotechnical
9. Soil Test -AP-54~55 : Metro Geotechnical
- AP55 ~ 56A : Metro geotechnical
10. Piling Work: Ongoing :
10. Piling Work Haven: ongoing:42/3, 43/1, 45/2, 47A/1, 58A/5, 44A/1
28B/3, 37A/2, 42/4 - completed,58A/6-Completed Mobilization: 58A,57/4, 46B/1, 44A/1, 44A,58A/4,58A/3
Haven: 42/3 (11/16), 43/1 (5/16), 45/2 (3/16), 47A/1 (15/16), 58A/5 S. Tel:
Work List (7/16), 58A/6 (10/16) ongoing: 47B/1 , 47B/3, 50/5,34/1
mobilization:32/1, 33, 48/1, 49/1, 50/4, 50/5, 55
S. Tel: 47B/1(15/16), 47A/3 (4/16), 50/5 (4/16)
Mopower: Ongoing: 27A/6 , 28B/6, 29/4, 30/2, 30/4
Mopower: 27A/6 (8/16), 28B/6 (5/16),29/4 (0/16), 30/2 (10/16), 30/4 mobilization: 27/1, 28/1, 28B/1, 28B/5, 29/3, 29/4, 30/1
(9/16).
EnCo: Ongoing: 38/1 , 38A/2,AP37A,AP-38
EnCo: 38/1 (14/16), 38A/2 (1/16) Mobilization: 38A/1, 38A/4
Bhai Bhai: 12/6 (0/16) RSE : Ongoing: 37/1
Mobilization: 37/2, 36/1, 36A/1, 36A/2, 36A/4
RSE: 37/1 (3/16)
KS Traders: Ongoing:35A/1, 35A/2
KS Traders : 35A/1 (4/16), 35A/2 (3/16) Mobilization: 35A, 35A/3.
2. Basic design
2. Basic design -4D1: FU approval
-4D1T: Clarify PGCB comments -4DT6: FU approval
-4DT6: Submitted (05.12.2017) -4DAX- Submit to PGCB (17.12.2017)
-4DAX- Preppare for submission
3. Stub & Foundation design
3. Stub & Foundation design -4D45 stub: FU approval
- 4D45 stub: Submitted (13.12.2017) -4D45 Foundation: Prepare for submission
-4D45 foundation: Stub drawing information give to designer
4. P&P drawings
4. P&P drawings -AP7-8: Prepapre for Site Visit & resubmit
-AP7-8: PGCB accept GS proposal. Resubmitted (14.12.2017)
5. Tower Load Test
5. Tower Load Test - 4DL : FU approval
-4DL: Resubmitted (06.12.2017) -4D25: Prepare rigging chart
-4D25: Loading tree approved
6. Technical Documents
6. Technical Documents -Conductor & Earthwire: Resubmit as per PGCB comment
-Conductor & Earthwire: Grease GTP approved & comment on QAP. -Fitting : Resubmit as per PGCB comment
-Fitting: PGCB met with Dervax & inform thier comments.
7. Route Map(151.08 Km)
7. Route Map -Prepare River Crossing Root Map Finalize & Profile drawing
-Approved 151.08km (except River Crossing Portion)
8. Pile Schedule(180 locations)
8. Pile Schedule -P-16: Submit to PGCB
-P-15: Approved -P-17:Submit to PGCB
-P-16: Preparing for submission -P-18: Submit to PGCB
-P-17: Draft send to designer
-P-18: Draft send to designer 9. Soil Test
9. Soil Test -AP51 ~ 53 : Metro geotechnical
- AP53 ~ 55 : Metro geotechnical
10. Piling Work: Ongoing :
10. Piling Work Haven: ongoing:43/1, 44A/1, 45/2, 57/4, 58A/5
27A/6, 30/2, 30/4, 47A/1, 47B/1- completed Mobilization: 42/1, 44A, 45/1, 46B/1, 47/1, 58A, 58A/4
Haven: 43/1 (13/16), 44A/1(7/16), 45/2 (9/16), 57/4 (4/16), 58A/5 S. Tel:
(14/16), ongoing: 33, 34/1, 47B/3, 50/5
mobilization:32/1, 33A/2, 49/1, 49/2, 49/5, 49/6, 50/4, 55, 50/6, 34A
S. Tel: 33(1/32), 34/1(5/16), 47B/3 (11/16), 50/5 (14/16)
Mopower: Ongoing: 28B/1, 28B/6,29/4
Mopower: 28B/1(1/16), 28B/6 (7/16),29/4 (11/16), mobilization: 27/1, 28/1, 28B/5, 29/3, 30/1, 27A/3, 29/2
Work List
EnCo: 37A(2/32), 38 (2/32), 38A/2 (12/16) EnCo: Ongoing: 37A, 38, 38A/2
Bhai Bhai: 12/6 (7/16), 13/4( 0/16), 13/5 (6/16) Mobilization: 38A, 38A/1, 38A/4
Bhai Bhai: 12/6 (7/16), 13/4 (0/16), 13/5(13/16) Mobilization: 37A/1, 38A, 38A/1
RSE: 37/2(0/16) RSE : Ongoing: 37/2
Mobilization: 36/1, 36A/1, 36A/2, 36A/4
KS Traders :
KS Traders: Ongoing:
MZR: 15/1 (4/16), 15/2 (4/16), 19/1 (3/16) Mobilization: 34A/1, 35/1, 35A/3, 35B
Bhai-Bhai: Ongoing: 12/6 , 13/4, 13/5
Mobilization: 12/2, 13A/2
RSE: Ongoing: 37/1
Mobilization: 36A/1, 37/2, 36A/5
MZR Digitech:Ongoing 15/1 , 15/2, 19/1
Mobilization: 17/1, 17/2, 19/2
Ringtech: Mobilization: 9/5, 9/6, 10/4, 11/2
Bhai-Bhai: Ongoing: 12/6 , 13/4, 13/5
Mobilization: 12/2, 13A/2
RSE: Ongoing: 37/1
Mobilization: 36A/1, 37/2, 36A/5
MZR Digitech:Ongoing 15/1 , 15/2, 19/1
Mobilization: 17/1, 17/2, 19/2
Ringtech: Mobilization: 9/5, 9/6, 10/4, 11/2
Weekly Schedule
Description Last Week (12/31 ~ 01/05) This Week (01/07 ~ 01/12) Remark
1.Fab. dwg 1. Fab. dwg
- 4D25 fab making : Resubmitted & PGCB give query on BOM - 4D25 : FU approval 07.01.2018
-4D45: Fabrication drawing making (Cross arm making & E9 main led -4D45: Expadite fabrication drawing making.
ongoing) -4D1: Discuss with CSL for making fabrication drawing.
-4D1: Handover outline drawing
2. Basic design
-4DT6: FU approval
2. Basic design -4DAX- Resubmit 10.01.2018
-4DT6: Resubmitted 31.12.2017
-4DAX- PGCB give comment 31.12.2017 3. Stub & Foundation design
-4D1 stub: Prepare stub design.
3. Stub & Foundation design
-4D1 stub: Foundation reaction prepare
-4D45 foundation: Approved 04.01.2018 4. P&P drawings
4. P&P drawings 5. Tower Load Test
- 4DL : FU approval (07.01.2018)
-4D25: Finalize for submission of rigging chart
5. Tower Load Test
-4DL: Rigging chart resubmitted (02.01.2018) 6. Technical Documents
-4D25: Prepare rigging chart -Conductor & Earthwire: Resubmit as per comment
-Fitting : Resubmit as per PGCB comment
6. Technical Documents
-Conductor & Earthwire: PGCB give comment 02.01.2018 7. Route Map(151.08 Km)
-Fitting: PGCB give comments -Prepare River Crossing Root Map Finalize & Profile drawing
7. Route Map 8. Pile Schedule(221 locations)
-Approved 151.08km (except River Crossing Portion)
-P-18: Submit to PGCB
8. Pile Schedule -P-19: Submit to PGCB
P-17: Approved on 04.01.2018 -P-20: Submit to PGCB
P-18: Need to submit
-P-19: Draft send to designer 9. Soil Test
-P-20: Draft send to designer -T47B/3, T56C/4, T57/2 : Metro geotechnical
Mopower: 26/6 (7/16), 27/1 (3/16), 27A/2 (3/16), 28A (3/32), 28A/3 Mopower: Ongoing: 26/6, 27/1, 27A/2, 28A, 28A/3, 28B/1, 28B/2, 29/1, 30
(12/16), 28B/1 (9/16), 28B/2 (4/16), 29/1 (10/16), 30 (9/32) mobilization: 28B
EnCo: 37/3 (7/16), 37B (9/32), 38A (6/32) EnCo: Ongoing: 37/3, 37B, 38A
Mobilization:
Bhai Bhai: 12/2 (12/16), 12/4 (2/16), 13A/1 (5/16), 13/3 (4/16)
KS Traders: Ongoing: 34A/2, 35/1, 35B
RSE: 36A/1 (8/16), 36A/2 (7/16),36A/6 (2/16), 37 (9/32) Mobilization: 34A, 34A/1
KS Traders : 34A/2 (0/16), 35/1 (2/16), 35B (26/32) Bhai-Bhai: Ongoing: 12/2, 12/4, 13/3, 13A/1
Mobilization: 12/1, 13/2
MZR: 15 (3/32), 17/1 (11/16), 19/2 (2/16)
RSE: Ongoing: 36A/1, 36A/2, 36A/6, 37
Mobilization: 36/1
MZR Digitech:Ongoing: 15, 17/1, 19/2
Ringtech: 10/1 (1/16), 10/2 (1/16) Mobilization: 17/2
11. Pile Cap Work: Ringtech: Ongoing : 10/1, 10/2
Completed : 58/1 Mobilization: 8/4, 10/3, 11/1, 11A/1, 11B/1, 11B/2
Ongoing:
Heaven : 58/2
11. Pile Cap Work: Ringtech: Ongoing : 10/1, 10/2
Completed : 58/1 Mobilization: 8/4, 10/3, 11/1, 11A/1, 11B/1, 11B/2
Ongoing:
Heaven : 58/2
Weekly Schedule
Description Last Week (01/26 ~ 02/02) This Week (02/4 ~ 02/09) Remark
1.Fab. dwg 1. Fab. dwg
- 4D25 fab making : E9 & stub submitted. - 4D25 : Submit other extension
-4D45: GS confirm CSL query -4D45: Submit E9
-4D1: Basic body given for checking,stub finalize -4D1: Handover plate & joint information drawing.
2. Basic design 2. Basic design
-4DT6: PGCB checking -4DT6: FU approval
-4DAX- PGCB give comment -4DAX- Resubmit
-4DR1- PGCB give comment -4DR1- Resubmit
-4DR2- Resubmitted -4DR2- FU approval
3. Stub & Foundation design 3. Stub & Foundation design
-4D1 stub: Stub drawing making E25 & E40. -4D1 stub: Submit E25 & E40 stub drawing, Foundation also prepare.
2. Basic design
-4DT6: PGCB checking
-4DAX- PGCB give comment
-4DR1- PGCB give comment
-4DR2- Resubmitted
3. Stub & Foundation design
-4D1 stub: Stub drawing making E25 & E40.
4. P&P drawings
- AP-59 to AP-60: Appproved 31.01.18
6. Technical Documents
-Conductor & Earthwire: FAT report format submitted
-Fitting: Approved except river crossing
7. Route Map
-400kV: Approved 151.08km (except River Crossing Portion),
TT-1 location confirmed
-132kV: Route survey completed.
8. Pile Schedule
-P-20: Approved
-P-21: Approved
-P-22: Draft send to designer
-P-23: Draft send to designer
-P-24: Draft send to designer
9. Soil Test
Completed for all approved location- Metro Geotechnical
Work List Mopower: 27/1 (14/16), 28A (16/32), 28B (0/32), 28B/2
(14/16), 29 (4/32), 30 (25/32)
EnCo: 6/1 (3/16), 6/2 (4/16), 6A/6 (0/16), 37B (25/32), 38A
(18/32)
Work List Mopower: 27/1 (14/16), 28A (16/32), 28B (0/32), 28B/2
(14/16), 29 (4/32), 30 (25/32)
EnCo: 6/1 (3/16), 6/2 (4/16), 6A/6 (0/16), 37B (25/32), 38A
(18/32)
RSE: 37 (23/32)
Completed :
Ongoing:
Heaven : 57A/7
ekly Schedule
This Week (02/11 ~ 02/16) Remark
1. Fab. dwg
- 4D25 : Submit other extension
-4D45: Submit E9
-4D1: Handover plate & joint information drawing.
2. Basic design
-4DT6: FU approval
-4DAX- Resubmit
-4DR1- Resubmit
-4DR2- FU approval
3. Stub & Foundation design
-4D1 stub: Submit E25 & E40 stub drawing,
Foundation also prepare.
4. P&P drawings
- AP-60 to AP-60/5: Resubmit
-AP-2 to TT-1 : Prepare for submission
9. Soil Test
-AP-59 to AP-60 : Metro geotechnical
10. Piling Work: Ongoing :
Heaven:
ongoing: 44, 46, 46B/1, 47/1, 57, 57/2, 58A/3
Mobilization: 45/1, 46/1, 58, 58A
S. Tel:
ongoing: 7/5, 8/4, 33A, 34, 47B/4, 48/1, 49/2, 50/1
mobilization: 32/1, 33/1, 50, 50/2, 52/4, 52/5, 53, 55
Mopower:
Ongoing: 27/1, 28A, 28B, 28B/2, 29, 30
mobilization: 26/5, 27, 27A/1, 28A/2, 28A/4
EnCo:
Ongoing: 6/1, 6/2, 6A/6, 37B, 38A
Mobilization: 4A/4
Bhai-Bhai:
Ongoing: 12/1, 12/4, 13/2, 13/3
Mobilization: 13/6, 13A
RSE:
Ongoing: 37
Mobilization: 36/1, 36/2, 36/3, 36A/3, 36A/5
KS Traders:
Ongoing: 34A, 34A/2, 35, 35/1
Mobilization: 34A/1, 35A
MZR Digitech:
Mopower:
Ongoing: 27/1, 28A, 28B, 28B/2, 29, 30
mobilization: 26/5, 27, 27A/1, 28A/2, 28A/4
EnCo:
Ongoing: 6/1, 6/2, 6A/6, 37B, 38A
Mobilization: 4A/4
Bhai-Bhai:
Ongoing: 12/1, 12/4, 13/2, 13/3
Mobilization: 13/6, 13A
RSE:
Ongoing: 37
Mobilization: 36/1, 36/2, 36/3, 36A/3, 36A/5
KS Traders:
Ongoing: 34A, 34A/2, 35, 35/1
Mobilization: 34A/1, 35A
MZR Digitech:
Ongoing: 15, 19/2
Mobilization: 16/1, 16/2, 16/3, 17/2
Ringtech:
Ongoing : 10/1, 10/2, 10/3, 11/1
Mobilization: 10, 11A/1, 11B/1, 11B/2
Hossain:
Ongoing : 55/10
Mobilization: 55/9
Pile Cap Work :
Heaven:
Ongoing : 57A/7
Mobilization: 58A/1, 58A/2
S.Tel:
Mobilization: 47B/1
Enco:
Mobilization: 38A/2, 38A/3, 38A/4