Weekly Report - 09.02.2018

This weekly schedule document outlines the tasks for two consecutive weeks relating to the fabrication of tower drawings, basic design works, foundation designs, P&P drawings, load testing, technical documents, route maps, and piling works for a transmission line project. Key tasks for the current week include obtaining approval for 4DL fabrication drawings, submitting the 4D25 foundation design, finalizing P&P drawings for submission, resubmitting and obtaining approval for 4DL load testing, and ongoing piling works. The next steps and timelines are also noted.

Uploaded by

SMJV AATL
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views36 pages

Weekly Report - 09.02.2018

This weekly schedule document outlines the tasks for two consecutive weeks relating to the fabrication of tower drawings, basic design works, foundation designs, P&P drawings, load testing, technical documents, route maps, and piling works for a transmission line project. Key tasks for the current week include obtaining approval for 4DL fabrication drawings, submitting the 4D25 foundation design, finalizing P&P drawings for submission, resubmitting and obtaining approval for 4DL load testing, and ongoing piling works. The next steps and timelines are also noted.

Uploaded by

SMJV AATL
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 36

Weekly Schedule

Description Last Week(9/10 ~ 9/15) This Week (9/17 ~ 9/22) Remark


1.Fab. dwg 1. Fab. dwg
- Cross arm revised by PGCB & informed to - FU with confidance for resubmission of 4DL to PGCB (20th Sep) 1. Stub: 1st Week Nov.
confidance - 4D25 fab. dwg making FU 2. 4DL Testing material
- 4D25 fab. dwg start(send plate & joint dwg to :1st Week Oct.
confidance) 2. Basic design 3. Tower Production Order
-4D1: Expedite the revised draft design of 15m & 40m ext
2. Basic design -4D45: Comment on draft design from ETCBL.
-4D25 :
i)Send revised outline drawing to confidance. 3. Foundation Design
-4D1T: Comment on 15m & 40m extension -4D25:
-4D45: Swing angle give to PGCB i) stub drawing & submit (19th Sep)

3. P&P drawings 4. P&P drawings


-AP32-39 : Approved on 13.09.2017 (except: AP-33 to -AP24-32: Draft checking & submit (18th Sep)
Work List AP-34/1). -AP33-34A: Draft Prepare with route map

ETC. 5. Tower Load Test


-4DL
-Insulator vendor drawing FU approval : Load case 9 cases selected but some cases not possible to test
-Route map: Approved on 11.09.2017 (AP-2 to AP-7,
AP-7 to AP-20 & AP-24 to AP-30B) 6.Technical Documents
-Insulator: FU approval
-Conductor : Checking then submit
Weekly Schedule
Description Last Week (9/22 ~ 9/29) This Week (9/30~ 10/05) Remark
1.Fab. dwg 1. Fab. dwg
- 4DL fab drawing resubmitted as per PGCB - 4DL FU approval 1. Stub: 1st week Nov.
- 4D25 fab making ongoing ( 9m ext common part - 4D25 fab. dwg making FU 2. 4DL Testing material
completed) : 1st Week Oct.
2. Basic design 3. 4D25 Testing material
2. Basic design -4D1: Expedite the revised draft design of 15m & 40m ext
-4D1T: Comment given on draft design -4D45: Expedite the revised draft design
-4D45: Comment given on draft design
3. Stub & Foundation design
3. Stub & Foundation design -4D25: i)FU stub approval
-4D25 stub drawing calculation submitted ii)Expedite draft foundation design making

4. P&P drawings 4. P&P drawings


-AP24-30A : Checking finish and give comments -AP24-30A: approval
-AP8-20 : Submission to PGCB(27.09.17) -AP8-20: FU apporal
-AP02-7: Draft Submit (03.10.2017)
5. Tower Load Test -AP33-34A: Resubmitted (03.10.2017)
-4DL: Comments on revised load case
-4D25: Load case submit for nomination 5. Tower Load Test
- 4DL : REsubmitted & approval
6. Technical Documents -4D25: Discuss with PGCB
-Insulator: PGCB checked
-Conductor & Earthwire: submitted 21.09.2017 6. Technical Documents
Work List
-OPGW & Joint Box: submitted 21.09.2017 -Insulator: FU approval
-Earthing arrangement drawing submitted -Conductor & Earthwire: FU approval
-OPGW & Joint Box: FU approval
7. Route Map -Earthing arrangement: FU approval
-Approved 148.87km (except River Crossing Portion)
7. Route Map(148.87 Km)
8. Pile Schedule -Prepare River Crossing Portion for Next month
-P5 & P6 : Submitted to PGCB
-P7 & P-8: Draft send to designer for checking 8. Pile Schedule(57 locations)
-P5 & P6 : Approval (03.10.2017)
9. Soil Test
-AP34A to AP36(Alif Digital)
-AP28B/5 ,AP28B/6,29/2(Metro geotechnical) 9. Soil Test
-AP35 to AP39(Alif Digital)
10. Piling Work -AP30A to AP24(Metro geotechnical)
-58/2(Completed),58/1(5/16)
-Rig Mob:57A/6,57A/7,57A/1,44/1,47A/1,47A/2,51/1 10. Piling Work: Ongoing : 58/1(5/16)
-Start:57A/6,57A/7,51/1
Weekly Schedule
Description Last Week (9/30 ~ 10/06) This Week (10/8 ~ 10/13) Remark
1.Fab. dwg 1. Fab. dwg
- 4DL fab drawing checked by PGCB - 4DL approval : 8.10.2017 1. Stub: 15 Oct. 50 sets
- 4D25 fab making ongoing ( 9m ext upto bottom cross arm - 4D25 fab. dwg making FU 2. 4DL Testing material
completed, submission schedule : 22.10.2017) : 15 Oct.
2. Basic design 3. 4D25 Testing material : 24th
2. Basic design -4D1: Expedite the revised draft design of 15m & 40m ext Nov.
-4D1T: Comment given on draft design -4D45: Review the revised draft design
-4D45: Preparing the revised draft as per GS comments.
3. Stub & Foundation design
3. Stub & Foundation design -4D25: i)FU stub approval : 9.10.2017
-4D25 stub drawing calculation submitted ii) Draft foundation design submit to PGCB : 11.10.2017
-4D25 foundation design making ongoing
4. P&P drawings
4. P&P drawings -AP8-20: FU apporal
-AP24-30A : Approved 02.10.2017 -AP02-7: Draft Submit (08.10.2017)
-AP7-20 : Submitted
-AP2-8 : Finalize for submission 5. Tower Load Test
- 4DL : Resubmitt & FU approval
5. Tower Load Test -4D25: Discuss with PGCB
-4DL: Comments on revised load case
-4D25: Load case submit for nomination 6. Technical Documents
-Insulator: FU approval 08.10.2017
6. Technical Documents -Conductor & Earthwire: FU approval
Work List
-Insulator: PGCB checked -OPGW & Joint Box: FU approval
-Conductor & Earthwire: submitted 21.09.2017 -Earthing arrangement: FU approval 08.10.2017
-OPGW & Joint Box: submitted 21.09.2017
-Earthing arrangement drawing submitted 7. Route Map(148.87 Km)
-Prepare River Crossing Portion for Next month
7. Route Map
-Approved 148.87km (except River Crossing Portion) 8. Pile Schedule(57 locations)
-P5 & P6 : Approval (03.10.2017)
8. Pile Schedule
-P5 & P6 : Submitted to PGCB
-P7 & P-8: Draft send to designer for checking 9. Soil Test
-AP35 to AP39(Alif Digital)
9. Soil Test -AP30A to AP24(Metro geotechnical)
-AP34A to AP36(Alif Digital)
-AP28B/5 ,AP28B/6,29/2(Metro geotechnical) 10. Piling Work: Ongoing : 58/1(5/16)
-Start:57A/6,57A/7,51/1
10. Piling Work
-58/2(Completed),58/1(5/16)
-Rig Mob:57A/6,57A/7,57A/1,44/1,47A/1,47A/2,51/1
Weekly Schedule
Description Last Week (10/8 ~ 10/13) This Week (10/15 ~ 10/20) Remark
1.Fab. dwg 1. Fab. dwg
- 4DL fab drawing: Approved 8.10.2017 - 4DL approval : Resubmit only changed sheet as per load test load case 1. Stub: 15 Oct. 50 sets
- 4D25 fab making : Factory visit & give comment to follow - 4D25 fab. dwg making FU 2. 4DL Testing material
GS opinion( 9m ext upto middle cross arm completed, : 15 Oct.
submission schedule : 22.10.2017) 2. Basic design 3. 4D25 Testing material : 24th
-4D1: Expedite the revised draft design of 15m & 40m ext Nov.
2. Basic design -4D45: Receive revised draft design
-4D1T: Comment given on draft design
-4D45: Expedite the revised draft as per GS comments. 3. Stub & Foundation design
i) Draft foundation design submit to PGCB : 16.10.2017
3. Stub & Foundation design
-4D25 stub drawing: Approved 8.10.2017 4. P&P drawings
-4D25 foundation design: Draft checking -AP8-20: FU apporal
-AP02-7: FU approval
4. P&P drawings
-AP7-20 : Submitted 5. Tower Load Test
-AP2-8 : Submitted - 4DL : Prepare rigging chart
-4D25: Prepare load tree
5. Tower Load Test
-4DL: Confirmed by PGCB 6. Technical Documents
-4D25: Selected by PGCB 11.10.2017 -Fitting : Review vendor document & submit
-Conductor & Earthwire: Resubmit as per comment
6. Technical Documents -OPGW & Joint Box: Resubmit joint box
-Insulator: Approved 9.10.2017
-Conductor & Earthwire: Comment by PGCB 10.10.2017 7. Route Map(148.87 Km)
-OPGW & Joint Box: Approve & Comment 10.10.2017 -Prepare River Crossing Portion visit 19.10.17 to 21.10.17
-Earthing arrangement drawing: Approved 9.10.2017
8. Pile Schedule(82 locations)
Work List
7. Route Map -P7 & P8 : Approval (15.10.2017)
-Approved 148.87km (except River Crossing Portion)

8. Pile Schedule 9. Soil Test


-P5 & P6 : Approved -AP9 to AP10(Alif Digital)
-P9 & P-10: Draft Send to Designer -AP26 to AP24(Metro geotechnical)

9. Soil Test 10. Piling Work: Ongoing :


-AP26 to AP24(Metro geotechnical) Heaven :47A/2(3/16),57A/6(15/15),57A/7(4/16),51/1(9/16),46/4(4/16)
-AP9 to AP10(Alif Digital) S. Tel:
-AP28B/5 ,AP28B/6,29/2(Metro geotechnical) Start:47B/2(15.10.17)
Mopower:
10. Piling Work Start:28b/7
-58/2(Completed),58/1(5/16)
-Rig Mob:57A/6,57A/7,57A/1,44/1,47A/1,47A/2,51/1
Weekly Schedule
Description Last Week (10/15 ~ 10/20) This Week (10/22 ~ 10/27) Remark
1.Fab. dwg 1. Fab. dwg
- 4DL fab drawing: Approved - 4DL approval : Resubmit only changed sheet as per load test approval 1. Stub: Meeting with
- 4D25 fab making : GS comment on drawing. Preparing as - 4D25 fab. dwg making FU confidance
per GS comments. 2. 4DL Testing material
2. Basic design : Meeting with confidance
2. Basic design -4D1: Expedite the revised draft design 3. 4D25 Testing material : 24th
-4D1T: Preparing as per GS comments -4D45: Submit to PGCB Nov.
-4D45: Receive revised draft design
3. Stub & Foundation design
3. Stub & Foundation design -4D25 foundation design: FU approval
-4D25 foundation design: Submitted (18.10.2017)
4. P&P drawings
4. P&P drawings -AP8-20: Confirm with PGCB & get approval (24.10.2017)
-AP7-20 : PGCB initially checked -AP02-7: Confirm with PGCB & get approval (24.10.2017)
-AP2-8 : PGCB initially checked -AP33-34A: Submit to PGCB with route map(23.10.2017)
-AP7-8: Submit to PGCB with route map(23.10.2017)
5. Tower Load Test
-4DL: Loading tree approved (17.10.2017) 5. Tower Load Test
- 4DL : Prepare rigging chart
6. Technical Documents -4D25: Prepare load tree
-Conductor & Earthwire: Resubmit (19.10.2017)
-OPGW & Joint Box: Comment given to manufacturer 6. Technical Documents
-Fitting: Submitted (19.10.2017) -Fitting : FU approval
-Conductor & Earthwire: FU approval
7. Route Map -OPGW & Joint Box: Resubmit joint box
-Approved 148.87km (except River Crossing Portion)
7. Route Map(148.87 Km)
Work List 8. Pile Schedule -Prepare River Crossing Portion visit
-P7 : Submitted
-P8 : Approved (15.10.2017) 8. Pile Schedule(82 locations)
-P9 & P-10: Draft Send to Designer -P7 : Approval (23.10.2017)
-P9 & P10 : Submit to PGCB
9. Soil Test
-AP10 ~ 12 : Metro geotechnical
9. Soil Test
10. Piling Work -AP12 ~ 13 : Metro geotechnical
:47A/2(4/16),57A/6-completed,
57A/7(9/16),51/1(13/16),46/4(10/16) 10. Piling Work: Ongoing :
S. Tel: Haven: ongoing:47A/2, 57A/7, 51/1, 46/4
47B/2(3/16) Mobilization:56c/1, 44/1, 47A/1
Mopower: S. Tel:
28b/7(1/16) ongoing: 47B/2, mobilization: 47B/1, 48/1
Mopower:
ongoing: 28b/7(1/16), mobilization: 28b/3, 28b/5, 28b/6, 29/3.
EnCo: Mobilization: 38A/2, 38A/3, 37A/2
Weekly Schedule
Description Last Week (10/22 ~ 10/27) This Week (10/29 ~ 11/03) Remark
1.Fab. dwg 1. Fab. dwg
- 4DL fab drawing: Resubmit as per PGCB (25.10.2017,5 - 4DL approval : FU approval (29.10.2017) 1. Stub: Meeting with
sheet) - 4D25 : Visit confidance factory for meeting with drafter confidance
- 4D25 fab making : GS comment on drawing. Preparing as 2. 4DL Testing material
per GS comments. 2. Basic design : Meeting with confidance
-4D1: Expedite the revised draft design 3. 4D25 Testing material : 24th
2. Basic design -4D45: Meeting with ETCBL, finalize the draft & submit to PGCB(02.11.2017) Nov.
-4D1T: Preparing as per GS comments
-4D45: Receive revised draft design 3. Stub & Foundation design

3. Stub & Foundation design


-4D25 foundation design: Approved (26.10.2017) 4. P&P drawings
-AP33-34A: Submit to PGCB with route map
4. P&P drawings -AP7-8: Submit to PGCB with route map
-AP7-20 : Approved (25.10.2017)
-AP2-8 : Approved (25.10.2017) 5. Tower Load Test
- 4DL : Submit rigging chart
5. Tower Load Test -4D25: Submit loading tree (02.11.2017)
-4DL: Receive draft rigging chart
-4D25: Preparing loading tree 6. Technical Documents
-Fitting : FU approval
6. Technical Documents -Conductor & Earthwire: FU approval
-Conductor & Earthwire: Resubmit -OPGW & Joint Box: FU approval
-OPGW & Joint Box: Resubmit (22.10.2017)
-Fitting: Submitted 7. Route Map(151.08 Km)
-Prepare River Crossing Portion site visit
7. Route Map
Work List -Approved 151.08km (except River Crossing Portion) 8. Pile Schedule(80 locations)
-P7 : Approval (30.10.2017)
8. Pile Schedule -P10 : Submit to PGCB
-P7 : Submitted
-P9 : Approved (24.10.2017)
-P-10: Draft Send to Designer 9. Soil Test
-AP12 ~ 13 : Metro geotechnical
9. Soil Test
-AP12 ~ 13 : Metro geotechnical 10. Piling Work: Ongoing :
Haven: ongoing:47A/2, 57A/7, 51/1, 46/4
10. Piling Work Mobilization:56c/1, 44/1, 47A/1
:47A/2(4/16),57A/6-completed, S. Tel:
57A/7(9/16),51/1(13/16),46/4(10/16) ongoing: 47B/2, mobilization: 47B/1, 48/1
S. Tel: Mopower:
47B/2(3/16) ongoing: 28b/7(1/16), mobilization: 28b/3, 28b/5, 28b/6, 29/3.
Mopower: EnCo: Mobilization: 38A/2, 38A/3, 37A/2
28b/7(1/16)
Weekly Schedule
Description Last Week (10/29 ~ 11/03) This Week (11/05 ~ 11/10) Remark
1.Fab. dwg 1. Fab. dwg
- 4DL fab drawing: Approved (29.10.2017) - 4D25 : Finalize & prepare to submit PGCB 1. Stub: Production start next
- 4D25 fab making : Factory visit for checking progress. (9m week
cross arm finalizing) 2. Basic design 2. 4DL Testing material
-4D1: Expedite the revised draft design : Production start next week. FU
2. Basic design -4D45: Submit to PGCB (05.11.2017) schedule.
-4D1T: Preparing as per GS comments 3. 4D25 Testing material : 24th
-4D45: Finalize the design with ETCBL 3. Stub & Foundation design Nov.

3. Stub & Foundation design


- 4. P&P drawings
-AP33-34A: Submit to PGCB with route map
4. P&P drawings -AP7-8: Submit to PGCB with route map
-AP2-8 : Approved
5. Tower Load Test
5. Tower Load Test - 4DL : Submit rigging chart (09.11.2017)
-4DL: Comment of draft rigging chart -4D25: Submit loading tree (08.11.2017)
-4D25: Preparing loading tree
6. Technical Documents
6. Technical Documents -Fitting : FU approval
-Conductor & Earthwire: Comment & EW approved -Conductor & Earthwire: Receive the revised document from vendor.
(31.10.2017)
-OPGW & Joint Box: Approved (29.10.2017)
-Fitting: Checking ongoing 7. Route Map(151.08 Km)
-Prepare River Crossing Portion site visit
7. Route Map
-Approved 151.08km (except River Crossing Portion) 8. Pile Schedule(91 locations)
Work List -P10 : Submit to PGCB (05.11.2017)
8. Pile Schedule -P11 : Submit to PGCB (09.11.2017)
-P-10: Confirm by Designer -P12 : Submit to PGCB (09.11.2017)
-P-11: Draft send to Designer
-P-12: Draft send to Designer 9. Soil Test
-AP05 ~ 07 : Metro geotechnical
9. Soil Test
-AP13 ~ 16 : Metro geotechnical 10. Piling Work: Ongoing :
Haven: ongoing:44/1 , 47A/2 , 56C/1.
10. Piling Work Mobilization: 43/1, 42/4, 47A/1, 45/2, 46B/1
:46/4-completed, S. Tel:
Haven: 44/1 (1/16), 47A/2 (10/16), 56C/1 (7/16). ongoing: 47B/2, 32A/1 , 32A/2 , mobilization: 47B/1, 47B/3, 48/1
S. Tel: Mopower:
47B/2(7/16), 32A/1 (1/16), 32A/2 (10/16) ongoing: 28B/7, 28B/3 , mobilization: 27A/5, 27B/5, 28B/6, 29/3, 29/4, 30/1
Mopower: EnCo: Mobilization: 38A/2, 38A/3, 37A/2
28B/7(6/16), 28B/3 (1/16)
Weekly Schedule
Description Last Week (11/05 ~ 11/10) This Week (11/12 ~ 11/17) Remark
1.Fab. dwg 1. Fab. dwg
- 4D25 fab making : EW cross arm ongoing. 9m will submit - 4D25 : Finalize & prepare to submit PGCB (16.10.2017) 1. Stub: Production start
first.
2. Basic design 2. 4DL Testing material
2. Basic design -4D1: Check draft & finalize for submission. (20.11.2017) : PAT 25 November
-4D1T: Preparing as per GS comments -4D45: FU approval
-4D45: Submit & discuss with PGCB (05.11.2017) 3. 4D25 Testing material : 24th
3. Stub & Foundation design Nov.
3. Stub & Foundation design
-
4. P&P drawings
4. P&P drawings -AP33-34A: FU approval (14.11.2017)
-AP33-34A: Submit to PGCB (07.11.2017) -AP7-8: FU approval (14.11.2017)
-AP7-8: Submit to PGCB (07.11.2017)
5. Tower Load Test
5. Tower Load Test - 4DL : FU approval rigging chart
-4DL: Submit rigging chart (08.11.2017) -4D25: FU approval loading tree
-4D25: Submit loading tree (09.11.2017)
6. Technical Documents
6. Technical Documents -Conductor & Earthwire: FU approval
-Conductor & Earthwire: Resubmit (06.11.2017) -Fitting : Receive the revised document from vendor.
-Fitting: PGCB give comment (05.11.2017)
7. Route Map(151.08 Km)
7. Route Map -Prepare River Crossing Profile drawing
-Approved 151.08km (except River Crossing Portion)
8. Pile Schedule(106 locations)
8. Pile Schedule -P11 : Submit to PGCB (13.11.2017)
Work List -P-10: Approved (09.11.2017) -P12 : Submit to PGCB (13.11.2017)
-P-11: Designer Confirmed
-P-12: Draft send to Designer 9. Soil Test
-AP03 ~ 04 : Metro geotechnical
9. Soil Test
-AP04 ~ 05, AP50 ~ 51 : Metro geotechnical 10. Piling Work: Ongoing :
Haven: ongoing:44/1, 56C/1
10. Piling Work Mobilization: 42/3, 42/4, 43/1, 45/2, 47A/1
:47A/2-completed, S. Tel:
Haven: 44/1 (4/16), 56C/1 (13/16). ongoing: 47B/1, 47B/2, 32A/1, 32A/2
S. Tel: 47B/1(1/16),47B/2(12/16), 32A/1 (9/16), 32A/2 (9/16) mobilization: 47B/3, 48/1
Mopower: 28B/7(10/16), 28B/3 (4/16), 30/3 (5/16) Mopower:
EnCo: 37A/2 (3/16), 38A/3 (2/16) ongoing: 28B/7, 28B/3, 30/3
mobilization: 27A/5, 27B/5, 28B/6, 29/3, 29/4, 30/1
EnCo:
Ongoing: 37A/2, 38A/3
Mobilization: 38/1, 38A/2, 38A/4
RSE : Mobilization: 37/1, 37/2, 36/1, 36A/1, 36A/2, 36A/4
KS Traders: Mobilization: 35A/1, 35A, 35A/2, 35A/3.
Weekly Schedule
Description Last Week (11/12 ~ 11/17) This Week (11/19 ~ 11/24) Remark
1.Fab. dwg 1. Fab. dwg
- 4D25 fab making : Submitted (15.11.2017) - 4D25 : FU approval (30.11.2017) 1. Stub: FAT 20 th Nov (70 sets)

2. Basic design 2. Basic design 2. 4DL Testing material


-4D1T: Finalizing for submission -4D1: Submit (20.11.2017) : PAT 22~23 November
-4D45: Provide bak file as per PGCB commnets -4D45: FU approval (23.11.2017)
3. 4D25 Testing material : 24th Nov.
3. Stub & Foundation design 3. Stub & Foundation design
- -

4. P&P drawings 4. P&P drawings


-AP33-34A: Approved (14.11.2017) -AP7-8: Prepapre for resubmit
-AP7-8: Comments from PGCB (14.11.2017)
5. Tower Load Test
5. Tower Load Test - 4DL : Resubmit as per PGCB
-4DL: PGCB give comments (13.11.2017) -4D25: FU approval loading tree
-4D25: Submit loading tree
6. Technical Documents
6. Technical Documents -Fitting : Receive the revised document from vendor.
-Conductor & Earthwire: Approved (12.11.2017)
-Fitting: PGCB give comment 7. Route Map(151.08 Km)
-Prepare River Crossing Profile drawing
7. Route Map
-Approved 151.08km (except River Crossing Portion) 8. Pile Schedule(106 locations)
-P-11: FU approval (19.11.2017)
8. Pile Schedule -P-12: FU approval
-P-11: Submitted (15.11.2017) -P-13: FU approval
-P-12: Submitted (15.11.2017) -P-14: Submit
-P-13: Submitted (15.11.2017)
-P-14: Draft send to designer 9. Soil Test
-AP56B ~ 56C : Metro geotechnical
9. Soil Test
-AP03 ~ 04, 56B ~ 56C : Metro geotechnical 10. Piling Work: Ongoing :
Haven: ongoing:44/1, 42/4, 58A/5, 58A/6
10. Piling Work Mobilization: 44A/1, 46/3, 58A
28B/3, 32A/1, 47B/2, 56C/1-completed,
S. Tel:
Haven: 44/1 (9/16), 42/4 (6/16), 58A/5 (0/16), 58A/6 (1/16) ongoing: 47B/1, 47B/2, 32A/2
Work List mobilization: 33,33A/2, 34/1, 49/1, 50/4.
S. Tel: 47B/1(5/16),47B/2(12/16), 32A/2 (15/16)
Mopower:
Mopower: 27A/6 (0/16), 28B/6 (0/16), 28B/3 (9/16), 30/2 (11/16), ongoing: 27A/6 , 28B/6, 28B/3, 30/2, 30/3
30/3 (11/16) mobilization: 27/1, 28/1, 28B/1, 28B/5, 29/3, 29/4

EnCo: 37A/2 (7/16), 38/1 (3/16), 38A/3 (8/16) EnCo:


Ongoing: 37A/2 , 38/1 , 38A/3
Mobilization: 38A/4

RSE : Mobilization: 37/1, 37/2, 36/1, 36A/1, 36A/2, 36A/4

KS Traders: Mobilization: 35A/1, 35A, 35A/2, 35A/3.


Bhai-Bhai: Mobilization: 12/6, 13A/2
MZR Digitech: Mobilization: 19/1, 19/2, 17/1, 17/2, 15/1

Ringtech: Mobilization: 8/5,9/5, 9/6, 10/3


Ringtech: Mobilization: 8/5,9/5, 9/6, 10/3
Weekly Schedule
Description Last Week (11/19 ~ 11/24) This Week (11/26 ~ 12/01) Remark
1.Fab. dwg 1. Fab. dwg
- 4D25 fab making : PGCB checking - 4D25 : Meeting with PGCB & submit other comments. 1. Stub: FAT completed (70 sets)

2. Basic design 2. Basic design 2. 4DL Testing material


-4D1T: Submitted (20.11.2017) -4D1: FU approval : PAT 25 November
-4D45: PGCB give comments -4D45: Resubmit as per PGCB comment & FU approval.
3. 4D25 Testing material : Check
3. Stub & Foundation design 3. Stub & Foundation design material arrival.
- - Give foundation reaction to designer for 4D45 stub.

4. P&P drawings 4. P&P drawings


-AP7-8: Comments from PGCB -AP7-8: Prepapre for resubmit

5. Tower Load Test 5. Tower Load Test


-4DL: Preparing rigging chart as per PGCB - 4DL : Resubmit rigging chart as per PGCB
-4D25: FU approval -4D25: FU approval loading tree

6. Technical Documents 6. Technical Documents


-Conductor & Earthwire: Submit grease GTP & QAP (21.11.2017) -Conductor & Earthwire: FU approval
-OPGW: Resubmit with grease (21.11.2017) -OPGW: FU approval
-Fitting: Received resived document from vendor. -Fitting : Submit to PGCB (26.11.2017)

7. Route Map 7. Route Map(151.08 Km)


-Approved 151.08km (except River Crossing Portion) -Prepare River Crossing Profile drawing
8. Pile Schedule 8. Pile Schedule(106 locations)
-P-11: Approved (21.11.2017) -P-11: FU approval (19.11.2017)
-P-12: Checked by PGCB -P-12: FU approval
-P-13: Approved (21.11.2017) -P-13: FU approval
-P-14: Draft send to designer -P-14: Submit

9. Soil Test 9. Soil Test


-AP56A ~ 56B : Metro geotechnical -AP56A ~ 57A : Metro geotechnical

10. Piling Work 10. Piling Work: Ongoing :


30/3 47B/2, 32A/2- completed, Haven: ongoing:44/1, 42/4, 42/3, 45/2, 47A/1, 58A/5, 58A/6
Mobilization: 46/3, 58A
Haven: 44/1 (14/16), 42/4 (12/16), 42/3 (3/16), 45/2 (0/16), 47A/1
Work List (8/16), 58A/5 (0/16), 58A/6 (3/16) S. Tel:
ongoing: 47B/1
S. Tel: 47B/1(10/16), mobilization: 33,32/1, 47B/3, 48/1, 49/1, 50/4, 50/5, 55
Mopower: 27A/6 (4/16), 28B/6 (2/16), 28B/3 (13/16), 30/2 (5/16), Mopower:
30/4 (3/16). ongoing: 27A/6 , 28B/6, 28B/3, 30/2, 30/4
mobilization: 27/1, 28/1, 28B/1, 28B/5, 29/3, 29/4, 30/1
EnCo: 37A/2 (12/16), 38/1 (7/16), 38A/3 (13/16)
EnCo:
Ongoing: 37A/2 , 38/1 , 38A/3
Mobilization: 37/1, 38A/1, 38A/2, 38A/4

RSE : Mobilization: 37/1, 37/2, 36/1, 36A/1, 36A/2, 36A/4


KS Traders: Mobilization: 35A/1, 35A, 35A/2, 35A/3.
Bhai-Bhai: Mobilization: 12/6, 13A/2

MZR Digitech: Mobilization: 19/1, 19/2, 17/1, 17/2, 15/1


Ringtech: Mobilization: 8/5,9/5, 9/6, 10/3
MZR Digitech: Mobilization: 19/1, 19/2, 17/1, 17/2, 15/1

Ringtech: Mobilization: 8/5,9/5, 9/6, 10/3


Weekly Schedule
Description Last Week (12/03 ~ 12/08) This Week (12/08 ~ 12/15) Remark
1.Fab. dwg 1. Fab. dwg
- 4D25 fab making : PGCB give comments - 4D25 : Prepapre as per PGCB comments.
-4D45: Handover outline drawing to Confidance.
2. Basic design
-4D1T: PGCB checking 2. Basic design
-4D45: Approved (29.11.2017) -4D1: FU approval
-4DT6: Submit to PGCB (05.12.2017)
3. Stub & Foundation design
- 4D45 stub: Provide foundation reaction to designer. 3. Stub & Foundation design
-4D45 stub: Preppare for submission.
4. P&P drawings
-AP7-8: Comments from PGCB 4. P&P drawings
-AP7-8: Prepapre for resubmit
5. Tower Load Test
-4DL: Preparing rigging chart as per PGCB 5. Tower Load Test
-4D25: FU approval - 4DL : Resubmit rigging chart as per PGCB
-4D25: FU approval loading tree
6. Technical Documents
-Conductor & Earthwire: Submit grease GTP & QAP 6. Technical Documents
-OPGW: Approved (27.11.2017) -Conductor & Earthwire: FU approval
-Fitting: Submitted (26.11.2017). -Fitting : FU approval.

7. Route Map 7. Route Map(151.08 Km)


-Approved 151.08km (except River Crossing Portion) -Prepare River Crossing Profile drawing
8. Pile Schedule 8. Pile Schedule(106 locations)
-P-12: Checked by PGCB -P-12: FU approval
-P-14: Submitted -P-14:FU approval
9. Soil Test 9. Soil Test
-AP 33~AP34, AP55 ~ 56A : Metro geotechnical -AP55 ~ 56A : Metro geotechnical

10. Piling Work 10. Piling Work: Ongoing :


28B/3, 37A/2, 42/4 - completed, Haven: ongoing:42/3, 43/1, 45/2, 47A/1, 58A/5, 58A/6
Mobilization: 58A,57/4, 46B/1, 44A/1, 44A
Haven: 42/3 (11/16), 43/1 (5/16), 45/2 (3/16), 47A/1 (15/16), 58A/5
(7/16), 58A/6 (10/16) S. Tel:
ongoing: 47B/1 , 47B/3, 50/5
Work List S. Tel: 47B/1(15/16), 47A/3 (4/16), 50/5 (4/16) mobilization:32/1, 33, 48/1, 49/1, 50/4, 50/5, 55

Mopower: 27A/6 (8/16), 28B/6 (5/16),29/4 (0/16), 30/2 (10/16), 30/4 Mopower: Ongoing: 27A/6 , 28B/6, 29/4, 30/2, 30/4
(9/16). mobilization: 27/1, 28/1, 28B/1, 28B/5, 29/3, 29/4, 30/1
EnCo: 38/1 (14/16), 38A/2 (1/16) EnCo: Ongoing: 38/1 , 38A/2
Mobilization: 38A/1, 38A/4
Bhai Bhai: 12/6 (0/16)
RSE : Ongoing: 37/1
RSE: 37/1 (3/16) Mobilization: 37/2, 36/1, 36A/1, 36A/2, 36A/4

KS Traders : 35A/1 (4/16), 35A/2 (3/16) KS Traders: Ongoing:35A/1, 35A/2


Mobilization: 35A, 35A/3.
Bhai-Bhai: Ongoing: 12/6
Mobilization: 13A/2

MZR Digitech: Mobilization: 19/1, 19/2, 17/1, 17/2, 15/1

Ringtech: Mobilization: 8/5,9/5, 9/6, 10/3


MZR Digitech: Mobilization: 19/1, 19/2, 17/1, 17/2, 15/1

Ringtech: Mobilization: 8/5,9/5, 9/6, 10/3


Weekly Schedule
Description Last Week (12/03 ~ 12/08) This Week (12/08 ~ 12/15) Remark
1.Fab. dwg 1. Fab. dwg
- 4D25 fab making : PGCB give comments - 4D25 : Prepapre as per PGCB comments.
-4D45: Handover outline drawing to Confidance. -4D45: Handover outline drawing to Confidance.

2. Basic design
2. Basic design -4D1: FU approval
-4D1T: PGCB checking -4DT6: Submit to PGCB (05.12.2017)
-4D45: Approved (29.11.2017)
3. Stub & Foundation design
3. Stub & Foundation design -4D45 stub: Preppare for submission.
- 4D45 stub: Provide foundation reaction to designer.
4. P&P drawings
4. P&P drawings -AP7-8: Prepapre for Site Visit & resubmit
-AP7-8: Comments from PGCB
5. Tower Load Test
5. Tower Load Test - 4DL : Resubmit rigging chart as per PGCB
-4DL: Preparing rigging chart as per PGCB -4D25: FU approval loading tree
-4D25: FU approval
6. Technical Documents
6. Technical Documents -Conductor & Earthwire: FU approval
-Conductor & Earthwire: Submit grease GTP & QAP -Fitting : FU approval.
-OPGW: Approved (27.11.2017)
-Fitting: Submitted (26.11.2017). 7. Route Map(151.08 Km)
-Prepare River Crossing Root Map Finalize & Profile drawing
7. Route Map
-Approved 151.08km (except River Crossing Portion) 8. Pile Schedule(165 locations)
-P-15: FU approval
8. Pile Schedule -P-16:FU approval
-P-12: Approved
-P-14: Approved 9. Soil Test
-AP55 ~ 56A : Metro geotechnical
9. Soil Test -AP-54~55 : Metro Geotechnical
- AP55 ~ 56A : Metro geotechnical
10. Piling Work: Ongoing :
10. Piling Work Haven: ongoing:42/3, 43/1, 45/2, 47A/1, 58A/5, 44A/1
28B/3, 37A/2, 42/4 - completed,58A/6-Completed Mobilization: 58A,57/4, 46B/1, 44A/1, 44A,58A/4,58A/3
Haven: 42/3 (11/16), 43/1 (5/16), 45/2 (3/16), 47A/1 (15/16), 58A/5 S. Tel:
Work List (7/16), 58A/6 (10/16) ongoing: 47B/1 , 47B/3, 50/5,34/1
mobilization:32/1, 33, 48/1, 49/1, 50/4, 50/5, 55
S. Tel: 47B/1(15/16), 47A/3 (4/16), 50/5 (4/16)
Mopower: Ongoing: 27A/6 , 28B/6, 29/4, 30/2, 30/4
Mopower: 27A/6 (8/16), 28B/6 (5/16),29/4 (0/16), 30/2 (10/16), 30/4 mobilization: 27/1, 28/1, 28B/1, 28B/5, 29/3, 29/4, 30/1
(9/16).
EnCo: Ongoing: 38/1 , 38A/2,AP37A,AP-38
EnCo: 38/1 (14/16), 38A/2 (1/16) Mobilization: 38A/1, 38A/4
Bhai Bhai: 12/6 (0/16) RSE : Ongoing: 37/1
Mobilization: 37/2, 36/1, 36A/1, 36A/2, 36A/4
RSE: 37/1 (3/16)
KS Traders: Ongoing:35A/1, 35A/2
KS Traders : 35A/1 (4/16), 35A/2 (3/16) Mobilization: 35A, 35A/3.

Bhai-Bhai: Ongoing: 12/6


Mobilization: 13A/2

MZR Digitech:Ongoing 19/1, 19/2, 17/1, 17/2, 15/1


Ringtech: Mobilization: 8/5,9/5, 9/6, 10/3
MZR Digitech:Ongoing 19/1, 19/2, 17/1, 17/2, 15/1

Ringtech: Mobilization: 8/5,9/5, 9/6, 10/3


Weekly Schedule
Description Last Week (12/08 ~ 12/15) This Week (12/17 ~ 12/22) Remark
1.Fab. dwg 1. Fab. dwg
- 4D25 fab making : CSL prepareing as per PGCB comment. - 4D25 : Resubmit to PGCB
-4D45: Started Fabrication drawing making (main body ongoing) -4D45: Expadite fabrication drawing making.

2. Basic design
2. Basic design -4D1: FU approval
-4D1T: Clarify PGCB comments -4DT6: FU approval
-4DT6: Submitted (05.12.2017) -4DAX- Submit to PGCB (17.12.2017)
-4DAX- Preppare for submission
3. Stub & Foundation design
3. Stub & Foundation design -4D45 stub: FU approval
- 4D45 stub: Submitted (13.12.2017) -4D45 Foundation: Prepare for submission
-4D45 foundation: Stub drawing information give to designer
4. P&P drawings
4. P&P drawings -AP7-8: Prepapre for Site Visit & resubmit
-AP7-8: PGCB accept GS proposal. Resubmitted (14.12.2017)
5. Tower Load Test
5. Tower Load Test - 4DL : FU approval
-4DL: Resubmitted (06.12.2017) -4D25: Prepare rigging chart
-4D25: Loading tree approved
6. Technical Documents
6. Technical Documents -Conductor & Earthwire: Resubmit as per PGCB comment
-Conductor & Earthwire: Grease GTP approved & comment on QAP. -Fitting : Resubmit as per PGCB comment
-Fitting: PGCB met with Dervax & inform thier comments.
7. Route Map(151.08 Km)
7. Route Map -Prepare River Crossing Root Map Finalize & Profile drawing
-Approved 151.08km (except River Crossing Portion)
8. Pile Schedule(180 locations)
8. Pile Schedule -P-16: Submit to PGCB
-P-15: Approved -P-17:Submit to PGCB
-P-16: Preparing for submission -P-18: Submit to PGCB
-P-17: Draft send to designer
-P-18: Draft send to designer 9. Soil Test
9. Soil Test -AP51 ~ 53 : Metro geotechnical
- AP53 ~ 55 : Metro geotechnical
10. Piling Work: Ongoing :
10. Piling Work Haven: ongoing:43/1, 44A/1, 45/2, 57/4, 58A/5
27A/6, 30/2, 30/4, 47A/1, 47B/1- completed Mobilization: 42/1, 44A, 45/1, 46B/1, 47/1, 58A, 58A/4

Haven: 43/1 (13/16), 44A/1(7/16), 45/2 (9/16), 57/4 (4/16), 58A/5 S. Tel:
(14/16), ongoing: 33, 34/1, 47B/3, 50/5
mobilization:32/1, 33A/2, 49/1, 49/2, 49/5, 49/6, 50/4, 55, 50/6, 34A
S. Tel: 33(1/32), 34/1(5/16), 47B/3 (11/16), 50/5 (14/16)
Mopower: Ongoing: 28B/1, 28B/6,29/4
Mopower: 28B/1(1/16), 28B/6 (7/16),29/4 (11/16), mobilization: 27/1, 28/1, 28B/5, 29/3, 30/1, 27A/3, 29/2
Work List
EnCo: 37A(2/32), 38 (2/32), 38A/2 (12/16) EnCo: Ongoing: 37A, 38, 38A/2

Bhai Bhai: 12/6 (7/16), 13/4( 0/16), 13/5 (6/16) Mobilization: 38A, 38A/1, 38A/4

RSE: 37/1 (15/16) RSE : Ongoing: 37/1


Mobilization: 37/2, 36/1, 36A/1, 36A/2, 36A/4
KS Traders : 35A/1 (13/16), 35A/2 (11/16)
KS Traders: Ongoing:35A/1, 35A/2
MZR: 15/1 (3/16), 15/2 (3/16), 19/1 (1/16). Mobilization: 34A/1, 35A, 35A/3.

Bhai-Bhai: Ongoing: 12/6 , 13/4, 13/5


Mobilization: 12/2, 13A/2
RSE: Ongoing: 37/1
Mobilization: 36A/1, 37/2, 36A/5
MZR Digitech:Ongoing 17/1
Mobilization: 18/1, 16/1, 17/2

Ringtech: Mobilization: 8/5,9/5, 9/6, 10/4


Bhai-Bhai: Ongoing: 12/6 , 13/4, 13/5
Mobilization: 12/2, 13A/2
RSE: Ongoing: 37/1
Mobilization: 36A/1, 37/2, 36A/5
MZR Digitech:Ongoing 17/1
Mobilization: 18/1, 16/1, 17/2

Ringtech: Mobilization: 8/5,9/5, 9/6, 10/4


Weekly Schedule
Description Last Week (12/17 ~ 12/22) This Week (12/24 ~ 12/29) Remark
1.Fab. dwg 1. Fab. dwg
- 4D25 fab making : CSL prepareing as per PGCB comment. - 4D25 : Resubmit to PGCB, E9 (26.12.2017)
-4D45: Fabrication drawing making (E9 main body ongoing) -4D45: Expadite fabrication drawing making.
2. Basic design
2. Basic design -4DT6: FU approval
-4D1T: Approved (19.12.2017) -4DAX- FU approval
-4DT6: Submitted (05.12.2017)
-4DAX- Submitted (17.12.2017) 3. Stub & Foundation design
-4D1 stub: Prepare stub design.
3. Stub & Foundation design -4D45 Foundation: Submit to PGCB (27.12.2017)
-4D1 stub: Foundation reaction prepare
- 4D45 stub:Approved (21.12.2017) 4. P&P drawings
-4D45 foundation: Stub drawing information give to designer
5. Tower Load Test
4. P&P drawings - 4DL : Resubmit rigging chart as per PGCB.
-AP7-8: Approved (21.12.2017) -4D25: Finalize for submission of rigging chart
5. Tower Load Test 6. Technical Documents
-4DL: PGCB give comment (20.12.2017) -Conductor & Earthwire: FU approval
-4D25: Prepare rigging chart -Fitting : Resubmit as per PGCB comment
6. Technical Documents 7. Route Map(151.08 Km)
-Conductor & Earthwire: QAP submitted (18.12.2017) -Prepare River Crossing Root Map Finalize & Profile drawing
-Fitting: PGCB give comments (17.12.2017)
8. Pile Schedule(180 locations)
7. Route Map -P-16: FU approval
-Approved 151.08km (except River Crossing Portion) -P-17:Submit to PGCB
-P-18: Submit to PGCB
8. Pile Schedule -P-19: Submit to PGCB
-P-16: Submitted
-P-17: Draft send to designer 9. Soil Test
-P-18: Draft send to designer -AP07 ~ 08 : Metro geotechnical
-P-19: Draft send to designer
9. Soil Test 10. Piling Work: Ongoing :
- AP53 ~ 55, AP-06 ~ 07 : Metro geotechnical Haven: ongoing:42/1, 44A/1 , 45/2, 57/4 , 58A/5
Mobilization: 44A, 46B/1, 47/1, 58A ,45/1, 58A/4
10. Piling Work
43/1, 50/5, 29/4, 38A/2, 37/1, 35A/1, 35A/2 -completed S. Tel:
ongoing: 33 , 33A/2, 34/1, 47B/3
Haven: 42/1 (0/16), 44A/1 (11/16), 45/2 (9/16), 57/4 (6/16), mobilization:32/1, 49/1, 49/2, 49/5, 49/6, 50/4, 55, 50/6, 34A
58A/5(14/16)
Mopower: Ongoing: 28B/1 , 28B/6, 29/2 , 29/3
S. Tel: 33 (5/32), 33A/2 (5/16), 34/1 (12/16), 47B/3 (15/16) mobilization: 27/1, 28/1, 28B/5, 29/3, 30/1, 27A/3, 29/2
Work List Mopower: 28B/1 (1/16), 28B/6 (9/16), 29/2 (0/16), 29/3 (0/16) EnCo: Ongoing: 37A , 38 , 38A/4

EnCo: 37A (9/32), 38 (7/32), 38A/4 (1/16)


Mobilization: 37A/1, 38A, 38A/1
Bhai Bhai: 12/6 (7/16), 13/4 (0/16), 13/5(13/16)
RSE : Ongoing: 37/2
RSE: 37/2(0/16) Mobilization: 36/1, 36A/1, 36A/2, 36A/4
KS Traders : KS Traders: Ongoing:
Mobilization: 34A/1, 35/1, 35A/3, 35B
MZR: 15/1 (4/16), 15/2 (4/16), 19/1 (3/16)
Bhai-Bhai: Ongoing: 12/6 , 13/4, 13/5
Mobilization: 12/2, 13A/2
RSE: Ongoing: 37/1
Mobilization: 36A/1, 37/2, 36A/5
MZR Digitech:Ongoing 15/1 , 15/2, 19/1
Mobilization: 17/1, 17/2, 19/2
Ringtech: Mobilization: 9/5, 9/6, 10/4, 11/2
MZR: 15/1 (4/16), 15/2 (4/16), 19/1 (3/16)
Bhai-Bhai: Ongoing: 12/6 , 13/4, 13/5
Mobilization: 12/2, 13A/2
RSE: Ongoing: 37/1
Mobilization: 36A/1, 37/2, 36A/5
MZR Digitech:Ongoing 15/1 , 15/2, 19/1
Mobilization: 17/1, 17/2, 19/2
Ringtech: Mobilization: 9/5, 9/6, 10/4, 11/2
Weekly Schedule
Description Last Week (12/24 ~ 12/29) This Week (12/31 ~ 01/05) Remark
1.Fab. dwg 1. Fab. dwg
- 4D25 fab making : Finalizing to resubmit PGCB. - 4D25 : Resubmit to PGCB, E9 (31.12.2017)
-4D45: Fabrication drawing making (Cross arm making ongoing) -4D45: Expadite fabrication drawing making.
2. Basic design
2. Basic design -4DT6: Resubmit as per PGCB comment
-4DT6: PGCB give comment -4DAX- Meeting with PGCB & ETCBL (31.12.2017)
-4DAX- PGCB checking
3. Stub & Foundation design
3. Stub & Foundation design -4D1 stub: Prepare stub design.
-4D1 stub: Foundation reaction prepare -4D45 Foundation: Submit to PGCB (31.12.2017)
-4D45 foundation: Finalizing foundation drawing for submission.
4. P&P drawings
4. P&P drawings
5. Tower Load Test
- 4DL : Resubmit rigging chart as per PGCB.
5. Tower Load Test -4D25: Finalize for submission of rigging chart
-4DL: PGCB give comment (20.12.2017)
-4D25: Prepare rigging chart 6. Technical Documents
-Conductor & Earthwire: FU approval
6. Technical Documents -Fitting : Resubmit as per PGCB comment
-Conductor & Earthwire: QAP submitted (18.12.2017)
-Fitting: PGCB give comments (17.12.2017) 7. Route Map(151.08 Km)
-Prepare River Crossing Root Map Finalize & Profile drawing
7. Route Map
-Approved 151.08km (except River Crossing Portion) 8. Pile Schedule(200 locations)
8. Pile Schedule -P-17:Submit to PGCB
-P-16: Approved (28.12.27) -P-18: Submit to PGCB
P-17: Draft send to designer -P-19: Submit to PGCB
P-18: Draft send to designer
-P-19: Draft send to designer 9. Soil Test
-AP07 ~ 08 : Metro geotechnical
9. Soil Test
- AP53 ~ 55, AP-06 ~ 07 : Metro geotechnical 10. Piling Work: Ongoing :
Haven: ongoing:42/1, 44A/1 , 45/2, 57/4 , 58A/5
10. Piling Work Mobilization: 44A, 46B/1, 47/1, 58A ,45/1, 58A/4
43/1, 50/5, 29/4, 38A/2, 37/1, 35A/1, 35A/2 -completed
S. Tel:
Haven: 42/1 (0/16), 44A/1 (11/16), 45/2 (9/16), 57/4 (6/16), ongoing: 33 , 33A/2, 34/1, 47B/3
58A/5(14/16) mobilization:32/1, 49/1, 49/2, 49/5, 49/6, 50/4, 55, 50/6, 34A
S. Tel: 33 (5/32), 33A/2 (5/16), 34/1 (12/16), 47B/3 (15/16) Mopower: Ongoing: 28B/1 , 28B/6, 29/2 , 29/3
mobilization: 27/1, 28/1, 28B/5, 29/3, 30/1, 27A/3, 29/2
Mopower: 28B/1 (1/16), 28B/6 (9/16), 29/2 (0/16), 29/3 (0/16)
Work List EnCo: Ongoing: 37A , 38 , 38A/4
EnCo: 37A (9/32), 38 (7/32), 38A/4 (1/16)

Bhai Bhai: 12/6 (7/16), 13/4 (0/16), 13/5(13/16) Mobilization: 37A/1, 38A, 38A/1
RSE: 37/2(0/16) RSE : Ongoing: 37/2
Mobilization: 36/1, 36A/1, 36A/2, 36A/4
KS Traders :
KS Traders: Ongoing:
MZR: 15/1 (4/16), 15/2 (4/16), 19/1 (3/16) Mobilization: 34A/1, 35/1, 35A/3, 35B
Bhai-Bhai: Ongoing: 12/6 , 13/4, 13/5
Mobilization: 12/2, 13A/2
RSE: Ongoing: 37/1
Mobilization: 36A/1, 37/2, 36A/5
MZR Digitech:Ongoing 15/1 , 15/2, 19/1
Mobilization: 17/1, 17/2, 19/2
Ringtech: Mobilization: 9/5, 9/6, 10/4, 11/2
Bhai-Bhai: Ongoing: 12/6 , 13/4, 13/5
Mobilization: 12/2, 13A/2
RSE: Ongoing: 37/1
Mobilization: 36A/1, 37/2, 36A/5
MZR Digitech:Ongoing 15/1 , 15/2, 19/1
Mobilization: 17/1, 17/2, 19/2
Ringtech: Mobilization: 9/5, 9/6, 10/4, 11/2
Weekly Schedule
Description Last Week (12/31 ~ 01/05) This Week (01/07 ~ 01/12) Remark
1.Fab. dwg 1. Fab. dwg
- 4D25 fab making : Resubmitted & PGCB give query on BOM - 4D25 : FU approval 07.01.2018
-4D45: Fabrication drawing making (Cross arm making & E9 main led -4D45: Expadite fabrication drawing making.
ongoing) -4D1: Discuss with CSL for making fabrication drawing.
-4D1: Handover outline drawing
2. Basic design
-4DT6: FU approval
2. Basic design -4DAX- Resubmit 10.01.2018
-4DT6: Resubmitted 31.12.2017
-4DAX- PGCB give comment 31.12.2017 3. Stub & Foundation design
-4D1 stub: Prepare stub design.
3. Stub & Foundation design
-4D1 stub: Foundation reaction prepare
-4D45 foundation: Approved 04.01.2018 4. P&P drawings
4. P&P drawings 5. Tower Load Test
- 4DL : FU approval (07.01.2018)
-4D25: Finalize for submission of rigging chart
5. Tower Load Test
-4DL: Rigging chart resubmitted (02.01.2018) 6. Technical Documents
-4D25: Prepare rigging chart -Conductor & Earthwire: Resubmit as per comment
-Fitting : Resubmit as per PGCB comment
6. Technical Documents
-Conductor & Earthwire: PGCB give comment 02.01.2018 7. Route Map(151.08 Km)
-Fitting: PGCB give comments -Prepare River Crossing Root Map Finalize & Profile drawing
7. Route Map 8. Pile Schedule(221 locations)
-Approved 151.08km (except River Crossing Portion)
-P-18: Submit to PGCB
8. Pile Schedule -P-19: Submit to PGCB
P-17: Approved on 04.01.2018 -P-20: Submit to PGCB
P-18: Need to submit
-P-19: Draft send to designer 9. Soil Test
-P-20: Draft send to designer -T47B/3, T56C/4, T57/2 : Metro geotechnical

9. Soil Test 10. Piling Work: Ongoing :


- AP8, AP25/1-AP25/4 : Metro geotechnical Haven: ongoing: 42/1, 44A, 45/2, 46B, 58A/4
Mobilization: AP44, 46B/1, 47/1, 58A ,45/1
10. Piling Work
T28B/6, T33A/2, T57/4-completed S. Tel:
ongoing: 33, 49/1, 49/6, 50/4
Haven: 42/1 (8/16), 44A (8/32), 45/2 (7/16), 46B (7/32), 58A/4(2/16) mobilization:32/1, AP33A, AP34, AP34A, 49/2, 49/5, 55, 50/6, 50/1
S. Tel: 33 (13/32), 49/1 (9/16), 49/6 (9/16), 50/4 (9/16) Mopower: Ongoing: 27/2, 28/1, 28A/3, 28B/1, 28B/5, 29/2, 29/3, 30/1
mobilization: 27/1, 27A/3
Work List Mopower: 27/2 (7/16), 28/1 (7/16), 28A/3 (3/16), 28B/1 (2/16), 28B/5
(10/16), 29/2 (13/16), 29/3 (9/16), 30/1 (8/16) EnCo: Ongoing: 37A, 37A/1, 37B/1, 38, 38A/4
Mobilization: 38A, 38A/1
EnCo: 37A (23/32), 37A/1 (9/16), 37B/1 (1/16), 38 (21/32), 38A/4
(14/16) KS Traders: Ongoing: 35A/3, 35B
Mobilization: 34A/1, 35/1
Bhai Bhai: 12/3 (13/16), 12/5 (1/12), 12/6 (7/16), 13/4 (4/16),
13A/2(4/16) Bhai-Bhai: Ongoing: 12/3, 12/5, 12/6, 13/4, 13A/2
Mobilization: 12/2
RSE: 36A/1 (2/16), 36A/7 (3/16), 37/2 (11/16)
RSE: Ongoing: 36A/1, 36A/7, 37/2
KS Traders : 35A/3 (4/16), 35B (4/32) Mobilization: 36/1
MZR: 15/1 (9/16), 15/2 (11/16), 19/1 (8/16) MZR Digitech:Ongoing: 15/1, 15/2, 19/1
Mobilization: 17/1, 17/2, 19/2
Ringtech: Ongoing : 9/5, 9/6, 10/4, 11/2 Mobilization:
10/3, 11A/1, 11B/1, 11B/2
Ringtech: 9/5 (7/16), 9/6 (8/16), 10/4 (5/16), 11/2 (5/16)
Weekly Schedule
Description Last Week (01/07 ~ 01/12) This Week (01/14 ~ 01/19) Remark
1.Fab. dwg 1. Fab. dwg
- 4D25 fab making : Approved E9 (08.01.2018) - 4D25 : Prepare other extension for submission
-4D45: CSL give query. E9 ongoing -4D45: Expadite fabrication drawing making.
-4D1: Handover outline drawing -4D1: Discuss with CSL for making fabrication drawing.
2. Basic design
2. Basic design -4DT6: FU approval
-4DT6: Resubmitted -4DAX- Resubmit 15.01.2018
-4DAX- PGCB give comment -4DR1- FU approval
-4DR1- Submitted 08.01.2018 -4DR2- Prepare for submission
3. Stub & Foundation design 3. Stub & Foundation design
-4D1 stub: Foundation reaction prepare -4D1 stub: Prepare stub design.

4. P&P drawings 4. P&P drawings


- AP-59 to TT-2: Prepare for submission - AP-59 to TT-2: Submit to PGCB with route map
5. Tower Load Test 5. Tower Load Test
-4DL: Rigging chart apprvoed (09.01.2018) -4D25: Finalize for submission of rigging chart
-4D25: Prepare rigging chart
6. Technical Documents
6. Technical Documents -Conductor & Earthwire: FU approval
-Conductor & Earthwire: QAP ACCC submitted. Comment on ACSR, ACS -Fitting : FU approval
-Fitting: Resubmitted 04.01.2018
7. Route Map(151.08 Km)
7. Route Map -Prepare River Crossing Root Map Finalize & Profile drawing
-Approved 151.08km (except River Crossing Portion)
8. Pile Schedule(221 locations)
8. Pile Schedule -P-18: FU approval
-P-18: Submitted 08.01.2018 -P-19: Submit to PGCB
-P-19: Draft send to designer -P-20: Submit to PGCB
-P-20: Draft send to designer -P-21: Submit to PGCB
-P-21: Draft send to designer -P-22: Submit to PGCB
-P-22: Draft send to designer
9. Soil Test
9. Soil Test -T47B/3, T56C/4, T57/2 : Metro geotechnical
- AP8, AP25/1-AP25/4 : Metro geotechnical
10. Piling Work: Ongoing :
10. Piling Work Haven: ongoing: 42/1, 44A, 45/2, 46B, 58A/4
T28B/6, T33A/2, T57/4-completed Mobilization: AP44, 46B/1, 47/1, 58A ,45/1
Haven: 42/1 (8/16), 44A (8/32), 45/2 (7/16), 46B (7/32), 58A/4(2/16) S. Tel:
ongoing: 33, 49/1, 49/6, 50/4
S. Tel: 33 (13/32), 49/1 (9/16), 49/6 (9/16), 50/4 (9/16) mobilization:32/1, AP33A, AP34, AP34A, 49/2, 49/5, 55, 50/6, 50/1
Work List
Mopower: 27/2 (7/16), 28/1 (7/16), 28A/3 (3/16), 28B/1 (2/16), 28B/5 Mopower: Ongoing: 27/2, 28/1, 28A/3, 28B/1, 28B/5, 29/2, 29/3, 30/1
(10/16), 29/2 (13/16), 29/3 (9/16), 30/1 (8/16) mobilization: 27/1, 27A/3
EnCo: 37A (23/32), 37A/1 (9/16), 37B/1 (1/16), 38 (21/32), 38A/4 EnCo: Ongoing: 37A, 37A/1, 37B/1, 38, 38A/4
(14/16) Mobilization: 38A, 38A/1
Bhai Bhai: 12/3 (13/16), 12/5 (1/12), 12/6 (7/16), 13/4 (4/16), KS Traders: Ongoing: 35A/3, 35B
13A/2(4/16) Mobilization: 34A/1, 35/1
RSE: 36A/1 (2/16), 36A/7 (3/16), 37/2 (11/16) Bhai-Bhai: Ongoing: 12/3, 12/5, 12/6, 13/4, 13A/2
Mobilization: 12/2
KS Traders : 35A/3 (4/16), 35B (4/32)
RSE: Ongoing: 36A/1, 36A/7, 37/2
MZR: 15/1 (9/16), 15/2 (11/16), 19/1 (8/16) Mobilization: 36/1
MZR Digitech:Ongoing: 15/1, 15/2, 19/1
Mobilization: 17/1, 17/2, 19/2
Ringtech: 9/5 (7/16), 9/6 (8/16), 10/4 (5/16), 11/2 (5/16) Ringtech: Ongoing : 9/5, 9/6, 10/4, 11/2 Mobilization:
10/3, 11A/1, 11B/1, 11B/2
Weekly Schedule
Description Last Week (01/14 ~ 01/19) This Week (01/21 ~ 01/26) Remark
1.Fab. dwg 1. Fab. dwg
- 4D25 fab making : Shop drawing finalize - 4D25 : Prepare other extension for submission
-4D45: CSL give query. GS confirmed -4D45: Expadite fabrication drawing making.
-4D1: Stated 15M ext. -4D1: Give plate & joint information drawing.
2. Basic design 2. Basic design
-4DT6: Resubmitted -4DT6: FU approval
-4DAX- Resubmitted 17.01.2018 -4DAX- FU approval
-4DR1- Submitted -4DR1- FU approval
-4DR2- Submit to PGCB 22.01.2018
3. Stub & Foundation design
-4D1 stub: Foundation Design sent to the designer 3. Stub & Foundation design
-4D1 stub: Prepare stub design.
4. P&P drawings
- AP-59 to AP-60/5: Submit to PGCB 18.01.2018 4. P&P drawings
- AP-59 to AP-60/5: FU approval
5. Tower Load Test
-4D25: Prepare rigging chart 5. Tower Load Test
-4D25: Finalize for submission of rigging chart
6. Technical Documents
-Conductor & Earthwire: QAP Approved 6. Technical Documents
-Fitting: Resubmitted 04.01.2018 -Conductor & Earthwire:
-Fitting : FU approval
7. Route Map
-Approved 151.08km (except River Crossing Portion) 7. Route Map(151.08 Km)
-Prepare River Crossing Root Map Finalize & Profile drawing
8. Pile Schedule
-P-18: Submitted 08.01.2018 8. Pile Schedule(221 locations)
-P-19: Submitted -P-18: FU approval
-P-20: Submitted -P-19: FU approval
-P-21: Draft send to designer -P-20: FU approval
-P-22: Draft send to designer -P-21: Submit to PGCB
-P-22: Submit to PGCB
9. Soil Test
Completed for all approved location- Metro Geotechnical 9. Soil Test
-Completed for all approved location : Metro geotechnical
10. Piling Work
T9/6, T13/4, T13A/2, T15/1, T15/2, T19/1, T27/2, T28/1, T29/3, T30/1, 10. Piling Work: Ongoing :
T36A/7, AP37A, AP38, T42/1, T49/1, T49/6, T50/4, T58A/4-completed Haven: ongoing: 44, 44A, 45/2, 46B, 57/3
Mobilization: 46B/1, 47/1, 58A
Haven: 44 (8/32), 44A (19/32), 45/2 (14/16), 46B (19/32), 57/3(12/16)
S. Tel:
S. Tel: 33 (23/32), 34 (5/32), 47B/4 (4/16), 49/5 (5/16) ongoing: 33, 34, 47B/4, 49/5
mobilization: 32/1, 33A, 48/1, 49/2, 50/1, 55
Work List Mopower: 26/6 (0/16), 28A/3 (12/16), 28B/1 (5/16), 29/1 (3/16), 30
(1/32) Mopower: Ongoing: 26/6, 28A/3, 28B/1, 29/1, 30
mobilization: 27/1, 27A/2
EnCo: 37/3 (0/16), 37B (2/32), 37B/1 (13/16),38A/1 (9/16)
EnCo: Ongoing: 37/3, 37B, 37B/1,38A/1
Bhai Bhai: 12/2 (6/16), 12/5 (15/16), 12/6 (12/16) Mobilization: 38A
RSE: 36A/1 (8/16), 36A/2 (2/16), 37 (2/32) KS Traders: Ongoing: 35A/3, 35B
Mobilization: 34A/1, 35/1
KS Traders : 35A/3 (15/16), 35B (19/32)
Bhai-Bhai: Ongoing: 12/2, 12/5, 12/6
MZR: 17/1 (6/16) Mobilization: -
RSE: Ongoing: 36A/1, 36A/2, 37
Mobilization: 36/1
Ringtech: 9/5 (15/16), 10/4 (13/16), 11/2 (13/16)
MZR Digitech:Ongoing: 17/1
Mobilization: 17/2, 19/2
Ringtech: Ongoing : 9/5, 10/4, 11/2
Mobilization: 8/4, 10/3, 11A/1, 11B/1, 11B/2
Weekly Schedule
Description Last Week (01/21 ~ 01/26) This Week (01/28 ~ 02/02) Remark
1.Fab. dwg 1. Fab. dwg
- 4D25 fab making : E9 completed, stub finalized - 4D25 : Prepare other extension for submission
-4D45: OPGW & EW cross arm finalizing -4D45: Prepare for submission
-4D1: Basic body given for checking -4D1: Prepare plate & joint information drawing.
2. Basic design 2. Basic design
-4DT6: PGCB checking -4DT6: FU approval
-4DAX- Resubmitted -4DAX- FU approval
-4DR1- Submitted -4DR1- FU approval
-4DR2- Submitted 22.01.2018 -4DR2- FU approval
3. Stub & Foundation design 3. Stub & Foundation design
-4D1 stub: Stub drawing making E25 & E40. -4D1 stub: Prepare stub design for submission, Foundation also prepare.

4. P&P drawings 4. P&P drawings


- AP-59 to AP-60/5: Submit to PGCB 18.01.2018 - AP-59 to AP-60/5: FU approval
-AP-2 to TT-1 : Prepare for submission
5. Tower Load Test
-4D25: Prepare rigging chart 5. Tower Load Test
-4D25: Finalize for submission of rigging chart
6. Technical Documents
-Conductor & Earthwire: FAT report format submitted 6. Technical Documents
-Fitting: Approved 24.01.2018 except river crossing -Conductor & Earthwire: FU approval
-Fitting : Request type test & FAT report format
7. Route Map
-400kV: Approved 151.08km (except River Crossing Portion), TT-1 7. Route Map(151.08 Km)
location confirmed -400kV: Prepare TT-1 location route map
-132kV: Route survey completed. -132kV: Submit to PGCB
8. Pile Schedule 8. Pile Schedule(270 locations)
-P-20: Submitted -P-20: FU approval
-P-21: Submitted -P-21: FU approval
-P-22: Draft send to designer -P-22: Submit to PGCB
-P-23: Draft send to designer -P-23: Submit to PGCB
-P-24: Draft send to designer -P-24: Submit to PGCB
9. Soil Test 9. Soil Test
Completed for all approved location- Metro Geotechnical -Completed for all approved location : Metro geotechnical
10. Piling Work 10. Piling Work: Ongoing :
T9/5, T10/4, T11/2, T12/6, T37B/1, T38A/1, T45/2, T57/3-completed Heaven: ongoing: 44, 44A, 46B, 57
Mobilization: 45/1, 46, 46B/1, 47/1, 57/2, 58A, 58A/3
Heaven: 44 (15/32), 44A (26/32), 46B (25/32), AP57 (4/32)
S. Tel:
Work List S. Tel: 33 (29/32), 34 (12/32), 47B/4 (8/16), 49/5 (5/16), 50/1 (1/16), ongoing: 33, 34, 47B/4, 49/5, 50/1, 50/3
50/3 (3/16) mobilization: 32/1, 33A, 48/1, 49/2, 55

Mopower: 26/6 (7/16), 27/1 (3/16), 27A/2 (3/16), 28A (3/32), 28A/3 Mopower: Ongoing: 26/6, 27/1, 27A/2, 28A, 28A/3, 28B/1, 28B/2, 29/1, 30
(12/16), 28B/1 (9/16), 28B/2 (4/16), 29/1 (10/16), 30 (9/32) mobilization: 28B
EnCo: 37/3 (7/16), 37B (9/32), 38A (6/32) EnCo: Ongoing: 37/3, 37B, 38A
Mobilization:
Bhai Bhai: 12/2 (12/16), 12/4 (2/16), 13A/1 (5/16), 13/3 (4/16)
KS Traders: Ongoing: 34A/2, 35/1, 35B
RSE: 36A/1 (8/16), 36A/2 (7/16),36A/6 (2/16), 37 (9/32) Mobilization: 34A, 34A/1
KS Traders : 34A/2 (0/16), 35/1 (2/16), 35B (26/32) Bhai-Bhai: Ongoing: 12/2, 12/4, 13/3, 13A/1
Mobilization: 12/1, 13/2
MZR: 15 (3/32), 17/1 (11/16), 19/2 (2/16)
RSE: Ongoing: 36A/1, 36A/2, 36A/6, 37
Mobilization: 36/1
MZR Digitech:Ongoing: 15, 17/1, 19/2
Ringtech: 10/1 (1/16), 10/2 (1/16) Mobilization: 17/2
11. Pile Cap Work: Ringtech: Ongoing : 10/1, 10/2
Completed : 58/1 Mobilization: 8/4, 10/3, 11/1, 11A/1, 11B/1, 11B/2
Ongoing:
Heaven : 58/2
11. Pile Cap Work: Ringtech: Ongoing : 10/1, 10/2
Completed : 58/1 Mobilization: 8/4, 10/3, 11/1, 11A/1, 11B/1, 11B/2
Ongoing:
Heaven : 58/2
Weekly Schedule
Description Last Week (01/26 ~ 02/02) This Week (02/4 ~ 02/09) Remark
1.Fab. dwg 1. Fab. dwg
- 4D25 fab making : E9 & stub submitted. - 4D25 : Submit other extension
-4D45: GS confirm CSL query -4D45: Submit E9
-4D1: Basic body given for checking,stub finalize -4D1: Handover plate & joint information drawing.
2. Basic design 2. Basic design
-4DT6: PGCB checking -4DT6: FU approval
-4DAX- PGCB give comment -4DAX- Resubmit
-4DR1- PGCB give comment -4DR1- Resubmit
-4DR2- Resubmitted -4DR2- FU approval
3. Stub & Foundation design 3. Stub & Foundation design
-4D1 stub: Stub drawing making E25 & E40. -4D1 stub: Submit E25 & E40 stub drawing, Foundation also prepare.

4. P&P drawings 4. P&P drawings


- AP-59 to AP-60: Appproved 31.01.18 - AP-60 to AP-60/5: Resubmit
-AP-2 to TT-1 : Prepare for submission
5. Tower Load Test
-4D25: Prepare rigging chart 5. Tower Load Test
-4D25: Finalize for submission of rigging chart
6. Technical Documents
-Conductor & Earthwire: FAT report format submitted 6. Technical Documents
-Fitting: Approved except river crossing -Conductor & Earthwire: FU approval
-Fitting : Request type test & FAT report format
7. Route Map
-400kV: Approved 151.08km (except River Crossing Portion), TT-1 7. Route Map(151.08 Km)
location confirmed -400kV: Prepare TT-1 location route map
-132kV: Route survey completed. -132kV: Submit to PGCB
8. Pile Schedule 8. Pile Schedule(308 locations)
-P-20: Approved -P-22: Submit to PGCB
-P-21: Approved -P-23: Submit to PGCB
-P-22: Draft send to designer -P-24: Submit to PGCB
-P-23: Draft send to designer
-P-24: Draft send to designer 9. Soil Test
-AP-59 to AP-60 : Metro geotechnical
9. Soil Test
Completed for all approved location- Metro Geotechnical 10. Piling Work: Ongoing :
Heaven:
10. Piling Work ongoing: 44, 46B/1, 57, 57/2, 58A/3
T12/2, T29/1, T33, T35B, T44A, T46B-completed Mobilization: 45/1, 46, 46/1, 58, 58A
Heaven: 44 (22/32), 46B/1 (0/16), 57 (11/32), 57/2 (0/16), 58A/3 S. Tel:
(0/16) ongoing: 7/5, 8/4, 33A, 34, 47B/4, 49/2, 49/5, 50/1, 50/3
mobilization: 32/1, 55
S. Tel: 7/5 (4/16), 8/4 (4/16), 33A (0/32), 34 (19/32), 47B/4 (10/16),
49/2 (0/16),49/5 (12/16), 50/1 (7/16), 50/3 (10/16) Mopower:
Ongoing: 26/6, 27/1, 27A/2, 28A, 28A/3, 28B/1, 28B/2, 30
Mopower: 26/6 (14/16), 27/1 (8/16), 27A/2 (9/16), 28A (8/32), 28A/3 mobilization: 28B, 29
(12/16), 28B/1 (14/16), 28B/2 (9/16), 30 (17/32)
EnCo:
EnCo: 37/3 (14/16), 37B (17/32), 38A (13/32) Ongoing: 37/3, 37B, 38A
Mobilization:
Bhai Bhai: 12/4 (8/16), 13/2 (3/16), 13/3 (9/16), 13A/1 (11/16)
Work List KS Traders:
RSE: 36A/1 (15/16), 36A/2 (12/16),36A/6 (9/16), 37 (17/32) Ongoing: 34A, 34A/2, 35, 35/1
Mobilization: 34A/1, 35A
KS Traders : 34A (0/32), 34A/2 (6/16), 35 (2/32), 35/1 (7/16)
Bhai-Bhai:
MZR: 15 (9/32), 17/1 (13/16), 19/2 (9/16) Ongoing: 12/4, 13/2, 13/3, 13A/1
Mobilization: 12/1
RSE:
Ongoing: 36A/1, 36A/2, 36A/6, 37
Ringtech: 10/1 (8/16), 10/2 (8/16), 10/3 (5/16), 11/1 (5/16) Mobilization: 36/1
11. Pile Cap Work: MZR Digitech:
Completed : 57A/6, 58/1, 58/2 Ongoing: 15, 17/1, 19/2
Ongoing: Mobilization: 16/1, 16/2, 16/3, 17/2
Heaven : 58/2
Ringtech:
Ongoing : 10/1, 10/2, 10/3, 11/1
Mobilization: 11A/1, 11B/1, 11B/2

Pile Cap Work :


Heaven:
Mobilization: 57A/7, 58A/1, 58A/2
S.Tel:
Mobilization: 47B/1
Enco:
Mobilization: 38A/3
11. Pile Cap Work: MZR Digitech:
Completed : 57A/6, 58/1, 58/2 Ongoing: 15, 17/1, 19/2
Ongoing: Mobilization: 16/1, 16/2, 16/3, 17/2
Heaven : 58/2
Ringtech:
Ongoing : 10/1, 10/2, 10/3, 11/1
Mobilization: 11A/1, 11B/1, 11B/2
Pile Cap Work :
Heaven:
Mobilization: 57A/7, 58A/1, 58A/2
S.Tel:
Mobilization: 47B/1
Enco:
Mobilization: 38A/3
Weekly Schedule
Description Last Week (02/4 ~ 02/09)
1.Fab. dwg
- 4D25 fab making : E9 & stub submitted.
-4D45: GS confirm CSL query
-4D1: Basic body given for checking,stub finalize

2. Basic design
-4DT6: PGCB checking
-4DAX- PGCB give comment
-4DR1- PGCB give comment
-4DR2- Resubmitted
3. Stub & Foundation design
-4D1 stub: Stub drawing making E25 & E40.

4. P&P drawings
- AP-59 to AP-60: Appproved 31.01.18

5. Tower Load Test


-4D25: Prepare rigging chart

6. Technical Documents
-Conductor & Earthwire: FAT report format submitted
-Fitting: Approved except river crossing

7. Route Map
-400kV: Approved 151.08km (except River Crossing Portion),
TT-1 location confirmed
-132kV: Route survey completed.

8. Pile Schedule
-P-20: Approved
-P-21: Approved
-P-22: Draft send to designer
-P-23: Draft send to designer
-P-24: Draft send to designer

9. Soil Test
Completed for all approved location- Metro Geotechnical

10. Piling Work


T13A/1, T17/1, T26/6, T27A/2, T28A/3, T28B/1, T36A/1,
T36A/2, T36A/6, T37/3, T49/5, T50/3-completed
Heaven: 44 (29/32), 46 (0/32), 46B/1 (7/16), 47/1 (5/16), 57
(18/32), 57/2 (4/16), 58A/3 (6/16)
S. Tel: 7/5 (6/16), 8/4 (7/16), 33A (3/32), 34 (26/32), 47B/4
(14/16), 48/1 (7/16), 49/2 (2/16), 50/1 (12/16)

Work List Mopower: 27/1 (14/16), 28A (16/32), 28B (0/32), 28B/2
(14/16), 29 (4/32), 30 (25/32)

EnCo: 6/1 (3/16), 6/2 (4/16), 6A/6 (0/16), 37B (25/32), 38A
(18/32)

Bhai Bhai: 12/1 (4/16), 12/4 (14/16), 13/2 (10/16), 13/3


(15/16)
RSE: 37 (23/32)

KS Traders : 34A (7/32), 34A/2 (13/16), 35 (9/32), 35/1


(14/16)

MZR: 15 (12/32), 19/2 (12/16)


S. Tel: 7/5 (6/16), 8/4 (7/16), 33A (3/32), 34 (26/32), 47B/4
(14/16), 48/1 (7/16), 49/2 (2/16), 50/1 (12/16)

Work List Mopower: 27/1 (14/16), 28A (16/32), 28B (0/32), 28B/2
(14/16), 29 (4/32), 30 (25/32)
EnCo: 6/1 (3/16), 6/2 (4/16), 6A/6 (0/16), 37B (25/32), 38A
(18/32)

Bhai Bhai: 12/1 (4/16), 12/4 (14/16), 13/2 (10/16), 13/3


(15/16)

RSE: 37 (23/32)

KS Traders : 34A (7/32), 34A/2 (13/16), 35 (9/32), 35/1


(14/16)

MZR: 15 (12/32), 19/2 (12/16)

Ringtech: 10/1 (15/16), 10/2 (13/16), 10/3 (11/16), 11/1


(12/16)

Hossain : 55/10 (1/16)


11. Pile Cap Work:

Completed :
Ongoing:
Heaven : 57A/7
ekly Schedule
This Week (02/11 ~ 02/16) Remark
1. Fab. dwg
- 4D25 : Submit other extension
-4D45: Submit E9
-4D1: Handover plate & joint information drawing.

2. Basic design
-4DT6: FU approval
-4DAX- Resubmit
-4DR1- Resubmit
-4DR2- FU approval
3. Stub & Foundation design
-4D1 stub: Submit E25 & E40 stub drawing,
Foundation also prepare.

4. P&P drawings
- AP-60 to AP-60/5: Resubmit
-AP-2 to TT-1 : Prepare for submission

5. Tower Load Test


-4D25: Finalize for submission of rigging chart
6. Technical Documents
-Conductor & Earthwire: FU approval
-Fitting : Request type test & FAT report format
7. Route Map(151.08 Km)
-400kV: Prepare TT-1 location route map
-132kV: Submit to PGCB
8. Pile Schedule(308 locations)
-P-22: Submit to PGCB
-P-23: Submit to PGCB
-P-24: Submit to PGCB

9. Soil Test
-AP-59 to AP-60 : Metro geotechnical
10. Piling Work: Ongoing :
Heaven:
ongoing: 44, 46, 46B/1, 47/1, 57, 57/2, 58A/3
Mobilization: 45/1, 46/1, 58, 58A
S. Tel:
ongoing: 7/5, 8/4, 33A, 34, 47B/4, 48/1, 49/2, 50/1
mobilization: 32/1, 33/1, 50, 50/2, 52/4, 52/5, 53, 55

Mopower:
Ongoing: 27/1, 28A, 28B, 28B/2, 29, 30
mobilization: 26/5, 27, 27A/1, 28A/2, 28A/4

EnCo:
Ongoing: 6/1, 6/2, 6A/6, 37B, 38A
Mobilization: 4A/4

Bhai-Bhai:
Ongoing: 12/1, 12/4, 13/2, 13/3
Mobilization: 13/6, 13A
RSE:
Ongoing: 37
Mobilization: 36/1, 36/2, 36/3, 36A/3, 36A/5

KS Traders:
Ongoing: 34A, 34A/2, 35, 35/1
Mobilization: 34A/1, 35A

MZR Digitech:
Mopower:
Ongoing: 27/1, 28A, 28B, 28B/2, 29, 30
mobilization: 26/5, 27, 27A/1, 28A/2, 28A/4

EnCo:
Ongoing: 6/1, 6/2, 6A/6, 37B, 38A
Mobilization: 4A/4

Bhai-Bhai:
Ongoing: 12/1, 12/4, 13/2, 13/3
Mobilization: 13/6, 13A

RSE:
Ongoing: 37
Mobilization: 36/1, 36/2, 36/3, 36A/3, 36A/5

KS Traders:
Ongoing: 34A, 34A/2, 35, 35/1
Mobilization: 34A/1, 35A

MZR Digitech:
Ongoing: 15, 19/2
Mobilization: 16/1, 16/2, 16/3, 17/2

Ringtech:
Ongoing : 10/1, 10/2, 10/3, 11/1
Mobilization: 10, 11A/1, 11B/1, 11B/2

Hossain:
Ongoing : 55/10
Mobilization: 55/9
Pile Cap Work :
Heaven:
Ongoing : 57A/7
Mobilization: 58A/1, 58A/2

S.Tel:
Mobilization: 47B/1
Enco:
Mobilization: 38A/2, 38A/3, 38A/4