This document outlines the planning and implementation of a power evacuation project. It discusses 19 topics related to contracting, specifications, cost estimates, construction planning, land acquisition, environmental studies, risk analysis, implementation schedule, tower designs, foundation designs, assembly drawings, and detail design. It also includes sections on the organization of the report such as abbreviations, tables of contents, and introduction.

Uploaded by

Milan Karki
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
70 views1 page

Mind Map of Study Procedure For Transmission Line

This document outlines the planning and implementation of a power evacuation project. It discusses 19 topics related to contracting, specifications, cost estimates, construction planning, land acquisition, environmental studies, risk analysis, implementation schedule, tower designs, foundation designs, assembly drawings, and detail design. It also includes sections on the organization of the report such as abbreviations, tables of contents, and introduction.

Uploaded by

Milan Karki
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

19.

Contract

18. Specification

17. Cost Estimates & Financial Evaluation

I. Existing Condition
A. Access to Each Tower Location
II. Trail/ Track/ Improvement Planning

B. Construction Materials

C. Procurement

D. Supply & Delivery

E. Storage

F. Clearing of Right of Way

G. Excavation

H. Stub Setting
16. Construction Planning
I. Casting of Foundations

J. Erection of Super Structure

K. Stringing of Conductors

L. Final Checking & Commissioning

M. Safety Planning

I. Construction Camp

II. Contractor's Office

Project Organization Structure III. Construction Manpower N. Others

IV. Construction Equipment

V. Contingency Planning

15. Land Acquisition

14. Environmental Studies

13. Risk Analysis

12. Implementation Schedule

Design Parameters

Index of Loadings

Sag Tension Calculations

Load Calculation

Wind Load
SB
Design Calculations

Load Tree Drawings

Foundation Forces

Line Diagram
Tower Designs
Clearance Diagram

SC

SM A. Abbreviations

SD B. table of Contents

Stub Design C. List of figures

Excavation Marking Sheet 1. Report Setup D. List of tables

SB E. List of Annexes Power Evacuation Annexes

SC Foundation Design F. Organization of Report

SD
11. Detail Design A. Background
SM

SB B. Objectives of Study

SC
Asembly Drawing
DPR 2. Introduction C. Scope of works

SD D. Limitation of the Study

SM
A. Project Location
Shop Floor Drawing
B. Accessibility
Bill of Material
C. Infrastucture Facilities
Price Estimate

3. Description of Project I. Introduction


Land Accussition & Resettlement Planning
II. Transmission scenario of Nepal

III. Transmission Network in the Area


10. Optimization Study D. Power Evacuation Study
IV. Project In the Vicinity of LKHP

V. Power Evacuation of LKHP


A. Land Use
VI. Power Evacuation Scheme
B. Land Ownership 9. Cadastral Survey

8. Check Survey & Location Marking

A. Regional geology

B. Surface Geological Study


7. Geological Study
C. Soil Test and Classification

6. Description of Selected Route

Abbreviations

Table of Contents

List of Figures a. Report Setup

List of Tables

List of Annexes

b. Introduction

c. Methodology

d. Data Processing
i. Report
e. The Accuracy in Traverse Survey

f. Detail Topographic Survey

Plotting & Preparation of Maps


g. Preparation of Maps
Prepation of general Reference

h. Reporting

i. D Cards

overall contours (50-60)

Features (river, landslides, kholsi)

Settlement a. Reference Plan

Survey Boundary

Village Name

b. Location Map I. Detailed Topographical Survey


ii. Drawing
c. Traverse Chart

d. Overall Plan of Project Area

e. Strip Survey Map (Topographical Map)

f. Longitudional Profile

i. Tower
I. Cadastral Data
ii. Row

Tower 5. Topographical Survey and mapping


II. Ownership table iii. Cadastral Survey
Row

Overall
III. Cadastral Drawing
Drawings

I. Spotting Plan
iv. Tower Spotting
II. Profile

II. Cadastral Survey

4. Desk Study & Field Verification