PRIORITY CHECK LIST FOR PREPARATION OF D.P.R.
UNDER PMG GUIDELINES
PRIORITY LEVEL INDEX 1 2 HIGH MED-H
PART - I
State/ District/ Development Block Name of Road
1 2 Villages to be Connected NRRDA approval of Core Net Work Length in km. Estimated Cost Total Roadwork cost CD works cost Topographical details Design speed adopted No of curves Radii of curves horizental Length of transition curves Heavy cuts and fills if any Parallel drains 0ut fall Impact on erosion Side slope gradient in deserts/hills Water bodies/ local tanks if affected Formation width Height of embankment Width at toe line Location of borrow areas Source of embankment soil Format4 of SP20 available If soil meets the requirements Does it needs modification Source of modifier with lead Other local/waste materials if any
1 1 1 1 2 1 2 1 1 2
3 4 5 6 1 2 3 4 5 6 7 8 9 10 11
Alignment
Design
1 2 3 4
C
5 6 7 8 9 10
11 1 2 3
D
Is area subjected to flooding Source of materials with lead Source of alternate/waste materials Quality of materials Whether test results available Location of quarry if new Redevelopment of newly opened quarry Haul roads Storage of materials if out side the ROW Provision for salvage of top soil and its reuse No. of water Crossings Details of crossing No. of culverts Maximum afflux as per design Surface water flow Subsurface drainage Site for Camp for construction Approximate no. of workers expected Water for construction Design of Junctions Provision of Cattle crossings Side Ramps if any Bus Bays Bus Stand at destination Provision for turning radius at end Widening for storing materials Plantation scheme Scheme to contain induced development Provision for signs on working drgs.
2 1 1 2 1 1 1 1 1 2 2 1 2
Carriageway width
4 5 6 7 8
Detailed project report
1 1 2
Drainage Works
3 4 5 6
Others
1 2 3 4 5
G
6 7 8 9 10 11 12 13
FOR PREPARATION OF D.P.R. UNDER PMGSY GUIDELINES
PRIORITY LEVEL INDEX 3 4 MED-L LOW
4 4 3 3
3 3 4
4 4 4 4 4 4 4 4 4
3 4
4 4
4 4
4 4 4 3
3 4