Iyam River Flood Mitigation Design
Iyam River Flood Mitigation Design
B. ROADS
B.1. ROADWAY SECTION
STANDARDS FOR HORIZONTAL AND VERTICAL CURVES R-1 6
DESIGN PARAMETERS AND PAVEMENT LAYOUT PLAN R-2 7
TYPICAL CROSS SECTION, SECTION SHOWING DETAIL OF COFFERDAMING,
PARAPET BLOCKS ENLARGE SECTION, RUBBLE CONCRETE ENLARGE SECTION R-3 8
CRIB WALL & GROUTED RIPRAP DETAIL R-4 9
SANITATION TENT PLAN R-5 10
DETAILED PLAN OF FIELD OFFICE R-6 11
PROJECT BILLBOARD R-7 12
C. CROSS - SECTIONS
CROSS - SECTION ( STA. 0 + 740.00 - STA. 0 + 880.00) CS-1 14
CROSS - SECTION ( STA. 0 + 900.00 - STA. 1 + 040.00) CS-2 15
CROSS - SECTION ( STA. 1 + 060.00 - STA. 1 + 200.00) CS-3 16
CROSS - SECTION ( STA. 1 + 220.00 - STA. 1 + 268.00) CS-4 17
PROJECT NAME & LOCATION : SHEET CONTENTS : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES OO2: Protect Lives and Properties Against Major
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS JAY R M. ACOB
REGION IV-A
Floods, Flood Management Program, Construction/
Rehabilitation of Flood Mitigation Facilities within
ENGINEER II
CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL G 2
INDEX OF DRAWING PREPARED :
QUEZON II DISTRICT ENGINEERING OFFICE
LUCENA CITY
Major River Basins and Principal Rivers, Construction
of Slope Protection along Iyam River, Barangay Cotta
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION EINGINEER III
OIC - OFFICE OF THE ASSISTANT
ASSISTANT DISTRICT ENGINEER 2 5 17
MARK JAY E. ILAO DATE : DATE : OIC - OFFICE OF THE DISTRICT ENGINEER
(Phase I), Lucena City, Quezon ENGINEER II DATE : DISTRICT ENGINEER DATE :
GENERAL CONSTRUCTION NOTES
1.0 SPECIFICATIONS 8.0 CONCRETE 9.4 UNLESS OTHERWISE SHOWN ON THE DRAWINGS, THE CLEAR DISTANCE BETWEEN
1.1 ALL WORKS SHALL COMPLY WITH THE "DPWH STANDARD SPECIFICATIONS FOR 8.1 CONCRETE STRENGTH BY CLASS. PARALLEL BAR SHALL NOT BE LESS THAN THE NOMINAL DIAMETER OF THE BARS
HIGHWAYS, BRIDGES AND AIRPORTS", 2013 EDITION. NOT 1 - 1/3 TIMES THE MAXIMUM SIZE OF THE COARSE AGGREGATE WHEN
28 DAYS CYLINDER STRENGTH MAX SIZE OF COARSE AGGREGATE
CLASS mm. ( in ) REINFORCEMENT IN THE BEAMS OR GIRDER IS PLACED IN TWO OR MORE LAYERS.
2.0 DIMENSIONS MPa PSi
A 20.70 3,000 38 ( 1 - 1/2 ) THE CLEAR DISTANCE BETWEEN LAYERS SHALL NOT BE LESS THAN 25mm. NOR ONE
2.1 DISTANCE BETWEEN HORIZONTAL CONTROL POINTS INCLUDING REFERENCE POINTS B 16.50 2,400 50 ( 2 ) BAR DIAMETER AND THE BARS IN THE UPPER LAYER SHALL BE PLACED DIRECTLY
ARE MEASURED AND EXPRESSED IN METER. C 20.70 3,000 12.7 ( 1/2 )
ABOVE IN THE BOTTOM LAYER.
D 37.70 5,000 19 ( 3/4 )
2.2 UNLESS OTHERWISE SPECIFIED, DIMENSIONS OF PIPES, BOX CULVERTS, BRIDGES
LEAN 9.90 1,400 9.5 EXCEPT OTHERWISE SHOWN ON THE DRAWINGS, MINIMUM CONCRETE COVER SHALL
AND OTHER STRUCTURES ARE MEASURED AND EXPRESSED IN MILLIMETERS.
BE PROVIDED FOR REINFORCEMENT AS FOLLOWS.
2.3 ALL OTHER DIMENSIONS ARE EXPRESSED IN METERS. 8.2 ALL EXPOSED CONCRETE EDGES SHALL BE CHAMFERED OR AS DIRECTED
BY THE ENGINEER.
3.0 STATIONING
3.1 STATIONING OF ROADS BRIDGES, RCPC AND OTHER STRUCTURES AND ELEMENTS OF 9.0 REINFORCING STEEL MINIMUM CLEAR
MAX SIZE OF COARSE AGGREGATE mm. ( in )
HORIZONTAL AND VERTICAL CURVES SHOWN ON THE PLAN ARE RECKONED FROM 9.1 THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO THE ENGINEER FOR COVER, mm. (in)
THE ROADWAYS CENTERLINE. CONCRETE IN A MARINE ENVIRONMENT OR CONCRETE
APPROVAL PRIOR TO FABRICATION. SHOP DRAWINGS SHOULD SHOW DETAILS FOR CAST AGAINST AND PERMANENT EXPOSED TO EARTH. 75 ( 3 )
3.2 STATIONS ARE LOCATED AT EVERY 100.00m., AT EVERY CULVERT AND BRIDGE FABRICATION AND FOR PLACING REINFORCING STEEL. ONLY THOSE NECESSARY FOR CONCRETE EXPOSED TO EARTH OR WEATHER
APPROACH, AND AT EVERY PARTICULAR POINT OF HORIZONTAL GEOMETRY. THE PROPER LOCATION OF THE STEEL ARE REQUIRED ON THE DRAWINGS. BENDING PRIMARY REINFORCEMENT 50 ( 2 )
STIRRUPS, TIES & SPIRAL 40 ( 1 - 1/2 )
DETAILS MAY BE SHOWN ON A SEPARATE SHEET. CONCRETE NOT EXPOSED TO WEATHER OR IN
4.0 HORIZONTAL AND VERTICAL ALIGNMENT CONTACT WITH GROUND
9.2 NO MORE THAN ONE BAR IN THREE SHALL BE SPLICED AT THE SAME SECTION
4.1 NO ALTERATION / CHANGE IN ALIGNMENT SHALL BE MADE UNLESS EXISTING FIELD PRIMARY REINFORCEMENT 40 ( 1 - 1/2 )
UNLESS OTHERWISE SHOWN SPLICING SHALL BE KEPT TO A MINIMUM AND SHOULD STIRRUPS, TIES & SPIRAL 25 ( 1 )
CONDITIONS SO WARRANT AND ONLY UPON APPROVAL BY THE ENGINEER. CONCRETE DECK SLABS
BE STAGGERED AND LAPPED NOT LESS THAN 40 BAR DIAMETER UNLESS OTHERWISE
4.2 FINISHED GRADE ELEVATION SHOWN ON PLAN AND PROFILE SHEETS REFERS TO THE TOP REINFORCEMENT 50 ( 2 )
SHOWN ON DRAWING. WHERE THE CLEAR DISTANCE BETWEEN LAPPED BARS DO BOTTOM REINFORCEMENT 26 ( 1 )
FINISHED GRADE LEVEL AT CENTER AS SHOWN ON TYPICAL ROAD SECTION.
NOT MEET THE REQUIREMENTS IN ITEM 12.4 THE CONTRACTOR SHALL USED
4.3 GROUND LEVEL SHOWN ON THE PLAN AND PROFILE SHEETS REFERS TO THE
CRANKED SPLICES AS DETAILED BELOW.
ELEVATION OF ORIGINAL GROUND ALONG THE CENTERLINE OF THE PROJECT ROAD.
ALL CORRECTIONS / CHANGES IN GRADIENTS WILL BE DONE ON THE ORIGINAL 10.0 PAVEMENT DESIGN
MIN. 4
GROUND UPON THE APPROVAL OF THE ENGINEER. OFFSET 10.1 ADOPT 0.15m. thk. PCCP AS PER D.O. 40 SERIES 2012
MAX. d+3
PROJECT NAME & LOCATION : SHEET CONTENTS : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES OO2: Protect Lives and Properties Against Major
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS JAY R M. ACOB
REGION IV-A
Floods, Flood Management Program, Construction/
Rehabilitation of Flood Mitigation Facilities within
ENGINEER II
CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL G 3
GENERAL CONSTRUCTION NOTES PREPARED :
QUEZON II DISTRICT ENGINEERING OFFICE
LUCENA CITY
Major River Basins and Principal Rivers, Construction
of Slope Protection along Iyam River, Barangay Cotta
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION EINGINEER III
OIC - OFFICE OF THE ASSISTANT
ASSISTANT DISTRICT ENGINEER 3 5 17
MARK JAY E. ILAO DATE : DATE : OIC - OFFICE OF THE DISTRICT ENGINEER
(Phase I), Lucena City, Quezon ENGINEER II DATE : DISTRICT ENGINEER DATE :
REGION IV-A
LUCENA CITY
REPUBLIC OF THE PHILIPPINES
KEY MAP
VICINITY MAP
LAYOUT PLAN
THIS SITE
LOCATION MAP
127
178
WATER
41.285
180
WATER
42.651
WATER
41.684
0+
54
0
179
181
WATER
42.636
WATER
41.853
128
WATER
41.407
0+
56
0
177
WATER
42.320
176
175
174
WATER
42.320
WATER
42.621
42.023
173
WATER
41.400
163
RIVER
38.256
0+
58
0
185
WATER
41.900
183
184
182
WATER
WATER
42.323
41.900
WATER
41.900
129
WATER
41.123
DRAFTED :
0+
60
0
PREPARED :
193
189
191
192
WATER
187
188 44.532
186 WATER
WATER
WATER
WATER
42.032 44.532
44.932
WATER 42.032
42.391
190
41.411
WATER
41.411
130
WATER
41.101
0+
62
0
0+
64
0
131
132
WATER
41.091 WATER
41.447
164
197 199
RIVER 195
196
0
38.364
WATER WATER
44.921
WATER
WATER44.631
194 44.631
44.921
WATER
41.100
0+66
200
133 WATER
0
44.813
WATER
41.322
ENGINEER II
ENGINEER II
0+68
134
WATER
41.444
210
WATER
40.120
135 201
WATER
WATER
41.396 44.887
JAY R M. ACOB
0+700
ENDRR WATER
41.232 44.723
138
RR
STA. 0 + 740.00
44.907
137
141
WATER 142
140
41.413 RR
46.253
139 RR
RR 47.239
45.515
RR
43.017
143
RR
46.709
0+740
144
G
43.932
145
G
46.891
0+760
165
RIVER
38.546
BEGINNING OF PROJECT
0+780
0+800
REVIEWED :
146
198
X
X 46.510
41.411
147
X
47.170
0+820 0+840
204
DATE :
166
X
RIVER 41.219
38.245
0+860
154
X
45.482
153
X
45.193
ENGINEER II
205
X
41.391
0
152
X
48.783
324
323 R
45.904
R
0+88
44.377
322
321 R
43.124
R
43.097
320
319
318 R
R 42.675
41.849
R
41.246
203
X
45.193
0
209
X
44.369
341 208
WATER X
39.638 43.123
206
X
167 41.456
RIVER
38.369
0+90
207
RIVER
39.136
)
RETE WALL
OF CONC
BM2(TOP
ELEV: 48.179
0+
337
RILESCONCRETE
45.883
336
92
RILESCONCRETE
340 46.305
BM
325
48.179
0
RILES
48.369
326
RILES
48.360
151
328
327
RAIL
48.290 RILESCONCRETE
43.034
RILESCONCRETE
46.712
150
RAIL
48.262
330
329
RILESCONCRETE
RILESCONCRETE
46.787
42.861
334
333 R
47.142
R
46.643
331
332
RILESCONCRETE
43.137
46.752
0
94
310
R
46.667
0+
311
R
44.717
307
X
39.908
308
X
41.878 309
0
X
42.946
0+96
317
R
46.221
609
WATER
38.741
316
R
46.387
0
0+98
315
R
44.894
314
R
46.337
DATE :
0
313
X
42.308
312
X
SUBMITTED :
46.077
1+00
610
WATER
38.549
1+020
303
X
46.084
304
X
46.168
305
X
46.442
300
301
302
X X
41.950 42.708 X
42.811
306
X
39.841
1+040 1+060
STA. 0 + 740
342
WATER
38.023
1+080
299
X
44.237
296
X 298 297
40.164
X X
41.279 42.052
1+100
LAYOUT PLAN
295
X
38.804
292
293
294
X
WATER
42.089 X 44.773
44.356
291
X
44.949
0
DATE :
1+16
211
ER)
SET_BASE
45.535
WITH WASH
BM3(NAIL
ELEV: 45.535
0
1+18
288
ENDWALL
42.143
290
289
X
X 40.071
40.595
VICINITY MAP
RECOMMENDED :
343
WATER
37.836
1+220 1+200
608
284
WATER
42.236 WAL
47.668
281
285
WAL
WAL 283
50.548
48.051 282
WAL
WAL
48.190
49.727
286
WAL
48.028
287
WAL
47.663
279
X
45.688
280
WAL
47.450
277
1+240
X
45.682
278
WAL
46.129
276
X
46.234
275 274
X X
43.167 43.508 273
WAL
43.484
EINGINEER III
607
WATER
42.256
272
1+260
WAL
44.063
271
270
WAL
42.218
WAL
41.555
269
WAL
42.171
DISTRICT ENGINEER
WILFREDO L. RACELIS
1+280
268
WAL
42.205
1+300
1+320
267
WAL
40.239
265
WAL
264 266
41.294
WAL
WAL
42.15945.645
344
WATER
38.505
340
1+
262
261
X 263
41.526
WALL
42.216
WAL
46.016
0
1+36
DATE :
APPROVED :
0
1+38
256
X
40.428
257
258
RIPRAP
41.646 259
RIPRAP
42.424
RIPRAP
46.739
260
START
42.058
00
255
4
STARTRIPRAP
41.154
1+
STA. 1 +268.00
243
X
42.332
244
X
42.592
246
245
F
X
48.962
46.480
0
42
1+
END OF PROJECT
253
X
42.428
0
44
1+
345
249
WATER
38.080
X
42.385
251
252
X
44.803
X
45.911
247
PINAGTAASAN
40.360
248
PINAGTAASAN
40.362
250
X
46.559
0
46
1+
STA. 1 + 268.00
254
X
38.776
0
END OF PROJECT
48
1+
242
X
46.073
240
239
X
42.400
X
43.348
241
X
43.858
G
4 5
SET NO.
4
17
SHEET NO.
SUMMARY OF QUANTITIES
ITEM DESCRIPTION UNIT ORIGINAL QTY. REMARKS
A. FACILITIES FOR THE ENGINEER
A.1.1 (3) Construction of Field Office for the Engineer l.s. 1.00
Provision of Furnitures/Fixtures, Equipment & Appliances
A.1.1 (11) l.s. 1.00
for the Field Office for the Engineer
A.1.4 (1) Provision of Progress Photographs each 300.00
B. OTHER GENERAL REQUIREMENTS
B.5 Project Billboard / Signboard ea. 2.00
B.7(2) Occupational Safety and Health Program l.s. 1.00
B.9 Mobilization / Demobilization l.s. 1.00
B.15(1) Detour/Acess Road l.s. 1.00
C. EARTHWORKS
100(2) Clearing and Grubbing l.s. 1.00
100(3)a1 Structure Excavation (Common Soil) cu.m. 2,831.08
Shoring, cribbing and related works
103(5)b l.s. 1.00
(Cribbing/Cofferdamming)
104(1)2 Embankment from Borrow (Common Soil) cu.m. 6,623.45 Compacted Volume
NOTE:
PROJECT NAME & LOCATION : SHEET CONTENTS : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES OO2: Protect Lives and Properties Against Major
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS JAY R M. ACOB
REGION IV-A
Floods, Flood Management Program, Construction/
Rehabilitation of Flood Mitigation Facilities within
ENGINEER II
CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL G 5
SUMMARY OF QUANTITES PREPARED :
QUEZON II DISTRICT ENGINEERING OFFICE
LUCENA CITY
Major River Basins and Principal Rivers, Construction
of Slope Protection along Iyam River, Barangay Cotta
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION EINGINEER III
OIC - OFFICE OF THE ASSISTANT
ASSISTANT DISTRICT ENGINEER 5 5 17
MARK JAY E. ILAO DATE : DATE : OIC - OFFICE OF THE DISTRICT ENGINEER
(Phase I), Lucena City, Quezon ENGINEER II DATE : DISTRICT ENGINEER DATE :
HORIZONTAL CURVE (CIRCULAR) VERTICAL PARABOLIC CURVE
SCALE : NTS SCALE : NTS
VPI
PI
I - g%
+g
% VPT
VPC
E
L/2 L/2
L
25 m.
PC PT SYMMETRICAL
SCALE : NTS
VPI
R R
MO - g%
+ g%
VPT
VPC
PROJECT NAME & LOCATION : SHEET CONTENTS : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES OO2: Protect Lives and Properties Against Major
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS Floods, Flood Management Program, Construction/
JAY R M. ACOB
REGION IV-A Rehabilitation of Flood Mitigation Facilities within STANDARDS FOR HORIZONTAL PREPARED :
ENGINEER II
CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL R 6
QUEZON II DISTRICT ENGINEERING OFFICE Major River Basins and Principal Rivers, Construction AND VERTICAL CURVES ENGINEER II CHIEF, PLANNING AND DESIGN SECTION EINGINEER III ASSISTANT DISTRICT ENGINEER 1 7 17
LUCENA CITY of Slope Protection along Iyam River, Barangay Cotta DATE : DATE : OIC - OFFICE OF THE ASSISTANT OIC - OFFICE OF THE DISTRICT ENGINEER
(Phase I), Lucena City, Quezon
MARK JAY E. ILAO DISTRICT ENGINEER
ENGINEER II DATE : DATE :
PAVEMENT DESIGN PARAMETERS
3.) RELIABILITY
R 85.00%
Z R - 1.037
9.) RESILIENT MODULUS OF ROAD BED MATERIAL PAVEMENT LAYOUT PLAN FOR PATHWAY
M
R 9,966.26 psi SCALE 1 : 10 M
M
RBM 30.00%
T=SLAB DEPTH
STANDARD GRADIENTS OF EMBANKMENT SLOPES
HALF OF THE BAR ON THE SIDE OF THE
NEW PAVEMENT METAL DOWEL CAP SHALL BE PAINTED
SOIL CLASSIFICATION COMMON FILL MATERIAL
W/ RED LEAD AND THEN GREASED
SLOPE SHOULDER
A. AT NORMAL SECTION, SLOPE OF SHOULDER SHALL
BE 3% (MIN.) SLOPPING DOWNWARDS AWAY FROM
THE EDGE OF THE PAVEMENT.
PROJECT NAME & LOCATION : SHEET CONTENTS : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES OO2: Protect Lives and Properties Against Major
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS Floods, Flood Management Program, Construction/
JAY R M. ACOB
REGION IV-A Rehabilitation of Flood Mitigation Facilities within DESIGN PARAMETERS AND PREPARED :
ENGINEER II
CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL R 7
QUEZON II DISTRICT ENGINEERING OFFICE
LUCENA CITY
Major River Basins and Principal Rivers, Construction
of Slope Protection along Iyam River, Barangay Cotta
PAVEMENT LAYOUT PLAN ENGINEER II CHIEF, PLANNING AND DESIGN SECTION EINGINEER III ASSISTANT DISTRICT ENGINEER 2 7 17
DATE : DATE : OIC - OFFICE OF THE ASSISTANT OIC - OFFICE OF THE DISTRICT ENGINEER
(Phase I), Lucena City, Quezon
MARK JAY E. ILAO DISTRICT ENGINEER
ENGINEER II DATE : DATE :
"A" "B"
"A" "B"
1
1 1
1
1
1
2
2
L = 528.00 m.
CROSS SECTION
CROSS SECTION
"A" "B"
2 E N L A R G E S E C T I O N
SCALE NTS
PROJECT NAME & LOCATION : SHEET CONTENTS : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES OO2: Protect Lives and Properties Against Major
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS TYPICAL CROSS SECTION JAY R M. ACOB
REGION IV-A
Floods, Flood Management Program, Construction/
Rehabilitation of Flood Mitigation Facilities within
SECTION SHOWING DETAIL OF ENGINEER II
CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL R 8
COFFERDAMING PREPARED :
QUEZON II DISTRICT ENGINEERING OFFICE
LUCENA CITY
Major River Basins and Principal Rivers, Construction
of Slope Protection along Iyam River, Barangay Cotta
PARAPET BLOCKS ENLARGE SECTION ENGINEER II CHIEF, PLANNING AND DESIGN SECTION EINGINEER III
OIC - OFFICE OF THE ASSISTANT
ASSISTANT DISTRICT ENGINEER 3 7 17
RUBBLE CONCRETE ENLARGE SECTION MARK JAY E. ILAO DATE : DATE : OIC - OFFICE OF THE DISTRICT ENGINEER
(Phase I), Lucena City, Quezon ENGINEER II DATE : DISTRICT ENGINEER DATE :
TYPICAL BAR SCHEDULE
1
2 BAR SPACING
DIAGRAM BAR # SIZE Ø (mm)
1
2 COLUMN DETAIL
SCALE 1:10 (A1)
1 ELEVATION OF CRIB RIPRAP 1. STONES SHALL BE CLEAN, HARD AND DURABLE AND SHALL
SCALE 1:40 BE SUBJECTED TO THE ENGINEER'S APPROVAL. ADOBE STONES
SHALL NOT BE USED AS MAIN MATERIALS UNLESS OTHERWISE
2 ELEVATION OF CRIB RIPRAP SPECIFIED. THE MINIMUM SIZE OF STONES TO BE USED SHALL BE
SCALE 1:40 0.005 cu.m IN VOLUME WITH SPECIFIC GRAVITY OF 2.50 AND NOT
LESS THAN 75% OF THE TOTAL VOLUME OF ROCK. EMBANKMENT
SHALL CONSISTS OF STONES 0.010 METER IN VOLUME. STONES
OBTAINED FROM EXCAVATION PERFORMED UNDER THIS CONTRACT
MAYBE USED IF QUALIFIED.
4 4
3 FOOTING DETAIL
SCALE 1:10 (B10)
3 3
6 6
5 5
PROJECT NAME & LOCATION : SHEET CONTENTS : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES OO2: Protect Lives and Properties Against Major
JAY R M. ACOB
9
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS Floods, Flood Management Program, Construction/
REGION IV-A Rehabilitation of Flood Mitigation Facilities within
ENGINEER II
CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL R
CRIB WALL AND GROUTED PREPARED :
QUEZON II DISTRICT ENGINEERING OFFICE
LUCENA CITY
Major River Basins and Principal Rivers, Construction
of Slope Protection along Iyam River, Barangay Cotta
RIPRAP DETAIL ENGINEER II CHIEF, PLANNING AND DESIGN SECTION EINGINEER III ASSISTANT DISTRICT ENGINEER 4 7 17
DATE : DATE : OIC - OFFICE OF THE ASSISTANT OIC - OFFICE OF THE DISTRICT ENGINEER
(Phase I), Lucena City, Quezon
MARK JAY E. ILAO DISTRICT ENGINEER
ENGINEER II DATE : DATE :
..\..\..\desktop\sanitation plan\sanitentsph masterfile v1.00_011.jpg
PERSPECTIVE
HINGE
AWNING
WOODEN
WINDOW
REMOVABLE
BRACE STAND
3.69 M.
3.69 M.
2" x 2" COCO 26# CORR. G.I. ROOFING SHEETS APEX OF ROOF RAFTER
APEX OF ROOF RAFTER
2" x 4" JAMB
3.69 M.
LUMBER FRAME
3.69 M.
TOP OF ROOF GIRT
5.45 M. 2.72 M. 3.63 M.
TOP OF ROOF GIRT 1/4" MARINE
TOP OF ROOF GIRT
3.69 M. PLYWOOD 3.69 M. 3.69 M. 3.69 M.
3.63 M. 5.45 M.
3.63 M. 5.45 M.
DOUBLE WALL
12.47 M.
12.47 M.
9.53 M.
2.77 M.
2.77 M. 1/4" MARINE
1/4" MARINE PLYWOOD
12.47 M.
1/4" MARINE
12.47 M.
PLYWOOD PLYWOOD
DOUBLE WALL W-2
DOUBLE WALL W-1 W-1
3.69 M.
3.69 M.
DOUBLE WALL
W-1 W-2
FINISHING FLOOR LINE FINISHING FLOOR LINE MARINE
3.69 M.
3.69 M.
3.69 M.
AWNING TYPE AWNING TYPE PLYWOOD FIN. FLR. LINE
1-SET D-1 FLUSH DOOR AWNING TYPE AWNING TYPE
0.69 M.
0.69 M.
WOODEN WINDOW WOODEN WINDOW D-1 WOODEN WINDOW
0.69 M.
0.69 M.
MARINE FIN. FLR. LINE WOODEN WINDOW FIN. FLR. LINE N.G.L
4" CHB ZOCALO WALL
2-SETS 1-SET PLYWOOD 4" CHB ZOCALO WALL
FLUSH TYPE DOOR
N.G.L 4" CHB ZOCALO WALL N.G.L
4" CHB ZOCALO WALL
SCHEDULE OF DOORS & WINDOWS RIGHT SIDE ELEVATION LEFT SIDE ELEVATION
FRONT ELEVATION REAR ELEVATION
GENERAL NOTES :
3.00M. 3.00M.
2" x 3" COCO LUMBER
PURLINS @ .80M.O.C.
PF CF w/ 2" x 2" COCO LUMBER
WF CLEATS FASCIA BOARD
HARDIFLEX
6.81 M.
26# CORR. G.I. ROOFING SHEETS 26# PLAIN G.I. RIDGE ROLL
3.63 M.
1/2 x 12"
1- 2" X 5" COCO LUMBER TOP CHORD CL 2- 2" x 5" COLLAR PLATE COCO LUMBER
W-1
2" x 3" COCO LUMBER 1- 2" x 5" KING POST COCO LUMBER
PURLINS @ .80M.O.C. 2- 2" x 4" BOT. CHORD COCO LUMBER
w/ 2" x 2" COCO LUMBER
3.00M.
BOARD 1- 3" x 5" ROOF GIRT CLEATS 2" x 2" COCO LUMBER HANGER @ 1.20M.O.C.
APEX OF ROOF RAFTER
3.00M.
RAFTER TRUSS
RAFTER TRUSS
RAFTER TRUSS
COCO LUMBER
4" CHB
WF 4" THK. SLAB FLOOR . 2.25
4" THK. SLAB M
FLOORING
WF
2.25 M.
0.80 M.
3.00M.
ON-FILL
W-2
4" CHB
W-1
WF 1- 3" x 5" ROOF GIRT 1/4" MARINE PLYWOOD
PF PF COCO LUMBER 1/2 x 12" CEILING BOARD ON
D-1 HARDIFLEX 2" x 2" CEILING JOIST @ .60M.O.C. 1- 3" x 5" ROOF GIRT
FASCIA BOARD w/ 2- 12mm MACHINE BOLT
3.63 M.
4" x 4" COCO LUMBER BOTHWAYS 4" x 4" COCO LUMBER
FOUNDATION PLAN 1.80m.
w/ NUTS & WASHERS
1/2 x 12" 0.60m. 3.00m. 0.60m.
FLOOR PLAN HARDIFLEX
FASCIA BOARD
2.72 M. 3.00M. 2.72 M.
1.27 M.
ROOF FRAMING PLAN DETAILS OF RAFTER TRUSS (3-SETS)
TOP OF ZOCALO OR CHB WALL
12.05 M.
@ .60M.O.C.
6.34 M.
STRAPS w/ 2-12mm MACHINE
2.54 M.
BOLTS w/ NUTS & WASHERS 1- 10mm CONT. MAIN BARS
7.21 M.
2.40 M.
Sa 1.68 M.
PLAN SECTION
3.00 M.
a b PANEL BOARD (LPP)
NO. OF OUTLET SIZE OF CONDUCTORS AND 20 W
CKT NO. LOAD DESCRIPTION VA VOLTS AMPERES PROTECTION CONDUITS
20 W
LO CO SW SCO
Sab
ELECTRICAL LAYOUT
PROJECT NAME & LOCATION : SHEET CONTENTS : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES OO2: Protect Lives and Properties Against Major
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS JAY R M. ACOB
REGION IV-A
Floods, Flood Management Program, Construction/
Rehabilitation of Flood Mitigation Facilities within
ENGINEER II
CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL R 11
PREPARED :
DETAILED PLAN OF FIELD OFFICE
QUEZON II DISTRICT ENGINEERING OFFICE
LUCENA CITY
Major River Basins and Principal Rivers, Construction
of Slope Protection along Iyam River, Barangay Cotta
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION EINGINEER III
OIC - OFFICE OF THE ASSISTANT
ASSISTANT DISTRICT ENGINEER 6 7 17
MARK JAY E. ILAO DATE : DATE : OIC - OFFICE OF THE DISTRICT ENGINEER
(Phase I), Lucena City, Quezon ENGINEER II DATE : DISTRICT ENGINEER DATE :
14686
559
466
683
279
155
279
155
black
279
155
text
279
155
279
7212
155
279
155
279
1068
whitebackground
342
186
186
0.30m.Ø
NOTE:
For Source of Fund, State if DPWH Regular Budget, Priority Development
Assistance Fund, DepEd/DA/DAR Budget, Calamity Fund, MVUC Fund, etc.
DISPLAY AREA
BILLBOARD
EDGE OF ROAD
TRAFFIC DIRECTION
ROAD
40
45
STATION
50
WIDENING
RIVER BANK LINE
127
WATER 178
41.285 180 WATER
42.651
WATER
41.684
0+
128
WATER
41.407
0+
56
0
177
WATER
42.320
OTHERWISE INDICATED.
176
175
174
WATER
WATER
42.621
WATER42.320
42.023
173
WATER
163 41.400
RIVER
38.256
0+
5
80
185
WATER
41.900
184
183
182
WATER
WATER
41.900
42.323
WATER
41.900
129
WATER
EXCEPT OTHERWISE SPECIFIED.
41.123
0+
60
0
193
189 192
191 WATER
187
188 44.532
186 WATER WATER
42.032 WATER
WATER
WATER 44.532
44.932
WATER 42.032
42.391
190
41.411
WATER
41.411
130
WATER
41.101
REGION IV-A
LUCENA CITY
0+
3. ELEVATIONS ARE ASSUMED ELEVATION.
GENERAL NOTES
62
0
CLASS "A" UNLESS OTHERWISE INDICATED.
0+
197 199
RIVER 196
195
0
38.364
WATER WATER
WATER
WATER44.631 44.921
194 44.921
44.631
WATER
6
41.100
4. GRADE SHOWN IS THE TOP OF FINISHED PAVEMENT.
0+6
1. DISTANCE AND ELEVATIONS ARE IN METERS UNLESS
200
133 WATER
44.813
WATER
41.322
80
0+6
SPECIFICATION FOR HIGHWAYS AND BRIDGES, REVISED 2013
134
WATER
41.444
STRUCTURES MAY BE ADJUSTED TO SUIT FIELD CONDITIONS.
210
WATER
40.120
WATER
41.396
201
WATER
44.887
0+740
0+700
ENDRR WATER
41.232 44.723
138
RR
44.907
137
141
WATER 142
41.413 140 RR
139 RR
46.253
RR 47.239
45.515
RR
43.017
143
RR
46.709
0+740
STA 0+000, ELEV. 94.641
144
G
43.932
G
46.891
0+760
STA.0+740.00 165
RIVER
38.546
0+800
0+780
BY THE CENTER LINE OF THE EXISTING ROAD.
146
198
X
X 46.510
41.411
147
X
47.170
ADDING AND/OR SUBTRACTING DEFLECTION ANGLES DICTATED
0+820
THE AZIMUTH USED IN THIS PROJECT WAS RECKONED THRU THE
SHEET CONTENTS :
WAS RECKONED FROM BM NO. 1, LOCATED ON TOP OF EXISTING RIPRAP,
0+840
204
166
X
RIVER 41.219
38.245
154
X
45.482
153
X
45.193
205
X
41.391
R
324
R
45.904
0+880
44.377
322
321 R
43.124
R
43.097
320
319
318 R
R 42.675
R 41.849
41.246
203
X
45.193
0
209
X
44.369
341 208
WATER X
39.638 43.123
206
X
167 41.456
RIVER
38.369
0+90
RIVER
39.136
LL)
ETE WA
OF CONCR
0+900
BM2(TOP 79
ELEV: 48.1
0+
337
RILESCONCRETE
45.883
336
92
RILESCONCRETE
340 46.305
BM 325
48.179
0
RILES
48.369
326
RILES
48.360
151 328
RAIL 327
48.290 RILESCONCRETE
43.034
RILESCONCRETE
46.712
DRAFTED :
150
RAIL
48.262
330
329
RILESCONCRETE
RILESCONCRETE
46.787
42.861
PREPARED :
334
333 R
47.142
R
46.643
331
332
RILESCONCRETE
RILESCONCRETE
46.752
43.137
40
310
R
46.667
0+
311
R
44.717
307
X
39.908
308
X
41.878 309
0
X
42.946
6
0+9
317
R
46.221
42.30 44.15 46.36
ENGINEER II
ENGINEER II
609
WATER
38.741
316
R
46.387
0
SCALE:
0+98
JAY R M. ACOB
315
R
44.894
R
46.337
313
X
42.308
312
X
46.077
1+00
610
WATER
38.549
SCALE:
303
X
P LAN
46.084
304
X
46.168
305
X
46.442
300 301
302
X X
41.950 42.708 X
42.811
306
X
39.841
1+040
REVIEWED :
42.30 45.35 46.35
HOR.
1 : 70 M.
1 :700 M.
VERT.
1+000
1+060
DATE :
42.30 46.00 46.33
1 : 200 M.
342
1 : 2000 M.
WATER
PROFILE
38.023
ENGINEER II
1+080
299
X
44.237
296
X 298 297
40.164
X X
41.279 42.052
295
X
38.804
DATE :
293 292
294
WATER X
42.089 X 44.773
44.356
291
X
44.949
SUBMITTED :
42.30 45.29 46.25
0
1+16
211
SET_BASE
SHER)
45.535
WITH WA
BM3(NAIL 35
ELEV: 45.5
0
1+100
288
ENDWALL
42.143
290
289
X
X40.071
40.595
343
WATER
37.836
1+200
608
1+220
284
WATER
42.236 WAL
47.668
281
285
WAL283 WAL
50.548
48.051 282
WAL
48.190 WAL
49.727
CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ
286
WAL
48.028
287
WAL
47.663
X
45.688
280
WAL
47.450
DATE :
277
1+240
X
45.682 278
WAL
46.129
276
X
46.234
275 274
X X
43.167 43.508 273
WAL
43.484
WATER
42.256
272
1+260
WAL
44.063
RECOMMENDED :
271
270 WAL
42.218
WAL
41.555
269
WAL
42.171
1+280
WAL
42.205
EINGINEER III
1+300
DISTRICT ENGINEER
267
WAL
40.239
265
WAL
41.294 264 266
WALWAL
45.645
42.159
344
WATER
42.30 46.47 46.06 38.505
40
3
1+
262
261
X 263
41.526 WALL
WAL
42.216
46.016
60
DATE :
1+3
APPROVED :
STA.1+268.00
BEG. OF PROJECT
1+3
256
X
40.428
257
258
RIPRAP
41.646 259
RIPRAP
42.424
RIPRAP
46.739
260
START
42.058
255
40
STARTRIPRAP
41.154
1+
243
X
42.30 45.50 45.99 42.332
244
X
42.592
246
245
F
X
48.962
46.480
1+268
0
42
1+
253
X
42.428
0
44
1+
345
WATER 249
38.080
OIC - OFFICE OF THE DISTRICT ENGINEER
X
42.385
251
252
X
X
44.803
45.911
247
PINAGTAASAN
40.360
248
PINAGTAASAN
40.362
250
X
46.559
0
46
1+
254
X
38.776
PP
0
1 1
48
SET NO.
1+
0
50
1+
13
17
242
X
46.073
240
239 X
42.400
X
43.348
241
SHEET NO.
X
43.858
-36.074 -33.896
42.602
-25.696 44.408
AREA Cut and Fill
AFILL= 2.091
46.370
46.802 -31.669
-29.377
F.G. = 45.93
AFILL= 5.111
F.G. = 46.21
0+800 0+860
46.140 46.278
-29.776
-29.025
AREA Cut and Fill
AREA Cut and Fill L/S Cut 5.074
AFILL= 5.984
AFILL= 6.827
44.466 46.341
-25.531 46.351 -26.600
-28.463
AREA Cut and Fill AREA Cut and Fill
42.541
L/S Cut 7.357 -26.600 L/S Cut 4.893
42.441 42.306
-23.149 -25.758
AFILL= 5.781
AFILL= 7.192
PROJECT NAME & LOCATION : SHEET CONTENTS : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES OO2: Protect Lives and Properties Against Major
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS Floods, Flood Management Program, Construction/
JAY R M. ACOB
REGION IV-A Rehabilitation of Flood Mitigation Facilities within PREPARED :
ENGINEER II
CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL CS 14
CROSS SECTION
QUEZON II DISTRICT ENGINEERING OFFICE
LUCENA CITY
Major River Basins and Principal Rivers, Construction
of Slope Protection along Iyam River, Barangay Cotta
Sta. 0+740 - Sta. 0+880 ENGINEER II CHIEF, PLANNING AND DESIGN SECTION EINGINEER III ASSISTANT DISTRICT ENGINEER 1 4 17
DATE : DATE : OIC - OFFICE OF THE ASSISTANT OIC - OFFICE OF THE DISTRICT ENGINEER
(Phase I), Lucena City, Quezon
MARK JAY E. ILAO DISTRICT ENGINEER
ENGINEER II DATE : DATE :
46.447
46.444 46.442
-49.101 -46.237 46.309
-41.220
-43.105
44.537
-47.231
AREA Cut and Fill
42.811
L/S Cut 6.360
42.140 AREA Cut and Fill
-33.510 42.388 14.085
L/S Fill
-38.276 L/S Cut 7.001
-31.403
L/S Fill 15.923
48.036
48.036
-42.548
-40.802
46.541
46.685
46.286
-41.377
-44.264
-40.392
42.249
AFILL= 2.091 WATER LEVEL AFILL= 2.091
-32.621 WATER LEVEL
ELEV=42 F.G. = 46.36 AFILL= 1.091 ELEV=42 F.G. = 46.33 AFILL= 2.041
0+940 1+020
47.174
-40.476 46.234
46.395
46.077
47.174 -40.558
-42.856
-39.976 -39.225
45.658
-37.838 AREA Cut and Fill
47.181
46.371
-39.623 -44.767
47.181
-39.123
45.651
-36.899 44.414 AREA Cut and Fill
-42.591
L/S Cut 6.367
1+120 1+200
-20.738
46.268
-32.390 46.031
46.136
44.359 -28.848
44.237 -30.634 45.869
AREA Cut and Fill
-31.195
-26.393 L/S Cut 6.501 -28.345 AREA Cut and Fill
-24.480 42.126
ELEV=42 AFILL= 2.091 WATER LEVEL
-23.680
-20.017
46.623 46.028
-37.189
45.294 -32.555
-28.858
45.005 AREA Cut and Fill
-25.963 44.707
-25.393 L/S Cut 4.870
42.211
AREA Cut and Fill
-22.485 42.104
L/S Cut 5.177
-25.802
L/S Fill 8.738
AFILL= 2.091 WATER LEVEL
ELEV=42
AFILL= 8.244
AFILL= 2.091 WATER LEVEL
ELEV=42
40.080
-17.044
F.G. = 46.25 F.G. = 46.14 AFILL= 7.698
40.088
44.339
46.223
-38.000 45.937 44.702 -27.028
-35.240
-33.964
AFILL= 2.091
ELEV=42 AFILL= 2.091 WATER LEVEL ELEV=42 AFILL= 2.091 WATER LEVEL
AFILL= 2.129
F.G. = 46.28 F.G. = 46.17 AFILL= 8.015
-21.364
PROJECT NAME & LOCATION : SHEET CONTENTS : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES OO2: Protect Lives and Properties Against Major
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS Floods, Flood Management Program, Construction/
JAY R M. ACOB
REGION IV-A Rehabilitation of Flood Mitigation Facilities within
CROSS SECTION PREPARED :
ENGINEER II
CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL CS 16
QUEZON II DISTRICT ENGINEERING OFFICE
LUCENA CITY
Major River Basins and Principal Rivers, Construction
of Slope Protection along Iyam River, Barangay Cotta
Sta. 1+060 Sta. 1+200 ENGINEER II CHIEF, PLANNING AND DESIGN SECTION EINGINEER III
OIC - OFFICE OF THE ASSISTANT
ASSISTANT DISTRICT ENGINEER 3 4 17
MARK JAY E. ILAO DATE : DATE : OIC - OFFICE OF THE DISTRICT ENGINEER
(Phase I), Lucena City, Quezon ENGINEER II DATE : DISTRICT ENGINEER DATE :
AREA Cut and Fill
41.447
42.169
-26.215
-32.965
AFILL= 2.091 WATER LEVEL
ELEV=42
AFILL= 6.223
F.G. = 45.99
1+268
1+260
45.688
-30.257
42.243 AREA Cut and Fill
AFILL= 2.091
ELEV=42 WATER LEVEL
40.730
F.G. = 46.04 -22.128
AFILL= 7.401
1+240
47.471
-28.559
-24.157
1+220
PROJECT NAME & LOCATION : SHEET CONTENTS : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES OO2: Protect Lives and Properties Against Major
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS Floods, Flood Management Program, Construction/
JAY R M. ACOB
REGION IV-A Rehabilitation of Flood Mitigation Facilities within CROSS SECTION PREPARED :
ENGINEER II
CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL CS 17
QUEZON II DISTRICT ENGINEERING OFFICE
LUCENA CITY
Major River Basins and Principal Rivers, Construction
of Slope Protection along Iyam River, Barangay Cotta
Sta. 1+220 Sta. 1+268 ENGINEER II CHIEF, PLANNING AND DESIGN SECTION EINGINEER III
OIC - OFFICE OF THE ASSISTANT
ASSISTANT DISTRICT ENGINEER 44 17
MARK JAY E. ILAO DATE : DATE : OIC - OFFICE OF THE DISTRICT ENGINEER
(Phase I), Lucena City, Quezon ENGINEER II DATE : DISTRICT ENGINEER DATE :