Iyam River Flood Mitigation Design

This document is the index of drawings for a 2021 flood mitigation project along the Iyam River in Lucena City, Philippines. It includes 17 sheets covering: a title page, index of drawings, key maps, general notes, quantities summary, roadway design standards, pavement layout, typical cross sections, structural details, plan and profile, and cross sections. The project involves constructing slope protection along 528 linear meters of the Iyam River from station 0+740 to 1+268 to protect lives and property from major floods.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
502 views17 pages

Iyam River Flood Mitigation Design

This document is the index of drawings for a 2021 flood mitigation project along the Iyam River in Lucena City, Philippines. It includes 17 sheets covering: a title page, index of drawings, key maps, general notes, quantities summary, roadway design standards, pavement layout, typical cross sections, structural details, plan and profile, and cross sections. The project involves constructing slope protection along 528 linear meters of the Iyam River from station 0+740 to 1+268 to protect lives and property from major floods.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 17

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS & HIGHWAYS


REGION IV-A
QUEZON 2ND DISTRICT ENGINEERING OFFICE
LUCENA CITY

C.Y. 2021 PROJECT


DETAILED ENINEERING DESIGN PLAN FOR
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD
MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD
MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS,
CONSTRUCTION OF SLOPE PROTECTION ALONG IYAM RIVER, BARANGAY COTTA
(PHASE I), LUCENA CITY, QUEZON
STATION LIMIT
STA. 0 + 740.00 - STA. 1+ 268.00
L =528.00 L.M.

SUBMITTED: RECOMMENDED: APPROVED:

FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL


CHIEF, PLANNING AND DESIGN SECTION ENGINEER III ASSISTANT DISTRICT ENGINEER
DATE: OIC - OFFICE OF THE ASSISTANT DISTRICT ENGINEER OIC - OFFICE OF THE DISTRICT ENGINEER
DATE: DATE:
I N D E X O F D R A W I N G S

TITLE SET NO. SHEET NO.


A. GENERAL
TITLE PAGE G-1 1
INDEX OF DRAWINGS G-2 2
KEY MAP / LOCATION MAP / VICINITY MAP / LAYOUT PLAN G-3 3
GENERAL NOTES G-4 4
SUMMARY OF QUANTITIES G-5 5

B. ROADS
B.1. ROADWAY SECTION
STANDARDS FOR HORIZONTAL AND VERTICAL CURVES R-1 6
DESIGN PARAMETERS AND PAVEMENT LAYOUT PLAN R-2 7
TYPICAL CROSS SECTION, SECTION SHOWING DETAIL OF COFFERDAMING,
PARAPET BLOCKS ENLARGE SECTION, RUBBLE CONCRETE ENLARGE SECTION R-3 8
CRIB WALL & GROUTED RIPRAP DETAIL R-4 9
SANITATION TENT PLAN R-5 10
DETAILED PLAN OF FIELD OFFICE R-6 11
PROJECT BILLBOARD R-7 12

B.2. PLAN & PROFILE


PLAN AND PROFILE ( STA. 0 + 740.00 - STA. 1 + 268.00) PP-1 13

C. CROSS - SECTIONS
CROSS - SECTION ( STA. 0 + 740.00 - STA. 0 + 880.00) CS-1 14
CROSS - SECTION ( STA. 0 + 900.00 - STA. 1 + 040.00) CS-2 15
CROSS - SECTION ( STA. 1 + 060.00 - STA. 1 + 200.00) CS-3 16
CROSS - SECTION ( STA. 1 + 220.00 - STA. 1 + 268.00) CS-4 17

PROJECT NAME & LOCATION : SHEET CONTENTS : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES OO2: Protect Lives and Properties Against Major
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS JAY R M. ACOB
REGION IV-A
Floods, Flood Management Program, Construction/
Rehabilitation of Flood Mitigation Facilities within
ENGINEER II
CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL G 2
INDEX OF DRAWING PREPARED :
QUEZON II DISTRICT ENGINEERING OFFICE
LUCENA CITY
Major River Basins and Principal Rivers, Construction
of Slope Protection along Iyam River, Barangay Cotta
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION EINGINEER III
OIC - OFFICE OF THE ASSISTANT
ASSISTANT DISTRICT ENGINEER 2 5 17
MARK JAY E. ILAO DATE : DATE : OIC - OFFICE OF THE DISTRICT ENGINEER
(Phase I), Lucena City, Quezon ENGINEER II DATE : DISTRICT ENGINEER DATE :
GENERAL CONSTRUCTION NOTES

1.0 SPECIFICATIONS 8.0 CONCRETE 9.4 UNLESS OTHERWISE SHOWN ON THE DRAWINGS, THE CLEAR DISTANCE BETWEEN
1.1 ALL WORKS SHALL COMPLY WITH THE "DPWH STANDARD SPECIFICATIONS FOR 8.1 CONCRETE STRENGTH BY CLASS. PARALLEL BAR SHALL NOT BE LESS THAN THE NOMINAL DIAMETER OF THE BARS
HIGHWAYS, BRIDGES AND AIRPORTS", 2013 EDITION. NOT 1 - 1/3 TIMES THE MAXIMUM SIZE OF THE COARSE AGGREGATE WHEN
28 DAYS CYLINDER STRENGTH MAX SIZE OF COARSE AGGREGATE
CLASS mm. ( in ) REINFORCEMENT IN THE BEAMS OR GIRDER IS PLACED IN TWO OR MORE LAYERS.
2.0 DIMENSIONS MPa PSi
A 20.70 3,000 38 ( 1 - 1/2 ) THE CLEAR DISTANCE BETWEEN LAYERS SHALL NOT BE LESS THAN 25mm. NOR ONE
2.1 DISTANCE BETWEEN HORIZONTAL CONTROL POINTS INCLUDING REFERENCE POINTS B 16.50 2,400 50 ( 2 ) BAR DIAMETER AND THE BARS IN THE UPPER LAYER SHALL BE PLACED DIRECTLY
ARE MEASURED AND EXPRESSED IN METER. C 20.70 3,000 12.7 ( 1/2 )
ABOVE IN THE BOTTOM LAYER.
D 37.70 5,000 19 ( 3/4 )
2.2 UNLESS OTHERWISE SPECIFIED, DIMENSIONS OF PIPES, BOX CULVERTS, BRIDGES
LEAN 9.90 1,400 9.5 EXCEPT OTHERWISE SHOWN ON THE DRAWINGS, MINIMUM CONCRETE COVER SHALL
AND OTHER STRUCTURES ARE MEASURED AND EXPRESSED IN MILLIMETERS.
BE PROVIDED FOR REINFORCEMENT AS FOLLOWS.
2.3 ALL OTHER DIMENSIONS ARE EXPRESSED IN METERS. 8.2 ALL EXPOSED CONCRETE EDGES SHALL BE CHAMFERED OR AS DIRECTED
BY THE ENGINEER.
3.0 STATIONING
3.1 STATIONING OF ROADS BRIDGES, RCPC AND OTHER STRUCTURES AND ELEMENTS OF 9.0 REINFORCING STEEL MINIMUM CLEAR
MAX SIZE OF COARSE AGGREGATE mm. ( in )
HORIZONTAL AND VERTICAL CURVES SHOWN ON THE PLAN ARE RECKONED FROM 9.1 THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO THE ENGINEER FOR COVER, mm. (in)
THE ROADWAYS CENTERLINE. CONCRETE IN A MARINE ENVIRONMENT OR CONCRETE
APPROVAL PRIOR TO FABRICATION. SHOP DRAWINGS SHOULD SHOW DETAILS FOR CAST AGAINST AND PERMANENT EXPOSED TO EARTH. 75 ( 3 )
3.2 STATIONS ARE LOCATED AT EVERY 100.00m., AT EVERY CULVERT AND BRIDGE FABRICATION AND FOR PLACING REINFORCING STEEL. ONLY THOSE NECESSARY FOR CONCRETE EXPOSED TO EARTH OR WEATHER
APPROACH, AND AT EVERY PARTICULAR POINT OF HORIZONTAL GEOMETRY. THE PROPER LOCATION OF THE STEEL ARE REQUIRED ON THE DRAWINGS. BENDING PRIMARY REINFORCEMENT 50 ( 2 )
STIRRUPS, TIES & SPIRAL 40 ( 1 - 1/2 )
DETAILS MAY BE SHOWN ON A SEPARATE SHEET. CONCRETE NOT EXPOSED TO WEATHER OR IN
4.0 HORIZONTAL AND VERTICAL ALIGNMENT CONTACT WITH GROUND
9.2 NO MORE THAN ONE BAR IN THREE SHALL BE SPLICED AT THE SAME SECTION
4.1 NO ALTERATION / CHANGE IN ALIGNMENT SHALL BE MADE UNLESS EXISTING FIELD PRIMARY REINFORCEMENT 40 ( 1 - 1/2 )
UNLESS OTHERWISE SHOWN SPLICING SHALL BE KEPT TO A MINIMUM AND SHOULD STIRRUPS, TIES & SPIRAL 25 ( 1 )
CONDITIONS SO WARRANT AND ONLY UPON APPROVAL BY THE ENGINEER. CONCRETE DECK SLABS
BE STAGGERED AND LAPPED NOT LESS THAN 40 BAR DIAMETER UNLESS OTHERWISE
4.2 FINISHED GRADE ELEVATION SHOWN ON PLAN AND PROFILE SHEETS REFERS TO THE TOP REINFORCEMENT 50 ( 2 )
SHOWN ON DRAWING. WHERE THE CLEAR DISTANCE BETWEEN LAPPED BARS DO BOTTOM REINFORCEMENT 26 ( 1 )
FINISHED GRADE LEVEL AT CENTER AS SHOWN ON TYPICAL ROAD SECTION.
NOT MEET THE REQUIREMENTS IN ITEM 12.4 THE CONTRACTOR SHALL USED
4.3 GROUND LEVEL SHOWN ON THE PLAN AND PROFILE SHEETS REFERS TO THE
CRANKED SPLICES AS DETAILED BELOW.
ELEVATION OF ORIGINAL GROUND ALONG THE CENTERLINE OF THE PROJECT ROAD.
ALL CORRECTIONS / CHANGES IN GRADIENTS WILL BE DONE ON THE ORIGINAL 10.0 PAVEMENT DESIGN
MIN. 4
GROUND UPON THE APPROVAL OF THE ENGINEER. OFFSET 10.1 ADOPT 0.15m. thk. PCCP AS PER D.O. 40 SERIES 2012
MAX. d+3

5.0 ROAD CONNECTIONS AND SHOULDER IMPROVEMENT 20mm. Ø MIN


DIAMETER =
5.1 APPROACHES AND CONNECTIONS SHALL BE CONSTRUCTED BY THE CONTRACTOR 36mm. Ø MAX
AS SHOWN ON THE PLAN OR AS DIRECTED BY THE ENGINEER IN SUCH MANNER AS TO
ENSURE SMOOTH CONNECTION AND GOOD RIDING QUALITY.
5.2 EXACT LOCATIONS OF INTERSECTING ROADS WHERE ( NO. 5.1 ) ABOVE APPLIES,
9.3 BAR SHALL BE BENT COLD, NO BAR PARTIALLY EMBEDDED IN CONCRETE SHALL BE
SHALL BE DETERMINED IN THE FIELD BY THE ENGINEER.
FIELD BENT, UNLESS SHOWN ON THE DRAWING OR ESPECIALLY PERMITTED BY THE
ENGINEER. HOOKS SHALL BE FABRICATED AS SHOWN BELOW UNLESS OTHERWISE
6.0 REMOVAL OF EXISTING STRUCTURE AND OBSTRUCTION
INDICATED ON THE DRAWING BAR SHALL BE BENT AROUND A PIN WITH A MINIMUM
6.1 PORTIONS OF EXISTING UTILITIES, SUCH AS WATER MAIN LINES, ELECTRICAL POWER
DIAMETER D.
LINES & POLES, IRRIGATION CHANNELS, TELEPHONE POST AND TRUNK LINES. ETC.
THAT MAY CAUSE OBSTRUCTION TO THE CONSTRUCTION OF THIS PROJECT SHALL BE SIZES OF 90 - DEGREE AND 180 - DEGREE HOOKS
RELOCATED BY THE ENTITY OR OWNER CONCERNED. EXTREME PRECAUTION SHALL
BE EXERCISED AND DAMAGE THEREOF SHALL BE ON THE ACCOUNT OF
CONTRACTOR.

7.0 DRAINAGE STRUCTURES 90° 180°


7.1 EXACT LOCATIONS, SLOPES, OUTFALLS AND INVERT ELEVATIONS OF DRAINAGE PIN DIAMETER D = 6d FOR 10mm. Ø THRU 25mm. Ø
STRUCTURES SHALL BE CHECKED IN THE FIELD BY THE ENGINEER. MINOR D = 8d FOR 30mm. THRU 36mm. Ø
ADJUSTMENTS MAY BE MADE TO SUIT ACTUAL FIELD CONDITIONS WITH APPROVAL SIZES FOR STIRRUPS AND TIE HOOKS
OF THE ENGINEER.
7.2 ANY REVISION, REMOVAL, CLEANING AND / OR RE - LAYING OF DRAINAGE
STRUCTURES AS DIRECTED BY THE ENGINEERS TO SUIT EXISTING FIELD CONDITIONS
SHALL BE CONSIDERED AS SUBSIDIARY WORK PERTAINING TO OTHER CONTRACT
ITEMS. NO DIRECT PAYMENTS SHALL BE MADE FOR THIS WORK UNLESS OTHERWISE
SPECIFICALLY IDENTIFIED FOR PAYMENT IN THE BID SCHEDULE.
7.3 EXISTING DRAINAGE STRUCTURES OR PART THEREOF REMOVED BY THE PIN DIAMETER D = 4d FOR 16mm. Ø AND SMALLER
CONTRACTOR THAT ARE STILL SERVICEABLE SHALL TURNED OVER THE D = 5d FOR 20mm. AND 25mmØ
GOVERNMENT AND SHALL BE DEPOSITED AT A PLACE WITHIN THE PROJECT SITE NOTES: BENDS AND HOOKS IN STIRRUPS OR TIES MAY BE BENT TO THE
DESIGNATED BY THE ENGINEER WITHOUT ANY EXTRA COMPENSATION. EXTREME DIAMETER OF THE REINFORCING BAR CLOSED THEREIN.
PRECAUTION SHALL BE EXERCISED BY THE CONTRACTOR NOT TO DAMAGE THESE
MATERIALS DURING THE REMOVAL AND HANDLING.

PROJECT NAME & LOCATION : SHEET CONTENTS : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES OO2: Protect Lives and Properties Against Major
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS JAY R M. ACOB
REGION IV-A
Floods, Flood Management Program, Construction/
Rehabilitation of Flood Mitigation Facilities within
ENGINEER II
CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL G 3
GENERAL CONSTRUCTION NOTES PREPARED :
QUEZON II DISTRICT ENGINEERING OFFICE
LUCENA CITY
Major River Basins and Principal Rivers, Construction
of Slope Protection along Iyam River, Barangay Cotta
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION EINGINEER III
OIC - OFFICE OF THE ASSISTANT
ASSISTANT DISTRICT ENGINEER 3 5 17
MARK JAY E. ILAO DATE : DATE : OIC - OFFICE OF THE DISTRICT ENGINEER
(Phase I), Lucena City, Quezon ENGINEER II DATE : DISTRICT ENGINEER DATE :
REGION IV-A

LUCENA CITY
REPUBLIC OF THE PHILIPPINES

QUEZON II DISTRICT ENGINEERING OFFICE


DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
KEY MAP

PROJECT NAME & LOCATION :

(Phase I), Lucena City, Quezon


THIS SITE

OO2: Protect Lives and Properties Against Major

Rehabilitation of Flood Mitigation Facilities within


Floods, Flood Management Program, Construction/

of Slope Protection along Iyam River, Barangay Cotta


Major River Basins and Principal Rivers, Construction
SHEET CONTENTS :
LOCATION MAP

KEY MAP

VICINITY MAP
LAYOUT PLAN
THIS SITE

LOCATION MAP
127

178
WATER
41.285
180
WATER
42.651
WATER
41.684
0+
54
0

179
181
WATER
42.636
WATER
41.853

128

WATER
41.407
0+
56
0

177

WATER
42.320

176
175
174
WATER
42.320
WATER
42.621
42.023

173

WATER
41.400
163

RIVER
38.256
0+
58
0

185

WATER
41.900
183
184
182
WATER
WATER
42.323
41.900
WATER
41.900

129

WATER
41.123

DRAFTED :
0+
60
0

PREPARED :
193
189
191
192
WATER
187
188 44.532
186 WATER
WATER
WATER
WATER
42.032 44.532
44.932
WATER 42.032
42.391
190
41.411
WATER
41.411

130

WATER
41.101
0+
62
0
0+
64
0

131
132
WATER
41.091 WATER
41.447

164
197 199
RIVER 195
196
0

38.364
WATER WATER
44.921
WATER
WATER44.631
194 44.631
44.921

WATER
41.100
0+66

200

133 WATER
0

44.813

WATER
41.322

ENGINEER II
ENGINEER II
0+68

134

WATER
41.444

210

WATER
40.120

135 201

WATER
WATER
41.396 44.887

JAY R M. ACOB
0+700

MARK JAY E. ILAO


136
202
0+720

ENDRR WATER
41.232 44.723

138

RR
STA. 0 + 740.00

44.907

137
141
WATER 142
140
41.413 RR
46.253
139 RR
RR 47.239
45.515
RR
43.017

143

RR
46.709
0+740

144

G
43.932

145

G
46.891
0+760

165

RIVER
38.546
BEGINNING OF PROJECT

0+780
0+800

REVIEWED :
146
198
X
X 46.510
41.411

147

X
47.170
0+820 0+840

204

DATE :
166
X

RIVER 41.219
38.245
0+860

154

X
45.482

153

X
45.193

ENGINEER II
205

X
41.391
0

152

X
48.783

324

323 R
45.904

R
0+88

44.377

322

321 R
43.124

R
43.097

320
319
318 R
R 42.675
41.849
R
41.246

203

X
45.193
0

209

X
44.369

341 208

WATER X
39.638 43.123

206

X
167 41.456

RIVER
38.369
0+90

207

RIVER
39.136

)
RETE WALL
OF CONC
BM2(TOP
ELEV: 48.179
0+

337

RILESCONCRETE
45.883
336
92

RILESCONCRETE
340 46.305

BM
325
48.179
0

RILES
48.369
326

RILES
48.360

151
328
327
RAIL
48.290 RILESCONCRETE
43.034
RILESCONCRETE
46.712
150

RAIL
48.262

330
329

RILESCONCRETE
RILESCONCRETE
46.787
42.861

334

333 R
47.142
R
46.643

331
332

RILESCONCRETE
43.137
46.752
0
94

310

R
46.667
0+

311
R

44.717

307

X
39.908

308

X
41.878 309
0

X
42.946
0+96

317

R
46.221

609

WATER
38.741

316
R

46.387
0
0+98

315

R
44.894

314

R
46.337

DATE :
0

313

X
42.308

312

X
SUBMITTED :
46.077
1+00

610

WATER
38.549
1+020

303

X
46.084

304

X
46.168
305

X
46.442

300
301
302
X X
41.950 42.708 X
42.811

306

X
39.841
1+040 1+060

STA. 0 + 740

342

WATER
38.023
1+080

299

X
44.237
296

X 298 297
40.164
X X
41.279 42.052
1+100

LAYOUT PLAN

CHIEF, PLANNING AND DESIGN SECTION


1+120

CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ


BEGINNING OF PROJECT
1+140

295

X
38.804

292
293
294
X
WATER
42.089 X 44.773
44.356

291

X
44.949
0

DATE :
1+16

211
ER)
SET_BASE
45.535
WITH WASH
BM3(NAIL
ELEV: 45.535
0
1+18

288

ENDWALL
42.143

290
289
X
X 40.071
40.595
VICINITY MAP
RECOMMENDED :

343

WATER
37.836
1+220 1+200

608
284

WATER
42.236 WAL
47.668

281
285
WAL
WAL 283
50.548
48.051 282
WAL
WAL
48.190
49.727
286

WAL
48.028

287

WAL
47.663

279

X
45.688

280

WAL
47.450

277
1+240

X
45.682
278

WAL
46.129
276

X
46.234

275 274

X X
43.167 43.508 273

WAL
43.484
EINGINEER III

607

WATER
42.256

272
1+260

WAL
44.063

271

270
WAL
42.218
WAL
41.555

269

WAL
42.171
DISTRICT ENGINEER
WILFREDO L. RACELIS
1+280

OIC - OFFICE OF THE ASSISTANT

268

WAL
42.205
1+300
1+320

267

WAL
40.239

265

WAL
264 266
41.294
WAL
WAL
42.15945.645

344

WATER
38.505
340
1+

262
261
X 263
41.526
WALL
42.216
WAL
46.016
0
1+36

DATE :
APPROVED :
0
1+38

256

X
40.428

257

258
RIPRAP
41.646 259
RIPRAP
42.424
RIPRAP
46.739

260

START
42.058
00

255
4

STARTRIPRAP
41.154
1+

STA. 1 +268.00

243

X
42.332
244

X
42.592

246
245

F
X
48.962
46.480
0
42
1+

END OF PROJECT

253

X
42.428
0
44
1+

345

249
WATER
38.080
X
42.385

251
252
X
44.803
X
45.911

247

PINAGTAASAN
40.360

248

PINAGTAASAN
40.362

250

X
46.559
0
46
1+
STA. 1 + 268.00

254
X

38.776
0
END OF PROJECT

48
1+

MA. CHYMBELIN D. IBAL


ASSISTANT DISTRICT ENGINEER
0
50
1+

OIC - OFFICE OF THE DISTRICT ENGINEER

242

X
46.073

240
239
X
42.400
X
43.348

241

X
43.858
G
4 5
SET NO.

4
17
SHEET NO.
SUMMARY OF QUANTITIES
ITEM DESCRIPTION UNIT ORIGINAL QTY. REMARKS
A. FACILITIES FOR THE ENGINEER
A.1.1 (3) Construction of Field Office for the Engineer l.s. 1.00
Provision of Furnitures/Fixtures, Equipment & Appliances
A.1.1 (11) l.s. 1.00
for the Field Office for the Engineer
A.1.4 (1) Provision of Progress Photographs each 300.00
B. OTHER GENERAL REQUIREMENTS
B.5 Project Billboard / Signboard ea. 2.00
B.7(2) Occupational Safety and Health Program l.s. 1.00
B.9 Mobilization / Demobilization l.s. 1.00
B.15(1) Detour/Acess Road l.s. 1.00
C. EARTHWORKS
100(2) Clearing and Grubbing l.s. 1.00
100(3)a1 Structure Excavation (Common Soil) cu.m. 2,831.08
Shoring, cribbing and related works
103(5)b l.s. 1.00
(Cribbing/Cofferdamming)

104(1)2 Embankment from Borrow (Common Soil) cu.m. 6,623.45 Compacted Volume

104(7) Embankment from Structure Excavation cu.m. 2,562.12 Compacted Volume

105(1)a Subgrade Preparation (Common Material) sq.m. 2,640.00


D. SUBBASE AND BASE COURSE
200(1) Aggregate Subbase Course cu.m 396.00
E. SURFACE COURSE
Portland Cement Concrete Pavement (Unreinforced)
311(1)e1 sq.m. 2,640.00
(0.15m thick, 14days)
G. DRAINAGE AND SLOPE PROTECTION STRUCTURES
404(1)a Reinforcing Steel, Grade 40 kg. 66,966.23
405(1)a3 Structural Concrete (20.68 Mpa, Class A @ 28 days) cu.m. 791.51
505(2)a Grouted Riprap (Class A) cu.m. 933.77
507(1) Rubble Concrete cu.m. 1,267.20

NOTE:

1. THE STAKE OUT SURVEY BETWEEN THE CONTRACTOR AND


GOVERNMENT SHALL BE CONSIDERED AS THE FINAL PLAN.
2. THE ITEM OF WORKS IDENTIFIED CORRESPONDING WITH
COMPUTED QUANTITIES IN THE APPROVED JOINT AS-STAKE
SURVEY PLANS WILL BE THE BASIS OF PAYMENT.
3. THE THICKNESS OF THE ROAD STRUCTURAL LAYERS WAS
DESIGNED AND APPROVED BY THE QUEZON 2nd DISTRICT
ENGINEERING OFFICE, LUCENA CITY

PROJECT NAME & LOCATION : SHEET CONTENTS : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES OO2: Protect Lives and Properties Against Major
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS JAY R M. ACOB
REGION IV-A
Floods, Flood Management Program, Construction/
Rehabilitation of Flood Mitigation Facilities within
ENGINEER II
CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL G 5
SUMMARY OF QUANTITES PREPARED :
QUEZON II DISTRICT ENGINEERING OFFICE
LUCENA CITY
Major River Basins and Principal Rivers, Construction
of Slope Protection along Iyam River, Barangay Cotta
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION EINGINEER III
OIC - OFFICE OF THE ASSISTANT
ASSISTANT DISTRICT ENGINEER 5 5 17
MARK JAY E. ILAO DATE : DATE : OIC - OFFICE OF THE DISTRICT ENGINEER
(Phase I), Lucena City, Quezon ENGINEER II DATE : DISTRICT ENGINEER DATE :
HORIZONTAL CURVE (CIRCULAR) VERTICAL PARABOLIC CURVE
SCALE : NTS SCALE : NTS

VPI

PI
I - g%

+g
% VPT

VPC
E

L/2 L/2

L
25 m.

PC PT SYMMETRICAL
SCALE : NTS
VPI
R R
MO - g%
+ g%

VPT

VPC

HORIZONTAL CURVE (CIRCULAR) VERTICAL PARABOLIC CURVE


LEGEND: LEGEND:

PI = POINT OF INTERSECTION VPI = VERTICAL POINT OF INTERSECTION


I = INTERSECTION ANGLE (CENTRAL ANGLE) VPC = VERTICAL POINT OF CURVATURE UNSYMMETRICAL
T = TOTAL TANGENT DISTANCE VPT = VERTICAL POINT OF TANGENCY
R = HORIZONTAL RADIUS G = GRADE IN PERCENT SCALE : NTS
Lc = LENGTH OF CIRCULAR CURVE MO = MIDDLE ORDINATE
E = TOTAL EXTERNAL DISTANCE X = DISTANCE FROM VPC OR VPT TO ANY POINT OF CURVE
D = DEGREE OF CURVE (ARC DEFINITION) Yx = VERTICAL OFFSET IN METERS
PC = POINT OF CURVATURE A = ALGEBRAIC DIFFERENCE OF GRADES
PT = POINT OF TANGENCY
NOTE: NO HORIZONTAL CURVE IS REQUIRED WHEN
NOTE: NO HORIZONTAL CURVE IS REQUIRED WHEN THE
THE ALGEBRAIC DIFFERENCE IN GRADES IS LESS THAN 0.50%
INTERSECTION (CENTRAL) ANGLE I IS LESS THAN ONE
DEGREE ( 1 - 00 )
IN ANY VERTICAL PARABOLIC CURVE
SYMMETRICAL UNSYMMETRICAL
AL AL1L2
MO = MO =
8.00 200L
x2 (MO) x2 (MO)
Yx = Yx =
( L / 2 )2 ( L )2or ( L ) 2

PROJECT NAME & LOCATION : SHEET CONTENTS : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES OO2: Protect Lives and Properties Against Major
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS Floods, Flood Management Program, Construction/
JAY R M. ACOB
REGION IV-A Rehabilitation of Flood Mitigation Facilities within STANDARDS FOR HORIZONTAL PREPARED :
ENGINEER II
CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL R 6
QUEZON II DISTRICT ENGINEERING OFFICE Major River Basins and Principal Rivers, Construction AND VERTICAL CURVES ENGINEER II CHIEF, PLANNING AND DESIGN SECTION EINGINEER III ASSISTANT DISTRICT ENGINEER 1 7 17
LUCENA CITY of Slope Protection along Iyam River, Barangay Cotta DATE : DATE : OIC - OFFICE OF THE ASSISTANT OIC - OFFICE OF THE DISTRICT ENGINEER
(Phase I), Lucena City, Quezon
MARK JAY E. ILAO DISTRICT ENGINEER
ENGINEER II DATE : DATE :
PAVEMENT DESIGN PARAMETERS

PARAMETER DESIGN REQUIREMENT

1.) TRAFFIC ( FOR 20 YEARS DESIGN LIFE ) 36.08


DESIGN ESAL
2.) DESIGN CBR 6.64%
SUBGRADE CBR 25.00%
SUBBASE CBR 30.00%

3.) RELIABILITY
R 85.00%
Z R - 1.037

4.) OVERALL STANDARD DEVIATION


S 0.35
O
SHOULDER SHOULDER
5.) DESIGN SERVICE ABILITY LOSS
2.00 Contraction Joints with Dowel Bars( Deformed Bar)
PSI L= 750 mm , Dia. 16mm @ 750mm O.C
6.) PCC MODULUS OF RUPTURE
S'
C
635.55 psi Contraction Joints with Dowel Bars ( Plain Bar)
L= 750 mm , Dia. 16mm @ 600mm O.C @
7.) ELASTIC MODULUS OF PCCP Every End of Pouring
6 Parapet Blocks
E
C 3.37 x 10 psi

8.) LOSS OF SUPPORT


L
C 1.00

9.) RESILIENT MODULUS OF ROAD BED MATERIAL PAVEMENT LAYOUT PLAN FOR PATHWAY
M
R 9,966.26 psi SCALE 1 : 10 M
M
RBM 30.00%

10.) DRAINAGE COEFFICIENT


(FOR CHECKING PURPOSES ONLY) 1.0
Cd

11.) SUBBASE THICKNESS Parafet Blocks


150 mm
D CB

12.) COMPOSITE MODULUS OF SUBGRADE REACTION


K CB
-

13.) EFFECTIVE MODULUS SUBGRADE REACTION


K 2,049.74 psi

14.) LOAD TRANSFER COEFFICIENT


J 3.20
Contraction Joints with
15.) SLAB THICKNESS Dowel Bars ( Deformed Bar) Dowel Bars ( Deformed Bar)
D 150.00 mm L= 750 mm , Dia. 16mm @ 750mm O.C
L= 750 mm , Dia. 16mm @ 750mm O.C Must Be
Placed Before Pouring of Reinforced Structure (Beam)
STANDARD GRADIENTS OF CUT SLOPES

SOIL FOR THE NEXT STAGE OF POURING SECTION


SOFT ROCK
COMMON SOIL
Dowel Bars ( Deformed Bar)
CLASSIFICATION HARD ROCK RIPPABLE FIXED SLIDING
L= 750 mm , Dia. 16mm @ 750mm O.C Must Be 25mm
METAL DOWEL CAP GAUGE No. 18
SLOPE Placed Before Pouring of Reinforced Structure (Beam)
0.25:1 TO 0.5:1 0.5:1 TO 1:1 1 :1 TO 1.5:1 TO BE PLACED ON EACH DOWEL BAR
( HOR : VER )
ON ALTERNATE END

T=SLAB DEPTH
STANDARD GRADIENTS OF EMBANKMENT SLOPES
HALF OF THE BAR ON THE SIDE OF THE
NEW PAVEMENT METAL DOWEL CAP SHALL BE PAINTED
SOIL CLASSIFICATION COMMON FILL MATERIAL
W/ RED LEAD AND THEN GREASED

SLOPE ( HOR : VER ) 1.50 : 1 TO 2 : 1

DETAIL OF EXPANSION JOINT (DOWELLED) AT


CERTAIN INTERSECTION AND STRUCTURES
NOTES: NOT TO SCALE

SLOPE SHOULDER
A. AT NORMAL SECTION, SLOPE OF SHOULDER SHALL
BE 3% (MIN.) SLOPPING DOWNWARDS AWAY FROM
THE EDGE OF THE PAVEMENT.

B. IF THE SUPER ELEVATION (e) IS LESS THAN OR


EQUAL TO 3% SLOPE OF INNER SHOULDER (ei.)
SHALL BE 3 (MIN.)

C. IF THE SUPER ELEVATION (e) IS BETWEEN 4% TO


8% SLOPE OF INNER SHOULDER (ei.) SHALL BE DETAIL OF CONNECTION OF REINFORCED STRUCTURE
SAME AS (e).
TO PCCP (DOWELLED) AND PARAFET BLOCKS NOTE:
D. ALGEBRAIC DIFFERENCE OF CROSS-OVER BETWEEN
SUPER ELEVATION (e) AND SLOPE OF OUTER SHOULDER TRANSVERSE CONSTRUCTION (CONTACT) JOINT
NOT TO SCALE
(s) SHALL NOT BE MORE THAN 7%. SHALL BE PROVIDED AT THE END OF ANY RUN WHERE
LAYING OF CONCRETE HAS BEEN STOPPED FOR THIRTY
E. IN PLACES WHERE SUPER ELEVATION (e) IS GREATER (30) MINUTES OR LONGER.
THAN 7-8%, INNER SHOULDER (ei) MUST BE PAVED. TRANSVERSE CONSTRUCTION JOINT WHICH OCCUR
AT LOCATION OF WEAKENED PLANE JOINT SHOULD BE
BUT JOINTS WITH DOWELS. IF JOINTS OCCURS IN THE
MIDDLE THIRD OF THE WEAKENED JOINT INTERVAL
(1500-3000mm) IT SHOULD BE KEYED JOINTS WITH
TIE BARS.

PROJECT NAME & LOCATION : SHEET CONTENTS : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES OO2: Protect Lives and Properties Against Major
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS Floods, Flood Management Program, Construction/
JAY R M. ACOB
REGION IV-A Rehabilitation of Flood Mitigation Facilities within DESIGN PARAMETERS AND PREPARED :
ENGINEER II
CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL R 7
QUEZON II DISTRICT ENGINEERING OFFICE
LUCENA CITY
Major River Basins and Principal Rivers, Construction
of Slope Protection along Iyam River, Barangay Cotta
PAVEMENT LAYOUT PLAN ENGINEER II CHIEF, PLANNING AND DESIGN SECTION EINGINEER III ASSISTANT DISTRICT ENGINEER 2 7 17
DATE : DATE : OIC - OFFICE OF THE ASSISTANT OIC - OFFICE OF THE DISTRICT ENGINEER
(Phase I), Lucena City, Quezon
MARK JAY E. ILAO DISTRICT ENGINEER
ENGINEER II DATE : DATE :
"A" "B"
"A" "B"
1
1 1
1

1
1
2
2

SECTION SHOWING PROPOSED REVETMENT CRIB WALL ,


EMBANKMENT & CONCRETING
3 SECTION SHOWING DETAIL OF COFFERDAMING
STA.0+740.00 - STA.1+268.00 L = 528.00 m. SCALE 1 : 50 MTS

L = 528.00 m.

1 TYPICAL CROSS SECTION


SCALE 1:50 MTS

CROSS SECTION

CROSS SECTION

"A" "B"

2 E N L A R G E S E C T I O N
SCALE NTS

4 PARAPET BLOCKS ENLARGE SECTION 5 RUBBLE CONCRETE ENLARGE SECTION


SCALE 1 : 20 MTS SCALE 1 : 20 MTS

PROJECT NAME & LOCATION : SHEET CONTENTS : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES OO2: Protect Lives and Properties Against Major
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS TYPICAL CROSS SECTION JAY R M. ACOB
REGION IV-A
Floods, Flood Management Program, Construction/
Rehabilitation of Flood Mitigation Facilities within
SECTION SHOWING DETAIL OF ENGINEER II
CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL R 8
COFFERDAMING PREPARED :
QUEZON II DISTRICT ENGINEERING OFFICE
LUCENA CITY
Major River Basins and Principal Rivers, Construction
of Slope Protection along Iyam River, Barangay Cotta
PARAPET BLOCKS ENLARGE SECTION ENGINEER II CHIEF, PLANNING AND DESIGN SECTION EINGINEER III
OIC - OFFICE OF THE ASSISTANT
ASSISTANT DISTRICT ENGINEER 3 7 17
RUBBLE CONCRETE ENLARGE SECTION MARK JAY E. ILAO DATE : DATE : OIC - OFFICE OF THE DISTRICT ENGINEER
(Phase I), Lucena City, Quezon ENGINEER II DATE : DISTRICT ENGINEER DATE :
TYPICAL BAR SCHEDULE
1
2 BAR SPACING
DIAGRAM BAR # SIZE Ø (mm)
1

1 CROSS BEAM DETAIL


SCALE 1:10 (A1)

2 COLUMN DETAIL
SCALE 1:10 (A1)

GENERAL NOTES FOR GROUTED RIPRAP :

1 ELEVATION OF CRIB RIPRAP 1. STONES SHALL BE CLEAN, HARD AND DURABLE AND SHALL
SCALE 1:40 BE SUBJECTED TO THE ENGINEER'S APPROVAL. ADOBE STONES
SHALL NOT BE USED AS MAIN MATERIALS UNLESS OTHERWISE
2 ELEVATION OF CRIB RIPRAP SPECIFIED. THE MINIMUM SIZE OF STONES TO BE USED SHALL BE
SCALE 1:40 0.005 cu.m IN VOLUME WITH SPECIFIC GRAVITY OF 2.50 AND NOT
LESS THAN 75% OF THE TOTAL VOLUME OF ROCK. EMBANKMENT
SHALL CONSISTS OF STONES 0.010 METER IN VOLUME. STONES
OBTAINED FROM EXCAVATION PERFORMED UNDER THIS CONTRACT
MAYBE USED IF QUALIFIED.

2. CONCRETE SHALL BE CLASS "B" IN ACCORDANCE WITH ITEM


405, STRUCTURAL CONCRETE OF THE SPECIAL PROVISIONS.

3. THE FOUNDATION BED SHALL BE EXCAVATED TO THE LINES


AND GRADES AS SHOWN IN THE PLANS AS DIRECTED BY THE
ENGINEER AND SHALL BE THOROUGHLY COMPACTED.
5
4. FALSEWORK / FORMWORK IF USED SHALL BE CONSTRUCTED
6 SO AS TO WITHSTAND THE STRESSES IMPOSED. FORMWORK USED
SHALL BE CONSTRUCTED WITH EFFICIENT STRENGTH, RIGIDLY AND
SHAPE AS TO LEAVE THE FINISHED WORKS TRUE TO THE
2 2
DIMENSIONS SHOWN ON THE PLANS AND WITH THE SURFACE
FINISHED AS SPECIFIED.
1 1

4 4

3 FOOTING DETAIL
SCALE 1:10 (B10)
3 3

6 6

5 5

5 ISOMETRIC DRAWING 6 SECTIONAL DETAIL OF CRIB RIPRAP


B-10 SCALE NTS (B10) B-10 SCALE NTS (B10)

PROJECT NAME & LOCATION : SHEET CONTENTS : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES OO2: Protect Lives and Properties Against Major
JAY R M. ACOB
9
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS Floods, Flood Management Program, Construction/
REGION IV-A Rehabilitation of Flood Mitigation Facilities within
ENGINEER II
CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL R
CRIB WALL AND GROUTED PREPARED :
QUEZON II DISTRICT ENGINEERING OFFICE
LUCENA CITY
Major River Basins and Principal Rivers, Construction
of Slope Protection along Iyam River, Barangay Cotta
RIPRAP DETAIL ENGINEER II CHIEF, PLANNING AND DESIGN SECTION EINGINEER III ASSISTANT DISTRICT ENGINEER 4 7 17
DATE : DATE : OIC - OFFICE OF THE ASSISTANT OIC - OFFICE OF THE DISTRICT ENGINEER
(Phase I), Lucena City, Quezon
MARK JAY E. ILAO DISTRICT ENGINEER
ENGINEER II DATE : DATE :
..\..\..\desktop\sanitation plan\sanitentsph masterfile v1.00_011.jpg

PERSPECTIVE

..\..\..\desktop\sanitation plan\sanitentsph masterfile v1.00_012 (new).jpg

..\..\..\desktop\sanitation plan\sanitentsph masterfile v1.00_002.jpg

SANITATION TENT PLAN


PROJECT NAME & LOCATION : SHEET CONTENTS : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES OO2: Protect Lives and Properties Against Major
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS JAY R M. ACOB
REGION IV-A
Floods, Flood Management Program, Construction/
Rehabilitation of Flood Mitigation Facilities within
ENGINEER II
CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL R 10
SANITATION TENT PLAN PREPARED :
QUEZON II DISTRICT ENGINEERING OFFICE
LUCENA CITY
Major River Basins and Principal Rivers, Construction
of Slope Protection along Iyam River, Barangay Cotta
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION EINGINEER III
OIC - OFFICE OF THE ASSISTANT
ASSISTANT DISTRICT ENGINEER 5 7 17
MARK JAY E. ILAO DATE : DATE : OIC - OFFICE OF THE DISTRICT ENGINEER
(Phase I), Lucena City, Quezon ENGINEER II DATE : DISTRICT ENGINEER DATE :
LEGEND & SYMBOLS:

HINGE
AWNING
WOODEN
WINDOW
REMOVABLE
BRACE STAND

SECTION DETAIL OF WINDOW


1/4" MARINE APEX OF ROOF RAFTER
PLYWOOD ON 26# CORR. G.I. ROOFING SHEETS

3.69 M.

3.69 M.
2" x 2" COCO 26# CORR. G.I. ROOFING SHEETS APEX OF ROOF RAFTER
APEX OF ROOF RAFTER
2" x 4" JAMB

3.69 M.
LUMBER FRAME

3.69 M.
TOP OF ROOF GIRT
5.45 M. 2.72 M. 3.63 M.
TOP OF ROOF GIRT 1/4" MARINE
TOP OF ROOF GIRT
3.69 M. PLYWOOD 3.69 M. 3.69 M. 3.69 M.

3.63 M. 5.45 M.

3.63 M. 5.45 M.
DOUBLE WALL

12.47 M.

12.47 M.
9.53 M.
2.77 M.
2.77 M. 1/4" MARINE
1/4" MARINE PLYWOOD

12.47 M.
1/4" MARINE

12.47 M.
PLYWOOD PLYWOOD
DOUBLE WALL W-2
DOUBLE WALL W-1 W-1

3.69 M.

3.69 M.
DOUBLE WALL
W-1 W-2
FINISHING FLOOR LINE FINISHING FLOOR LINE MARINE

3.69 M.
3.69 M.

3.69 M.
AWNING TYPE AWNING TYPE PLYWOOD FIN. FLR. LINE
1-SET D-1 FLUSH DOOR AWNING TYPE AWNING TYPE

0.69 M.

0.69 M.
WOODEN WINDOW WOODEN WINDOW D-1 WOODEN WINDOW

0.69 M.

0.69 M.
MARINE FIN. FLR. LINE WOODEN WINDOW FIN. FLR. LINE N.G.L
4" CHB ZOCALO WALL
2-SETS 1-SET PLYWOOD 4" CHB ZOCALO WALL
FLUSH TYPE DOOR
N.G.L 4" CHB ZOCALO WALL N.G.L
4" CHB ZOCALO WALL
SCHEDULE OF DOORS & WINDOWS RIGHT SIDE ELEVATION LEFT SIDE ELEVATION
FRONT ELEVATION REAR ELEVATION

GENERAL NOTES :

3.00M. 3.00M.
2" x 3" COCO LUMBER
PURLINS @ .80M.O.C.
PF CF w/ 2" x 2" COCO LUMBER
WF CLEATS FASCIA BOARD
HARDIFLEX

6.81 M.
26# CORR. G.I. ROOFING SHEETS 26# PLAIN G.I. RIDGE ROLL

3.63 M.
1/2 x 12"
1- 2" X 5" COCO LUMBER TOP CHORD CL 2- 2" x 5" COLLAR PLATE COCO LUMBER
W-1
2" x 3" COCO LUMBER 1- 2" x 5" KING POST COCO LUMBER
PURLINS @ .80M.O.C. 2- 2" x 4" BOT. CHORD COCO LUMBER
w/ 2" x 2" COCO LUMBER

3.00M.
BOARD 1- 3" x 5" ROOF GIRT CLEATS 2" x 2" COCO LUMBER HANGER @ 1.20M.O.C.
APEX OF ROOF RAFTER
3.00M.

RAFTER TRUSS

RAFTER TRUSS

RAFTER TRUSS
COCO LUMBER
4" CHB
WF 4" THK. SLAB FLOOR . 2.25
4" THK. SLAB M
FLOORING
WF
2.25 M.

0.80 M.
3.00M.
ON-FILL
W-2
4" CHB

W-1
WF 1- 3" x 5" ROOF GIRT 1/4" MARINE PLYWOOD
PF PF COCO LUMBER 1/2 x 12" CEILING BOARD ON
D-1 HARDIFLEX 2" x 2" CEILING JOIST @ .60M.O.C. 1- 3" x 5" ROOF GIRT
FASCIA BOARD w/ 2- 12mm MACHINE BOLT

3.63 M.
4" x 4" COCO LUMBER BOTHWAYS 4" x 4" COCO LUMBER
FOUNDATION PLAN 1.80m.
w/ NUTS & WASHERS
1/2 x 12" 0.60m. 3.00m. 0.60m.
FLOOR PLAN HARDIFLEX
FASCIA BOARD
2.72 M. 3.00M. 2.72 M.
1.27 M.
ROOF FRAMING PLAN DETAILS OF RAFTER TRUSS (3-SETS)
TOP OF ZOCALO OR CHB WALL

10mm HORZ'L. BARS

12.05 M.
@ .60M.O.C.

10mm VERT'L. BARS


2.40 M. @ .90M.O.C.

LEGEND & SYMBOLS: 4" x 4" COCO LUMBER POST

1/4" x 2" x 12" STEEL POST


N.G.L.

6.34 M.
STRAPS w/ 2-12mm MACHINE

2.54 M.
BOLTS w/ NUTS & WASHERS 1- 10mm CONT. MAIN BARS

4- 12mm VERT'L BARS


w/ 10mm TIES @ .20M.O.C. 4.44 M.
8.66 M.

DETAIL SECTION OF WALL FTG. (WF)


2.40 M.
0.50 M.

7.21 M.
2.40 M.

Sa 1.68 M.

4- 12mm VERT'L BARS


2.40 M. 0.50 M. w/ 10mm TIES @ .20M.O.C.
Sab 0.50 M.
4- 10mm BASE BARS
3.00 M.
FOR FOOTING @ BOTHWAYS
PLAN SECTION
Sabc
2.80 M.
8.97 M.

DETAIL OF PEDESTAL FOOTING (PF)


S2W LPP
1.68 M. 8.97 M.
8.97 M.
5- 12mm BASE BARS
FOR FOOTING @ BOTHWAYS

PLAN SECTION

DETAIL OF COLUMN FOOTING (CF)


LOAD SCHEDULE

3.00 M.
a b PANEL BOARD (LPP)
NO. OF OUTLET SIZE OF CONDUCTORS AND 20 W
CKT NO. LOAD DESCRIPTION VA VOLTS AMPERES PROTECTION CONDUITS
20 W
LO CO SW SCO

1 ONE LINE DIAGRAM


E-2 SCALE: NTS.

Sab

ELECTRICAL LAYOUT

PROJECT NAME & LOCATION : SHEET CONTENTS : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES OO2: Protect Lives and Properties Against Major
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS JAY R M. ACOB
REGION IV-A
Floods, Flood Management Program, Construction/
Rehabilitation of Flood Mitigation Facilities within
ENGINEER II
CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL R 11
PREPARED :
DETAILED PLAN OF FIELD OFFICE
QUEZON II DISTRICT ENGINEERING OFFICE
LUCENA CITY
Major River Basins and Principal Rivers, Construction
of Slope Protection along Iyam River, Barangay Cotta
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION EINGINEER III
OIC - OFFICE OF THE ASSISTANT
ASSISTANT DISTRICT ENGINEER 6 7 17
MARK JAY E. ILAO DATE : DATE : OIC - OFFICE OF THE DISTRICT ENGINEER
(Phase I), Lucena City, Quezon ENGINEER II DATE : DISTRICT ENGINEER DATE :
14686

559
466

683
279
155

279
155
black

279
155
text

279
155

279
7212

155

279
155

279
1068
whitebackground

342
186
186

0.30m.Ø
NOTE:
For Source of Fund, State if DPWH Regular Budget, Priority Development
Assistance Fund, DepEd/DA/DAR Budget, Calamity Fund, MVUC Fund, etc.

DISPLAY AREA

DISPLAY AREA DISPLAY AREA


50 x 75 VERTICAL 50 x 75 VERTICAL
COCO LUMBER (1200 x 2400 x 12 COCO LUMBER (TARPAULIN 1200 x 2400 x 5
MARINE PLYWOOD) MARINE PLYWOOD)

BILLBOARD
EDGE OF ROAD

50 x 50 WOODEN 50 x 75 VERTICAL 50 x 75 VERTICAL


STAKE COCO LUMBER COCO LUMBER

50 x 50 WOODEN GROUND LEVEL 50 x 50 WOODEN GROUND LEVEL


STAKE STAKE

TRAFFIC DIRECTION
ROAD

ORIENTATION TYPICAL FRAME ELEVATION FRONT ELEVATION FRONT ELEVATION


(OPTION 1) (OPTION 2)

DPWH STANDARD PROJECT BILLBOARD


PROJECT NAME & LOCATION : SHEET CONTENTS : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES OO2: Protect Lives and Properties Against Major
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS JAY R M. ACOB
REGION IV-A
Floods, Flood Management Program, Construction/
Rehabilitation of Flood Mitigation Facilities within
ENGINEER II
CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL R 12
DETAILED PLAN OF PROJECT BILLBOARD PREPARED :
QUEZON II DISTRICT ENGINEERING OFFICE
LUCENA CITY
Major River Basins and Principal Rivers, Construction
of Slope Protection along Iyam River, Barangay Cotta
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION EINGINEER III
OIC - OFFICE OF THE ASSISTANT
ASSISTANT DISTRICT ENGINEER 7 7 17
MARK JAY E. ILAO DATE : DATE : OIC - OFFICE OF THE DISTRICT ENGINEER
(Phase I), Lucena City, Quezon ENGINEER II DATE : DISTRICT ENGINEER DATE :
E L E V A T I O N

40
45

STATION
50

WIDENING
RIVER BANK LINE
127

WATER 178
41.285 180 WATER
42.651
WATER
41.684

0+

WATER LEVEL ELEVATION


5
40

FINISHED GRADE ELEVATION


179
181
WATER
WATER 42.636
41.853

128

WATER
41.407

0+
56
0
177

WATER
42.320
OTHERWISE INDICATED.

176
175
174
WATER
WATER
42.621
WATER42.320
42.023

173

WATER
163 41.400

RIVER
38.256

0+
5
80
185

WATER
41.900
184
183
182
WATER
WATER
41.900
42.323
WATER
41.900

129

WATER
EXCEPT OTHERWISE SPECIFIED.

41.123

0+
60
0
193
189 192
191 WATER
187
188 44.532
186 WATER WATER
42.032 WATER
WATER
WATER 44.532
44.932
WATER 42.032
42.391
190
41.411

WATER
41.411

130

WATER
41.101

REGION IV-A

LUCENA CITY
0+
3. ELEVATIONS ARE ASSUMED ELEVATION.
GENERAL NOTES

62
0
CLASS "A" UNLESS OTHERWISE INDICATED.

0+

REPUBLIC OF THE PHILIPPINES


64
0
131
132
WATER
41.091 WATER
41.447

QUEZON II DISTRICT ENGINEERING OFFICE


164

197 199
RIVER 196
195
0

38.364
WATER WATER
WATER
WATER44.631 44.921
194 44.921
44.631

WATER
6

41.100
4. GRADE SHOWN IS THE TOP OF FINISHED PAVEMENT.

0+6
1. DISTANCE AND ELEVATIONS ARE IN METERS UNLESS

ALL PIPES SHALL HAVE A MINIMUM COVER OF 0.60 M.

DEPARTMENT OF PUBLIC WORKS & HIGHWAYS


5. LOCATIONS AND INVERT ELEVATION OF ALL DRAINAGE

7. ALL WORK SHALL COMPLY WITH THE DPWH STANDARD


2. ALIGNMENT AND GRADES IN THIS PROJECT WAS BASED

6. ALL CONCRETE TO BE USED IN THIS PROJECT SHALL BE


ON THE GRADE AND ALIGNMENT OF THE EXISTING ROAD.

200

133 WATER
44.813

WATER
41.322
80
0+6
SPECIFICATION FOR HIGHWAYS AND BRIDGES, REVISED 2013

134

WATER
41.444
STRUCTURES MAY BE ADJUSTED TO SUIT FIELD CONDITIONS.

210

WATER
40.120

42.30 44.46 45.79 135

WATER
41.396
201

WATER
44.887

0+740
0+700

42.30 46.00 45.86 136 202


0+720

ENDRR WATER
41.232 44.723

138

RR
44.907

137
141
WATER 142
41.413 140 RR
139 RR
46.253
RR 47.239
45.515
RR
43.017

143

RR
46.709
0+740
STA 0+000, ELEV. 94.641

144

G
43.932

PROJECT NAME & LOCATION :


42.30 46.50 45.93 145

G
46.891
0+760

STA.0+740.00 165

RIVER
38.546

(Phase I), Lucena City, Quezon


42.30 46.70 46.00
BEG. OF PROJECT

0+800
0+780
BY THE CENTER LINE OF THE EXISTING ROAD.

OO2: Protect Lives and Properties Against Major

Rehabilitation of Flood Mitigation Facilities within


VERTICAL CONTROL

Floods, Flood Management Program, Construction/

of Slope Protection along Iyam River, Barangay Cotta


Major River Basins and Principal Rivers, Construction
HORIZONTAL CONTROL

42.30 46.35 46.07


0+800

146
198
X
X 46.510
41.411

147

X
47.170
ADDING AND/OR SUBTRACTING DEFLECTION ANGLES DICTATED

0+820
THE AZIMUTH USED IN THIS PROJECT WAS RECKONED THRU THE

MAGNETIC NORTH. SUCEEDING AZIMUTHS WERE CALCULATED BY

42.30 46.14 46.14


THE ELEVATIONS USED IN THIS PROJECT WAS ASSUMED ELEVATION. IT

SHEET CONTENTS :
WAS RECKONED FROM BM NO. 1, LOCATED ON TOP OF EXISTING RIPRAP,

0+840

204
166
X
RIVER 41.219
38.245

42.30 46.37 46.21


0+860

154

X
45.482

153

X
45.193

205

X
41.391

PLAN AND PROFILE


152

Sta. 0+740.00 - Sta. 1+268.00


48.783
42.30 45.66 46.28 323

R
324

R
45.904
0+880

44.377

322

321 R
43.124
R
43.097

320
319
318 R
R 42.675
R 41.849
41.246

203

X
45.193
0

209

X
44.369

341 208

WATER X
39.638 43.123

206

X
167 41.456

RIVER
38.369
0+90

42.30 45.65 46.35 207

RIVER
39.136

LL)
ETE WA
OF CONCR

0+900
BM2(TOP 79
ELEV: 48.1
0+

337

RILESCONCRETE
45.883
336
92

RILESCONCRETE
340 46.305

BM 325
48.179
0

RILES
48.369
326

RILES
48.360

151 328

RAIL 327
48.290 RILESCONCRETE
43.034
RILESCONCRETE
46.712

DRAFTED :
150

RAIL
48.262

330
329

RILESCONCRETE
RILESCONCRETE
46.787
42.861

PREPARED :
334

333 R
47.142
R
46.643

331
332

RILESCONCRETE
RILESCONCRETE
46.752
43.137
40

42.30 45.00 46.36


9

310

R
46.667
0+

311

R
44.717

307

X
39.908

308

X
41.878 309
0

X
42.946
6
0+9

317

R
46.221
42.30 44.15 46.36

ENGINEER II
ENGINEER II
609

WATER
38.741

316

R
46.387
0
SCALE:

0+98

JAY R M. ACOB
315

R
44.894

MARK JAY E. ILAO


314

R
46.337

42.30 44.54 46.35


0

313

X
42.308

312

X
46.077
1+00

610

WATER
38.549
SCALE:

42.30 44.41 46.35


1+020
HOR.
VERT.

303

X
P LAN

46.084

304

X
46.168
305

X
46.442

300 301
302
X X
41.950 42.708 X
42.811

306

X
39.841
1+040

REVIEWED :
42.30 45.35 46.35
HOR.
1 : 70 M.
1 :700 M.

VERT.

1+000
1+060

DATE :
42.30 46.00 46.33
1 : 200 M.

342
1 : 2000 M.

WATER
PROFILE

38.023

ENGINEER II
1+080

299

X
44.237
296

X 298 297
40.164
X X
41.279 42.052

42.30 46.31 46.30


1+100
1+120

42.30 45.74 46.28


1+140

295

X
38.804

DATE :
293 292
294
WATER X
42.089 X 44.773
44.356

291

X
44.949
SUBMITTED :
42.30 45.29 46.25
0
1+16

211

SET_BASE
SHER)
45.535
WITH WA
BM3(NAIL 35
ELEV: 45.5
0

42.30 45.50 46.22


1+18

1+100

288

ENDWALL
42.143

290
289
X
X40.071
40.595

343

WATER
37.836
1+200

42.30 44.49 46.20


CHIEF, PLANNING AND DESIGN SECTION

608
1+220

284

WATER
42.236 WAL
47.668

281
285

WAL283 WAL
50.548
48.051 282
WAL
48.190 WAL
49.727
CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ

286

WAL
48.028

287

WAL
47.663

42.30 44.70 46.17


279

X
45.688

280

WAL
47.450
DATE :

277
1+240

X
45.682 278

WAL
46.129
276

X
46.234

275 274

X X
43.167 43.508 273

WAL
43.484

42.30 46.03 46.14


607

WATER
42.256

272
1+260

WAL
44.063
RECOMMENDED :

271

270 WAL
42.218
WAL
41.555

269

WAL
42.171
1+280

42.30 46.14 46.11


268

WAL
42.205
EINGINEER III
1+300

DISTRICT ENGINEER

42.30 46.71 46.09


WILFREDO L. RACELIS
1+200

OIC - OFFICE OF THE ASSISTANT


1+320

267

WAL
40.239

265

WAL
41.294 264 266

WALWAL
45.645
42.159

344

WATER
42.30 46.47 46.06 38.505
40
3
1+

262
261
X 263
41.526 WALL
WAL
42.216
46.016
60

DATE :
1+3

APPROVED :
STA.1+268.00

42.30 45.69 46.04


80

BEG. OF PROJECT
1+3

256

X
40.428

257
258
RIPRAP
41.646 259
RIPRAP
42.424
RIPRAP
46.739

260

START
42.058

42.30 45.70 46.01


0

255
40

STARTRIPRAP
41.154
1+

243

X
42.30 45.50 45.99 42.332
244

X
42.592

246
245
F
X
48.962
46.480
1+268
0
42
1+

MA. CHYMBELIN D. IBAL


ASSISTANT DISTRICT ENGINEER

253

X
42.428
0
44
1+

345

WATER 249
38.080
OIC - OFFICE OF THE DISTRICT ENGINEER

X
42.385

251
252
X
X
44.803
45.911

247

PINAGTAASAN
40.360

248

PINAGTAASAN
40.362

250

X
46.559
0
46
1+

254

X
38.776
PP
0

1 1
48

SET NO.
1+

0
50
1+

13
17

242

X
46.073

240

239 X
42.400
X
43.348

241
SHEET NO.

X
43.858
-36.074 -33.896
42.602
-25.696 44.408
AREA Cut and Fill

L/S Cut 6.613 -29.736


AREA Cut and Fill
L/S Fill 13.378
L/S Cut 7.480
42.300
42.300 -25.730 L/S Fill 8.647
-23.146

AFILL= 2.091

AFILL= 2.091 WATER LEVEL WATER LEVEL


ELEV=42 ELEV=42
AFILL= 2.603
AFILL= 4.648
F.G. = 46.00 F.G. = 46.28
0+820 0+880

46.370
46.802 -31.669
-29.377

AREA Cut and Fill AREA Cut and Fill

L/S Cut 5.997 L/S Cut 6.708

L/S Fill 14.612 L/S Fill 13.139


42.303
-25.287
42.565
-25.411
42.300
-23.224

AFILL= 2.091 WATER LEVEL AFILL= 2.091 WATER LEVEL


ELEV=42 ELEV=42
AFILL= 3.778

F.G. = 45.93
AFILL= 5.111
F.G. = 46.21
0+800 0+860

46.140 46.278
-29.776
-29.025
AREA Cut and Fill
AREA Cut and Fill L/S Cut 5.074

L/S Cut 5.959 L/S Fill 23.416


42.620 L/S Fill 15.979
-24.506
42.300
-23.206
42.416
-29.025 42.224
AFILL= 2.091 WATER LEVEL -27.163
ELEV=42 AFILL= 2.091 WATER LEVEL
ELEV=42

AFILL= 5.984
AFILL= 6.827

F.G. = 45.86 F.G. = 46.14


0+760 0+848

44.466 46.341
-25.531 46.351 -26.600
-28.463
AREA Cut and Fill AREA Cut and Fill
42.541
L/S Cut 7.357 -26.600 L/S Cut 4.893

L/S Fill 12.999 L/S Fill 23.414


42.709
-23.996

42.441 42.306
-23.149 -25.758

AFILL= 2.091 WATER LEVEL AFILL= 2.091 WATER LEVEL


ELEV=42 ELEV=42

AFILL= 5.781
AFILL= 7.192

F.G. = 45.79 F.G. = 46.07


0+740 0+827.3

PROJECT NAME & LOCATION : SHEET CONTENTS : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES OO2: Protect Lives and Properties Against Major
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS Floods, Flood Management Program, Construction/
JAY R M. ACOB
REGION IV-A Rehabilitation of Flood Mitigation Facilities within PREPARED :
ENGINEER II
CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL CS 14
CROSS SECTION
QUEZON II DISTRICT ENGINEERING OFFICE
LUCENA CITY
Major River Basins and Principal Rivers, Construction
of Slope Protection along Iyam River, Barangay Cotta
Sta. 0+740 - Sta. 0+880 ENGINEER II CHIEF, PLANNING AND DESIGN SECTION EINGINEER III ASSISTANT DISTRICT ENGINEER 1 4 17
DATE : DATE : OIC - OFFICE OF THE ASSISTANT OIC - OFFICE OF THE DISTRICT ENGINEER
(Phase I), Lucena City, Quezon
MARK JAY E. ILAO DISTRICT ENGINEER
ENGINEER II DATE : DATE :
46.447
46.444 46.442
-49.101 -46.237 46.309
-41.220
-43.105
44.537

-47.231
AREA Cut and Fill
42.811
L/S Cut 6.360
42.140 AREA Cut and Fill
-33.510 42.388 14.085
L/S Fill
-38.276 L/S Cut 7.001
-31.403
L/S Fill 15.923

AFILL= 2.091 WATER LEVEL


ELEV=42 AFILL= 2.091 WATER LEVEL ELEV=42
AFILL= 4.194
AFILL= 2.801
F.G. = 46.35 39.908 F.G. = 46.20 41.950
41.460
0+960 -36.414 -28.892
1+040 -30.551

48.036
48.036
-42.548
-40.802
46.541
46.685
46.286
-41.377
-44.264
-40.392

44.145 AREA Cut and Fill


-40.724
L/S Cut 6.954 AREA Cut and Fill

L/S Fill 14.635 L/S Cut 6.223


42.578 L/S Fill 10.817
42.340
-31.623 -34.237

42.249
AFILL= 2.091 WATER LEVEL AFILL= 2.091
-32.621 WATER LEVEL
ELEV=42 F.G. = 46.36 AFILL= 1.091 ELEV=42 F.G. = 46.33 AFILL= 2.041
0+940 1+020

47.174
-40.476 46.234
46.395
46.077
47.174 -40.558
-42.856
-39.976 -39.225

45.658
-37.838 AREA Cut and Fill

L/S Cut 6.208

L/S Fill 15.543


AREA Cut and Fill

L/S Cut 7.286


42.318
L/S Fill 9.755
-38.084

AFILL= 2.091 WATER LEVEL


ELEV=42
AFILL= 2.091 WATER LEVEL AFILL= 3.877
ELEV=42 F.G. = 46.36 AFILL= 2.053
F.G. = 46.35
0+920 1+000

47.181
46.371
-39.623 -44.767
47.181
-39.123
45.651
-36.899 44.414 AREA Cut and Fill
-42.591
L/S Cut 6.367

42.381 L/S Fill 12.769


43.091 AREA Cut and Fill
-30.317 -23.500 43.557
L/S Cut 8.129 42.100
-37.574 -33.304
L/S Fill 7.559

ELEV=42 AFILL= 2.091 WATER LEVEL


AFILL= 1.064
AFILL= 2.091 WATER LEVEL
ELEV=42 F.G. = 46.35 AFILL= 0.803

0+900 F.G. = 46.35


0+980
PROJECT NAME & LOCATION : SHEET CONTENTS : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES OO2: Protect Lives and Properties Against Major
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS Floods, Flood Management Program, Construction/
JAY R M. ACOB
REGION IV-A Rehabilitation of Flood Mitigation Facilities within
CROSS SECTION PREPARED :
ENGINEER II
CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL CS 15
QUEZON II DISTRICT ENGINEERING OFFICE
LUCENA CITY
Major River Basins and Principal Rivers, Construction
of Slope Protection along Iyam River, Barangay Cotta
Sta. 0+900 Sta. 1+040 ENGINEER II CHIEF, PLANNING AND DESIGN SECTION EINGINEER III
OIC - OFFICE OF THE ASSISTANT
ASSISTANT DISTRICT ENGINEER 2 4 17
MARK JAY E. ILAO DATE : DATE : OIC - OFFICE OF THE DISTRICT ENGINEER
(Phase I), Lucena City, Quezon ENGINEER II DATE : DISTRICT ENGINEER DATE :
46.986 46.705
-27.248
-25.979

44.492 AREA Cut and Fill


-29.992
L/S Cut 4.894

43.745 L/S Fill 13.275 AREA Cut and Fill


-28.000
42.069 L/S Cut 5.079
-25.199
L/S Fill 10.245

ELEV=42 AFILL= 2.091 WATER LEVEL 42.167


-22.553
40.527 AFILL= 2.091
-20.340
WATER LEVEL
ELEV=42
AFILL= 6.625
AFILL= 4.378
F.G. = 46.20 F.G. = 46.09 41.741

1+120 1+200
-20.738

46.268

-32.390 46.031
46.136
44.359 -28.848
44.237 -30.634 45.869
AREA Cut and Fill
-31.195
-26.393 L/S Cut 6.501 -28.345 AREA Cut and Fill

L/S Fill 7.881 L/S Cut 4.724

L/S Fill 6.668


42.052

-24.480 42.126
ELEV=42 AFILL= 2.091 WATER LEVEL
-23.680

41.279 ELEV=42 AFILL= 2.091 WATER LEVEL


AFILL= 7.024
-23.750
F.G. = 46.11 40.290

F.G. = 46.22 -19.938

1+100 40.164 1+180 AFILL= 8.066

-20.017

46.623 46.028
-37.189
45.294 -32.555
-28.858
45.005 AREA Cut and Fill
-25.963 44.707
-25.393 L/S Cut 4.870

L/S Fill 9.590

42.211
AREA Cut and Fill
-22.485 42.104
L/S Cut 5.177
-25.802
L/S Fill 8.738
AFILL= 2.091 WATER LEVEL
ELEV=42

AFILL= 8.244
AFILL= 2.091 WATER LEVEL
ELEV=42
40.080
-17.044
F.G. = 46.25 F.G. = 46.14 AFILL= 7.698
40.088

1+080 1+160 -21.423

44.339
46.223
-38.000 45.937 44.702 -27.028
-35.240
-33.964

AREA Cut and Fill

45.473 AREA Cut and Fill L/S Cut 6.099


-32.231
L/S Cut 6.527 L/S Fill 9.512
42.075
42.084
L/S Fill 5.670 -26.381
-27.034

AFILL= 2.091

ELEV=42 AFILL= 2.091 WATER LEVEL ELEV=42 AFILL= 2.091 WATER LEVEL
AFILL= 2.129
F.G. = 46.28 F.G. = 46.17 AFILL= 8.015

1+060 1+140 39.707

-21.364

PROJECT NAME & LOCATION : SHEET CONTENTS : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES OO2: Protect Lives and Properties Against Major
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS Floods, Flood Management Program, Construction/
JAY R M. ACOB
REGION IV-A Rehabilitation of Flood Mitigation Facilities within
CROSS SECTION PREPARED :
ENGINEER II
CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL CS 16
QUEZON II DISTRICT ENGINEERING OFFICE
LUCENA CITY
Major River Basins and Principal Rivers, Construction
of Slope Protection along Iyam River, Barangay Cotta
Sta. 1+060 Sta. 1+200 ENGINEER II CHIEF, PLANNING AND DESIGN SECTION EINGINEER III
OIC - OFFICE OF THE ASSISTANT
ASSISTANT DISTRICT ENGINEER 3 4 17
MARK JAY E. ILAO DATE : DATE : OIC - OFFICE OF THE DISTRICT ENGINEER
(Phase I), Lucena City, Quezon ENGINEER II DATE : DISTRICT ENGINEER DATE :
AREA Cut and Fill

L/S Cut 4.530

L/S Fill 23.668

41.447
42.169
-26.215
-32.965
AFILL= 2.091 WATER LEVEL
ELEV=42

AFILL= 6.223

F.G. = 45.99
1+268

AREA Cut and Fill


42.908
43.792 L/S Cut 5.081
-31.049 L/S Fill 16.526
-33.834
42.255
-27.808

AFILL= 2.091 WATER LEVEL


ELEV=42
40.912
AFILL= 6.801
F.G. = 46.01 -24.315

1+260

45.688

-30.257
42.243 AREA Cut and Fill

-25.987 L/S Cut 5.019

L/S Fill 7.595

AFILL= 2.091
ELEV=42 WATER LEVEL
40.730
F.G. = 46.04 -22.128
AFILL= 7.401
1+240

47.471
-28.559

AREA Cut and Fill

L/S Cut 5.742

L/S Fill 7.182


42.222

-24.157

AFILL= 2.091 WATER LEVEL


ELEV=42

F.G. = 46.06 AFILL= 5.650

1+220

PROJECT NAME & LOCATION : SHEET CONTENTS : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES OO2: Protect Lives and Properties Against Major
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS Floods, Flood Management Program, Construction/
JAY R M. ACOB
REGION IV-A Rehabilitation of Flood Mitigation Facilities within CROSS SECTION PREPARED :
ENGINEER II
CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL CS 17
QUEZON II DISTRICT ENGINEERING OFFICE
LUCENA CITY
Major River Basins and Principal Rivers, Construction
of Slope Protection along Iyam River, Barangay Cotta
Sta. 1+220 Sta. 1+268 ENGINEER II CHIEF, PLANNING AND DESIGN SECTION EINGINEER III
OIC - OFFICE OF THE ASSISTANT
ASSISTANT DISTRICT ENGINEER 44 17
MARK JAY E. ILAO DATE : DATE : OIC - OFFICE OF THE DISTRICT ENGINEER
(Phase I), Lucena City, Quezon ENGINEER II DATE : DISTRICT ENGINEER DATE :