TALI PROJECT - STRUCTURAL 28/09/22 100 MIN
250
B1
2-16mm TB
ROUGHEN SURFACE AND APPLY
10mm STIRR. SP. 1@50, HIT-HY 200R EPOXY (OR EQUIVALENT)
400
8@100, REST@200mm O.C. ADHESIVE PRIOR TO POURING OF
3-16mm BB NEW CONCRETE
TYPICAL B1 DETAIL
A B C D EX. COL
TYPICAL B1 TO EXISTING COLUMN
CONNECTION
12555
4165 4215 4175
EXISTING RAFTER
1
2355
3530 3530 3530
B12 SW
B1
SW
2 B1
SW
2
200x75x1.6mm GALVANISED
2 STEEL CONNECTOR PLATE
75x75x10mm ANGLE
S1 S1 S1 WITH 8-35x3.15mm NAILS
BRACKET WITH 1-M16 (8.8)
SW SW
2000
2000
BED ROOM 2 T&B BED ROOM 3 T&B BED ROOM 4 T&B
(4 EACH END)
3 3
D D D THROUGH BOLTS
B1
3 3 3
4175
B1
CLOSET CLOSET
B1 B1 CLOSET
B1
B1
B1
2175
2-M12 (8.8) HIT-Z ANCHORS.
TV
TV
TV
3 100mm MIN EMBEDMENT
INTO EXISTING COLUMN
14973
BED ROOM 2 BED ROOM 3 BED ROOM 4
WITH HIT-HY 200R EPOXY
12555
SW SW
4215
4215
4 4
4" x 4" H4 TREATED
4 SD SD SD
TIMBER POST
3 2 4
UP
OPEN BALCONY
4165
4165
B1
DETAIL A
DETAIL A
5
3880 3930 3890
12840
SLANTING POST DETAIL
SCHEDULE OF SLABS
S1
TYPICAL STAIR DETAILS