Welding Works JSA HSE Professionals

The JSA sheet summarizes the welding work activities and associated risks and control measures. It identifies 4 sub-activities: 1) manpower mobilization, 2) barricading the work area, 3) connecting the welding cable to power, and 4) work during dark hours. For each sub-activity, the potential hazards, risks, and required risk control measures are documented to ensure the work is performed safely. Only trained workers using proper PPE are to be involved, work areas are to be properly barricaded, equipment is to be inspected and grounded, and lighting is required for nightwork. Sign-off from supervisors and safety personnel is also mandated.

Uploaded by

Ali Kazi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
271 views1 page

Welding Works JSA HSE Professionals

The JSA sheet summarizes the welding work activities and associated risks and control measures. It identifies 4 sub-activities: 1) manpower mobilization, 2) barricading the work area, 3) connecting the welding cable to power, and 4) work during dark hours. For each sub-activity, the potential hazards, risks, and required risk control measures are documented to ensure the work is performed safely. Only trained workers using proper PPE are to be involved, work areas are to be properly barricaded, equipment is to be inspected and grounded, and lighting is required for nightwork. Sign-off from supervisors and safety personnel is also mandated.

Uploaded by

Ali Kazi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

JSA (Job Safety Analysis) Sheet

Activity Name:-Welding works Ref-

Location:- Date :

Sr.No. Sub-Activity Name Type Of Hazard Risk(s) Involved Risk Control measures
Only inducted worker shall be deputed at the work place.
1 Manpower Mobilization Untrained worker Personal injury
Given Tool Box Talk to all workers.
Use of proper PPEs as per SPCL safety norms- shoes safety helmet safety goggle
Barricading of work highlighter jacket
2 Personal injury Major burns Whole area under working will be properly barricaded
area
No any
Use unauthorized
of proper PPEs asmaterial to norms.Only
per SPCL be kept inside barricading
SPCL approvedarea
scaffolds to be used for
working at height, Trained persons to be deployed at work competent supervisor to be
For continuous protection double lanyard belt to be used. worker to tie his safety belt to
present at all time.
lifeline or nearest scaffold.
Use of good insulation of welding supply & erecting cable.
Electric Shock, Fire Joint free cable to be used
Connection of welding Approved welding machine to be used
Burns,Toxic
3 cable to power socket Injury/Death Hot work permit to be taken from concern project and safety dept.
Fumes,Explodification
earth & welding work. Proper earthing to welding machine.
Remove all flammable & combustible materiel from work area.
Fire bucket to be kept available near by working area.
Welding shield to be used for welding
Night work permit to be taken from concern engg.and safety dept.
Darkness, fall of
Work during dark Personal injury, Ensure proper illumination during dark hours.
4 person, fall of
hours damage to property Electrical cable should lead min 2 m height. No exposed electrical wire.Earthing.
machinery
Route shall be illuminated.

Name & Signature of Site Engineer / Supervisor :___________ Name & Signature of Site In-charge :___________

Name & Signature of Project In-charge :__________ Name & Signature of HSE Officer : ______