Weighbridge 100 Ton Erectionoperation and Maintenance JSA HSE Professionals

1. The document provides a job safety analysis for the erection, operation, and maintenance of a 100-ton weighbridge. 2. It identifies six sub-activities - manpower mobilization, shifting of weighbridge, erection and operation, electrical work, maintenance work, and work during dark hours - and lists the types of hazards, risks involved, and recommended risk control measures for each. 3. The risk control measures focus on ensuring only trained workers with proper supervision are involved, tools and equipment are in safe working condition, work areas are properly barricaded and illuminated, and lock-out/tag-out procedures are followed for maintenance work.

Uploaded by

Ali Kazi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
796 views2 pages

Weighbridge 100 Ton Erectionoperation and Maintenance JSA HSE Professionals

1. The document provides a job safety analysis for the erection, operation, and maintenance of a 100-ton weighbridge. 2. It identifies six sub-activities - manpower mobilization, shifting of weighbridge, erection and operation, electrical work, maintenance work, and work during dark hours - and lists the types of hazards, risks involved, and recommended risk control measures for each. 3. The risk control measures focus on ensuring only trained workers with proper supervision are involved, tools and equipment are in safe working condition, work areas are properly barricaded and illuminated, and lock-out/tag-out procedures are followed for maintenance work.

Uploaded by

Ali Kazi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

JSA (Job Safety Analysis) Sheet

Activity Name:- Weighbridge (100 ton)


erection,operation and maintenance Ref-

Location:- Date :

Sr.N
Sub-Activity Name Type Of Hazard Risk(s) Involved Risk Control measures
o.
Untrained Only inducted worker shall be deputed at the work place.
Manpower
1 worker,lack of skill Personal injury
Mobilization Given Tool Box Talk to all workers.
awareness
Operator having valid driving licence.
Horn & Light of the crane should be in working condition.
Improper shifting
Shifting of of material, Personal injury, Signal man should be guide properly
2
weighbridge Improper Property damage Work area should be clean & clear.
communication
Proper housekeeping should be maintained at wok area.
Work done under continuous supervision.

Faulty hand tools Hand tools should be inspected for any damage before they use & kept in proper toolkit.
Erection and
Personal injury, No work and worker should be deployed near weighbridge.
3 operation of
Property damage
weighbridge Swing of Crane Work area should be barricaded to avoid unauthorised entry.
Work shall be carried out under supervision.
Only authorised person shall work.
Use standard tools & equipment for electrical work.
All electrical accessories & cables shall be of adequate capacities.
Electrical All electrical connections shall be made by qualified electrician
shortciruit,shock, Electrical burn,
Panel boards shall have ELCB,MCB.
4 Electrical Work fire due to short Personal Injury,
circuit or electrical Property Damage. All cable joints to be properly jointed and insulated.
fault
Ensure proper earthling should be maintained, lightning arrestor should properly be mounted
on the weigh cabin.
Welding on or near the weighbridge should be strictly prohibited.
Remove power cords at the time of lightning.
Only Trained Person should be Deployed for work.
Personal injury,
Unskilled Worker LOCK-OUT-TAG-OUT (LO-TO) before start of the maintenance.
Property damage
Work area should be barricaded to avoid unauthorised entry.
5 Maintenance Work
Hand tools should be inspected for any damage before they use & kept in proper toolkit.
Faulty hand tools Personal injury Work shall be carried out under supervision.
No work and worker should be deployed near weighbridge.
Night work permit to be taken from concern engg.and safety dept.
Darkness, fall of Ensure proper illumination during dark hours.
Work during dark Personal injury,
6 person, fall of
hours damage to property Electrical cable should lead min 2 m height. No exposed electrical wire.Earthing.
machinery
Route shall be illuminated.

Name & Signature of Site Engineer / Supervisor :_______ Name & Signature of Site In-charge :___________
Name & Signature of Project In-charge :__________ Name & Signature of HSE Officer : ______