0% found this document useful (0 votes)
97 views1 page

Project Ruby: As Built Drawing

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
97 views1 page

Project Ruby: As Built Drawing

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

AS BUILT DRAWING

PROJECT NAME:

PROJECT RUBY
CLIENT NAME:

JFE MERANTI MYANMAR CO.,LTD.

USE POINT
DN80

USE POINT
DN80
BOP: FL+5.500
CWR-DN80
10 X 9 10 X 9 CWS-DN80

USE POINT
DN80

BOP: FL+5.500
CWR-DN100
CWS-DN100
DN32 DN100
DN200
DN100 BOP: FL+15.000 BOP: FL+15.000
BOP: FL+6.000 BOP: FL+6.000
CWR-DN200 CWR-DN200 CWR-DN100 CWR-DN100
CWS-DN200 CWS-DN200 CWS-DN100 CWS-DN100
CWR-DN200 BOP: FL+6.500 CWR-DN200 BOP: FL+6.500
CWS-DN200 BOP: FL+5.500 CWS-DN200 BOP: FL+5.500

BOP: FL+2.500
CWR-DN200
CWS-DN200
Paint Lathe

Gal Work Area TRENCH & GATE TRENCH & GATE

Backup Metal Lathe (Size TBC)


Truck Access Way Oil Storage

Filter Press
Stage 9b
Oil Separation
Stage 2a
Concentrated
Chrome Tank

Acidification
Stage 1a
Waste Water Tank
EL 000
Diameter 7650 x 8460 High
DN100
Chemical Storage Contents 380 m3

Chocks (Total 400 tons)

DN200
4100 x 7500 x 3000H
EL000
SLAB Thk: 800mm
RC Floor, Block Wall, Cladding to Roof
Number of Pile : 20 Nos
Neutralization
Stage 3a

USE POINT
Oxidation
Stage 3b

Chrome
Acidification
Reduction
Blower/ Compressor Room Stage 1b
2b
Pressure Clean Bay
Fall to rear corner pit
4100 x 7500 x 3000 High
EL000 Waste Water Tank

DN200
Wash RC Floor, Block Walls, Cladding to Roof EL 000
Tank Diameter 4000 x 8460 High
Contents 100 m3
(Total 105 tons)
Sludge Thickener pH adjustment DAF Flocculation
Stage 9a Stage 5 Storage 5 Stage 4
SLAB Thk: 800mm

450
Number of Pile : 6 Nos
Pit Sump
EL -500 EL - 1500
3850 x 4800 750x750

Treated Water Storage Tank


H2SO4 EL 000

Bund Wall EL + 500


Diameter 5972 x 8460 High
Sand Filter Sand Filter AC Filter AC Filter Contents 210 m3
EL+000 EL+000 EL+000 EL+000
Sump
(Total 220 tons)
EL - 1500

2,001
Down 750x750
Electrical SLAB Thk: 800mm
HCL

450
Room
EL +4500
Office Room
4800 x 3500 x 2500 H
Laboratory
5200 x 3500 x 2500H
Number of Pile : 11 Nos
3600 x 3500 x 2500 High EL +4500 EL +4500
RC Floor, Block Walls RC floor, Block Wall, Cladding to Roof RC Floor, Block Wall, Cladding to Roof

Down
Lime Mixing Lime Slurry

4,800 1,300
Sump
Pit

DN450
EL - 1500
EL - 500
FUTURE

750x750
3650 x 4800
AC Filter AC Filter
NaOH
Lime Silo
Down
Demin Water Storage Tank
Down
EL 000
Treated Water Storage Tank

4,800
Diameter 4226 x 8460 High
Pit
Down EL 000
EL - 500 Contents 120 m3
Multimedia Multimedia Diameter 5972 x 8460 High
4400 x 4800 Pit (Total 125 tons)
EL -150
Filter Filter Contents 210 m3

Bund Wall EL + 500


3600 x 3600
(Total 220 tons)
Na2S2O3 FeSO4
SLAB Thk: 800mm
Number of Pile : 07 Nos
FUTURE

SLAB Thk: 800mm


Cationic
PAM
Anionic
PAM RI Raw Number of Pile : 11 Nos
Water Tank
Na2S2O3 FeSO4 Anionic Anionic Cationic Cationic

1,400
Resin Resin Resin Resin

Sump
Sump EL - 1000
EL - 1500 750x750
750x750

Bund Wall EL + 500

MAKE UP WATER-DN50
CWR-DN450 CWR-DN450 CWR-DN450
CWS-DN450 CWS-DN450 CWS-DN450
BOP: FL+5.000 BOP: FL+2.500 BOP: FL+2.500

DN450
CWR-DN450-BOP (FL+6.000)
CWS-DN450-(FL+4.750)

CWR-DN250 BOP: FL+5.000


CWS-DN250 BOP: FL+5.000

CWR-DN250 BOP: FL+5.500

CWR-DN250 BOP: FL+5.000


CWS-DN250 BOP: FL+4.500

CWS-DN250 BOP: FL+5.000


DN150 L2 24 X 10

LOCK SEAMER

USE POINT L1
USE POINT
ALKALI CHEMICAL CHEMICAL STORE
GUILLOTINE

STORE DN250 DN100 PRESS PUNCH

DN300 DN250 DN150 L DN150 DN65

9 10 11 CWR-DN300 BOP: FL+5.500 CWR-DN250 BOP: FL+5.500 CWR-DN150 BOP: FL+5.000 CWR-DN150 BOP: FL+5.500 CWR-DN65 BOP: FL+5.000
CWR-DN300 BOP: FL+5.500
CWR-DN450 CWS-DN300 BOP: FL+4.500 CWS-DN300 BOP: FL+4.500 CWS-DN250 BOP: FL+4.500 CWS-DN150 BOP: FL+5.000 CWS-DN150 BOP: FL+4.500 CWS-DN65 BOP: FL+5.000
CWS-DN450
BOP: FL+5.500

USE POINT
DN300 DN250 USE POINT USE POINT USE POINT DN150 DN65 USE POINT
DN65
DN65 DN200, EL+4500 DN65 DN65 0 20 Aug 19 FOR APPROVAL

REV DATE DESCRIPTION

REVISIONS

CONTRACTOR:

2-2-8, KORAKU, BUNKYO-KU TOKYO (112-8576) JAPAN


TEL: +81-338177182 FAX: +81-338177642

CIVIL & STRUCTURAL ENGINEER :

SLAB

LV

STEEL STRUCTURAL DESIGN:

SLAB SLAB

ADMISTRATION OFFICE

G2-B
MECHANICAL DESIGN:
CONIC - MM ENGINEERING CO., LTD
G2-A
+10 +10 +10
Address: No. B306, Pearl Condominium, Kabar Aye Pagoda Road,
LV

Bahan Township, Yangon City - Myanmar

SLOPE 1%

SLOPE 1%
SLAB

+10

Tel: +951551757
+0 +0 +0 +0

E-mail: [email protected]
+0

G1-1 G1-2 G1-3


Website: www.coniccorp.com.vn
G1-B LV LV

ELECTRICAL DESIGN:
CONCRETE CURB (120x120)
ASL +6.355
STOPPER ASL+6.205
OVER HEAD GUIDE RAIL

LV LV LV LV LV

G1-A

TAMADA ENGINEERING & SERVICES COMPANY LTD


Yangon office: No.52 B Aung Chan Thar Housing Township, Yangon City,
Union of Myanmar.
Tel: +95 9422286688, Email: [email protected]
Website: www.tamadaco.com

PREPARED BY CHECKED BY CHECKED BY APPROVED BY

CONIC PHYOKO T.J TAKARA

DRAWING TITTLE:

LAYOUT PLAN

DWG No: M-U-CWS/R-02 REV: 0

SCALE: A3/ 1:100 A1/ 1:500 SHEET: 02