Managing Project Uncertainty
Erin Berglund
OGL 321
Ben Pandya
March 21, 2022
Berglund 2
The most challenging and most important part of project management is to
mitigate risks and uncertainty in projects. Because of this, it is very important for the
project manager to understand how to confront uncertainty. He/She can do this by
creating a risk averse plan. This type of plan creates a breakdown of possible risks to
the project and helps the project manager navigate through these adverse possibilities.
The risk averse plan also makes it possible to see new threats and creates a way to
navigate past them. In Managing Project Uncertainty by David Cleden he outlines four
possible modes for confronting uncertainty. These include suppress, adapt, detour, and
reorient. If the right steps are taken the project will stay on track and possible risks will
be reverted.
The first step in preventing possible adverse reactions in your project is to
suppress them. This is defined as “taking pre-emptive steps to reduce overall levels of
uncertainty before the problems occur”. Suppression is the most used method of
managing uncertainty because it reduces the uncertainty at the source. The
suppression technique works by identifying the sources of uncertainty, forecasting future
scenarios, analyzing potential threats, converting areas of uncertainty into specific
problems, and finally developing a tactical plan to resolve the issues. Although this
technique is very widely used. It does have some unfavorable consequences. For
example, It can be very difficult to assess problems at the source. And it may be a very
costly approach. Large projects and some with co-dependencies may find it difficult to
suppress all possible areas of uncertainty (Clenden).
Berglund 3
The next technique for preventing uncertainty is adaptation. Adaptation is an
approach where the project manager permits some uncertainty in the project but is
prepared to adjust the approach to limit the effects from the most damaging aspects of
uneasiness in the project. The uncertainty of the project is closely monitored to catch
early warning signs. This is done by having good information-gathering and forewarning
systems in place. Understanding the key objectives in order to stay focused on what
needs to be accomplished. And finally acting rapidly and decisively in order to continue
steering your project toward its goals. The adaptation method can be very pragmatic
and management must be agile and flexible to ensure the impending problems are
handled correctly and efficiently.
The next option when managing risk in projects is to detour. “Avoiding the source
of uncertainty means that the consequences (that is the expected outcomes) are no
longer relevant to the project (Clenden).” This option has some great advantages: it
prevents uncostly precautions and prevents negative repercussions. The detour
approach has an emphasis on reaching a clear understanding of project objectives,
being creative in identifying planning options, evaluating and comparing the risks and
benefits of alternative approaches, and finally seizing the initiative when better options
present themselves (Clenden). This risk management plan isn’t always reliable. Some
problems are simply unavoidable or the result would be too costly. This approach also
only works for issues that are already known. Some issues are impossible to spot
before they occur. When this arises, it is important to use a different form of risk
management.
Berglund 4
The final technique to managing project uncertainty is the reorientation approach.
The reorientation approach focuses on modifying a set of objectives to prevent
uncertainty. This approach is most used in dynamic projects where the uncertainty of
risk can lead to total failure. The only option to alleviate the uncertainty is to redefine
project goals and reorient the project to abate the unpredictable.This approach focus on
understanding the nature of the threat, being honest about chances of success and
failure, keeping an open mind on redefining objectives, and finally being persuasive in
seeking the agreement of stakeholders to reorient the project. This technique, if used
correctly, can create a thorough blueprint to alleviate problems and excess work in the
future.
Regardless of the type of risk litigation technique used, problem solving is a
critical characteristic all project managers should express. Problem solving can be
broken down into two parts, problem-framing and solution-finding. Problem-framing acts
by reconstructing a particular area of uncertainty into a set of specific problems. By
breaking these problems down we are able to assess the impact they have on the
project and solutions to resolve it. Problem framing is constructed on the idea that we
cannot find answers if we do not understand the problem. Once a thorough breakdown
of questions that need to be answered are defined, the first step to managing
uncertainties is complete. Solution-finding on the other hand is characterized by finding
answers to resolve the uncertainties. This means choosing the best solution to
problems that arise and mitigation techniques to solve it.
Blog Posts
Berglund 5
Risk assessment is a critical part to project planning, by ensuring all components
that may derail the project are accounted for, you are better able to manage the project.
In a blog post by Eight to Late titled Risk Analysis he breaks down the importance of
risk planning. He states, “this process begins by identifying and classifying risks. Once
this is done, one determines the probability and impact of each risk. Then, based on
priorities and resources available (again determined by the organization’s risk appetite)
one develops strategies to mitigate the risks that are significant from the organization’s
perspective.” This ensures a strong plan is in place for when risks do arise. Another
blog that caught my eye regarding risk analysis is by Mike Shuttleworth titled Risk
Response Planning- Doing it the SMART way. He created an acronym for setting goals
and objectives in career development plans, the SMART acronym. SMART stands for
Specific, Measurable, Achievable, Realistic, and Time-Bound. “When it comes to
managing risks, using the S.M.A.R.T principle is an especially useful technique to help
ensure the effectiveness of proposed risk response plans (Shuttleworth)”.
Personal Takeaways
Researching the importance of managing project uncertainty has helped me gain
insight into the benefits of thorough planning and risk litigation. Without using these
techniques the project can be derailed or may fail altogether. In my future projects I will
most definitely use these techniques to ensure I have accounted for all unforeseen
events that will impact the project. I agree with the assertions from this module and find
them to all be very beneficial in proper project planning. There were a few components
from this week's reading that relate to the Harvard Simulation from this week's module.
Berglund 6
For example, in the simulation there was a sudden unexpected change in project
schedule. It was shortened to 12 weeks instead of the projected 23. This resulted in
stress to the workers and a need for an improvised plan. If there was already a plan in
place for a change in schedule such as this. There would already be an improvised plan
and risk litigation for meeting the new targets. A time I remember utilizing project risk
techniques was planning for my brother's wedding. I was in charge of scheduling the
band. I had scheduled one band I knew he would enjoy and had another on the back
burner in case something happened a few weeks before the wedding. A week before
the wedding the initial band canceled and I quickly contacted my back up to ensure they
could fill in. Because I had already created a backup plan it was an easy fix. Managing
project uncertainty is a crucial part to project management and ensures all foreseen and
unforeseen events will be managed swiftly.
Berglund 7
References
Awati, K. (2021, September 14). Risk Analysis. Eight to Late.
https://eight2late.wordpress.com
Cleden, D. (2016). Managing project uncertainty. Taylor & Francis Group.
Powell, R.A., and D.M. Buede. 2006. “Decision-making for successful product
development,” Project management journal 37.1
Powell, Robert Col. Buede, Dennis. (2009). Project Manager’s Guide to Making
Successful Decisions. Management Concepts, Inc.. Retrieved from
https://app.knovel.com/hotlink/toc/id:kpPMGMSD08/project-manager-s-guide/proj
ect-manager-s-guide
Shuttleworth, M. (2018, May 24). Risk Response Planning – Doing it the SMART way.
Project Risk Management.
https://www.project-risk-manager.com/blog/risk-response-planning/