0% found this document useful (0 votes)
245 views1 page

Civic Center Sdp-Model

This document provides information about the layout of Marilor River, a sustainable community development. It includes landmarks such as an irrigation pond, community farm, statue, municipal hall, clock tower, constructed wetlands, justice hall, parks, a fire station, and bike paths. The document contains geographic coordinates for various locations within the development.

Uploaded by

Koreen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
245 views1 page

Civic Center Sdp-Model

This document provides information about the layout of Marilor River, a sustainable community development. It includes landmarks such as an irrigation pond, community farm, statue, municipal hall, clock tower, constructed wetlands, justice hall, parks, a fire station, and bike paths. The document contains geographic coordinates for various locations within the development.

Uploaded by

Koreen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

MA

RIL
AO
RIV
ER

45.53

38
PR .42
STP IV
AT
ER
O
AD

7
67.8
IRRIGATION POND

.31
20
BIKE
TURBINES
COMMUNITY FARM

56.38

47.84
STATUE

MUNICIPAL
HALL
CLOCK

PAVEMENT
TOWER

BIKE LANE
8
49.4

VEM NE
T
EN
E LA
TED Y

BIK
PA
VA
CONSTRUCTED ELE LKWA

CONSTRUCTED
WETLAND
WETLAND WA JUSTICE HALL

KING

52.04
PAR PARKING

ROAD
PARKING
PARKING
FIRESTATION
T
BIK EMEN
NE

PAVEMENT
E LA

BIKE LANE
RETENTION
V
PA

POND
48

VEM NE
T
EN
E LA
62.

BIK
PA

M
A
RI
PAVEMENT

25
BIKE LANE

LA
O
.
CONSTRUCTED

20

RI
VE
R
WETLAND

TED Y CONSTRUCTED
POLICE STATION
VA
ELE LKWA WETLAND
WA

.34 PAVEMENT PAVEMENT PAVEMENT

28
BIKE LANE BIKE LANE BIKE LANE
T
BIK EMEN
NE

ROAD ROAD
E LA
V
PA

44.71
BIKE LANE BIKE LANE
PAVEMENT PAVEMENT

DROP OFF POINT MAIN DROP OFF POINT


20.58

ENTRY

PUBLIC TRANSPORTATION PUBLIC TRANSPORTATION


ENTRY ENTRY

PATUBIG ROAD
219.66

SITE DEVELOPMENT PLAN


SCALE: MTS

You might also like