Topic 3 Charging For Civil Engineering Services
Topic 3 Charging For Civil Engineering Services
For Civil
Engineering
Services
Contents
Salary Cost Times
Multiplier plus Direct Schedule of
Non-salary expense Basic Minimum
(“Reimbursable”) Per diem Fixed Price Fees
2 4 6 8
3 5 7
1
5
Salary Cost Times
Multiplier plus Direct Non-
Salary Expense
Salary Cost x (Multiplier) + Direct Non-Salary
Expenses
✓ Compensation on the basis of the salary
cost times an agreed multiplier is a
frequently used method of determining
charges for engineering services.
✓ Two Versions: Multiplier x Salary Cost
(Two Multiplier Version) Multiplier x
Direct Salary Cost (Single Multiplier
Version)
7
✓ The following factors are pertinent to
the salary cost times multiplier version
of this methods:
8
b) Multiplier – which is applied to
salary cost is a factor that
compensates the Civil Engineer for
overhead plus a reasonable margin for
contingencies, interest or invested
capital, readiness to serve, and profit.
The size of the multiplier will vary with
the type of service, the nature and
experience of the civil engineering
firm, and the geographical area in
which its office is located. The
average multiplier should be between
2.5 and 3 times the average salary
cost.
9
c) Direct non-salary expenses (reimbursable)
usually incurred in engineering engagements may
include the following:
10
d) The Civil Engineer’s overhead which comprises
a major portion of the compensation generated by
the multiplier on salary cost, includes the following
indirect cost:
12
Hourly Billing Rate
Charge per hour
13
Hourly Billing Rate
Charge per hour
14
PER DIEM
Per Day
15
“
This basis is particularly
suited to expert witness or
other legal-type services and
to other short-term
engagements involving
intermittent personal services.
16
The per diem charge should be based on
Risks Importance
1 2 3
18
PER DIEM Rate Variations
Per Day
Employee Regional
Classification Location
reimbursement
21
tsoenaginito
#EngineeringServices
negotiations
22
vderhoae
#CElaws
Overhead
23
oespnoanctmi
#CivilEngineering
compensation
24
ernpceegta
#Contracts
percentage
25
Cost Plus Fixed Fee
26
Cost Plus Fixed Fee
✓ A COST-PLUS FIXED FEE
CONTRACT is a type of contract in
which the contractor is paid for the
project's normal expenses as well as an
additional fixed fee for their services.
These allow the contractor to profit from
the project and promote economic
production in a variety of industries.
27
Under a cost plus fixed fee agreement, the Civil
Engineer is Reimbursed for the actual costs of all
services and supplies related to the project,
including:
1
3
2
4
28
Cost Plus Fixed Fee
✓ In most cases, the expenses in a cost-
plus fixed fee are calculated based on
market values. The "fixed fee" portion
of the contract, on the other hand, may
be subject to negotiation between the
parties and thus vary depending on the
needs of each project. Contracts for
cost-plus fixed fees are also known as
CPFF contracts, cost-plus contracts,
cost-reimbursement contracts, and
cost + fixed fee contracts.
29
The cost plus fixed fee method can also be used when the Civil
Engineer is required to start providing service before the
detailed scope of services can be determined. In such cases,
the following considerations apply:
30
The types of service to be performed by the
Civil Engineer should be agreed upon and
fully set forth. The agreements should also
provide for appropriate adjustments in the
fixed fee. In the event that the physical
scope of the project time of completion, or
level of effort and services required are
materially changed over those
contemplated during the negotiations.
31
Some advantages of a CPFF
contract can include:
The final cost may be They can often
lower than in a normal ensure higher-quality
contract, as the output than normal
contractor usually will contracts
not “inflate” prices to
cover risks
32
Fixed Price
33
“ The fixed price amount can be calculated
as the sum total of estimated
engineering costs for salaries overhead
and non-salary expenses, an allowance
for contingencies, interest on invested
capital, readiness to serve, and a
reasonable amount for profit.
34
“ Fixed price compensation for basic
services on certain design-type projects
can also be computed as an appropriate
percentage of estimated construction
costs; this method and its limitations are
discussed in the following section.
Results using the percentage method and
the direct calculation method are
frequently used to check each other.
35
The Percentage of
Construction Cost
What is Percentage of Construction Cost?
37
The percentage fee shall consider the type, complexity, location, and
magnitude of the construction cost of the project and shall not exceed the
following percentages of estimated construction cost:
FEASIBILITY DETAILED
STUDIES ENGINEERING
DESIGN
DETAILED
ARCHITECTURAL
AND
ENGINEERING CONSTRUCTION
DESIGN SUPERVISION
38
Schedule of Basic
Minimum Fees
Schedule of Minimum Basic Fees
Principles to Observe:
40
2.) Civil Engineers regularly employed in the private
sector shall have a minimum compensation
corresponding to 10% more than the minimum wage
prevailing in the region as basic monthly salary. Civil
Engineers employed in the government sector shall have
a minimum basic monthly salary corresponding to
appropriate entry positions provided by the Civil Service
Commission.