WORK PERMIT (Newest)

This work permit document provides details for a contractor working at the Pico De Loro Condominium Corporation in Nasugbu, Batangas. It lists the contractor's name, the unit owner they will work for, the nature and schedule of the work, a list of workers and materials, and terms and conditions for the work. The permit must be approved at least two days before work starts and is only valid for the specified dates and times. Workers must follow building rules and present identification.

Uploaded by

Nikki
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
137 views

WORK PERMIT (Newest)

This work permit document provides details for a contractor working at the Pico De Loro Condominium Corporation in Nasugbu, Batangas. It lists the contractor's name, the unit owner they will work for, the nature and schedule of the work, a list of workers and materials, and terms and conditions for the work. The permit must be approved at least two days before work starts and is only valid for the specified dates and times. Workers must follow building rules and present identification.

Uploaded by

Nikki
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PICO DE LORO CONDOMINIUM CORPORATION Form No.

: F6-0-012115-A
Hamilo Coast Brgy. Papaya Nasugbu Batangas Effectivity: April 6,2015

WORK PERMIT

Name of Occupant/Tenant Date


Unit No.
Floor Nature of Work:
Name of Contractor Delivery Air-conditioning
Name of Person-in-charge Pick-up Plumbing
Telephone Nos. Communications Others, pls. specify
Civil/carpentry/Painting
Work Schedule: Electrical
Start End Mechanical
Date Date
Time Time

LIST OF WORKERS/PERSONNEL
NAMES WORK DESCRIPTION

LIST OF MATERIALS LIST OF TOOLS


QUANTITY DESCRIPTION QUANTITY DESCRIPTION

TERMS AND CONDITIONS


1. This permit is valid only on the dates and time specified above.
2. This permit must be submitted to the Property Administration Office for approval at least two (2) days BEFORE actual work schedule
3. Approval of Permit is from 10:00 AM to 4:00 PM, Monday to Friday only.
4. Work permit must be presented to the Guard-on-Duty for access on any area.
5. A copy of this work permit must be posted on the door of the unit during the whole duration of work.
6. All workers must use the specify access of workers to Residential Units .
7. Workers must present their Company ID in exchange with the Building's Contractor ID.
8. Loitering in the common areas is prohibited.
9. All workers are bound by the Rules and Regulations of Pico De Loro Condominium Corporation
Prepared by: Endorsed by: Noted by: Approved by:

Signature Over Printed Name Unit Owner/Tenant Representative Property/Chief Engineer Property/Complex Manager
TO BE FILLED-UP BY INSPECTOR: DATE OF INSPECTION:
COMMENTS:

SIGNATURE OF INSPECTOR:
Copies to [ ] Property Management Office [ ] Contractor
[ ] Contractror [ [] ]Security
Building Security