MJP Karad, Village Khatav, Taluka Khatav
Item Quantity Unit
Item No.1
Designing (aesthetically), and constructing RCC
elevated service reservoirs of following capacity with
RCC staging consisting of columns, internal and
external bracings spaced vertically not more than 4.5
meters centre to centre for E.S.R. having capacity 500
m3 & not more than 6 m c/c for E.S.R.having
capacity above 500 m3 including excavation in all
types of strata, foundation concret, cement plaster
with water proofing compound to the inside face of
the container including refilling disposing of the
surplus stuff within a lead of 50 meters, all labour and
material charges including lowering, laying, erecting,
hoisting and jointing of pipe assembly of inlet, outlet,
washout, overflow and bypass arrangements as per
departmental
design.
providing and fixing accessories such as Stainless
steel ladder inside and M.S. ladder with G.I. railing
outside, C. I. manhole frame and covers water level
indicatiors, lightening conductor, G. I. pipe railing
around walk way and top slab, providing spiral staire
case from ground level to roof level, M.S.Grill gate of
2 Mtrs height with locking arrangement, B.B.
masonry chambers for all valves, ventilating shafts,
providing and applying three coats of acrylic emulsion
with silicon additives paint to the structure including
roof slab and epoxy paint to internal surface & anti-
termite treatment for underground parts of the
structures and giving satisfactory water tightness test
as per I.S. code, The job to include painting the name
of the scheme and other details on the reservoir as per
the directions of Engineer-in-charge.
Contractor
1. The design of the structure be in accordance with
relevent (I.S.3370 - 1965 or revised)
2. The design shall satisfy the stipulation as per IS
1893-1984 and I.S. 13920/1993 for seismic focrce and
I.S.- 11682/1985 for R.C.C. staging of overhead
tanks.
3. For design having more than 6 columns,
Providing of internal bracing is obligatory,. External
bracking is also obligatory.
4.. The entire structure shall be in M 300 mix only.
5. Plain round mild steel bars grade - I confirming to
I.S,432 Part-I or high yield strengh deformed bars
confirming to I.S. 1786 or I.S. 1139 shall be used,
grade-II mild steel bars will not be allowed.
6. Irrespective of the type of foundation proposed in
the design, one set of bracing be provided at the
gound level.
7. These rates include providing, M.S. ladder for
E.S.R's upto 2 lakhs liters capacity and providing
sprial staircase for E.S.R. above 2 lakhs liters
capacity.
8. Stagging shall have to be designed with stresses of
M-250 for ESR. However all RCC construction
should be done in M-300
9. These rates are including the cost of uplift pressure
if any and entire dewatering during execution. In case
of water logging area where water is struck at shallow
depth extra provision of dewatering shall be made as
per site condition.
10. All condition given in the Member Secretary"s
Circular No.MJP/TS-I/350/1668 dt. 2.8.97 and
MJP/S-I/350/2127 dt. 13.7.99 shall be strictly
followed and additional cost, if any due to these
conditions is included in the rates mentioned below.
11.. 75% part rate shall be payable for reinforced
cocnrete and plastering items of containers of
E.S.R. till satisfactory hydraulic testing for water
tightness is given ; and till that work shall be treated
as incomplete.
12. The rates indicated in the table are excluding the
cost of pipes, specials and valves required for inlet,
outlet washout overflow and by-pass arrangement.
The scope of work, however inclueds cost of
erecting, laying and jointing of pipes and valvews
including cost of jointing materials upto 5M beyond
outer face of outermost column.
13. For ESR upto 500cum capacity C.I.D. double
flanged pipes upto 300mm dia shall be provided and
C.I.Specials shall be used.For ESR above 500 cum
capacity C.I./M.S. pipes assembly with minimum
8mm thick ness up to 500mm dia. And minimum
10mm thickness above 500mm dia can be used with
proper anti-corrosive epoxy teratment from inside and
outside.
14. Below mentioned rates are for foundation, with
individuals footing with bearing capacity of 30 tonnes
per square metre. For raft foundations, these rates
shall be increased by 7.5% where safe bearing
capacity ( SBC) is 5 M.T. per Sq.m and by 5% where
SBC is more than 5 MT/Sqm. and upto 10MT/Sq.m.
This percentage of 5% or 7,5% is applicable for
estimation of amount of L.S. items ESR for Extra item
due to change from individual footing foundation to
raft actual increase in concrete and steel quantities be
paid as per relevent DSR Item.
15. The rates shall be increase by 30% for brearing
piles upto depth of 10m and for further increased in
depth by 5M each it shall be increased by another
10% These rates are applicable where raft is not
reasible for pile foundation sulfate resistant cement
shall only be used. Single pile for the column is not
permitted Group of piles shall be designed with pile
cap for each column of ESR.
16. These rates are applicable for staging height of 12
M These rates shall be increased or decreased for per
metre variation in the staging height as
below
12 to 16 M staging 2% per metre
16 to 20m staging 3% per meter
20 M and abovd - 4% per metre
I.e. for 20m stagging height
percentage calculation will be like below
12 to16m = 4 x 2 = 8%
16 to 17 m x 1 x 3 = 3%
Total = 11 %
For 20 m stagging height
CPonetrraccetonrtage calculation will be like below
1 2 to 16m = 4 x 2
6 8
= 8%
16 to 20m = 4 x 3 = 12%
20m = 5 X 4 = 20%
Total = 40%
17. Following rates are for seismic zone-III for Zone
IV these rates shall be increased by 5% and for Zone-
II, these rates shall be decreased by 5% concerned
Executive Engineer shall confirm the seismic zone for
the scheme from seismic zones plan before estimation
and adopt appropriate rates as per actual seismic
zones( Seismic maps attached
in this C.S.R.)
Note:- 1) Conditin from Sr.No.1 to 11 shall form a
part and parcel of the tender papers and shall be
included in the DTP for works of R.C.C.E.S.R.
Note:- 2) Condition from Sr.No.12 to 17 are for
estimation purpose only and shall not be appear in
the tender.
MBR At Shastrinagar - Cap.- 2,00,000 Lts., 1.00 Job Work
St.Ht. 12 m.
Item No.2
Providing and supplying ISI standard DI double
flanged pipes excluding GST levied by GOI & GOM
in all respect including railway freight, insurance,
unloading from railway wagon, loading into truck
transport to stores, unloading etc.
complete as directed by Engineer-in-charge
250 mm dia D.I. pipe - (inlet + Washout) 180.00 Rmt.
250 mm dia D.I .pipe- (Outlet) 80.00 Rmt.
Item No.3
Providing and supplying ISI standard DI specials and
fitting with seal rubber gasket of SBR complete with
cast iron follower gland and MS nut bolt coated or
otherwise protected from rusting and suitable for DI
pipes including cost of labour materials and
transportation to store/site,loading unlaoding exluding
GST levied by GOI and GOM in all respect,complete
as per IS -9523 .For all type of specials, bends and
tees etc. For all types of specials ,bends tees etc .
80 to 300 mm 2200.00 Kg
Item No.4
Providing and supplying double flange sluice valves
confirming for IS 14846 including warn gear
arrangement as per test pressure stainless steel spindle
caps including inspection charges transportation upto
departmental store,loading unloading,stacking
excluding GST levied by GOI
and GOM in all respect etc complete.
A) Sluice Valves P.N.-1.0
250 mm dia 6.00 No.
Item No.1
Designing (aesthetically), and constructing RCC
elevated service reservoirs of following capacity with
RCC staging consisting of columns, internal and
external bracings spaced vertically not more than 4.5
meters centre to centre for E.S.R. having capacity 500
m3 & not more than 6 m c/c for E.S.R.having
capacity above 500 m3 including excavation in all
types of strata, foundation concret, cement plaster
with water proofing compound to the inside face of
the container including refilling disposing of the
surplus stuff within a lead of 50 meters, all labour and
material charges including lowering, laying, erecting,
hoisting and jointing of pipe assembly of inlet, outlet,
washout, overflow and bypass arrangements as per
departmental
design.
providing and fixing accessories such as Stainless
steel ladder inside and M.S. ladder with G.I. railing
outside, C. I. manhole frame and covers water level
indicatiors, lightening conductor, G. I. pipe railing
around walk way and top slab, providing spiral
staire case from ground level to roof level,
M.S.Grill gate of 2 Mtrs height with locking
arrangement, B.B. masonry chambers for all valves,
ventilating shafts, providing and applying three
coats of acrylic emulsion with silicon additives
paint to the structure including roof slab and epoxy
paint to internal surface & anti-termite treatment for
underground parts of the structures and giving
satisfactory water tightness test as per I.S. code, The
job to include painting the name of the scheme and
other details on the reservoir as per the directions of
Engineer-in-charge.
Notes:
1. The design of the structure be in accordance with
relevent (I.S.3370 - 1965 or revised)
2. The design shall satisfy the stipulation as per IS
1893-1984 and I.S. 13920/1993 for seismic focrce
and I.S.- 11682/1985 for R.C.C. staging of overhead
tanks.
3. For design having more than 6 columns,
Providing of internal bracing is obligatory,. External
bracking is also obligatory.
4.. The entire structure shall be in M 300 mix only.
5. Plain round mild steel bars grade - I confirming to
I.S,432 Part-I or high yield strengh deformed bars
confirming to I.S. 1786 or I.S. 1139 shall be used,
grade-II mild steel bars will not be allowed.
6. Irrespective of the type of foundation proposed in
the design, one set of bracing be provided at the
gound level.
7. These rates include providing, M.S. ladder for
E.S.R's upto 2 lakhs liters capacity and providing
sprial staircase for E.S.R. above 2 lakhs liters
capacity.
8. Stagging shall have to be designed with stresses of
M-250 for ESR. However all RCC construction
should be done in M-300
9. These rates are including the cost of uplift
pressure if any and entire dewatering during
execution. In case of water logging area where
water is struck at shallow depth extra provision of
dewatering shall be made as per site condition.
10. All condition given in the Member Secretary"s
Circular No.MJP/TS-I/350/1668 dt. 2.8.97 and
MJP/S-I/350/2127 dt. 13.7.99 shall be strictly
followed and additional cost, if any due to these
conditions is included in the rates mentioned below.
11.. 75% part rate shall be payable for reinforced
cocnrete and plastering items of containers of
E.S.R. till satisfactory hydraulic testing for water
tightness is given ; and till that work shall be treated
as incomplete.
12. The rates indicated in the table are excluding
the cost of pipes, specials and valves required for
inlet, outlet washout overflow and by-pass
arrangement. The scope of work, however inclueds
cost of erecting, laying and jointing of pipes and
valvews including cost of jointing materials upto
5M beyond outer face of outermost column.
13. For ESR upto 500cum capacity C.I.D. double
flanged pipes upto 300mm dia shall be provided
and C.I.Specials shall be used.For ESR above 500
cum capacity C.I./M.S. pipes assembly with
minimum 8mm thick ness up to 500mm dia. And
minimum 10mm thickness above 500mm dia can be
used with proper anti-corrosive epoxy teratment
from inside and outside.
14. Below mentioned rates are for foundation, with
individuals footing with bearing capacity of 30
tonnes per square metre. For raft foundations, these
rates shall be increased by 7.5% where safe bearing
capacity ( SBC) is 5 M.T. per Sq.m and by 5%
where SBC is more than 5 MT/Sqm. and upto
10MT/Sq.m. This percentage of 5% or 7,5% is
applicable for estimation of amount of L.S. items
ESR for Extra item due to change from individual
footing foundation to raft actual increase in
concrete and steel quantities be paid as per relevent
DSR Item.
15. The rates shall be increase by 30% for brearing
piles upto depth of 10m and for further increased in
depth by 5M each it shall be increased by another
10% These rates are applicable where raft is not
reasible for pile foundation sulfate resistant cement
shall only be used. Single pile for the column is not
permitted Group of piles shall be designed with pile
cap for each column of ESR.
16. These rates are applicable for staging height of 12
M These rates shall be increased or decreased for
per metre variation in the staging height as
below
C1on2trtaocto1r6 M staging 2% per metre
8
1 6 to 20m staging
2
3% per meter
20 M and abovd - 4% per metre
I.e. for 20m stagging height
percentage calculation will be like below
12 to16m = 4 x 2 = 8%
16 to 17 m x 1 x 3 = 3%
Total = 11 %
For 20 m stagging height
Percentage calculation will be like below
12 to 16m = 4 x 2 = 8%
16 to 20m = 4 x 3 = 12%
20m =2 x 1 = 2%
Total = 22%
17. Following rates are for seismic zone-III for Zone
IV these rates shall be increased by 5% and for Zone-
II, these rates shall be decreased by 5% concerned
Executive Engineer shall confirm the seismic zone for
the scheme from seismic zones plan before estimation
and adopt appropriate rates as per actual seismic
zones( Seismic maps attached
in this C.S.R.)
Note:- 1) Conditin from Sr.No.1 to 11 shall form a
part and parcel of the tender papers and shall be
included in the DTP for works of R.C.C.E.S.R.
Note:- 2) Condition from Sr.No.12 to 17 are for
estimation purpose only and shall not be appear in the
tender.
ESR - Ambai Wasti Cap. - 100000 Lts. St.Ht.-12 1.00 Job work
m.
ESR - Shivaji Nagar Cap. - 150000 Lts. St.Ht.-12 1.00 Job work
m.
ESR - Hanuman Nagar Cap. - 331000 Lts. St.Ht. 1.00 Job work
12 m.
ESR - Bharade Wasti- Cap. - 32000 Lts. St.Ht.- 1.00 Job work
12 m.
ESR - Shiaras Wasti Cap. - 25000 Lts. St.Ht.-12 m 1.00 Job work