ANNEX A.3.
a - Hydro
-Power Generation Facility Name-
-Plant Address-
-Tel./Fax No:-
Commission Year: ____
MONTHLY OPERATIONS REPORT
EPIMB_PPDD Form 04-002
FOR THE (MONTH, YEAR)
Billing Period : (per month)
Period Covered : (26th of the previous month up to the 25th of the current month)
PLANT OPERATIONAL DATA Units
Unit 1 Unit 2 Unit 3 Unit 4 Total
1.0 Rated Capacity, MW
2.0 Station Use, MWh
3.0 Average Dependable Capacity, MW
4.0 Peak Load, MW ###
5.0 Minimum Load, MW ###
6.0 Average Load, MW ###
7.0 Gross Generation, kWh
8.0 Total Station Used, kWh ###
9.0 Net Generation , kWh ###
10.0 Water Consumed, Million Cubic Meter ###
11.0 Water Utilization Rate, Cubic Meter/kWh ###
12.0 Spilled Energy, MWh ###
13.0 Spiled Energy, Million Cubic Meter ###
14.0 Reservoir Level and Stored Energy ###
14.1 Beginning
Reservoir Level (Meter)
Stored Energy (Million Cubic Meter)
Equivalent (MWh)
14.1 Ending
Reservoir Level (Meter)
Stored Energy (Million Cubic Meter)
Equivalent (MWh)
15.0 Inflow, Million Cubic Meter ###
16.0 Inflow, MWh
17.0 Outflow, Million Cubic Meter
18.0 Operating Hours ###
19.0 Plant Outage, Hours
18.1 Reserved Shutdown
18.2 Planned Outage
18.3 Maintenace Outage ###
18.4 Forced Outage
18.5 Deactivated Shutdown
20.0 Forced Outage Rate, %
21.0 Availability Factor, %
22.0 Capacity Factor, %
23.0 Estimated MWh lost due to Forced Outage
24.0 Plant Production Cost, Pesos/kWh
25.0 Total Plant Operating Expenses, Php
Prepared by :________________ Approved by :_______________
Position :________________ Position :_______________
ANNEX A.3.b - Hydro
-Power Generation Facility Name-
-Plant Address-
-Tel./Fax No:-
Commission Year: ____
MONTHLY OPERATIONS REPORT
EPIMB_PPDD Form 04-002
FOR THE (MONTH, YEAR)
Billing Period : (per month)
Period Covered : (26th of the previous month up to the 25th of the current month)
CURRENT YEAR (20__) PREVIOUS YEAR
PRESENT PREVIOUS
GENERATION & SALES DATA MONTH MONTH G.R. (%) February 20__ G.R. (%)
(February) (January)
1. Gross Electricity Generation, MWh ###
2. Station Service Use, MWh ###
3. Net Electricity Generation, MWHh
4. Purchased Electricity if any, MWh ###
NPC
IPPs (Pls Specify) ###
5. Total Net Generation & Purchased, MWh
6. No. of Customers (Pls.Specify) ###
6.1 Customer 1
6.2 Customer 2 ###
Total
7. ELECTRICITY SALES, MWh
7.1 Customer 1 ###
7.2 Customer 2 ###
Total ###
8. Losses & Unaccounted, MWh ###
9. Estimated Unserved Energy, MWh ###
10. Minimum Stable Load, MW ###
11 Average Load, MW ###
12. Maximum Delivered Load, MW
Prepared by :________________ Approved by :_______________
Position :________________ Position :_______________
ANNEX A.3.c - Hydro
-Power Generation Facility Name-
-Plant Address-
-Tel./Fax No:-
Commission Year: ____
MONTHLY OPERATIONS REPORT
EPIMB_PPDD Form 04-002
FOR THE (MONTH, YEAR)
PLANT OPERATIONAL DATA Month
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total
1.0 Rated Capacity, MW
2.0 Station Use, MWh
3.0 Average Dependable Capacity, MW
4.0 Peak Load, MW
5.0 Minimum Load, MW
6.0 Average Load, MW
7.0 Gross Generation, kWh
8.0 Total Station Used, kWh
9.0 Net Generation , kWh
10.0 Water Consumed, Million Cubic Meter
11.0 Water Utilization Rate, Cubic Meter/kWh
12.0 Spilled Energy, MWh
13.0 Spiled Energy, Million Cubic Meter
14.0 Reservoir Level and Stored Energy
14.1 Beginning
Reservoir Level (Meter)
Stored Energy (Million Cubic Meter)
Equivalent (MWh)
14.1 Ending
Reservoir Level (Meter)
Stored Energy (Million Cubic Meter)
Equivalent (MWh)
15.0 Inflow, Million Cubic Meter
16.0 Inflow, MWh
17.0 Outflow, Million Cubic Meter
18.0 Operating Hours
19.0 Plant Outage, Hours
18.1 Reserved Shutdown
18.2 Planned Outage
18.3 Maintenace Outage
18.4 Forced Outage
18.5 Deactivated Shutdown
20.0 Forced Outage Rate, %
21.0 Availability Factor, %
22.0 Capacity Factor, %
23.0 Estimated MWh lost due to Forced Outage
24.0 Plant Production Cost, Pesos/kWh
25.0 Total Plant Operating Expenses, Php
Prepared by :________________ Approved by :_______________
Position :________________ Position :_______________