0% found this document useful (0 votes)
427 views46 pages

1762-112-Cal-7102-0c Calculation Report For Warehouse

The document provides design calculations for the foundation, floors, staircase, and structural analysis of a warehouse building that is part of the MFM Mogas Project Phase II in Kot Bahadur Shah PS-6. The one-story reinforced concrete building has an area of 3,979.741 square feet. The calculations include parameters for seismic loads, dead loads, live loads, load combinations, material properties, and geotechnical design parameters. Appendices provide detailed calculations from ETABS for the main building structure, slab analysis, and foundation analysis. The recommendations are that all concrete members meet design requirements according to code ACI 318.

Uploaded by

Wasimullah Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
427 views46 pages

1762-112-Cal-7102-0c Calculation Report For Warehouse

The document provides design calculations for the foundation, floors, staircase, and structural analysis of a warehouse building that is part of the MFM Mogas Project Phase II in Kot Bahadur Shah PS-6. The one-story reinforced concrete building has an area of 3,979.741 square feet. The calculations include parameters for seismic loads, dead loads, live loads, load combinations, material properties, and geotechnical design parameters. Appendices provide detailed calculations from ETABS for the main building structure, slab analysis, and foundation analysis. The recommendations are that all concrete members meet design requirements according to code ACI 318.

Uploaded by

Wasimullah Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 46

MFM MOGAS PROJECT (MFMMP)

PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.:1762-112-CAL-7102 REV: 0C PAGE 1 OF 46

PAK ARAB REFINERY LTD. (PARCO)

MFM MOGAS PROJECT (MFMMP)


PHASE-II, KBS (PS-6)

CALCULATION REPORT FOR


WAREHOUSE

Contract No.: 1762-112-2017

0C ISSUED FOR APPROVAL 15-Mar-2018 YYC WSY LQS

0B ISSUED FOR APPROVAL 01-Feb-2018 YYC WSY LQS

0A ISSUED FOR REVIEW 28-Jan-2018 YYC WSY LQS

REV. DESCRIPTION DATE PREP'D CHK'D APP'D CLIENT


MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 2 OF 46

TABLE OF CONTENTS
1.0 OBJECTIVE.......................................................................................................................................... 3
2.0 REFERENCES..................................................................................................................................... 3
3.0 ANALYSIS AND RESULTS............................................................................................................... 4
3.1 CALCULATION PARAMETERS........................................................................................................................................ 4
3.2 MATERIALS PROPERTIES..............................................................................................................................................4
3.3 FOUNDATION DESIGN PARAMETERS..............................................................................................................................5
3.4 CALCULATION DETAILED SHEET.................................................................................................................................... 5
4.0 RECOMMENTATIONS AND CONCLUSION..................................................................................5
MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 3 OF 46

1.0 OBJECTIVE

The objective of this document is to present the design calculation of foundation, floors,
stair case and structural analysis of the WAREHOUSE of KOT BAHADUR SHAH PS-6.
The building is a one-story reinforced concrete frame structure with reinforced concrete
roof, part of the building is two-story. The building area is 3,979.741 sq.ft (369.73m2).

See Table.1 for the dimension for major members.


Table 1 Dimension of Major Members
Number Location and Function Dimension(mm) Dimension(in)
C550x400 Main Column 400X550 15.75X21.65
C460x230 Main Column 230X460 9.06X18.11
C600x230 Main Column 230X600 9.06x23.62
PB230X600 Plinth Beam 230x600 9.06x23.62
B230x1200 Main Beam 230x1200(h) 9.06x47.25(h)
B230x800 Main Beam 230x800(h) 9.06x31.50(h)
B230x900 Main Beam 230x900(h) 9.06x35.44(h)
Slab 120 Floors 120 thk. 4.73
Slab 150 Floors 150 thk. 5.91

2.0 REFERENCES

Geotechnical Investigation Report for KOT BAHADUR SHAH PS-6


ACI318-2014-Building Code Requirements for Structural Concrete and Commentary
MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 4 OF 46

UBC97-Uniform Building Code

3.0 ANALYSIS AND RESULTS

3.1 Calculation Parameters

 Seismic Load
Zone: 2A
Seismic Zone Factor, Z:0.15
Importance Factor for seismic load: 1.00
Response Modification Factor, R:5.5
 Dead Load
Materials Unit Weight (kg/m3) Unit Weight (lb/ft3)
Reinforced Concrete 2500 150
Plain Concrete 2300 144
Brick Masonry 2300 144
Backfill Compacted 1900 120
Saturated Soil 1900 120
Steel 7850 490
Exterior Wall/Interior Wall: 0.144(approximate weight of block+painting,etc)*9/12(exterior
wall thickness ) *9.84 (wall clear height)=1.06kip/ft
Ceramic Tiles Flooring+ 2in Thk. 1:2:4 C.C.= 40psf (2.0kN/m2)
Roof Slab Finishes: 1in screeding + 2in thermo pore sheet + 2.5in screeding = 58.48psf
(2.8kN/m2)
 Live Load
Roof Slab=20psf (0.96kN/m2)
Stair=100psf(4.79kN/m2)
 Load Conditions and combinations
For the design of building the loading conditions will be as per ACI 318. The various
load cases applied to structures in combination with the required strength factors. The
load combination producing the maximum resultant forces and moments shall be
adopted for the design of structural members.

3.2 Materials Properties

 Concrete Strength
The minimum concrete cylinder compressive strength at 28 days for structural members
MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 5 OF 46

and foundations are 3000 psi. The blinding concrete shall have minimum compressive
cylinder strength of 1000 psi at 28 days.
 Poisson’s Ratio for Concrete
Poisson’s ratio will be considered as 0.20 for all concrete strengths.
 Modulus of Elasticity
Modulus of elasticity of normal concrete will be worked out from following the formula:
Ec = 57000√fc (Psi)
Where fc’ is concrete cylinder compressive strength at 28 days.
 Steel Reinforcement
The reinforcing steel shall be deformed bars conforming to ASTM A615 Grade 60,
Fy=413.69 MPa, Fu=620.53 MPa

3.3 Foundation Design Parameters

The following geotechnical parameters were used in the design as


recommended in soil investigation report.
- Net Allowable Bearing Capacity = 0.80 kg/cm2
- Foundation Depth for building = 6ft below ground level

3.4 Calculation Detailed Sheet

See Appendix A for input, calculation and result exported by Etabs for structural analysis.
See Appendix B for Slab Analysis & Result. See Appendix C for Foundation Analysis &
Result.

4.0 RECOMMENTATIONS AND CONCLUSION

All concrete members have passed design requirements according to code ACI 318.
MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 6 OF 46

3-D View Longitudinal Reinforcing (ACI 318-14) -in2

3-D View Rebar Percentage for Columns (ACI 318-14)


MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 7 OF 46

Plan View - Story1 Longitudinal Reinforcing (ACI 318-14)-in2

Plan View - Story2 Longitudinal Reinforcing (ACI 318-14)-in2


MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 8 OF 46

Plan View - Story3 Longitudinal Reinforcing (ACI 318-14)-in2

Plan View - Story1 Shear Reinforcing For Plinth Beam (ACI 318-14)-in2
MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 9 OF 46

Plan View - Story2 Shear Reinforcing For Plinth Beam (ACI 318-14)-in2

Plan View - Stor3 Shear Reinforcing For Plinth Beam (ACI 318-14)-in2
MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 10 OF 46

3-D View Shear Reinforcing For Column (ACI 318-14)-in2


MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 11 OF 46

APPENDIX A
CALCULATION FOR MAIN STRUCTURE BY ETABS
MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 12 OF 46

1 Structure Data
1 Structure Data
This chapter provides model geometry information, including items such as story levels, point
coordinates, and element connectivity.
1.1 Story Data
Elevati
Height
Name on
in
in
Story3 118.1102 269.685
Story2 118.1102 151.5748
Story1 92.5197 33.4646
Base 0 -59.0551

1.2 Grid Data


Grid Grid Bubble Ordinate
Grid ID Visible
System Direction Location ft
G1 X 1 Yes End 0
G1 X 2 Yes End 13.1234
G1 X 3 Yes End 26.2467
G1 X 4 Yes End 39.3701
G1 X 5 Yes End 52.4934
G1 X 6 Yes End 65.6168
G1 X 7 Yes End 78.7402
G1 Y A Yes Start 0
G1 Y B Yes Start 7.874
G1 Y C Yes Start 13.4514
G1 Y D Yes Start 18.7008
G1 Y D1 Yes Start 24.6063
G1 Y E Yes Start 26.9029
G1 Y F Yes Start 40.3543

1.3 Mass
Include
Include Include Include Include Lump at Load
Name Added IsDefault Multiplier
Elements Loads Lateral Vertical Stories Pattern
Mass
MsSrc1 No Yes Yes Yes Yes Yes Yes Dead 1
MsSrc1 No Yes Yes Yes Yes Yes Yes Live 0.5
MsSrc1 No Yes Yes Yes Yes Yes Yes Finishes 1
MsSrc1 No Yes Yes Yes Yes Yes Yes Partion 1

UX UY UZ
Story
lb-s²/ft lb-s²/ft lb-s²/ft
Story3 23980.47 23980.47 23980.47
Story2 10275.12 10275.12 10275.12
Story1 14180.96 14180.96 14180.96
Base 772.04 772.04 772.04
2 Properties
This chapter provides property information for materials, frame sections, shell sections, and links.
MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 13 OF 46

2.1 Materials
Unit
E
Name Type ν Weight Design Strengths
lb/in²
lb/ft³
3000Psi Concrete 3122018.6 0.2 150 Fc=3000 lb/in²
Fy=60000 lb/in², Fu=90000
A615Gr60 Rebar 29000000 0.3 490
lb/in²

2.2 Frame Sections

Name Material Shape


Concrete
B230x800 3000Psi
Rectangular
Concrete
B230x900 3000Psi
Rectangular
Concrete
B350x1200 3000Psi
Rectangular
Concrete
C460x230 3000Psi
Rectangular
Concrete
C550x400 3000Psi
Rectangular
Concrete
C600x230 4000Psi
Rectangular
Concrete
PB230X600 3000Psi
Rectangular

Property data of frame sections:


MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 14 OF 46


MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 15 OF 46

2.3 Shell Sections


Total
Design Element
Name Material Thickness
Type Type
in
Slab 120 Slab Shell-Thin 3000Psi 4.7244
Slab150 Slab Shell-Thin 3000Psi 5.9055
3 Loads
This chapter provides loading information as applied to the model.
3.1 Load Patterns
MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 16 OF 46

Self Weight
Name Type Auto Load
Multiplier

Dead Dead 1
Live Live 0
Earthquake-X+ Seismic 0 UBC 97
Earthquake-X- Seismic 0 UBC 97
Earthquake-X Seismic 0 UBC 97
Earthquake-Y Seismic 0 UBC 97
Earthquake-Y+ Seismic 0 UBC 97
Earthquake-Y- Seismic 0 UBC 97
Finishes Dead 0
Partion Dead 0

3.2 Load Sets

Load Load
Load Set
Pattern lb/ft²
LoadSet1 Finishes 58.48
LoadSet1 Live 20.05
3.3 Auto Seismic Loading

UBC 97 Auto Seismic Load Calculation


This calculation presents the automatically generated lateral seismic loads for load pattern Earthquake-X+
according to UBC 97, as calculated by ETABS.
Direction and Eccentricity
Direction = X + Eccentricity Y
Eccentricity Ratio = 5% for all diaphragms
Structural Period
Period Calculation Method = Program Calculated
Coefficient, Ct [UBC 1630.2.2]
Structure Height Above Base, hn
Approximate Fundamental Period, Ta [UBC
1630.2.2 Eq. 30-8]
Program Calculated Period, T [UBC
1630.2.2.2]

Factors and Coefficients


Response Modification Factor, R [UBC Table 16-N]
Importance Factor, I [UBC Table 16-K]
Seismic Zone Factor, Z [UBC Table 16-I]
Soil Profile [UBC Table 16-J] = SD
Site Coefficient, Ca [UBC Table 16-Q]
Site Coefficient, Cv [UBC Table 16-R]

Equivalent Lateral Forces

Base Shear Coefficient [UBC 1630.2.1, Eq. 30-4]


MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 17 OF 46

maximum [UBC 1630.2.1, Eq. 30-5]

minimum [UBC 1630.2.1, Eq. 30-6]

Calculated Base Shear


Period Used W V Ft
Direction Vcoeff
(sec) (kip) (kip) (kip)
X + Ecc. Y 0.587 0 1558.3998 154.5313 0

Applied Story Forces

Story Elevation X-Dir Y-Dir


ft kip kip
Story3 22.4738 107.242 0
Story2 12.6312 29.441 0
Story1 2.7887 17.848 0
Base -4.9213 0 0
MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 18 OF 46


MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 19 OF 46

UBC 97 Auto Seismic Load Calculation


This calculation presents the automatically generated lateral seismic loads for load pattern Earthquake-X-
according to UBC 97, as calculated by ETABS.
Direction and Eccentricity
Direction = X - Eccentricity Y
Eccentricity Ratio = 5% for all diaphragms
Structural Period
Period Calculation Method = Program Calculated
Coefficient, Ct [UBC 1630.2.2]
Structure Height Above Base, hn
Approximate Fundamental Period, Ta [UBC
1630.2.2 Eq. 30-8]
Program Calculated Period, T [UBC
1630.2.2.2]

Factors and Coefficients


Response Modification Factor, R [UBC Table 16-N]
Importance Factor, I [UBC Table 16-K]
Seismic Zone Factor, Z [UBC Table 16-I]
Soil Profile [UBC Table 16-J] = SD
Site Coefficient, Ca [UBC Table 16-Q]
Site Coefficient, Cv [UBC Table 16-R]

Equivalent Lateral Forces

Base Shear Coefficient [UBC 1630.2.1, Eq. 30-4]

maximum [UBC 1630.2.1, Eq. 30-5]

minimum [UBC 1630.2.1, Eq. 30-6]

Calculated Base Shear


Period Used W V Ft
Direction Vcoeff
(sec) (kip) (kip) (kip)
X - Ecc. Y 0.587 0 1558.3998 154.5313 0

Applied Story Forces


MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 20 OF 46

Story Elevation X-Dir Y-Dir


ft kip kip
Story3 22.4738 107.242 0
Story2 12.6312 29.441 0
Story1 2.7887 17.848 0
Base -4.9213 0 0
MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 21 OF 46

UBC 97 Auto Seismic Load Calculation


This calculation presents the automatically generated lateral seismic loads for load pattern Earthquake-X
according to UBC 97, as calculated by ETABS.
Direction and Eccentricity
Direction = X
Structural Period
Period Calculation Method = Program Calculated
Coefficient, Ct [UBC 1630.2.2]
Structure Height Above Base, hn
Approximate Fundamental Period, Ta [UBC
1630.2.2 Eq. 30-8]
Program Calculated Period, T [UBC
1630.2.2.2]

Factors and Coefficients


Response Modification Factor, R [UBC Table 16-N]
Importance Factor, I [UBC Table 16-K]
Seismic Zone Factor, Z [UBC Table 16-I]
Soil Profile [UBC Table 16-J] = SD
Site Coefficient, Ca [UBC Table 16-Q]
Site Coefficient, Cv [UBC Table 16-R]

Equivalent Lateral Forces

Base Shear Coefficient [UBC 1630.2.1, Eq. 30-4]

maximum [UBC 1630.2.1, Eq. 30-5]

minimum [UBC 1630.2.1, Eq. 30-6]

Calculated Base Shear


Period Used W V Ft
Direction Vcoeff
(sec) (kip) (kip) (kip)
X 0.587 0 1558.3998 154.5313 0

Applied Story Forces


MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 22 OF 46

Story Elevation X-Dir Y-Dir


ft kip kip
Story3 22.4738 107.242 0
Story2 12.6312 29.441 0
Story1 2.7887 17.848 0
Base -4.9213 0 0
MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 23 OF 46

UBC 97 Auto Seismic Load Calculation


This calculation presents the automatically generated lateral seismic loads for load pattern Earthquake-Y
according to UBC 97, as calculated by ETABS.
Direction and Eccentricity
Direction = Y
Structural Period
Period Calculation Method = Program Calculated
Coefficient, Ct [UBC 1630.2.2]
Structure Height Above Base, hn
Approximate Fundamental Period, Ta [UBC
1630.2.2 Eq. 30-8]
Program Calculated Period, T [UBC
1630.2.2.2]

Factors and Coefficients


Response Modification Factor, R [UBC Table 16-N]
Importance Factor, I [UBC Table 16-K]
Seismic Zone Factor, Z [UBC Table 16-I]
Soil Profile [UBC Table 16-J] = SD
Site Coefficient, Ca [UBC Table 16-Q]
Site Coefficient, Cv [UBC Table 16-R]

Equivalent Lateral Forces

Base Shear Coefficient [UBC 1630.2.1, Eq. 30-4]

maximum [UBC 1630.2.1, Eq. 30-5]

minimum [UBC 1630.2.1, Eq. 30-6]

Calculated Base Shear


Period Used W V Ft
Direction Vcoeff
(sec) (kip) (kip) (kip)
Y 0.587 0 1558.3998 154.5313 0

Applied Story Forces


MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 24 OF 46

Story Elevation X-Dir Y-Dir


ft kip kip
Story3 22.4738 0 107.242
Story2 12.6312 0 29.441
Story1 2.7887 0 17.848
Base -4.9213 0 0
MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 25 OF 46

UBC 97 Auto Seismic Load Calculation


This calculation presents the automatically generated lateral seismic loads for load pattern Earthquake-Y+
according to UBC 97, as calculated by ETABS.
Direction and Eccentricity
Direction = Y + Eccentricity X
Eccentricity Ratio = 5% for all diaphragms
Structural Period
Period Calculation Method = Program Calculated
Coefficient, Ct [UBC 1630.2.2]
Structure Height Above Base, hn
Approximate Fundamental Period, Ta [UBC
1630.2.2 Eq. 30-8]
Program Calculated Period, T [UBC
1630.2.2.2]

Factors and Coefficients


Response Modification Factor, R [UBC Table 16-N]
Importance Factor, I [UBC Table 16-K]
Seismic Zone Factor, Z [UBC Table 16-I]
Soil Profile [UBC Table 16-J] = SD
Site Coefficient, Ca [UBC Table 16-Q]
Site Coefficient, Cv [UBC Table 16-R]

Equivalent Lateral Forces

Base Shear Coefficient [UBC 1630.2.1, Eq. 30-4]

maximum [UBC 1630.2.1, Eq. 30-5]

minimum [UBC 1630.2.1, Eq. 30-6]

Calculated Base Shear


Period Used W V Ft
Direction Vcoeff
(sec) (kip) (kip) (kip)
Y + Ecc. X 0.587 0 1558.3998 154.5313 0

Applied Story Forces


MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 26 OF 46

Story Elevation X-Dir Y-Dir


ft kip kip
Story3 22.4738 0 107.242
Story2 12.6312 0 29.441
Story1 2.7887 0 17.848
Base -4.9213 0 0
MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 27 OF 46

UBC 97 Auto Seismic Load Calculation


This calculation presents the automatically generated lateral seismic loads for load pattern Earthquake-Y-
according to UBC 97, as calculated by ETABS.
Direction and Eccentricity
Direction = Y - Eccentricity X
Eccentricity Ratio = 5% for all diaphragms
Structural Period
Period Calculation Method = Program Calculated
Coefficient, Ct [UBC 1630.2.2]
Structure Height Above Base, hn
Approximate Fundamental Period, Ta [UBC
1630.2.2 Eq. 30-8]
Program Calculated Period, T [UBC
1630.2.2.2]

Factors and Coefficients


Response Modification Factor, R [UBC Table 16-N]
Importance Factor, I [UBC Table 16-K]
Seismic Zone Factor, Z [UBC Table 16-I]
Soil Profile [UBC Table 16-J] = SD
Site Coefficient, Ca [UBC Table 16-Q]
Site Coefficient, Cv [UBC Table 16-R]

Equivalent Lateral Forces

Base Shear Coefficient [UBC 1630.2.1, Eq. 30-4]

maximum [UBC 1630.2.1, Eq. 30-5]

minimum [UBC 1630.2.1, Eq. 30-6]

Calculated Base Shear


Period Used W V Ft
Direction Vcoeff
(sec) (kip) (kip) (kip)
Y - Ecc. X 0.587 0 1558.3998 154.5313 0

Applied Story Forces


MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 28 OF 46

Story Elevation X-Dir Y-Dir


ft kip kip
Story3 22.4738 0 107.242
Story2 12.6312 0 29.441
Story1 2.7887 0 17.848
Base -4.9213 0 0
MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 29 OF 46

3.4 Load Combinations

Load Scale
Name Type Auto
Case/Combo Factor
DCon1 Dead 1.4 Linear Add Yes
DCon1 Finishes 1.4 No
DCon1 Partion 1.4 No
DCon2 Dead 1.2 Linear Add Yes
DCon2 Live 1.6 No
DCon2 Finishes 1.2 No
DCon2 Partion 1.2 No
DCon3 Dead 1.3 Linear Add Yes
DCon3 Live 1 No
DCon3 Finishes 1.3 No
DCon3 Partion 1.3 No
DCon3 Earthquake-X+ 1 No
DCon4 Dead 1.3 Linear Add Yes
DCon4 Live 1 No
DCon4 Finishes 1.3 No
DCon4 Partion 1.3 No
DCon4 Earthquake-X+ -1 No
DCon5 Dead 1.3 Linear Add Yes
DCon5 Live 1 No
DCon5 Finishes 1.3 No
DCon5 Partion 1.3 No
DCon5 Earthquake-X- 1 No
DCon6 Dead 1.3 Linear Add Yes
DCon6 Live 1 No
DCon6 Finishes 1.3 No
DCon6 Partion 1.3 No
DCon6 Earthquake-X- -1 No
DCon7 Dead 1.3 Linear Add Yes
DCon7 Live 1 No
DCon7 Finishes 1.3 No
DCon7 Partion 1.3 No
DCon7 Earthquake-X 1 No
DCon8 Dead 1.3 Linear Add Yes
DCon8 Live 1 No
DCon8 Finishes 1.3 No
DCon8 Partion 1.3 No
DCon8 Earthquake-X -1 No
DCon9 Dead 1.3 Linear Add Yes
DCon9 Live 1 No
DCon9 Finishes 1.3 No
DCon9 Partion 1.3 No
DCon9 Earthquake-Y 1 No
MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 30 OF 46

Load Scale
Name Type Auto
Case/Combo Factor
DCon10 Dead 1.3 Linear Add Yes
DCon10 Live 1 No
DCon10 Finishes 1.3 No
DCon10 Partion 1.3 No
DCon10 Earthquake-Y -1 No
DCon11 Dead 1.3 Linear Add Yes
DCon11 Live 1 No
DCon11 Finishes 1.3 No
DCon11 Partion 1.3 No
DCon11 Earthquake-Y+ 1 No
DCon12 Dead 1.3 Linear Add Yes
DCon12 Live 1 No
DCon12 Finishes 1.3 No
DCon12 Partion 1.3 No
DCon12 Earthquake-Y+ -1 No
DCon13 Dead 1.3 Linear Add Yes
DCon13 Live 1 No
DCon13 Finishes 1.3 No
DCon13 Partion 1.3 No
DCon13 Earthquake-Y- 1 No
DCon14 Dead 1.3 Linear Add Yes
DCon14 Live 1 No
DCon14 Finishes 1.3 No
DCon14 Partion 1.3 No
DCon14 Earthquake-Y- -1 No
DCon15 Dead 0.8 Linear Add Yes
DCon15 Finishes 0.8 No
DCon15 Partion 0.8 No
DCon15 Earthquake-X+ 1 No
DCon16 Dead 0.8 Linear Add Yes
DCon16 Finishes 0.8 No
DCon16 Partion 0.8 No
DCon16 Earthquake-X+ -1 No
DCon17 Dead 0.8 Linear Add Yes
DCon17 Finishes 0.8 No
DCon17 Partion 0.8 No
DCon17 Earthquake-X- 1 No
DCon18 Dead 0.8 Linear Add Yes
DCon18 Finishes 0.8 No
DCon18 Partion 0.8 No
DCon18 Earthquake-X- -1 No
DCon19 Dead 0.8 Linear Add Yes
DCon19 Finishes 0.8 No
DCon19 Partion 0.8 No
MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 31 OF 46

Load Scale
Name Type Auto
Case/Combo Factor
DCon19 Earthquake-X 1 No
DCon20 Dead 0.8 Linear Add Yes
DCon20 Finishes 0.8 No
DCon20 Partion 0.8 No
DCon20 Earthquake-X -1 No
DCon21 Dead 0.8 Linear Add Yes
DCon21 Finishes 0.8 No
DCon21 Partion 0.8 No
DCon21 Earthquake-Y 1 No
DCon22 Dead 0.8 Linear Add Yes
DCon22 Finishes 0.8 No
DCon22 Partion 0.8 No
DCon22 Earthquake-Y -1 No
DCon23 Dead 0.8 Linear Add Yes
DCon23 Finishes 0.8 No
DCon23 Partion 0.8 No
DCon23 Earthquake-Y+ 1 No
DCon24 Dead 0.8 Linear Add Yes
DCon24 Finishes 0.8 No
DCon24 Partion 0.8 No
DCon24 Earthquake-Y+ -1 No
DCon25 Dead 0.8 Linear Add Yes
DCon25 Finishes 0.8 No
DCon25 Partion 0.8 No
DCon25 Earthquake-Y- 1 No
DCon26 Dead 0.8 Linear Add Yes
DCon26 Finishes 0.8 No
DCon26 Partion 0.8 No
DCon26 Earthquake-Y- -1 No

4. Calculation Results
4.1 Modal Results
Table 4.1 - Modal Periods and Frequencies
Circular
Frequenc
Period Frequenc Eigenvalue
Case Mode y
sec y rad²/sec²
cyc/sec
rad/sec
Modal 1 0.7 1.428 8.9729 80.513
Modal 2 0.625 1.6 10.0561 101.1242
Modal 3 0.455 2.198 13.811 190.7447
Modal 4 0.261 3.829 24.0569 578.7347
Modal 5 0.233 4.286 26.9288 725.16
Modal 6 0.227 4.405 27.6763 765.9795
Modal 7 0.227 4.408 27.6947 766.9977
Modal 8 0.225 4.454 27.9864 783.2363
MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 32 OF 46

Circular
Frequenc
Period Frequenc Eigenvalue
Case Mode y
sec y rad²/sec²
cyc/sec
rad/sec
Modal 9 0.212 4.712 29.6047 876.439
Modal 10 0.188 5.319 33.4195 1116.8622
Modal 11 0.186 5.373 33.7577 1139.5835
Modal 12 0.175 5.708 35.8632 1286.1663
Modal 13 0.172 5.813 36.5212 1333.7989
Modal 14 0.16 6.258 39.3207 1546.1161
Modal 15 0.157 6.366 39.9982 1599.8582
Modal 16 0.147 6.782 42.6147 1816.0102
Modal 17 0.146 6.872 43.1786 1864.3896
Modal 18 0.138 7.222 45.374 2058.8042
Modal 19 0.135 7.424 46.6463 2175.8738
Modal 20 0.132 7.548 47.424 2249.0391

Table 4.2 - Modal Participating Mass Ratios (Part 1 of 2)


Period
Case Mode UX UY UZ Sum UX Sum UY Sum UZ
sec
Modal 1 0.7 0.7871 0.0001 0 0.7871 0.0001 0
Modal 2 0.625 0.0003 0.5337 0 0.7874 0.5338 0
Modal 3 0.455 0.0001 0.271 0 0.7875 0.8049 0
Modal 4 0.261 0.0126 0 0.0027 0.8001 0.8049 0.0027
Modal 5 0.233 0.0001 0 0.1231 0.8002 0.8049 0.1258
Modal 6 0.227 4.979E-05 2.866E-06 1.308E-05 0.8002 0.8049 0.1258
Modal 7 0.227 0.0038 9.558E-07 0.0004 0.8041 0.8049 0.1262
Modal 8 0.225 0.0798 4.353E-06 0 0.8838 0.8049 0.1262
Modal 9 0.212 0.0001 0 0.0173 0.884 0.8049 0.1435
Modal 10 0.188 0.0008 0.0001 0.0001 0.8848 0.805 0.1436
Modal 11 0.186 0.002 2.964E-05 0.0023 0.8868 0.805 0.1459
Modal 12 0.175 2.99E-05 0.0001 0.0013 0.8868 0.8051 0.1473
Modal 13 0.172 0.0012 0.0017 0 0.888 0.8068 0.1473
Modal 14 0.16 0.001 0.0287 1.567E-05 0.889 0.8356 0.1473
Modal 15 0.157 4.71E-05 0.0006 0.0105 0.889 0.8361 0.1578
Modal 16 0.147 0.0005 0.0055 0.0076 0.8895 0.8417 0.1655
Modal 17 0.146 0.0003 0.0084 0.0128 0.8898 0.8501 0.1782
Modal 18 0.138 6.983E-06 0.0005 0.0097 0.8898 0.8506 0.188
Modal 19 0.135 0 3.148E-05 0.0001 0.8898 0.8507 0.188
Modal 20 0.132 0.0004 5.75E-06 1.057E-06 0.8902 0.8507 0.188

Table 4.3 - Modal Participating Mass Ratios (Part 2 of 2)


Case Mode RX RY RZ Sum RX Sum RY Sum RZ
Modal 1 1.369E-05 0.0219 0.0002 1.369E-05 0.0219 0.0002
Modal 2 0.0545 3.774E-06 0.2366 0.0545 0.0219 0.2369
Modal 3 0.0031 0 0.5294 0.0576 0.0219 0.7662
Modal 4 5.734E-07 3.819E-05 1.234E-06 0.0576 0.0219 0.7662
Modal 5 2.734E-05 0.0373 0 0.0576 0.0592 0.7662
Modal 6 2.939E-05 0.0006 0.0007 0.0576 0.0598 0.7669
Modal 7 2.721E-06 0.0157 3.994E-05 0.0576 0.0755 0.767
Modal 8 1.91E-06 0.0475 3.96E-05 0.0576 0.1231 0.767
Modal 9 3.848E-06 0.0061 0 0.0576 0.1291 0.767
Modal 10 0.0001 0.0006 0.001 0.0577 0.1297 0.768
MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 33 OF 46

Case Mode RX RY RZ Sum RX Sum RY Sum RZ


Modal 11 2.71E-05 0.0191 0.0002 0.0578 0.1488 0.7681
Modal 12 2.952E-05 0.0006 0.0001 0.0578 0.1494 0.7682
Modal 13 0.0016 0.0005 0.0038 0.0594 0.1498 0.7721
Modal 14 0.0241 0.0001 0.0064 0.0834 0.15 0.7785
Modal 15 0.0098 0.0094 1.811E-05 0.0932 0.1594 0.7785
Modal 16 0.0048 0.0026 0.0189 0.0981 0.1619 0.7974
Modal 17 0.0147 0.0085 0.0152 0.1128 0.1704 0.8126
Modal 18 0.0022 0.0058 0.0004 0.1149 0.1763 0.8129
Modal 19 0.0002 4.2E-05 7.07E-06 0.1151 0.1763 0.8129
Modal 20 7.75E-06 0.0001 0.0001 0.1151 0.1764 0.813

Modal 1 Shape
MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 34 OF 46

Modal 2 Shape

Modal 3 Shape
MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 35 OF 46

APPENDIX B
SLAB ANALYSIS & RESULT
MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 36 OF 46

Ground Slab Thickness 4.73 in & Reinf. #3@ 5.9055 in(BOT) #3@ 5.9055in(TOP)
Slab Resultant Mmax Diagram - (1.2D+1.6L) [kip-ft/ft]
Capacity 1.69 kip-ft/ft

Ground Slab Thickness 4.73 in & Reinf. #3@ 5.9055 in(BOT) #3@ 5.9055in(TOP)
Deformed Shape - Displacements (1.2D+1.6L) [in]
Max Displacements-0.144in
MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 37 OF 46

Ground Slab Thickness 4.73 in & Reinf. #3@ 5.9055 in(BOT) #3@ 5.9055in(TOP)
Crack Width - Bottom Face - (1.2D+1.6L) [in]
Max Crack Width-0.0051in

Roof Slab Thickness 5.91in & Reinf. #3@ 5.9055 in(BOT) #3@ 5.9055in(TOP)
Slab Resultant Mmax Diagram - (1.2D+1.6L) [kip-ft/ft]
Capacity 0.8025 kip-ft/ft
MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 38 OF 46

Roof Slab Thickness 5.91in & Reinf. #3@ 5.9055 in(BOT) #3@ 5.9055in(TOP)
Deformed Shape - Displacements (1.2D+1.6L) [in]
Max Displacements-0.285in

Roof Slab Thickness 5.91in & Reinf. #3@ 5.9055 in(BOT) #3@ 5.9055in(TOP)
Crack Width - Bottom Face - (1.2D+1.6L) [in]
Max Crack Width-0.0016in
MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 39 OF 46

APPENDIX C
FOUNDATION ANALYSIS & RESULT
MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 40 OF 46

Calculation for Modulus of sub-grade reaction:


Qa=0.80X2.204+6X0.12=2.4832ksf (Allowable Bearing Capacity)
MSR=12XFOSXQa=12X3X2.4832=89.40 K/ft2/ft
In which, FOS=Factor of safety
MSR=Modulus of sub-grade reaction.

Foundation Layout
MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 41 OF 46

Analysis Loads (Dead_ABOVE) [kip, kip-ft]

Analysis Loads (Live_ABOVE) [kip, kip-ft]


MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 42 OF 46

Analysis Loads (Finishes_ABOVE) [kip, kip-ft]

Bearing Pressure - [lb/ft2]


MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 43 OF 46

Punching Shear Capacity Ratios/Shear Reinforcement

Foundation Reinf. Less Than #4@ 4.7244 in (Top), #4 @ 4.7244 in (Bot)


MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 44 OF 46

APPENDIX D
STAIR ANALYSIS & RESULT
MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 45 OF 46

1. Basic Parameters Of Stair Case


Thickness of stair slab: h=5.52in
Height of step: d=6.56in
Width of step: b=11.03in

Concrete: 3000psi, f’c=3.0ksi

2. Loads On Stair Case


The thickness of stair slab is 5.52 in.
Selfweight of stair slab:
5.52/12x0.15=0.069ksf
Selfwight of step:

(6.56x11.03/12X12)/( √(6.56+11.03)/12)x0.15/2=0.0353ksf

Total DL:
MFM MOGAS PROJECT (MFMMP)
PHASE-II, KBS (PS-6)

DETAIL DESIGN DOC. NO.: 1762-112-CAL-7102 REV: 0C PAGE 46 OF 46

0.0353+0.069=0.1043ksf
For live load, according to ACI 318, the value shall be the following:
LL=100psf=0.1 ksf
1.2DL+1.6LL=1.2x0.1043+1.6x0.1=0.2852ksf
So Mu shall be:

Mu=0.2852x10.112/8=4.38k·ft

The rebar for the stair case adopted :


#[email protected]

You might also like