0% found this document useful (0 votes)
76 views2 pages

00UMF611 - LAYOUT A ARRANGEMENT POWER HOUSE - Equipment Location Plan - 005

This document is an equipment location plan for a fixed type gas engine power plant project in Bima, Indonesia. It provides details on the client (PT. PLN Persero), contractor consortium (Wika - MDT), project name, job number, location, and revision details. The plan shows the layout and arrangement of equipment within the power house, including dimensions and labels for different areas. General notes specify that a 10 meter clear area is required around the powerhouse for storage, prefabrication, and erection activities during installation.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
76 views2 pages

00UMF611 - LAYOUT A ARRANGEMENT POWER HOUSE - Equipment Location Plan - 005

This document is an equipment location plan for a fixed type gas engine power plant project in Bima, Indonesia. It provides details on the client (PT. PLN Persero), contractor consortium (Wika - MDT), project name, job number, location, and revision details. The plan shows the layout and arrangement of equipment within the power house, including dimensions and labels for different areas. General notes specify that a 10 meter clear area is required around the powerhouse for storage, prefabrication, and erection activities during installation.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Equipment Location Plan

PT. PLN (Persero)


KONSORSIUM WIKA - MDT

REV. DOC NO.


Layout A arrangement power house 06EC16B-
DWG-102-40-003-08

COMPANY : PT. PLN (PERSERO)


CONTRACTOR : KONSORSIUM PT. WIJAYA KARYA (PERSERO)
TBK – MAN DIESEL AND TURBO
PROJECT NAME : FIXED TYPE GAS ENGINE POWER PLANT
PACKAGE IV
JOB NUMBER : 06EC16
LOCATION : Bima – INDONESIA
MDT NUMBER : 5303218_00UMF611

26/01/2018 2 AFC MDT MDT MDT


REV DATE PAGE DESCRIPTION PREP’D CHK’D APP’D
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

S1-LOOKING EAST
SCALE 1:75 PH01
C
PH01
C-OLD
PH01
B1
PH01
B
PH01
A

40700
M

700 8000 1000 31000

Important general notes:

Sufficient area on all sides of the powerhouse is to be provided


L
(at least 10 meter surrounding the building) for temporary storage of goods,
prefabrication purposes and erection. The area shall be covered with lean
L
concrete supplied by the civil contractor.
For the installation of the engine, generator and other heavy parts a
01SAM21 temporary wall opening of min. 15 metres width by 7 meters height is to be
provided at powerhouse axis 1 depending on accessibility for heavy load
trucks and trailers. Special care must be taken for the transportation area for
the engines. The area must be able to sustain an axle load of 30 tons of the
heavy load trailers.
The loads on steel construction of powerhouse resulting from intake air
system and exhaust gas system are shown on separate drawings.
For noise protection reasons all pipe installation openings are to be closed
by the erection contractor after finishing of piping works.
Floor openings for the pipework of the modules must not be underneath the
modules. Modules are to be bolted directly onto powerhouse floor, except
K with equipment that has separate foundation sockets. Use shim plates for
levelling where necessary. K
Concrete sleepers for pipe racks are to be supplied by civil contractor. The
final positioning and specification of the sleeper is to be done after finishing of
pipe work design.
Design of auxiliary structures must be calculated according to the local
requirements (earthquake, wind forces) and existing local standards by the
civil contractor.
All cable ducts to be covered with concrete plates (load capacity: 2000 kg/m²)

Notes for building contractor:

Building construction, access openings and transportation areas for engine


and accessories are to be executed according to MAN Diesel and Turbo
drawings and requirements.
J 01MJR10BS010 Attention: exhaust gas temperatures are about 400°C. Keep any combustible
material away from the exhaust gas system. J
Building floor and foundation surfaces are to be protected against water
and oil penetration. Anti-slip flooring is to be provided by the civil contractor
MR01 to a void accidents.
All foundations for pipe supports, walkways, etc. are to be provided by the
24100mm civil contractor.
The drainage systems for the entire power plant area and buildings are to
be provided by the civil contractor.
22770mm
Notes for installation works:
22300mm
02MJR31 During installation the erection manuals and assembly instructions of the
01MJG19 Suppliers and the Q10.09028-2104 "Site Manual (Specification for the provision
of services on MAN Diesel & Turbo power plant sites)" have to be followed.
H 01MJ Elastic hose connections must not be fitted under tension.
Measuring instruments have to be located in an easily accessible, protected H
20260mm MR01
and reachable way.

9453
19658mm All pipes have to be laid according to installation plans and related isometric
drawings. Pipes have priority during installation works e.g. cables are to be
01MJQ11
laid with by-passes where necessary. Existing pipes, equipment parts and
cables are to be temporarily removed where necessary for free access
01EKG11 during the installation works. Pipes are to be supported under consideration
01SAM11 of thermal expansion and so that they are free of vibration. Drains are to be

5010
17550mm located at the lowest points and vents at the highest points of the piping
systems. Fixed, sliding and loose bearing points are to be taken from the
MR01
16800mm single pipe isometric drawings.
2856

2715
Cables are to be installed in a way, so that there is free access to the

1785
equipment during use maintenance or repair. In order to achieve the optimized
G MR01 pipe arrangement, the position of equipment parts might change slightly during
550 design works. G
15300mm
15

01MJV11
01EGD12 01CDC01.02 01CDK01 01BLA01 01BLB01 01BLC01
01CDC01.01 KEYPLAN
NOTE

ONLY MAIN EQUIPMENT


SHOWN (SUFFICIENT FOR
STATIC CALCULATIONS)
F
F

S2-LOOKING WEST PH01


A
PH01
B
PH01
B1
PH01
C-OLD
PH01
C
PH TOP OF CONCRETE(FFL) = +15.30m
40700
SCALE 1:75 SOIL LEVEL = +15.00m

31000 1000 8000 700

0 0.75 1.5 2.25 3 3.75 7.5 METER


AFC: Approved For Construction!
01SAM21
E
E

Pcrs Mech Elct Pipg Civl I&C


REV DATE DESCRIPTION PREP RVW APVD
CHECKED
CUSTOMER

PT PLN (PERSERO)

CONSULTANT

D
EPC CONTRACTOR
D

PT. WIJAYA KARYA (PERSERO) Tbk MAN Diesel & Turbo

MANUFACTURE

01MJR10BS010

PROJECT
FIXED TYPE GAS ENGINE POWER PLANT
PACKAGE IV (FIXED POWER PLANT)

01MJR31
KSO WIKA - MDT PT PLN ENJINIRING(PERSERO) PT PLN (PERSERO)
ggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggg

C
24100mm C
MR01

/MR01

22300mm DATE: DATE: DATE:


01MJ 01MJV91 DWG. NO : 06EC16B-DWG-102-40-003-08
01MJG18
MDT NO : UMF611_DE_LH020_03
MR01
01MJQ11 --- --- --- --- --- --- --- --- ---
--- --- --- --- --- --- --- --- ---
19660mm --- --- --- --- --- --- --- --- ---
8483

B --- --- --- --- --- --- --- --- ---


01MJV21 50MJG71 --- --- --- --- --- --- --- --- ---
- R.Bhole 18.01.2018 V.Badgujar 22.01.2018 S.Augustin 22.01.2018 Drawing revised for AFC status.WIKA steel stru & Grids updated. AFC B
8047

01MJG10AP010 GEZEICHNET / GEZ. DATUM / GEPRÜFT / GEPR. DATUM / GENEHMIGT / GEN. DATUM / BESCHREIBUNG /
MR01 REV. DRAWN Drawn Date CHECKED CHK. DATE APPROVED BY APPR. DATE DESCRIPTION STAT.
01SAM12
5290

Allgemeintoleranz ISO 2768-mK Kanten ISO 13715 Oberflächenbeschaffenheit ISO 1302


Tolerance class acc. to ISO 2768-mK Edges acc. to ISO 13715 Indication of surface texture ISO 1302
MR01 17550mm
VERTRAULICH / CONFIDENTIAL
MR01 ZEICHN. NR. KUNDE / CUST. DRAWING NO.
MR01 06EC16B-DWG-102-40-003-08
3005

16800mm TYP / TYPE MAßSTAB / SCALE KUNDE / CUSTOMER PROJEKT NR / PROJECT NO WERKSTOFF / MATERIAL GEWICHT / WEIGHT
2256

3x18V51/60DF
2107

1:75 BIMA 5303218


1770

PROJEKT / PROJECT VORMATERIAL / BLANK

MR01 BIMA Equipment Location Plan


362 15300mm
POWER HOUSE
SECTION S1-S2

A
A
01MKA01GH010 01BAU01 01MJV21AP010 01MJG31 50ERB11 DATUM / DATE REV GEZEICHNET / DRAWN DOC TYPE DOKUMENT NR. / DOCUMENT NO. BLATT / SHEET REV/STAT SEITE/PAGE CAD-SYS.
22.01.2018 R.Bhole PDMS
ÄNDERUNG / REVISION GEPRÜFT / CHECKED
DRW 11831050001 05 von/of - von/of FORMAT
2700077392 V.Badgujar 09 AFC A0
Zeichnung ist Eigentum der MAN Diesel & Turbo SE. Weitergabe oder Vervielfältigung verboten, soweit nicht ausdürcklich gestattet. Schutzvermerk ISO 16016 ist zu beachten.
This drawing is the property of MAN Diesel & Turbo SE. The distribution or reproduction is prohibited unless explicitly authorized. Protection notice ISO 16016 is to be considered.
16 15 14 13 12 11 10 9 8 7 6 5 4
M

You might also like