Nimir Industrial Chemicals LTD: Chlor - Alkali Units

The document lists 24 maintenance jobs across various chemical production units for Nimir Industrial Chemicals Ltd dated 28/09/22. The jobs include addressing leaky pipes and valves, equipment repairs, cleaning jobs, and missing components across primary and secondary brine systems, cell room, Na-Hypo, Ca-Hypo, liquid chlorine, CPW, and HCl units. Most jobs are assigned medium priority with remarks noting task numbers, with two jobs labeled high priority shutdowns in the cell room.

Uploaded by

Umair Nasim
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views

Nimir Industrial Chemicals LTD: Chlor - Alkali Units

The document lists 24 maintenance jobs across various chemical production units for Nimir Industrial Chemicals Ltd dated 28/09/22. The jobs include addressing leaky pipes and valves, equipment repairs, cleaning jobs, and missing components across primary and secondary brine systems, cell room, Na-Hypo, Ca-Hypo, liquid chlorine, CPW, and HCl units. Most jobs are assigned medium priority with remarks noting task numbers, with two jobs labeled high priority shutdowns in the cell room.

Uploaded by

Umair Nasim
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Nimir Industrial Chemicals Ltd

Chlor - Alkali Units


Daily Maintenance Jobs Date:28
Sr# Description Executing Deptt
Primary Brine
1 Common Pit Sample point chocked Mechnical
2 03P01-AB need proper piping assembly Mechnical
3 03P04-B motor under electrical Electrical
4 03N-2 Reactor 2 outlet chennel FRP coating broke FRP
5 03P04-AB Suction lines need to be rerouted Mechnical
Secondary Brine
6 07P03-B fan cover abnormal sound Electrical
07P001-AB discharge line leaky from 2 points Mechnical

Cell Room
7 Caustic Head tank Leakage increased FRP
8 Caustic feed line near Heat Exchanger leaky FRP

Na-Hypo
9 34D02-C sight glass coller leaky FRP
10 34D01-A level tube valve need replacement Mechnical
11 34D03-A leaky from bottom FRP
12 Chlorine condensate line leaky FRP
13 Chlorine Manometer pipe leaky Instrument

Ca-Hypo
14 33P001-A discharge valve flange coller leaky FRP

Liquid Chlorine
15 Cl2 Blower cleaning Mechnical
16 Heatexchangers Cleaning Mechnical
17 Demister Dishend opening Mechnical
18 Cl2 Blower 22K001 seal changing Mechnical

CPW
19 V-402E&F suction lines to mixture tank pump missing Mechanical
20 V-403A&B top manhole missing Mechanical
21 V-301, V-302A&B level tubes and level transmiters faulty Instrument
22 V-301 and V-302B manhole seapage Mechanical
HCl
23 Furnace A is under Mech Mechanical
als Ltd

Date:28/09/22
Priority Remarks

Medium 13645
Medium 13646
Medium 13647
Medium 13648
Medium 13649

Medium 13650
Medium SHUT DOWN JOB

High SHUT DOWN JOB


Medium SHUT DOWN JOB

Medium 13652
Medium 13644
Medium
Medium 13642
Medium 13643

Medium 13651

Medium Project
Medium Project
Medium Project
Medium Project

Medium Project
Medium Project
Medium Project
Medium Project