BOQ FOR GYPSUM WALL PARTITION WORKS
PROJECT : DOWN TOWN VIEWS II - Proposed Residential & Commercial Builidng - (3-Towers) on
Plot No. 3370587, @ Zabeel Second Dubai-UAE
ITEM
DESCRIPTION QTY UNIT UNIT RATE AMOUNT (AED)
NO.
Installation of dry wall partition works type 1. all works as
1 per approved naterials and drawings including jointing & 100 M2 30 3,000.00
Taping
Installation of dry wall partition works type 2-6. All works as
2 per approved naterials and drawings including jointing & 100 M2 30 3,000.00
Taping
Installation of dry wall partition works type 2-6B. All works
3 as per approved naterials and drawings including jointing & 100 M2 30 3,000.00
Taping
Installation of dry wall partition works type 9. All works as
4 per approved naterials and drawings including jointing & 100 M2 27 2,700.00
Taping
Installation of dry wall partition works type 7. All works as
5 per approved naterials and drawings including jointing & 100 M2 27 2,700.00
Taping
Installation of dry wall partition works type 8. All works as
6 per approved naterials and drawings including jointing & 100 M2 30 3,000.00
Taping
Installation of dry wall partition works type 9. All works as
7 per approved naterials and drawings including jointing & 100 M2 25 2,500.00
Taping
Installation of dry wall partition works type 1 wet. All works
8 as per approved naterials and drawings including jointing & 100 M2 34 3,400.00
Taping
Installation of dry wall partition works type 1E. All works as
9 per approved naterials and drawings including jointing & 100 M2 32 3,200.00
Taping
Installation of partition shaft wall Type 8A1,2,B1,C,B2, A3D.
10 Allworks as per approved materials and drawings including 100 M2 34 3,400.00
jointing & taping.
Installation of dry wall partition above pod. All works as per
11 100 M2 34 3,400.00
approved naterials and drawings including jointing & Taping
Total 33,300.00
THIRTY THREE THOUSAND THREE HUNDRED DIRHAM ONLY.
NOTE 5% VAT IS EXCLUDED
PAYMENT TERMS
Payment shall be submitted within 15 days once the bill reaches 30,000AED. Otherwise, if in excess of 30,000AED
1
the payment shall be paid within 30 days.
Mobilization of 20,000 Dhs shall be paid after 15 days from site mobilization. To cope-up our intermittent
2
expenses and complete the works as per schedule.
No Retention. As this is only Labor Sub-Contract. Any concerns on workmanship durind inspection, we are ready
3
to rectify the works.