Itp Survillance Equipments

This document provides an inspection and test plan for the installation of surveillance equipment for the project "Construction of Satellite Monitoring Center - Wadi Al Markhiya". It outlines various activities to be inspected such as material delivery, storage and handling, calibration of testing equipment, and safety of the work area. Inspections will be conducted by the contractor, consultant, and Ashghal on a regular basis according to the project specifications to ensure compliance with the acceptance criteria and project requirements. Records of inspections and test results will be maintained.

Uploaded by

syed nadeem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
176 views

Itp Survillance Equipments

This document provides an inspection and test plan for the installation of surveillance equipment for the project "Construction of Satellite Monitoring Center - Wadi Al Markhiya". It outlines various activities to be inspected such as material delivery, storage and handling, calibration of testing equipment, and safety of the work area. Inspections will be conducted by the contractor, consultant, and Ashghal on a regular basis according to the project specifications to ensure compliance with the acceptance criteria and project requirements. Records of inspections and test results will be maintained.

Uploaded by

syed nadeem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 6

Project name: CONSTRUCTION OF SATELLITE MONITORING CENTER - WADI AL MARKHIYA Doc. no.

: xxxxxxxxxxxxx
Project Number: BP 2020 C 018 S Rev.: XXXXXXX
Date :13-12-2022
Inspection and Test Plan for Installation of Surveillance Equipment’s.
* Inspection & Test code
(R, S, W, H)
Control Records to

Third Party
Sl. Acceptance Responsible

Consultant
Contractor
Description of Activity Procedure/ Spec. / Frequency be

Sub-cont.
no Criteria person

Ashghal
codes/ standard generated

1 General

1.1 Verify the work permit are obtained  Project MEP


from the concerned authorities prior specification Prior to start Compliance to Coordinator, PTW (permit
H H R R N/A
to commencement of any activity  QCS 2014 the activity. project requirement. HSE, SE to work)

Approval of Method statement, ITP,  Project MEP


1.2 Material submittals, shop drawings specification Prior to start Compliance to Coordinator, Approved
H H R R N/A
etc.  QCS 2014 the activity project requirement. HSE, QC copies

1.3 Check for safety of the work area.  Ashghal Prior to start Compliance to MEP
Safety the activity project requirement Coordinator, H H S S N/A Start cards
regulations SE, HSE, QC

1.4 Calibration certificate of testing and  Project spec Every


measuring instrument. measuring Compliance to
equipment and project requirement Calibration
SE, QC H R R R N/A
testing certificate
equipment

Legend: R- Review
S- Surveillance inspection
W- Witness, raising of Inspection Request is not mandatory which shall be at the discretion of consultant/ Ashghal
H- Hold Point, raising of Inspection Request is mandatory

Page 1 of 6
Project name: CONSTRUCTION OF SATELLITE MONITORING CENTER - WADI AL MARKHIYA Doc. no.: xxxxxxxxxxxxx
Project Number: BP 2020 C 018 S Rev.: XXXXXXX
Date :13-12-2022
Inspection and Test Plan for Installation of Surveillance Equipment’s.
* Inspection & Test code
(R, S, W, H)
Control Records to

Third Party
Sl. Acceptance Responsible

Consultant
Contractor
Description of Activity Procedure/ Spec. / Frequency be

Sub-cont.
no Criteria person

Ashghal
codes/ standard generated

2.0 Material delivery storage and Handling

2.1 Cat6A cables delivery storage and  Project 1. In accordance


handling. specification with project
 Approved Up on delivery specification, shop
IP Indoor and Outdoor cameras material at site drawing, and
delivery and storage submission. method statement.
SE, QC H S S S N/A
 QCS 2014 2. Manufacture
recommendation.

2.2 Cat6A cables Material inspection  Project 1. In accordance


specification Up on delivery with project
Surveillance Equipment’s  Approved at site specification, shop Approved MIR
Inspection. material drawing, and xxxxxx, test
method statement. SE, QC H H H S N/A
submission. certificate,
 QCS 2014 2. Manufacture delivery note,
recommendation.

Legend: R- Review
S- Surveillance inspection
W- Witness, raising of Inspection Request is not mandatory which shall be at the discretion of consultant/ Ashghal
H- Hold Point, raising of Inspection Request is mandatory

Page 2 of 6
Project name: CONSTRUCTION OF SATELLITE MONITORING CENTER - WADI AL MARKHIYA Doc. no.: xxxxxxxxxxxxx
Project Number: BP 2020 C 018 S Rev.: XXXXXXX
Date :13-12-2022
Inspection and Test Plan for Installation of Surveillance Equipment’s.
* Inspection & Test code
(R, S, W, H)
Control Records to

Third Party
Sl. Acceptance Responsible

Consultant
Contractor
Description of Activity Procedure/ Spec. / Frequency be

Sub-cont.
no Criteria person

Ashghal
codes/ standard generated

3.0 Cat6A Structured Cabling Installation

3.1 Obtaining Civil and mechanical  Project 1. In accordance


clearance before installation specification with approved
 QCS 2014 method statement,
Visual shop drawing and
mentioned project checkllist-
inspection H
specification. SE, QC H S S N/A xxxxxx
for each item
2.As per
Manufacture
recommendation

3.2  Project 1. In accordance


specification with approved
 QCS 2014 method statement,
Approved IR
Visual shop drawing and
xxxxxxx
inspection mentioned project SE, QC H H W S N/A
checkllist-
for each item specification.
xxxxxx
2.As per
Manufacture
recommendation
Legend: R- Review
S- Surveillance inspection
W- Witness, raising of Inspection Request is not mandatory which shall be at the discretion of consultant/ Ashghal
H- Hold Point, raising of Inspection Request is mandatory

Page 3 of 6
Project name: CONSTRUCTION OF SATELLITE MONITORING CENTER - WADI AL MARKHIYA Doc. no.: xxxxxxxxxxxxx
Project Number: BP 2020 C 018 S Rev.: XXXXXXX
Date :13-12-2022
Inspection and Test Plan for Installation of Surveillance Equipment’s.
* Inspection & Test code
(R, S, W, H)
Control Records to

Third Party
Sl. Acceptance Responsible

Consultant
Contractor
Description of Activity Procedure/ Spec. / Frequency be

Sub-cont.
no Criteria person

Ashghal
codes/ standard generated

3.3  Project 1. In accordance


1.Installation of CCTV specification with approved
system rack and its  QCS 2014 method statement,
components shop drawing and
project specification.
2. Installation of false 2.As per
ceiling/wall mounted camera Manufacture
3.Installation of roof mounted recommendation
camera
Visual
4.Identification & termination Approved IR
inspection SE, QC H H W S N/A
xxxxxxx
of all wires/cable for each item
5.Link cable connections
between all IDF AND MDF
Rooms.

Legend: R- Review
S- Surveillance inspection
W- Witness, raising of Inspection Request is not mandatory which shall be at the discretion of consultant/ Ashghal
H- Hold Point, raising of Inspection Request is mandatory

Page 4 of 6
Project name: CONSTRUCTION OF SATELLITE MONITORING CENTER - WADI AL MARKHIYA Doc. no.: xxxxxxxxxxxxx
Project Number: BP 2020 C 018 S Rev.: XXXXXXX
Date :13-12-2022
Inspection and Test Plan for Installation of Surveillance Equipment’s.
* Inspection & Test code
(R, S, W, H)
Control Records to

Third Party
Sl. Acceptance Responsible

Consultant
Contractor
Description of Activity Procedure/ Spec. / Frequency be

Sub-cont.
no Criteria person

Ashghal
codes/ standard generated

3.7 Mock Up installation of Cat6A Cable  Project 1. In accordance


and Installation of cameras specification with approved
 QCS 2014 method statement,
Visual shop drawing and Approved IR
inspection mentioned project SE, QC H H H S N/A xxxxxx
for each item specification. checkllist-
2.As per xxxxxx
Manufacture
recommendation
3.8 Complete Surveillance equipment’s  Project 1. In accordance
installation specification with approved
 QCS 2014 method statement,
Visual shop drawing and
mentioned project Approved IR
inspection for SE, QC H H H S N/A
specification. xxxxxx
each item
2.As per checkllist-
Manufacture xxxxx
recommendation

Prepared by (QA/QC Eng.) XXXXXX Reviewed by (QA/QC Eng.): XXXXX Approved by (PM): XXXXXXX
Legend: R- Review
S- Surveillance inspection
W- Witness, raising of Inspection Request is not mandatory which shall be at the discretion of consultant/ Ashghal
H- Hold Point, raising of Inspection Request is mandatory

Page 5 of 6
Project name: CONSTRUCTION OF SATELLITE MONITORING CENTER - WADI AL MARKHIYA Doc. no.: xxxxxxxxxxxxx
Project Number: BP 2020 C 018 S Rev.: XXXXXXX
Date :13-12-2022
Inspection and Test Plan for Installation of Surveillance Equipment’s.
* Inspection & Test code
(R, S, W, H)
Control Records to

Third Party
Sl. Acceptance Responsible

Consultant
Contractor
Description of Activity Procedure/ Spec. / Frequency be

Sub-cont.
no Criteria person

Ashghal
codes/ standard generated

Legend: R- Review
S- Surveillance inspection
W- Witness, raising of Inspection Request is not mandatory which shall be at the discretion of consultant/ Ashghal
H- Hold Point, raising of Inspection Request is mandatory

Page 6 of 6