0% found this document useful (0 votes)
499 views12 pages

Itp For Structural Steel Work

The document outlines an inspection and test plan for the fabrication and erection of steel structures for a 3000 BBL/Day semi-regenerative catalytic reforming unit. It details 40 items to be checked including reviewing design documents, testing materials, verifying welding procedures, inspecting assembly, ensuring lifting equipment is properly calibrated, and conducting a final inspection prior to hydrotesting. The plan specifies the characteristics to check for each item and the acceptance standards to ensure all fabrication and erection meets contract and industry requirements.

Uploaded by

nguyen thang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
499 views12 pages

Itp For Structural Steel Work

The document outlines an inspection and test plan for the fabrication and erection of steel structures for a 3000 BBL/Day semi-regenerative catalytic reforming unit. It details 40 items to be checked including reviewing design documents, testing materials, verifying welding procedures, inspecting assembly, ensuring lifting equipment is properly calibrated, and conducting a final inspection prior to hydrotesting. The plan specifies the characteristics to check for each item and the acceptance standards to ensure all fabrication and erection meets contract and industry requirements.

Uploaded by

nguyen thang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 12

EMPLOYER : PROJE

3000 BBL/DAY CAPACITY SEMI REG


ASSOCIATED FACILITIES

INSPECTION AND TEST PLAN FOR FABRICATION & ER


SR NO DESCRIPTION OF ITEMS CHARACTERISTICS TO BE TYPE / METHOD OF
CHECKED CHECK

DESIGN & Procedure REVIEW /APPROVAL


1 Steel Structure Specification Review Verification

Steel Structure Construction Ensure Approved drawing is


2 Drawing obtained Verification

3 Fabrication, Pre-assembly & Review Verification


Erection Procedure
4 Quality Control Procedure for Review Verification
Fabrication, Pre-assembly and
erection

5 Sand Blasting Procedure Review Verification


6 Painting Procedure Review Verification
7 Insulation Procedure Review Verification
8 Fire Proofing Procedure Review Verification
9 Non Destructive Test (NDT) Review Verification
Procedure
MATERIAL IDENTIFICATION
10 Beam, Channel, Angle Physical & chemical Quality Tests
properties
Dimensions and quality Measurment &
Visual
11 Steel Plates, Flat bar Physical & chemical Quality Tests
properties
Dimensions and quality Measurment &
Visual
12 Bolts, nuts Physical & chemical Quality Tests
properties
Dimensions and quality Measurement &
Visual
FABRICATION
13 Welding Procedure Correctness Scrutiny
Specification
14 Procedure Qualification Test And Desired property of welding Visual, & NDT Tests
Record establishing correctness of
welding
variables

EMPLOYER : PROJE

3000 BBL/DAY CAPACITY SEMI REG


ASSOCIATED FACILITIES

INSPECTION AND TEST PLAN FOR FABRICATION & ER


SR NO DESCRIPTION OF ITEMS CHARACTERISTICS TO BE TYPE / METHOD OF
CHECKED CHECK

15 Welders Performance Abilitty of welders to Visual & NDT Tests


Qualification make sound weld
16 Inspection of Structural Steel Weld Dimensions & Exactness Measurement & Visual
Fit-up, tack welding, dimensional
check

17 Welding Correctness Visual & NDT

18 Weld Repair Work Correctness Visual & NDT

Surface preparation Visual


19 Painting Surface finish Visual
Coating Thickness Elco Meter
20 Tagging Dimensions & Exactness Measurement &
Visual
CONTROL OF LIFTING, INSPECTION, MEASURING AND TESTING EQUIPMENT
Inspection measuring and test
21 equipment calibration Dimensions & Capacity Validity

22 Torque wrenches Dimensions & Capacity Validity


Lifting Gears (Belt, Hook, Chain
23 pulley, winch, hand Dimensions & Capacity Visual & Validity
tools)
24 Heavy Equipment (Crane, Capacity Visual & Validity
Fork-lift, Hydra)
ASSEMBLY & ERECTION
25 Receiving & Inspecing of Dimensions & Exactness Measurement &
structural steel parts Visual
26 Assemble the Structural steel parts Dimensional acceptance & Measurement & Visual
at ground Torquing

27 Check elevation of Dimensions Measurement &


foundation Visual
28 Location of anchor bolts (if Dimensions Measurement &
applicable) Visual
29 Embedded plates installation Dimensions Measurement &
(if applicable) Visual

EMPLOYER : PROJE

3000 BBL/DAY CAPACITY SEMI REG


ASSOCIATED FACILITIES

INSPECTION AND TEST PLAN FOR FABRICATION & ER


SR NO DESCRIPTION OF ITEMS CHARACTERISTICS TO BE TYPE / METHOD OF
CHECKED CHECK

Verification of lifting points & Visual & Inspection


support points (During Reposrt
30 transportation, Before & after Dimensions & Welding
lifting the structure)

31 Structural Steel Installation Dimensions & Visual


Correctness
32 Anchor Bolt Tightening Check Correctness & Bolt Measurement &
Tightening Visual
33 Machine Bolt Tightening Correctness & Bolt Measurement &
Check Tightening Visual
Alignment & verticality Check (after Dimensions & Correctness
34 bolt tightening and or Visual
welding)
35 Grouting Dimensions & Measurement &
Correctness Visual
Painting / Coating Repair works ( if
36 applicable) Coating Thickness Elco Meter

Final Inspection of accessories Measurement & Visual


(Ladders, stairs treads, safety
37 cages, Gratings, Davits, platforms, Dimensions & Exactness
roofing
etc.

38 Fire Proofing Perfectness Visual


39 Insulation Perfectness Visual
Punch list & Final Check list Completeness , asbult Visual Random
40 prior to release for hydrostatic test drawing,all NDT reports Verification of all
etc. records
P:PERFOMED BY W:WITNESSED BY, R:REVIEW BY, V:VERIFIED & APPROED BY, H:THOLD TILL CLEARED BY 1,
(1)-FABRICATOR, (2)- EPC CONTRACTOR, (3)-3RD PARTY , (4)-CLIENT, CR-CRITICAL , M-MAJOR, IR-INSPECTION RECORD, MEAS-M
PROJECT TITLE

APACITY SEMI REGENERATIVE CATALYTIC REFORMING UNIT &


CILITIES

FOR FABRICATION & ERECTION OF STEEL STRUCTURAL WORK


EXTENT OF CHECK REFERENCEE DOCUMENT ACCEPTANCE STANDARD

100% Contract/ Relevant Design Contract/ Relevant Design


Standard Standard
Contract/ Relevant Design
100% Standard AISC

100% Contract/ Relevant Standard/ AISC, ASTM & AWS


Specification
100% Contract/ Relevant Standard/ AISC, ASTM & AWS
Specification

100% Approved Specification SSPC SP 6, 7 & 10


100% Approved Specification SSPC SP 1,2,3, ASME B13.1
100% Approved Specification ASTM C547 & ASTM C585
100% Approved Specification API 2218
100% Approved Specification AISC & ASME

As per Specification Approved Specification A36 or equivalent

Random Approved Specification & A36 or equivalent


Drawing
As per Specification Approved Specification A36 or equivalent

Random Approved Specification & A36 or equivalent


Drawing
As per Specification Approved Specification SA 193 GR B7 / SA 194 2H

Random Approved Specification & ASME B1.1


Drawing
100% WPS ASME SEC IX

100% PQR ASME SEC IX

PROJECT TITLE

APACITY SEMI REGENERATIVE CATALYTIC REFORMING UNIT &


CILITIES

FOR FABRICATION & ERECTION OF STEEL STRUCTURAL WORK


EXTENT OF CHECK REFERENCEE DOCUMENT ACCEPTANCE STANDARD

100% WQT ASME SEC IX

100% Approved Drawing & WPS ASME B31.3 & AWSD1.1

As per approved WPS ASME B31.3 & AWSD1.1


specification
As per approved WPS ASME B31.3 & AWSD1.1
specification
100%
Random Approved Procedure Approved Procedure
Random
100% Approved Drawing Approved Procedure

100% Approved Specification Approved Procedure

100% Approved Specification Approved Procedure


100% Approved Specification Approved Procedure

100% Approved Specification Approved Procedure

100% Approved Procedure Approved Drawing

100% Approved Procedure Approved Drawing

100% Approved Procedure Approved Drawing

100% Approved Procedure Approved Drawing

100% Approved Procedure Approved Drawing

PROJECT TITLE

APACITY SEMI REGENERATIVE CATALYTIC REFORMING UNIT &


CILITIES

FOR FABRICATION & ERECTION OF STEEL STRUCTURAL WORK


EXTENT OF CHECK REFERENCEE DOCUMENT ACCEPTANCE STANDARD

100% Approved Procedure Approved Drawing & AISC

100% Approved Drawing AISC

100% Approved Procedure AISC

100% Approved Procedure AISC


100% Approved Drawing AISC

100% Approved Drawing Approved Procedure

Random Approved Procedure Approved Procedure

100% Approved Procedure Approved Drawing

Random Approved Procedure Approved Speicfication


Random Approved Procedure Approved Speicfication

Random Aproved Drawing, Data Sheet AISC, ASME B31.3

CLEARED BY 1,
IR-INSPECTION RECORD, MEAS-MEASUREMENT
CONTRACTOR :

REV. A

FORMAT OF RECORDS Inspection Scope REMARKS

P W R V

Approved Specification 2 4

Approved Steel Structure


drawings for construction 2 4

Approved Procedure 2 4

Approved Procedure 2 4

Approved Procedure 2 4
Approved Procedure 2 4
Approved Procedure 2 4
Approved Procedure 2 4
Approved Procedure 2 4

MILL TC 2 4

SITE ACC 1 2 4

MILL TC 2 4

SITE ACC 1 2 4

MILL TC 2 4

SITE ACC 1 2 4
ASME WPS Formats 1 2/3 3 4

ASME PQR Formats 1 2/3 3 4

Page 1 of 3

CONTRACTOR :

REV. A

FORMAT OF RECORDS Inspection Scope REMARKS

P W R V

ASME WQT Format 1 2/3 3 4

FIT-UP INSPCTION REPORT 1 2 4

WELDING INSPECTION 1 2 3 4
REPORT
REPAIR WELDING 1 2 3 4
INSPECTION REPORT
BLASTING & PAINTING REPORT
1 2 4

CHECKLIST 1 2

Calibration certificate 1 2 4

Calibration certificate 1 2 4
Calibration certificate 1 2 4

Calibration certificate 1 2 4

CHECKLIST 1 2 4

Pre-assembled Structural steel


Report 1 2 4

CHECKLIST 1 2 4

CHECKLIST 1 2 4

CHECKLIST 1 2 4

Page 2 of 3
CONTRACTOR :

REV. A

FORMAT OF RECORDS Inspection Scope REMARKS

P W R V

CHECKLIST 1 2 4

STRUCTURAL STEEL 1 2 4
INSTALLATION REPORT
ANCHOR BOLT 1 2 4
TIGHTENING REPORT
STRUCTURAL STEEL 1 2 4
INSTALLATION REPORT
CHECKLIST 1 2

STEEL STRUCTURE 1 2 4
GROUTING REPORT

CHECKLIST 1 2 4

ACCESSORIES INSTALATION
REPORT & CHECKLIST
1 2 4

FIRE PROOFING REPORT 1 2 4


INSULATION REPORT 1 2 4

PUNCH LIST REPORT 1 2 4

Page 3 of 3