EMPLOYER :                                                                PROJE
3000 BBL/DAY CAPACITY SEMI REG
                                                         ASSOCIATED FACILITIES
                                               INSPECTION AND TEST PLAN FOR FABRICATION & ER
 SR NO         DESCRIPTION OF ITEMS        CHARACTERISTICS TO BE       TYPE / METHOD OF
                                           CHECKED                     CHECK
DESIGN & Procedure REVIEW /APPROVAL
     1     Steel Structure Specification   Review                      Verification
           Steel Structure Construction    Ensure Approved drawing is
     2     Drawing                         obtained                   Verification
     3     Fabrication, Pre-assembly &     Review                      Verification
           Erection Procedure
     4     Quality Control Procedure for   Review                      Verification
           Fabrication, Pre-assembly and
           erection
     5     Sand Blasting Procedure         Review                      Verification
     6     Painting Procedure              Review                      Verification
     7     Insulation Procedure            Review                      Verification
     8     Fire Proofing Procedure         Review                      Verification
     9     Non Destructive Test (NDT)      Review                      Verification
           Procedure
MATERIAL IDENTIFICATION
   10      Beam, Channel, Angle            Physical & chemical         Quality Tests
                                           properties
                                           Dimensions and quality      Measurment &
                                                                       Visual
    11     Steel Plates, Flat bar          Physical & chemical         Quality Tests
                                           properties
                                           Dimensions and quality      Measurment &
                                                                       Visual
    12     Bolts, nuts                     Physical & chemical         Quality Tests
                                           properties
                                           Dimensions and quality      Measurement &
                                                                       Visual
FABRICATION
    13    Welding Procedure                  Correctness                 Scrutiny
          Specification
    14    Procedure Qualification Test And   Desired property of welding Visual, & NDT Tests
          Record                             establishing correctness of
                                             welding
                                             variables
              EMPLOYER :                                                                        PROJE
                                                              3000 BBL/DAY CAPACITY SEMI REG
                                                              ASSOCIATED FACILITIES
                                                  INSPECTION AND TEST PLAN FOR FABRICATION & ER
 SR NO       DESCRIPTION OF ITEMS            CHARACTERISTICS TO BE       TYPE / METHOD OF
                                             CHECKED                     CHECK
    15    Welders Performance                Abilitty of welders to      Visual & NDT Tests
          Qualification                      make sound weld
    16    Inspection of Structural Steel Weld Dimensions & Exactness     Measurement & Visual
          Fit-up, tack welding, dimensional
          check
    17    Welding                            Correctness                 Visual & NDT
    18    Weld Repair Work                   Correctness                 Visual & NDT
                                             Surface preparation         Visual
    19    Painting                           Surface finish              Visual
                                             Coating Thickness           Elco Meter
    20    Tagging                            Dimensions & Exactness      Measurement &
                                                                         Visual
CONTROL OF LIFTING, INSPECTION, MEASURING AND TESTING EQUIPMENT
          Inspection measuring and test
    21    equipment calibration              Dimensions & Capacity       Validity
    22    Torque wrenches                    Dimensions & Capacity       Validity
           Lifting Gears (Belt, Hook, Chain
    23     pulley, winch, hand                Dimensions & Capacity       Visual & Validity
           tools)
    24     Heavy Equipment (Crane,            Capacity                    Visual & Validity
           Fork-lift, Hydra)
ASSEMBLY & ERECTION
    25    Receiving & Inspecing of            Dimensions & Exactness      Measurement &
          structural steel parts                                          Visual
    26     Assemble the Structural steel parts Dimensional acceptance &   Measurement & Visual
           at ground                           Torquing
    27     Check elevation of                 Dimensions                  Measurement &
           foundation                                                     Visual
    28     Location of anchor bolts (if       Dimensions                  Measurement &
           applicable)                                                    Visual
    29     Embedded plates installation       Dimensions                  Measurement &
           (if applicable)                                                Visual
                EMPLOYER :                                                                       PROJE
                                                             3000 BBL/DAY CAPACITY SEMI REG
                                                             ASSOCIATED FACILITIES
                                                  INSPECTION AND TEST PLAN FOR FABRICATION & ER
 SR NO        DESCRIPTION OF ITEMS            CHARACTERISTICS TO BE       TYPE / METHOD OF
                                              CHECKED                     CHECK
           Verification of lifting points &                               Visual & Inspection
           support points (During                                         Reposrt
    30     transportation, Before & after     Dimensions & Welding
           lifting the structure)
    31     Structural Steel Installation      Dimensions &                Visual
                                              Correctness
    32     Anchor Bolt Tightening Check       Correctness & Bolt          Measurement &
                                              Tightening                  Visual
    33     Machine Bolt Tightening            Correctness & Bolt          Measurement &
           Check                              Tightening                  Visual
           Alignment & verticality Check (after Dimensions & Correctness
    34     bolt tightening and or                                          Visual
           welding)
    35     Grouting                            Dimensions &                Measurement &
                                               Correctness                 Visual
           Painting / Coating Repair works ( if
    36     applicable)                          Coating Thickness          Elco Meter
           Final Inspection of accessories                                 Measurement & Visual
           (Ladders, stairs treads, safety
    37     cages, Gratings, Davits, platforms, Dimensions & Exactness
           roofing
           etc.
    38     Fire Proofing                       Perfectness                 Visual
    39     Insulation                          Perfectness                 Visual
           Punch list & Final Check list         Completeness , asbult     Visual Random
    40     prior to release for hydrostatic test drawing,all NDT reports   Verification of all
                                                 etc.                      records
P:PERFOMED BY W:WITNESSED BY, R:REVIEW BY, V:VERIFIED & APPROED BY, H:THOLD TILL CLEARED BY 1,
(1)-FABRICATOR, (2)- EPC CONTRACTOR, (3)-3RD PARTY , (4)-CLIENT, CR-CRITICAL , M-MAJOR, IR-INSPECTION RECORD, MEAS-M
                    PROJECT TITLE
APACITY SEMI REGENERATIVE CATALYTIC REFORMING UNIT &
CILITIES
FOR FABRICATION & ERECTION OF STEEL STRUCTURAL WORK
       EXTENT OF CHECK          REFERENCEE DOCUMENT             ACCEPTANCE STANDARD
                100%                Contract/ Relevant Design    Contract/ Relevant Design
                                            Standard                     Standard
                              Contract/ Relevant Design
                100%          Standard                                     AISC
                100%            Contract/ Relevant Standard/        AISC, ASTM & AWS
                                        Specification
                100%         Contract/ Relevant Standard/           AISC, ASTM & AWS
                             Specification
                100%                 Approved Specification          SSPC SP 6, 7 & 10
                100%                 Approved Specification      SSPC SP 1,2,3, ASME B13.1
                100%                 Approved Specification      ASTM C547 & ASTM C585
                100%                 Approved Specification              API 2218
                100%                 Approved Specification            AISC & ASME
      As per Specification           Approved Specification          A36 or equivalent
      Random                        Approved Specification &         A36 or equivalent
                                           Drawing
      As per Specification           Approved Specification          A36 or equivalent
      Random                        Approved Specification &         A36 or equivalent
                                           Drawing
      As per Specification           Approved Specification      SA 193 GR B7 / SA 194 2H
      Random                        Approved Specification &            ASME B1.1
                                           Drawing
      100%                                 WPS                     ASME SEC IX
      100%                                 PQR                     ASME SEC IX
                  PROJECT TITLE
APACITY SEMI REGENERATIVE CATALYTIC REFORMING UNIT &
CILITIES
FOR FABRICATION & ERECTION OF STEEL STRUCTURAL WORK
       EXTENT OF CHECK       REFERENCEE DOCUMENT            ACCEPTANCE STANDARD
      100%                                 WQT                     ASME SEC IX
      100%                        Approved Drawing & WPS      ASME B31.3 & AWSD1.1
      As per approved                      WPS                ASME B31.3 & AWSD1.1
      specification
      As per approved                      WPS                ASME B31.3 & AWSD1.1
      specification
      100%
      Random                  Approved Procedure             Approved Procedure
      Random
      100%                           Approved Drawing          Approved Procedure
      100%                         Approved Specification      Approved Procedure
      100%                         Approved Specification      Approved Procedure
      100%                       Approved Specification      Approved Procedure
      100%                       Approved Specification      Approved Procedure
      100%                        Approved Procedure          Approved Drawing
      100%                        Approved Procedure          Approved Drawing
      100%                        Approved Procedure          Approved Drawing
      100%                        Approved Procedure          Approved Drawing
      100%                        Approved Procedure          Approved Drawing
                 PROJECT TITLE
APACITY SEMI REGENERATIVE CATALYTIC REFORMING UNIT &
CILITIES
FOR FABRICATION & ERECTION OF STEEL STRUCTURAL WORK
       EXTENT OF CHECK      REFERENCEE DOCUMENT           ACCEPTANCE STANDARD
      100%                        Approved Procedure       Approved Drawing & AISC
      100%                         Approved Drawing                 AISC
      100%                        Approved Procedure                AISC
      100%                        Approved Procedure                AISC
         100%                        Approved Drawing                  AISC
         100%                        Approved Drawing           Approved Procedure
         Random                      Approved Procedure         Approved Procedure
         100%                        Approved Procedure          Approved Drawing
         Random                      Approved Procedure        Approved Speicfication
         Random                      Approved Procedure        Approved Speicfication
         Random                  Aproved Drawing, Data Sheet     AISC, ASME B31.3
CLEARED BY 1,
IR-INSPECTION RECORD, MEAS-MEASUREMENT
                         CONTRACTOR :
                                            REV.         A
 FORMAT OF RECORDS            Inspection Scope       REMARKS
                               P     W R     V
Approved Specification         2                 4
Approved Steel Structure
drawings for construction      2                 4
Approved Procedure             2                 4
Approved Procedure             2                 4
Approved Procedure             2                 4
Approved Procedure             2                 4
Approved Procedure             2                 4
Approved Procedure             2                 4
Approved Procedure             2                 4
            MILL TC            2                 4
           SITE ACC            1    2            4
            MILL TC            2                 4
           SITE ACC            1    2            4
            MILL TC            2                 4
           SITE ACC            1    2            4
          ASME WPS Formats      1    2/3 3        4
          ASME PQR Formats      1    2/3 3        4
                                                                Page 1 of 3
                          CONTRACTOR :
                                              REV.        A
 FORMAT OF RECORDS             Inspection Scope       REMARKS
                                P     W R      V
   ASME WQT Format              1    2/3 3        4
FIT-UP INSPCTION REPORT         1    2            4
     WELDING INSPECTION         1    2    3       4
          REPORT
        REPAIR WELDING          1    2    3       4
      INSPECTION REPORT
 BLASTING & PAINTING REPORT
                                1    2            4
        CHECKLIST               1    2
Calibration certificate         1    2            4
Calibration certificate         1    2            4
Calibration certificate           1    2            4
Calibration certificate           1    2            4
        CHECKLIST                 1    2            4
Pre-assembled Structural steel
Report                            1    2            4
        CHECKLIST                 1    2            4
        CHECKLIST                 1    2            4
        CHECKLIST                 1    2            4
                                                                  Page 2 of 3
                          CONTRACTOR :
                                                REV.        A
 FORMAT OF RECORDS               Inspection Scope       REMARKS
                                  P   W     R    V
           CHECKLIST              1    2            4
       STRUCTURAL STEEL           1    2            4
     INSTALLATION REPORT
         ANCHOR BOLT              1    2            4
      TIGHTENING REPORT
       STRUCTURAL STEEL           1    2            4
     INSTALLATION REPORT
         CHECKLIST        1   2
  STEEL STRUCTURE         1   2   4
  GROUTING REPORT
         CHECKLIST        1   2   4
ACCESSORIES INSTALATION
REPORT & CHECKLIST
                          1   2   4
   FIRE PROOFING REPORT   1   2   4
     INSULATION REPORT    1   2   4
     PUNCH LIST REPORT    1   2   4
                                      Page 3 of 3