0% found this document useful (0 votes)
53 views2 pages

Government of Andhra Pradesh: RD ST

The document summarizes the minutes of a sub-committee meeting held on August 20, 2009 to finalize material rates for the third month of the first quarter of the 2009-2010 fiscal year. Specifically: 1. The sub-committee finalized rates for cement, steel, and other materials for use in August 2009. 2. All superintending engineers were requested to communicate the new rates to executive engineers under their jurisdiction. 3. The rates listed, including for cement, steel rods, plates, and wire, are inclusive of all taxes unless otherwise noted.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
53 views2 pages

Government of Andhra Pradesh: RD ST

The document summarizes the minutes of a sub-committee meeting held on August 20, 2009 to finalize material rates for the third month of the first quarter of the 2009-2010 fiscal year. Specifically: 1. The sub-committee finalized rates for cement, steel, and other materials for use in August 2009. 2. All superintending engineers were requested to communicate the new rates to executive engineers under their jurisdiction. 3. The rates listed, including for cement, steel rods, plates, and wire, are inclusive of all taxes unless otherwise noted.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

GOVERNMENT OF ANDHRA PRADESH

Office of the Engineer-in-Chief


Public Health, `Kashana’,
A.C. Guards, Hyderabad – 4.
FAX No. 040 – 3393371 ENC (PH)

C.Memo.No.146/SSR/2009-10/Cement/T1/09. Dated:- 20-08-2009.

Sub:- Sub-Committee meeting held in the chambers of Engineer-in-Chief


(IW),I&CAD Dept. Hyderabad on 20-08-2009 @ 10.45 AM for review and
finalization of Cement, Steel and other material Rates for the month of
August 2009 (3rd month of 1st quarter) of 2009-10 SSR-Communicated –
Reg.

Ref:- Minutes of Sub-Committee meeting held on 20-08-2009 @ 10.45AM


***

It is to inform that the Sub-Committee have finalized the rates for the following
materials during the meeting held in the chamber‘s of Engineer-in-Chief (IW), I&CAD
Dept. Hyderabad on 20-08-2009 @ 10.45 AM for the month of August 2009 (3rd month of
1st quarter of 2009-10 SSR). Hence all the Superintending Engineers (PH) are requested to
take necessary action in the matter and to communicate the rates to all Executive Engineers
(PH) under their respective jurisdictions for adoption for the month of August 2009. All
the rates are inclusive of all taxes, unless otherwise mentioned.

Sl.No. Description of Material Rate in Rs. Unit


1 Cement 3,900.00 M.T
2 6mm M.S rods 30,000.00 M.T
3 M.S. Flats 30,000.00 M.T

4 Mild Steel, Structural Steel, i.e. 30,000.00 M.T


Angles, Channels &I. Sections
5 TMT bars
a HYSD bars - FE 415. 30,000.00 M.T
b HYSD bars - FE 500 30,500.00 M.T
6 M.S. Plates 34,500.00 M.T
7 P.C. drawn Wire / H.T. Wire 3mm. 44,000.00 M.T
8 P.C. drawn Wire / H.T. Wire 4mm. 43,000.00 M.T
9 H.R. Sheet in coils1.6 mm. 40,000.00 M.T
10 H.R. Sheet in coils2.0 mm 39,000.00 M.T
11 5.5/6.0 mm M.S. Wire rod coil 34,000.00 M.T

12 Foundry Grade Pig Iron (2.0 to 19,000.00 M.T


2.24) (Excluding Taxes)
C:\Documents and Settings\aaa\Desktop\steel&cement\2009\09-08-20- C.me.doc Page 1
of 2
To
All Superintending Engineers (PH)
B. CHANDRA SHEKER
forENGINEER-IN-CHIEF (PH)

Copy to Engineer-in Chief, GHMC, for information .


Copy to Chief Engineers, GHMC,GVMC &VMC for information.
Copy to Executive Engineer (1) & Executive Engineer (2) for information .
Copy to Dy.E.Es T1 to T7 sections of this office for information .

//F.B.O.//

EXECUTIVE ENGINEER (PH)

C:\Documents and Settings\aaa\Desktop\steel&cement\2009\09-08-20- C.me.doc Page 2


of 2

You might also like