WPSS Approval for Railway Bridge Fabrication

This document contains: 1) Approval of a Quality Assurance Plan (QAP) and Welding Procedure Specification Sheet (WPSS) for the fabrication of a 60m bow string girder bridge according to RDSO drawings. 2) A request to ensure work is carried out according to the approved QAP and WPSS by approved welders using approved consumables. 3) A request to provide inspection charge details for the RDSO, including the name of the work, estimate details, bridge details, fabrication work tonnage, total fabrication cost, and 1% of the cost to be deposited as inspection charges.

Uploaded by

Kaushal Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
111 views1 page

WPSS Approval for Railway Bridge Fabrication

This document contains: 1) Approval of a Quality Assurance Plan (QAP) and Welding Procedure Specification Sheet (WPSS) for the fabrication of a 60m bow string girder bridge according to RDSO drawings. 2) A request to ensure work is carried out according to the approved QAP and WPSS by approved welders using approved consumables. 3) A request to provide inspection charge details for the RDSO, including the name of the work, estimate details, bridge details, fabrication work tonnage, total fabrication cost, and 1% of the cost to be deposited as inspection charges.

Uploaded by

Kaushal Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

H7RETHRb-ATTY

èzHpria/Tele BSNL-0522-
2451299(O)Rly.-42952(0) HUT- 226011

of Railways
r/Fax 0522-2451299/2450398
Email ID- [email protected]
Governmentof India-Ministry
& Standards
Research Designs
Organisation
Lucknow- 226011

No. CBS/INSPWBG/HMM/AMBALA Date: 13.06.2022

Senior Divisional Engineer/ll


North Eastern Railway
Office of the
Divisional Railway Manager/Engg
Lucknow

Sub: Construction of 2 lane ROB wilh approaches at existing chainage Km 103+/1/Gr


120+850 (Design chainage Km 103+907 and Km120+985) of NH-730 under EF
mode in the state of Uttar Pradesh.
Ref: Your office letter No. W-218/LJN/721/RDSO/D-3A, dt.09.05.2022

***********

1. QAP & WPSS submitted in reference to above, for fabrication of 60m Bow String Girder as
per RDSO Drawing No. RDSO/B-10423/R series have been scrutinized and found in order
after minor corrections (incorporated in QAP & WPSS ). One set of approved QAP & WPSS
are enclosed herewith.
2. It shall be ensured that work is carried out as per approved QAP & WPSS by approved
welders and using consumables of approved RDSO firms. For these purpose, suitable
Railway officials may be nominated at your end.
3 You are also requested to deposit the inspection charges of RDSO and also provide details
in Performa given below:-
Name of work
(0
() Sanctioned estimate no. and date
(ii) Bridge details (No. of spans and span length)
Quantum of Bridge Girder Fabrication Work in Tonnage.
(iv)
Total cost of Steel Bridge Fabrication (includes cost of Raw material & cost
()
of fabrication)
1% of the above steel Bridge Fabrication Cost to be deposited as RDSO
(vi)
inspection charge
(vii) Chargeable Head

DA: As above

(Satish Chander)
ADE InsplB&S
For Director General/B&s

Mandour Ambala City, Haryana-134003


Ms HMM Infra Limited, Village-
Copy to:
(Satish Chahder)

7/o6/202 ADE /Insp/B&S


For Director General/B&S