Construction Equipment Rental List

The document lists various construction equipment and their rental rates per unit of time. There are 78 different pieces of equipment listed with codes from E.01 to E.78.a. The equipment includes excavators, bulldozers, cranes, compactors, generators, pumps, and various other machinery used in construction. For each item, the document provides the equipment name and the unit it is rented in, such as per hour, day, or month.

Uploaded by

tama saputra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
233 views174 pages

Construction Equipment Rental List

The document lists various construction equipment and their rental rates per unit of time. There are 78 different pieces of equipment listed with codes from E.01 to E.78.a. The equipment includes excavators, bulldozers, cranes, compactors, generators, pumps, and various other machinery used in construction. For each item, the document provides the equipment name and the unit it is rented in, such as per hour, day, or month.

Uploaded by

tama saputra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 174

HARGA SATUAN BIAYA ALAT

TAHUN 2022

KODE NAMA ALAT SATUAN


E.01 Asphalt Mixing Plant (Amp) Jam
E.02 Asphalt Finisher Jam
E.03 Asphalt Sprayer Jam
E.04 Bulldozer 100-150 Hp Jam
E.05 Compressor 4000-6500 L\M Jam
E.05.a Air Compressor Jam
E.06 Concrete Mixer 0.3-0.6 M³ Jam
E.07 Crane 10-15 Ton Jam
E.07.a Crane hari
E.07.b Crane Kecil hari
E.07.c Crane Besar hari
E.07.e Crane 5 Ton (Long Arm 15 M) Sewa-hari
E.07.f Mobile Crane ≤ 3 Ton Hari
E.07.g Sewa Crane Unit-hari
E.08 Dump Truck 3-4 M³, 10 Ton Jam
E.08.a Sewa Dump Truk (Dump Truck 3.5 Ton) hari
E.09 Dump Truck 10 Ton Jam
E.10 Excavator 80-140 Hp Jam
E.10.a Excavator Standard Jam
E.10.b Excavator (Long Arm) Jam
E.10.d Excavator 1 (Long Arm) + Ponton 1 Jam
E.10.e Sewa Excavator Type 225 Kapasitas 0,5 -1,0 M³ Hari
E.10.f Sewa Excavator (Excavator 80-140 Hp) hari
E.99 Mud Pump Hari
E.100.a Temporary Cassing Cid 12" Meter
E.101 Sewa Lahan ha-bulan
E.102 Reaming Ø 8 3/4" -14 3/4" Meter
E.102.a Reaming Ø 8 3/4" - 12" Meter
E.103 Pick Up Jam
E.104 Truck Cargo Jam
E.105 Pumping Test Unit Jam
E.106 Water Jetting Jam
E.11 Flat Bed Truck 3-4 M³ Jam
E.11 Flat Bed Truck 3-4 M³ Hari
E.12 Generator Set (Genset) Jam
E.12.a Sewa Genset 1500 Watt Hari
E.12.b Generator Set 5 Kw Sewa-hari
E.13 Motor Grader >100 Hp Jam
E.13.a Sewa Motor Grader (Motor Grader >100 Hp) hari
E.13.b Sewa Genset (15 Kva) hari
E.14 Track Loader 75-100 Hp Jam
E.14 Track Loader 75-100 Hp Hari
E.15 Wheel Loader 1.0-1.6 M³ Jam
E.15.a Sewa Whell Loader (Wheel Loader 1.0-1.6 M3) hari
E.16 Three Wheel Roller 6-8 T Jam
E.17 Tandem Roller 6-8 T. Jam
E.18 Tire Roller 8-10 T. Jam
E.18.a Pneumatic Tire Roller Jam
E.19 Vibratory Roller 5-8 T. Jam
E.19.a Vibrator Sewa-hari
E.19.b Sewa Vibro Roller (Vibratory Roller 5-8 T.) hari
E.20 Concrete Vibrator Jam
E.21 Stone Crusher Jam
E.22 Water Pump 70-100 Mm Jam

E.23 Water Tanker 3000-4500 L. Jam


E.23.a Sewa Water Tanker (Water Tanker 3000-4500 L.) hari
E.24 Pedestrian Roller Jam
E.25 Tamper Jam
E.25.a Tamper (Pemadatan Lapis Dasar) Jam
E.25.b Tamper (Pemadatan Timbunan) Jam
E.25.b Pemadatan Timbunan (Stamper) Sewa-hari
E.25.c Stamper Unit/hr
E.26 Jack Hammer Jam
E.26.a Jack Hammer Sewa-hari
E.26.b Jack Hammer bh
E.27 Fulvi Mixer Jam
E.28 Concrete Pump Jam
E.29 Trailer 20 Ton Jam
E.29.a Trailer 28 Ton Jam
E.30 Pile Driver + Hammer Jam
E.30.c Pile Driver Kohering K-50 Jam
E.30.d Pile Driver Kohering K-80 Jam
E.31 Crane On Track 35 Ton Jam
E.32 Welding Set Jam
E.33 Bore Pile Machine Jam
E.34 Asphalt Liquid Mixer Jam
E.35 Trailler 15 Ton Jam
E.36 Cold Milling Jam
E.37 Rock Drill Breaker Jam
E.37.a Rock Drill Breaker + Excavator Jam
E.38 Cold Recycler Jam
E.39 Hot Recycler Jam
E.40 Aggregat (Chip) Spreader Jam
E.41 Asphalt Distributor Jam
E.42 Slip Form Paver Jam
E.43 Concrete Pan Mixer Jam
E.43.a Batching Plant (Concrete Pan Mixer) Jam
E.44 Concrete Breaker Jam
E.45 Aspahlt Tanker Jam
E.46 Cement Tanker Jam
E.47 Concrete Mixer (350) Jam
E.48 Vibrating Rammer Jam
E.49 Truk Mixer (Agitator) Jam
E.49.a Truck Mixer Jam
E.50 Bore Pile Machine Dia 60 Jam
E.51 Crane On Track 75-100 Ton Jam
E.52 Blending Equipment Jam
E.53 Bar Bender Jam
E.54 Alat Pemotong (Chainsaw) Jam
E.54.a Alat Pemotong (Chainsaw) Sewa-hari
E.54.b Mesin Potong Rumput Sewa-hari
E.54.c Mesin Cat Marka Jalan Thermoplastic Jam
E.56 Grouting Pump Jam
E.57 Jack Hidrolic Jam
E.58 Mesin Las Jam
E.58.a Mesin Las Sewa-hari
E.58.b Las Listrik 250 A Diesel Sewa-hari
E.58.c Las Listrik 250 A Diesel Jam
E.58.e Mesin Las Listrik 250 A, Diesel hari
E.58.d Sewa Mesin Las (150a) hari
E.59 Pile Driver Leader, 75 Kw Jam
E.60 Pile Hammer Jam
E.61 Pile Hammer 2,5 Ton Jam
E.62 Stressing Jack Jam
E.62.a Stressing Jack Sewa-hari
E.63 Welding Machine, 300 A Jam
E.64.a Ponton 2 Jam
E.64.b Ponton Sewa-hari
E.65 Tongkang Jam
E.65.a Tongkang (Besar) 2000 Ton Jam
E.66 Perahu Jam
E.66.a Rakit Sewa-hari
E.68.a Sewa Pompa Submersible 3 M³/H Hari
E.68.b Pompa Air Diesel 5 Kw Sewa-hari
E.68.c Pompa Air Diesel 10 Kw Sewa-hari
E.68.d Pompa Air Diesel 20 Kw Unit
E.68.e Pompa Lumpur Diesel 2,5 Kw; 3" Sewa-hari
E.68.f Pompa Sedot Pasir Diesel 5 Kw; 3" Sewa-hari
E.68.g Pompa Dan Conveyor Beton Sewa-hari
E.68.h Pompa Air Diesel 5 Kw bh
E.68.i Pompa Air Diesel 10 Kw bh
E.68.j Pompa Air Diesel 20 Kw bh
E.69 Alat Pancang + Hammer 0,5 Ton Sewa-hari
E.69.a Alat Pancang + Hammer 1,0 Ton Sewa-hari
E.69.b Alat Pancang + Hammer 2 Ton Sewa-hari
E.69.c Alat Pancang Hammer 2 Ton hari
E.69.d Alat Pancang Tenaga Uap/Diesel 8 Ton hari
E.69.e Tiang Pancang Beton Bertulang 40 X 40 Cm m

E.69.f Alat Pancang Kompressor Udara 8 Ton hari

E.70 Peralatan Potong Pipa T1/Manual (Gergaji)/Saw Hari


E.70.a Peralatan Potong Pipa T2/Mekanik/Cilinder Saw Hari
E.71 Boat, Speedboat, Motor 10 Hp Sewa-hari
E.73 Drilling Rig + Perlengkapan Jam
E.73.a Mesin Bor (Drilling Rig) Jam
E.74 Sewa Pipe Support Buah-hari
E.75 Sewa Scaffolding Unit-hari
E.76 Sewa Alat Jam
E.77 Sewa Tripot/Tackel & Handle Crane 2 T Hari
E.77.a Trackle / Tripod Tinggi 4-5 Cm Sewa-hari
E.77.b Trackle / Tripod Sewa-hari
E.77.c Trackle / Tripod Tinggi 3-5 Cm Sewa-hari
E.77.d Tripod Tinggi 5 M Sewa-hari
E.77.e Tripod Tinggi 7 M Sewa-hari
E.77.f Tripod Tinggi 5 M hari
E.78 Geo Listrik Sewa-hari
E.78.a Geo Listrik jam
E.79 Lift Sewa-hari
E.80 Molen Sewa-hari
E.80.a Molen Kapasitas 0,3 M3 Sewa-hari
E.80.b Molen (Concrete Mixer.350) Unit/hr
E.81 Kendaraan Pengangkut Sewa-hari
E.82 Theodolith Sewa-hari
E.82.a Pesawat Ukur/Theodolith Unit/hr
E.84 Waterpass Sewa-hari
E.85 Bor Listrik Sewa-hari
E.86 Gergaji Listrik Sewa-hari
E.86.a Gergaji Besi bh
E.86.b Chainshaw Jam
E.91 Sewa Komputer Sewa- bulan
E.93 Pahat Beton (Baja Keras) bh
E.94 Linggis (Baja Keras) bh
E.95 Palu / Godam (Baja Keras) bh
E.99 Lift hari
E.100 Alat Penyambung Tiang Pancang hari
E.101 Gunting Keramik hari
E.102 Sewa Alat Geolistrik hari
E.103 Transportasi Alat Dan Personil Ls
E.104 Biaya Pembuatan Laporan Ls
E.105 Penyusutan Mata Bor Ls
E.106 Sewa Pompa Tes hari
E.107 Meteran bh
E.108 Keranjang bh
E.109 Ganco bh
E.110 Alat Pelancip/Pisau Besar bh
E.111 Kereta Dorong Unit
E.112 Timbris Unit
E.113 Tang Pemotong Kawat bh
E.114 Kunci Pembengkok Tulangan bh
E.117 Waterpass bh
E.118 Borehole Ø 8 3/4" Meter
E.119 Peralatan Sampling Kualitas Air Sewa-hari
E.120 Peralatan Uji Parameter Lapangan Sewa-hari
E.69.b Alat Pancang + Hammer 2 Ton Jam
E.06xx Chainsaw Meter
E.50xx Waterpass Sewa-hari
E.62x Sewa Alat Cuting Laser Hari
E.58.d Mesin Las Listrik 250 A, Diesel bh
E.76.a Alat Listrik Set/hari
E.76.b Alat Bantu Pasang Pju Set/hari
E.103.a Pick Up Hari
E.121 Concrete Cutter Jam
E.122 Power Broom Jam
E.123 Aspal Slurriy Seal Truck Jam
E.124 Drum Mixer Jam
E.125 Silicon Seal Pump Jam
E.126 Asphalt Cutter 130 Feet/Mnt; 22 Hp Jam
E.127 Hydraulic Pump Jam
E.128 Manifold Jam
E.129 Kunci Torsi Jam
E.130 Pompa Generator Jam
E.29.b Trailer Tronton 30 T; 200 Hp Jam
E.33.a Bore Pile Machine, Diameter Maks 2m; 150 Hp jam
E.131 Crack Filling Machine; 12 Ltr/Mnt; 2,92 Hp Jam
E.68.k Pompa Graut Jam
E.132 Self Propelled Mixer Jam
E.133 Vibratory Padfoot Roller 25t Jam
E.23.b Watertank Truck Jam
E.135 Sewa Casing, Diameter 800 Mm Rp/M'/jam
E.51.a Crane On Track (10-15) Ton; 260 Hp Jam
E.136 Asphalt Cutter 130 Feet/Mnt; 22 Hp Jam
E.137 Hose Jam
E77 Sand Blaster Jam
E70 Hand Mixer Jam
E69 Gerinda Tangan Gws 750-100 4"; 1 Hp Jam
E78 Skyliftcrane Truck, 16 M, 1 Ton Jam

E73 Mesin Amplas Kayu Jam


(E68) Pompa (+Mixer) Pengisi Bahan Perekat Epoxy, 600 Watt Jam
E62 Stressing Jack; 46--100 Ton; 89 Hp Jam

E81 Stamper Jam


E80 Satu Set Alat Pembersihan Dan Pengecatan Ulang Jam
E.32.a Welding ; D 5400 Watt; 7,16 Hp Jam
(E85) Thermoplastic Road Marking Machine Jam
(E86) Cold Paint Spray Machine Jam
(E65) Mesin Pemotong Rumput Jam
E.99 Mud Pump Jam
E07 Sewa Alat Geofisikal, Elektrikal, Logging hari
E.82 Mesin Injeksi Beton Ls
E.83 Tabung Injeksi Ls
E.58.b Mesin Las Ls
E.100 Chain Block Ls
E.33.b Sewa Mesin Bor Jam
HARGA 2022 HARGA 2022 OVER HEAD 2%
11,572,342 11,345,433 226908.66
643,910 631,284 12625.68
72,109 70,695 1413.9

607,992 596,071 11921.42


282,744 277,200 5544

311,957 305,840 6116.8

249,125 244,240 4884.8

851,716 835,016 16700.32


6,496,750 6,369,363 127387.26
2,362,455 2,316,132 46322.64
3,543,682 3,474,198 69483.96
956,232 937,482 18749.64
833,159 816,823 16336.46
833,159 816,823 16336.46
415,558 407,410 8148.2

2,278,419 2,233,744 44674.88


735,505 721,083 14421.66
745,251 730,638 14612.76
281,245 275,730 5514.6

393,742 386,022 7720.44

731,236 716,898 14337.96


731,011 716,677 14333.54
4,222,494 4,139,700 82794

1,860,489 1,824,009 36480.18


281,245 275,730 5514.6

843,734 827,190 16543.8

1,349,974 1,323,504 26470.08


1,181,227 1,158,066 23161.32
59,249 58,087 1161.74

1,330,399 1,304,313 26086.26


520,865 510,652 10213.04
562,489 551,460 11029.2

899,232 881,600 17632

900,811 883,148 17662.96


517,956 507,800 10156

683,987 670,575 13411.5

1,124,978 1,102,920 22058.4

589,254 577,700 11554

3,837,444 3,762,200 75244

2,058,935 2,018,564 40371.28


452,342 443,473 8869.46

3,166,399 3,104,313 62086.26


490,490 480,873 9617.46

2,745,172 2,691,345 53826.9

303,041 297,099 5941.98

492,163 482,513 9650.26

547,552 536,816 10736.32


537,926 527,378 10547.56
426,462 418,100 8362

250,420 245,510 4910.2

2,798,064 2,743,200 54864

44,717 43,840 876.8

822,301 806,177 16123.54


45,594 44,700 894

241,332 236,600 4732

1,598,952 1,567,600 31352

120,967 118,595 2371.9

51,195 50,191 1003.82

112,498 110,292 2205.84

112,498 110,292 2205.84

524,465 514,181 10283.62


292,044 286,318 5726.36

29,412 28,835 576.7

394,304 386,573 7731.46


138,148 135,439 2708.78

218,994 214,700 4294

440,656 432,016 8640.32

795,784 780,180 15603.6

843,734 827,190 16543.8

447,678 438,900 8778

618,738 606,606 12132.12


787,485 772,044 15440.88
716,698 702,645 14052.9

158,824 155,710 3114.2

172,788 169,400 3388

45,900 45,000 900

643,300 630,686 12613.72


869,550 852,500 17050

474,504 465,200 9304

843,734 827,190 16543.8

8,317,727 8,154,634 163092.68


12,604,752 12,357,600 247152

554,302 543,433 10868.66


531,006 520,594 10411.88
874,650 857,500 17150

1,196,256 1,172,800 23456

1,340,420 1,314,137 26282.74


1,289,698 1,264,410 25288.2

813,785 797,828 15956.56


805,289 789,499 15789.98
110,058 107,900 2158

46,167 45,262 905.24

904,230 886,500 17730

904,230 886,500 17730

990,522 971,100 19422

1,038,156 1,017,800 20356

336,973 330,366 6607.32

77,963 76,434 1528.68

35,634 34,935 698.7


393,742 386,022 7720.44

281,245 275,730 5514.6

56,249 55,146 1102.92

51,149 50,146 1002.92

561,285 550,279 11005.58


70,649 69,264 1385.28

448,698 439,900 8798

899,983 882,336 17646.72


112,498 110,292 2205.84

531,553 521,130 10422.6

452,804 443,925 8878.5

6,676,001 6,545,099 130901.98


99,899 97,940 1958.8

164,914 161,680 3233.6

117,617 115,311 2306.22

2,699,948 2,647,008 52940.16


106,086 104,006 2080.12

168,747 165,438 3308.76

1,349,974 1,323,504 26470.08


281,245 275,730 5514.6

562,489 551,460 11029.2

112,498 110,292 2205.84

899,983 882,336 17646.72


112,498 110,292 2205.84

1,453,508 1,425,008 28500.16


1,618,506 1,586,771 31735.42
2,249,957 2,205,840 44116.8

2,249,957 2,205,840 44116.8

2,812,446 2,757,300 55146

3,374,935 3,308,760 66175.2

5,315,523 5,211,297 104225.94


12,993,501 12,738,726 254774.52
18,309,023 17,950,023 359000.46
337,494 330,876 6617.52

449,991 441,168 8823.36


1,181,227 1,158,066 23161.32
41,978 41,155 823.1

1,912,463 1,874,964 37499.28


428,563 420,160 8403.2

2,024,961 1,985,256 39705.12

224,996 220,584 4411.68

224,996 220,584 4411.68

843,734 827,190 16543.8

331,500 325,000 6500

428,400 420,000 8400

16,875 16,544 330.88

33,750 33,088 661.76

67,499 66,175 1323.5

3,578,557 3,508,389 70167.78


590,614 579,033 11580.66
590,614 579,033 11580.66
590,614 579,033 11580.66
590,614 579,033 11580.66
590,614 579,033 11580.66
590,614 579,033 11580.66
3,737,178 3,663,900 73278

467,148 457,988 9159.76

753,735 738,956 14779.12


168,747 165,438 3308.76

169,422 166,100 3322

569,014 557,857 11157.14


281,245 275,730 5514.6

321,300 315,000 6300

337,494 330,876 6617.52

168,747 165,438 3308.76

106,873 104,777 2095.54

103,048 101,027 2020.54

88,648 86,910 1738.2


56,249 55,146 1102.92

449,991 441,168 8823.36

177,184 173,710 3474.2

73,124 71,690 1433.8

118,123 115,807 2316.14

1,860,489 1,824,009 36480.18


590,614 579,033 11580.66
35,437 34,742 694.84

3,255,237 3,191,409 63828.18


3,374,935 3,308,760 66175.2

393,742 386,022 7720.44

393,742 386,022 7720.44

5,100,000 5,000,000 100000

119,810 117,461 2349.22

11,813 11,581 231.62

120,260 117,902 2358.04

42,975 42,132 842.64

771,511 756,383 15127.66


35,437 34,742 694.84

29,587 29,007 580.14

28,179 27,626 552.52

88,592,049 86,854,950 1737099


1,406,223 1,378,650 27573

337,494 330,876 6617.52

337,494 330,876 6617.52

149,073 146,150 2923

204,000 200,000 4000

127,500 125,000 2500

67,068 65,753 1315.06

615,825 603,750 12075

57,283 56,160 1123.2

169,728 166,400 3328

375,972 368,600 7372

48,626 47,673 953.46

89,196 87,447 1748.94


573,125 561,887 11237.74
99,866 97,908 1958.16

142,217 139,428 2788.56

48,626 47,673 953.46

39,232 38,463 769.26

37,250 36,520 730.4

42,668 41,831 836.62

341,304 334,612 6692.24

410,410 402,363 8047.26

583,442 572,002 11440.04


573,125 561,887 11237.74
38,334 37,582 751.64

583,440 572,000 11440

410,410 402,363 8047.26

86,088 84,400 1688

45,046 44,163 883.26

1,192,729 1,169,342 23386.84


48,626 47,673 953.46

37,250 36,520 730.4

38,605 37,848 756.96

106,080 104,000 2080

39,296 38,525 770.5

192,747 188,968 3779.36

21,216 20,800 416

37,562 36,825 736.5

184,702 181,080 3621.6

50,793 49,797 995.94

142,217 139,428 2788.56

76,818 75,312 1506.24

69,720 68,353 1367.06

55,063 53,983 1079.66

3,871,920 3,796,000 75920

153,000 150,000 3000


408,000 400,000 8000

25,500 25,000 500

20,400 20,000 400

10,200 10,000 200

51,000 50,000 1000


132,149 129,558 2591.16
HARGA SATUAN BIAYA BAHAN BANGUNAN
TAHUN 2022

KODE NAMA BAHAN


M.001 Pasir Urug
M.001.a Pasir
M.001.b Pasir Halus (untuk HRS))
M.001.c Pasir Urug (Ada Unsur Lempung)
M.002 Pasir Beton
M.002.a Pasir Beton
M.003 Pasir Pasang
M.003.a Pasir Pasang
M.003.b Pasir Cor
M.003.c Pasir Silika
M.004 Sirtu
M.005 Bahan Timbunan
M.005.a Timbunan pasir
M.005.b Timbunan Porus
M.005.c Timbunan Porus
M.005.d Bahan Tanah Timbunan
M.006 Sewa pasir
M.007 Tanah Liat
M.008 Tanah Timbun
M.008.a Tanah Urug Taman/Katel
M.009 Galian tanah biasa
M.010 Kapur
M.010.a Kapur Padam
M.010.b Kapur Sirih
M.011 Batu belah
M.011.a Batu belah Wire mesh 5 mm ulir
M.011.b Batu 1 kg - 3 kg
M.011.q Batu belah Wire mesh 5 mm ulir
M.011.c Batu 3 kg - 5 kg
M.011.d Batu 5 kg - 10 kg
M.011.e Batu 10 kg - 30 kg
M.011.f Batu 30 kg - 50 kg
M.011.g Batu 50 kg - 100 kg
M.011.h Batu 100 kg - 200 kg
M.011.i Batu 200 kg - 300 kg
M.011.j Batu 200 kg - 500 kg
M.011.k Batu 300 kg - 400 kg
M.011.l Batu 400 kg - 500 kg
M.011.m Batu 500 kg - 650 kg
M.011.n Batu 650 kg - 800 kg
M.011.o Batu Kali
M.011.p Batu Belah Kali
M.012 Batu candi
M.013 Batu Granit
M.014 Batu muka
M.015 Batu Paras
M.015.a Batu Palimanan
M.015.b Batu Ampyangan Granit
M.015.c Batu Apung
M.016 Batu Pecah
M.016.a Stenslah/batu pecah tangan 2/3
M.016.b Batu pecah mesin 2/3
M.016.c Batu pecah mesin 1/1
M.016.d Batu pecah mesin 1/2
M.017 Batu tempel hitam
M.018 Batu Traso
M.019 Batu Kerikil (maks 30 mm)
M.020 Kerikil
M.020.a Kerikil (maks 30 mm)
M.020.b Kerikil (2cm/3cm)
M.021 Koral
M.021.a Koral Beton
M.022 Bata merah
M.022.a Bata Merah
M.022.b Batu Bata Tahan Api
M.023 Bata Rooster
M.023.a Bata Rooster
M.024 Bata Berongga
M.024.a Bata Berongga
M.025 Bata Ringan tebal 7,5 cm
M.025.c Bata Ringan tebal 10 cm
M.026 Bata Pelapis
M.027 Paving block 6 cm natural
M.027.f Kansteen Uk. 15 x 40 x 50 cm
M.027.b Paving block 8 cm natural
M.027.c Paving block segi enam natural
M.027.d Paving block segi enam warna
M.028 Paving block 6 cm berwarna
M.028.a Paving block 8 cm berwarna
M.028.b Paving Block K 300, t=6 cm
M.028.c Paving Block Tiga Berlian biasa
M.028.d Paving Block Tiga Berlian warna
M.028.e Paving Stone t 6 cm 20 x 20 cm K-300
M.028.f Paving Stone t 6 cm 10 x 20 cm K-300
M.028.g Paving Stone t 8 cm K-300
M.029 Chipping
M.029.a Chipping (kg)
M.030 Portland Cement (PC)
M.030.a Portland Cement (PC) Warna
M.030.b Semen merah
M.030.c Semen Grout
M.030.d Semen Merah
M.030.e Portland Cement (PC) Tahan Api
M.030.f Portland Cement (PC) 40kg
M.030.g Semen Warna
M.031 Arbocell
M.032 Mortar siap pakai (MSP)
M.033 Hollow Block (HB. 10)
M.033.a Hollow Block (HB. 15)
M.033.c Hollow Aluminium
M.033.d Hollow Block (HB. 20)
M.033.e Hollow Block (HB. 15)
M.033.f Hollow Block (HB. 10)
M.034 Rangka Metal Hollow 40.40.2 mm
M.035 Besi Hollow
M.036 Besi angker diameter 8
M.037 Besi beton Polos
M.037.a Besi beton Ø 12 mm
M.037.b Besi beugel : 0,005 x 0,05 x 500
M.037.c Besi Beton Ulir
M.038 Besi Lis Kaca (1x1) cm
M.039 Besi pengaku
M.039.a Besi pengaku dari profil siku
M.040 Besi Strip
M.040.a Besi Strip
M.040.b Besi Strip tebal 5 mm
M.041 Besi Scuare tube
M.042 Besi Siku L 30.30.3
M.042.a Besi siku L.50.50.5
M.043 Besi Profil
M.044 Profil siku
M.045 Pelat Setrip / 3x30x300 mm
M.046 Besi Plat Baja
M.046.a Besi plat baja tebal 2 mm
M.046.b Besi plat baja tebal 3 mm
M.047 Besi Baja IWF
M.048 Tulangan praktis 120 kg/m3
M.049.a Wire Mesh M6 Asli
M.050 Frame besi L30.30.3
M.051 Pembesian
M.052 Baja Tulangan
M.052.a Baja Tulangan untuk Dowel D3
M.052.b Baja Tulangan Polos U 24
M.052.c Baja Tulangan (Ulir) D32
M.052.d Baja Tulangan (Polos) U32
M.052.e Baja Tulangan (Ulir) D39
M.052.f Baja Tulangan (Ulir) D48
M.053 Baja profil L.40.40.4
M.053.a Baja profil L.50.50.5
M.053.b Turap Baja Profil Larsen lebar 350 mm
M.053.c Turap Beton Bertulang pre-cast 30x12 cm
M.053.d Turap Beton Bertulang pre-cast 40x15 cm
M.053.e Baja Profil
M.053.f Baja Clips & Adjustable
M.053.g Baja Struktur
M.054 Baja strip (0,2 x 2) cm
M.054.a Baja Bergelombang
M.054.b Baja Prategang
M.054.d Baja Ringan
M.055 PCI Girder L=17m
M.055.a PCI Girder L=21m
M.055.b PCI Girder L=26m
M.055.c PCI Girder L=32m
M.055.d PCI Girder L=36m
M.055.e PCI Girder L=41m
M.056 Kayu
M.056.a Kayu untuk landasan
M.056.b Kayu untuk dinding spul bak sirkulasi
M.057 Balok Kayu
M.057.a Kayu Usuk 5/7 (Balok Bekisting Biasa)
M.057.b Kayu Usuk 5/7 kelas III
M.057.c Balok Kayu, 6 x 12
M.057.d Balok kayu 8/12
M.057.e Balok kayu 8/12
M.057.f Balok Kayu, 6 x 12
M.057.g Balok kayu 8/12
M.057.h Balok kayu 8/12
M.057.i Balok Kayu, 6 x 12
M.057.j Balok kayu 8/12
M.057.k Balok kayu 8/12
M.058 Balok Kayu Kelas II
M.058.a Balok Kayu Kelas III
M.059 Kayu Balok Borneo
M.059.b Usuk : 5/7
M.059.c Papan (2x20) cm
M.059.d Papan (3x20) cm
M.059.g Usuk : 5/7
M.059.h Balok
M.059.i Papan (2x20) cm
M.059.j Papan (3x20) cm
M.059.k Papan (3x30) cm
M.059.l Reng : 2/3, 3/5
M.059.m Usuk : 5/7
M.059.n Balok
M.059.o Papan (2x20) cm
M.059.p Papan (3x20) cm
M.059.q Papan (3x30) cm
M.059.r Reng : 2/3, 3/5
M.059.s Usuk : 5/7
M.059.t Balok
M.059.w Papan (3x30) cm
M.060 Kayu kelas II
M.060.a Kayu kelas I
M.061.b Kayu Perancah I (papan) Expose
M.061.c Kayu Perancah II (balok) Biasa
M.061.d Kayu Perancah II (papan) Biasa
M.062 List Kayu profil
M.062.a List Kayu 2/4
M.062.b List Gypsum
M.063 Kaso 4/6 cm
M.063.a Kayu Kaso 5 X 7 cm Kelas I
M.063.b Kayu Kaso 5 x 7 cm Kelas II
M.063.c Kayu Kaso 5 x 7 cm Kelas III
M.064 Kayu Papan/Papan Kayu
M.065 Kayu Papan kelas I
M.066 Kayu Papan Kelas II
M.066.a Kayu papan klas 2 Borneo
M.067 Kayu Papan kelas III
M.067.a Kayu Papan Bekisting
M.068 Papan 2/20
M.068.a Papan 3/20 cm
M.068.aa Papan (3x30) cm
M.068.b Papan (3x30) cm
M.068.c Papan 2/20
M.068.d Papan 3/20 cm
M.068.e Papan (3x30) cm
M.068.f Papan 2/20
M.068.g Papan 3/20 cm
M.068.h Papan (3x30) cm
M.068.i Papan Kayu Jati Ex Malang (3x30) cm
M.068.j Reng : 2/3, 3/5
M.068.k Usuk : 5/7
M.068.l Balok
M.068.m Papan (2x20) cm
M.068.n Papan (3x20) cm
M.068.o Papan (3x30) cm
M.068.p Reng : 2/3, 3/5
M.068.q Usuk : 5/7
M.068.r Balok
M.068.s Papan (2x20) cm
M.068.t Papan (3x20) cm
M.068.u Papan (3x30) cm
M.068.v Reng : 2/3, 3/5
M.068.w Usuk : 5/7
M.068.x Balok
M.068.y Papan (2x20) cm
M.068.z Papan (3x20) cm
M.069 Kayu Papan (3x20) cm
M.070 Tiang kayu 5/7 kelas II, tinggi 3m'
M.071 Tiang kayu 8/12 kelas II Tinggi 4 m
M.072 Patok kayu 5/7 - 1m'
M.073 Patok kayu 5/7 (kayu kelas 2 Borneo)
M.074 Parquet

M.075.a Dolken Kayu Ø 8-10/400 cm


M.075.b Dolken kayu kelas III Ø 8 - 10 cm, panjang 4
M.075.c m
Kayu Dolken diameter 20 cm
M.075.d Kayu Dolken diameter 10 cm - 12 cm
M.075.e Kayu Galam dia 8-10cm
M.076 Kayu Acuan
M.077 Bekesting
M.077.a Kayu Bekisting
M.078 Kayu Perancah
M.079 Formwork Plate tebal 6 mm
M.080 Bambu
M.080.a Bambu Ø 8 - 10 cm
M.080.b Bambu Ø 8 - 10 cm, panjang 4 m
M.080.c Bambu diameter 6-8/600 cm
M.080.d Gedeg (2.00 x 3.00) m
M.081 Bilik Bambu
M.082 Seseg bambu
M.083 Batang skoor L.40.40.4
M.086 Profil Alluminium
M.086.a Profil Allum "T"
M.087 Frame alluminium L.10.10.1
M.088 Allumunium Strip
M.089 Allumunium gel tebal 0,55
M.090 Allumunium Foil
M.091 Profil Kaca
M.092 Kaca Polos
M.092.a Kaca tebal 3 mm
M.092.b Kaca tebal 5 mm
M.092.c Kaca tebal 8 mm
M.092.d Kaca Polos tebal 12 mm
M.093 Kaca "Wireglassed" 5 mm
M.093.a Kaca Rayben tebal 3 mm
M.093.b Kaca Rayben tebal 5 mm
M.093.c Kaca Rayben tebal 8 mm
M.093.d Kaca Rayben tebal 12 mm
M.094 Kaca Buram tebal 12 mm
M.094.a Kaca Buram tebal 3 mm
M.094.b Kaca Buram tebal 5 mm
M.094.c Kaca Buram tebal 8 mm
M.095 Kaca Cermin tebal 3 mm
M.095.a Kaca Cermin tebal 5 mm
M.095.b Kaca Cermin tebal 6 mm
M.095.c Kaca Cermin tebal 8 mm
M.096 Kaca Patri 5 mm
M.096.a Glass Block
M.096.b Painting Glass
M.097 Kawat Ø 4 mm
M.097.a Kawat Ayam
M.098 Kawat ikat
M.099 Kawat bronjong
M.099.a Kawat bronjong Ø 2 mm
M.099.b Kawat bronjong Ø 2,7 mm
M.099.c Kawat bronjong Ø 3 mm
M.099.d Kawat bronjong
M.100 Kawat Beton
M.100.a Kawat Beton/Bendrat RRT
M.101 Kawat Las
M.101.a Kawat Las Listrik
M.101.b Kawat Las
M.101.c Kawat BC
M.102 Kawat jaring
M.102.a Kawat Galvanis 3 mm
M.102.b Kawat Galvanis 2 mm
M.103 Kawat Duri
M.103.a Kawat Duri
M.104 Kawat Nyamuk
M.105 Kawat seng 3 mm
M.106 Kawat kasa sampel
M.106.a Kawat Harmonika Gas
M.107 Jaring Kawat Baja Dilas
M.108 Geotekstil
M.109 Paku
M.109.a Paku 1 cm - 2,5 cm
M.109.b Paku 3 - 6 cm
M.109.c Paku 5-7 cm
M.109.d Paku 5 dan 7 cm
M.109.e Paku campuran 5cm dan 7 cm
M.109.f Paku 5-10 cm
M.109.g Paku 5 dan 10 cm
M.109.h Paku 5-12 cm
M.109.i Paku 7 cm
M.109.j Paku 7cm - 10 cm
M.109.k Paku 7 cm - 12 cm
M.109.l Paku 10 cm
M.109.m Paku 12 cm
M.109.n Paku 2"-3"
M.109.o Paku Kayu Segala Ukuran
M.110 Paku Biasa
M.110.a Paku biasa ½" - 1"
M.110.b Paku Biasa 2"-5"
M.111 Paku Skrup
M.111.a Paku Skrup 1 cm - 2,5 cm
M.111.b Paku skrup 3,5 "
M.111.c Paku/Skrup 5 cm
M.111.d Paku Skrup 10 cm
M.112 Paku tripleks
M.113 Paku asbes
M.114 Paku payung
M.115 Paku seng
M.116 Paku Pancing 6 x 23
M.116.a Cetakan armor kubus 0,3 x 0,3 x 0,3 m3
M.116.b Cetakan armor kubus 0,4 x 0,4 x 0,4 m3
M.116.c Cetakan armor 3B: Blok Beton Bergigi
M.116.d Cetakan armor 0,5 ton (Kubus)
M.116.e Cetakan armor 0,75 ton (Kubus)
M.116.f Cetakan armor 1,0 ton (Kubus)
M.116.g Cetakan armor 1,5 ton (Kubus)
M.116.h Cetakan armor 2,0 ton (Kubus)
M.116.i Cetakan armor 2,5 ton (Kubus)
M.116.x Cetakan armor 0,5 ton
M.117 Paku hak panjang 15 cm
M.118 Baut + Muur, Ø 100 mm - panjang 3-5 cm
M.119 Baut Ø 12 - 20 cm
M.119.a Baut Ø 12 mm panjang 5 cm
M.119.b Baut Ø 12 mm - panjang 20cm
M.119.c Baut
M.119.d Baut Angkur
M.120 Dinabolt Ø12 mm (10-15 cm)
M.121 Dynabolt / raamset Ø 8 mm
M.121.a Dynabolt / raamset Ø 8 mm panjang 4 - 5 cm
M.122 Fitting
M.122.a Fiting Flafond
M.123 Skrup Fixer
M.124 Reng 2 x 3 cm
M.124.a Reng 3 x 4 cm
M.124.b Reng : 2/3, 3/5
M.125 Triplek 3 mm
M.125.a Triplek 4 mm
M.126 Dinding triplek 4 mm
M.127 Gypsum board
M.128 Multiflex 12 mm
M.128.a Multiflex 18 mm
M.129 Multiplex tebal (8mm**)
M.129.a Multiplex tebal 9mm
M.130 Plywood (30 x 60) cm x 4 mm
M.130.a Plywood (30 x 60) cm x 4 mm
M.130.b Plywood 4 mm, 120 x 240
M.130.c Plywood (30 x 60) cm x 6 mm
M.130.d Plywood (60 x 120) cm x 4 mm
M.130.e Plywood (60 x 120) cm x 6 mm
M.131 Plywood Tebal 4 mm Ukuran (90x220) cm
M.131.a Plywood Tebal 9 mm
M.132 Teakwood 4 mm, 90 x 220
M.132.a Teakwood (30 x 60) cm x 4 mm
M.132.b Teakwood (60 x 120) cm x 4 mm
M.132.c Teakwood (120 x 240) cm x 4 mm
M.133 Wallpaper
M.133.a Wallpaper lebar 50 cm
M.134 Seng pelat
M.134.a Seng plat/pelat
M.134.b Seng pelat 3"x6"
M.134.c Seng plat 3 x 6" bjls 28
M.134.d Seng plat BJLS 30 L = 0.60 M
M.134.e Seng plat BJLS 30 L = 0.90 M
M.134.f Seng plat BJLS 28 (90 x 180) cm
M.134.g Seng plat BJLS 30 L = 0.60 M
M.134.h Seng plat BJLS 30 L = 0.90 M
M.135 Seng gelombang
M.135.a Seng gelombang

M.135.b Seng gel 3' x 6'


M.135.c Seng gelombang BJLS-30(t=0,05) tinggi 1,8 m' dan lebar 0,9 m'
M.136 Asbes Semen
M.137 Asbes gelombang
M.137.a Asbes Gelombang (92 cm x 250 cm)
M.137.b Asbes (1,00 x 1,00) m x 6 mm
M.137.c Asbes (1,00 x 1,00) m x 5 mm
M.137.d Asbes (1,00 x 1,00) m x 4 mm
M.137.e Asbes (1,00 x 1,00) m x 3,5 mm
M.138 Plafon asbes 3 mm(1x1m)
M.139 Rooflight 90 x 180
M.140 Sunscreen Aluminium
M.141 Bubung Stel Gelombang 0.92 m
M.141.a Bubung Stel Gelombang 1.05 m
M.141.b Bubung Stel Gelombang 1.08 m
M.141.c Bubung Genteng Biasa ex. Malang
M.141.d Bubung Genteng Press ex. Trenggalek

M.141.e Bubung Genteng Karang Pilang ex. Malang


M.141.f Bubung Genteng Karang Pilang ex.
M.141.g Trenggalek
Bubung Genteng Karang Pilang ex. Surabaya
M.141.h Bubung Genteng Palentong Kecil
M.141.i Bubung Genteng Beton
M.141.j Bubung Genteng Aspal
M.141.k Bubung Genteng Metal
M.141.l Bubung Seng Gelombang
M.141.m Bubung Atap Aluminium
M.141.n Bubung Atap Seng Galvalum
M.142 Akustik
M.142.a Akustik 60 x 120
M.142.b Akustik (30 x 60) cm
M.142.c Akustik (30 x 30) cm
M.143 Internal cove artistik 5 x 5 x 20 cm
M.144 Genteng Beton
M.144.a Genteng Biasa ex. Malang
M.144.b Genteng Press ex. Trenggalek
M.144.c Genteng Karang Pilang ex. Malang
M.144.d Genteng Karang Pilang ex. Trenggalek
M.144.e Genteng Karang Pilang ex. Surabaya
M.145 Genteng Aspal
M.146 Genteng Bubung Palentong
M.146.a Genteng Bubung Palentong Besar
M.146.b Genteng Bubung Kodok Glazuur
M.147 Sirap Kayu
M.147.a Atap Sirap
M.147.b Atap Polycarbonat
M.147.c Atap Seng Galvalum
M.148 Genteng Kodok Glazuur
M.149 Genteng Kodok palentong besar/super
M.150 Genteng Palentong Kecil
M.151 Genteng Metal
M.152 Pintu Aluminium
M.152.a Pintu Fiber KM
M.153 Pintu double taekwood rangka kayu
M.154 Pintu Lipat
M.155 Pintu Gulung Besi
M.156 Door Holder
M.157 Door Closer
M.158 Door Stop
M.158.a Grendel Pintu
M.158.b Grendel Jendela
M.158.c Hak Angin
M.159 Rolling Door Allumunium
M.160 Rel Pintu Sorong
M.161 Jendela kaca nako
M.161.a Jendela Naco
M.161.b Jendela Nako (Rangka + Kaca 5 mm)
M.162 Venections blinds dan vertical blinds (tirai)
M.163 Spring Knip
M.164 Engsel Pintu
M.164.a Engsel kupu-kupu
M.164.b Engsel tanam di las
M.164.c Engsel angin
M.168 Kunci slot
M.169 Kunci Tanam
M.169.a Kunci Tanam Biasa
M.169.b Kunci Tanam Antik
M.169.c Kunci Tanam KM
M.169.d Kunci Silinder
M.170 Kunci Lemari
M.171 Kait Angin
M.172 Bak Air Fiberglass
M.172.a Bak Mandi Fibre
M.173 Bak Cuci Piring Stainlessteel
M.174 Bak Cuci Piring Teraso
M.175 Bathcuip
M.175.a Tempat Sabun Keramik
M.175.b Afur Stainless
M.175.c Afur Plastic
M.176 Urinoir
M.177 Kloset Duduk
M.177.a Kloset Duduk Lux
M.178 Kloset Jongkok Porselen
M.178.a Kloset Jongkok Lux
M.179 Kloset Jongkok Teraso
M.180 Wastafel
M.180.a Wastafel Komplit (Kran + Sipon ) Lux
M.181 Waterdrain
M.182 Ubin pc abu-abu 20 x 20 cm
M.182.a Ubin pc abu-abu 30 x 30 cm
M.182.b Ubin pc abu-abu 40 x 40 cm
M.183 Ubin Granit 30 x 30 cm
M.183.a Ubin Granit 40 x 40 cm
M.184 Ubin Porselen
M.185 Ubin Teralux 30 x 30 cm
M.185.a Ubin Teralux 40 x 40 cm
M.185.b Ubin Teralux kerang 40 x 40 cm
M.185.c Ubin Teralux kerang30 x 30 cm
M.186 Ubin Teralux marmer 30 x 30 cm
M.186.a Ubin Teralux marmer 40 x 40 cm
M.186.b Ubin Teralux marmer 60 x 60 cm
M.187 Ubin Teraso 30 x 30 cm
M.187.a Ubin Teraso 40 x 40 cm
M.188 Ubin warna 20 x 20 cm
M.188.a Ubin warna 30 x 30 cm
M.188.b Ubin warna 40 x 40 cm
M.189 Ubin Keramik 10 x 33 cm
M.189.a Ubin Keramik 20 x 20 cm
M.189.b Ubin Keramik 30 x 30 cm
M.189.c Ubin Keramik 33 x 33 cm

M.190 Ubin Keramik artistik 10 x 20 cm


M.190.a Ubin Keramik artistik 10 x 10 cm atau 5 cm x 20 cm
M.191 Ubin keramik Mozaik 30 x 30 cm
M.192 Keramik artistik 5 cm x 20 cm
M.192.a Keramik artistik 10 x 20 cm
M.192.b Keramik artistik 20 cm x 20 cm
M.192.c Keramik Lantai 20 x 20 cm putih
M.192.d Keramik Lantai 20 x 20 cm warna/motif
M.192.e Keramik Lantai KM 20 x 20 cm
M.192.f Keramik Lantai 30 x 30 cm putih
M.192.g Keramik Lantai 30 x 30 cm warna/motif
M.192.h Keramik Lantai 40 x 40 cm putih
M.192.i Keramik Lantai 40 x 40 cm warna/motif

M.192.j Keramik Dinding 20 x 25 cm

M.192.k Keramik Lantai 5 x 30 cm warna/motif


M.192.l (potongan)
Keramik Lantai 5 x 40 cm warna/motif (potongan)
M.192.m Keramik Dinding 20 x 40
M.192.n Keramik Dinding 20 x 60
M.193 Porselin 11 x 11
M.193.a Porselin 11 x 11 cm
M.193.b Porselin 10 x 20 cm
M.193.c Porselin 20 x 20 cm
M.193.d Porselin 15 x 15 cm putih
M.193.e Porselin 11 x 11 cm warna
M.193.f Porselin 15 x 15 cm warna
M.193.g Porselin 20 x 20 cm warna
M.193.h Porselin 10 x 20 cm warna
M.194 Teraso Cor
M.195 Plint ubin pc abu-abu 10 x 30 cm
M.195.a Plint ubin pc abu-abu 10 x 40 cm
M.195.b Plint ubin pc abu-abu 15 x 20 cm
M.196 Plint ubin pc warna 10 x 20 cm
M.196.a Plint ubin pc warna 10 x 30 cm
M.196.b Plint ubin pc warna 10 x 40 cm
M.197 Plint Ubin Terasso 10 x 30 cm
M.197.a Plint Ubin Terasso 10 x 40 cm
M.198 Plint ubin teralux marmer 10 x 30 cm
M.198.a Plint ubin teralux marmer 10 x 40 cm
M.198.b Plint ubin teralux marmer 10 x 60 cm
M.199 Plint teralux kerang 10 x 30
M.199.a Plint teralux kerang 10 x 40
M.199.b Keramik ukuran 60 x 60
M.199.c Keramik Granit ukuran 60 x 60 (cina)
M.200 Plint Ubin Granit 10 x 30 cm
M.200.a Plint Ubin Granit 10 x 40 cm
M.201 Plint keramik 5 x 20 cm
M.201.a Plint keramik 10 x 10 cm
M.201.b Plint keramik 10 x 20 cm
M.201.c Plint Keramik Lantai 10 x 30 cm
M.201.d Plint Keramik Lantai 10 x 40 cm
M.202 Marmer
M.202.a Marmer 100x100 cm
M.203 Marmer ukuran 10x10 cm tulisan graphir
M.203.a Marmer ukuran 12x12 cm tulisan graphir
M.204 Floor drain
M.205 Nok genteng aspal
M.206 Nok genteng beton
M.207 Nok genteng metal
M.208 Nok paten 92 cm
M.209 Nok standar 40 x 18
M.210 Pipa Baja Ø 63 mm
M.210.a Pipa Baja Ø 63 mm
M.210.af Pipa Baja
M.210.b Pipa Baja Ø 100 mm
M.210.c Pipa Baja Ø 100 mm
M.210.d Pipa Baja Ø 125 mm
M.210.e Pipa Baja Ø 125 mm
M.210.f Pipa Baja Ø 150 mm
M.210.g Pipa Baja Ø 150 mm
M.210.h Pipa Baja Ø 200 mm
M.210.i Pipa Baja Ø 200 mm
M.210.j Pipa Baja Ø 250 mm
M.210.k Pipa Baja Ø 250 mm
M.210.l Pipa Baja Ø 300 mm
M.210.m Pipa Baja Ø 300 mm
M.210.n Pipa Baja Ø 400 mm
M.210.o Pipa Baja Ø 400 mm
M.213 Pipa DCI Ø 100 mm
M.213.a Pipa DCI Ø 100 mm
M.213.b Pipa DCI Ø 125 mm
M.213.c Pipa DCI Ø 125 mm
M.213.d Pipa DCI Ø 150 mm
M.213.e Pipa DCI Ø 150 mm
M.213.f Pipa DCI Ø 200 mm
M.213.g Pipa DCI Ø 200 mm
M.213.h Pipa DCI Ø 250 mm
M.213.i Pipa DCI Ø 250 mm
M.213.j Pipa DCI Ø 300 mm
M.213.k Pipa DCI Ø 300 mm
M.213.m Pipa DCI Ø 400 mm
M.213.o Pipa DCI Ø 450 mm
M.213.q Pipa DCI Ø 500 mm
M.213.s Pipa DCI Ø 600 mm
M.213.u Pipa DCI Ø 800 mm
M.213.w Pipa DCI Ø 900 mm
M.213.y Pipa DCI Ø 1000 mm
M.213.aa Pipa DCI Ø 1100 mm
M.213.ac Pipa DCI Ø 1200 mm
M.214.a Pipa Galvanis Ø 1/2 "
M.214.c Pipa Galvanis Ø 3/4 "
M.214.e Pipa Galvanis Ø 1"
M.214.g Pipa Galvanis Ø 1.5 "
M.214.i Pipa Galvanis Ø 1.6 "
M.214.k Pipa Galvanis Ø 3 "
M.214.m Pipa Galvanis Ø 4 "
M.214.o Pipa Galvanis Ø 1.5 ", tebal 2 mm
M.214.q Pipa Galvanis Ø 2 ", tebal 2.3 mm
M.214.s Pipa Galvanis Ø 2.5 ", tebal 2.5 mm
M.214.u Pipa Galvanis Ø 3 ", tebal 2.5 mm
M.214.w Pipa Galvanis Ø 4 ", tebal 2.8 mm
M.215.a Pipa GIP Ø 63 mm
M.215.b Pipa GIP Ø 63 mm
M.215.c Pipa GIP Ø 100 mm
M.215.d Pipa GIP Ø 100 mm
M.215.e Pipa GIP Ø 125 mm
M.215.f Pipa GIP Ø 125 mm
M.215.g Pipa GIP Ø 150 mm
M.215.h Pipa GIP Ø 150 mm
M.215.i Pipa GIP Ø 200 mm
M.215.j Pipa GIP Ø 200 mm
M.215.k Pipa GIP Ø 250 mm
M.215.l Pipa GIP Ø 250 mm
M.215.m Pipa GIP Ø 300 mm
M.215.n Pipa GIP Ø 300 mm
M.217.a Pipa PVC Ø 63 mm
M.217.ag Pipa PVC Ø 2"
M.217.b Pipa PVC Ø 63 mm
M.217.c Pipa PVC Ø 90 mm
M.217.d Pipa PVC Ø 90 mm
M.217.e Pipa PVC Ø 110 mm
M.217.f Pipa PVC Ø 110 mm
M.217.g Pipa PVC Ø 150 mm
M.217.h Pipa PVC Ø 150 mm
M.217.i Pipa PVC Ø 200 mm
M.217.j Pipa PVC Ø 200 mm
M.217.k Pipa PVC Ø 250 mm
M.217.l Pipa PVC Ø 250 mm
M.217.m Pipa PVC Ø 300 mm
M.217.n Pipa PVC Ø 300 mm
M.218.a Pipa PVC tipe AW Ø 1/2 "
M.218.b Pipa PVC tipe AW Ø 3/4 "
M.218.c Pipa PVC tipe AW Ø 3/4 "
M.218.d Pipa PVC tipe AW Ø 1"
M.218.e Pipa PVC tipe AW Ø 1"
M.218.f Pipa PVC tipe AW Ø 1.5 "
M.218.g Pipa PVC tipe AW Ø 1.5 "
M.218.h Pipa PVC tipe AW Ø 2 "
M.218.i Pipa PVC tipe AW Ø 2 "
M.218.k Pipa PVC tipe AW Ø 2.5 "
M.218.m Pipa PVC tipe AW Ø 3 "
M.218.o Pipa PVC tipe AW Ø 4 "
M.218.p Pipa PVC tipe D Ø 3 "
M.218.q Pipa PVC tipe D Ø 4 "
M.218.r Pipa PVC tipe AW Ø 6 "
M.218.s Pipa PVC tipe AW Ø 8 "
M.218.t Pipa PVC tipe D Ø 1/2 "
M.218.u Pipa PVC tipe D Ø 3/4 "
M.218.v Pipa PVC tipe D Ø 1"
M.218.w Pipa PVC tipe D Ø 1.5 "
M.218.x Pipa PVC tipe D Ø 2 "
M.218.y Pipa PVC tipe D Ø 2.5 "
M.218.z Pipa PVC tipe D Ø 3 "
M.218.aa Pipa PVC tipe D Ø 4 "
M.218.ab Pipa PVC tipe C Ø 1/2 "
M.218.ac Pipa PVC tipe C Ø 3/4 "
M.218.ad Pipa PVC tipe C Ø 1"
M.218.ae Pipa PVC tipe C Ø 1.5 "
M.218.af Pipa PVC tipe C Ø 2 "
M.218.ag Pipa PVC tipe C Ø 2.5 "
M.218.ah Pipa PVC tipe C Ø 3 "
M.218.ai Pipa PVC tipe C Ø 4 "
M.218.aj Pipa PVC 5/8"
M.218.ak Pipa Screen PVC tipe AW Ø 6 "
M.218.al Pipa PVC tipe AW Ø 5 "
M.218.am Pipa Screen PVC tipe AW Ø 5 "
M.218.an Pipa PVC moof 6 m S - 12,5 Ø 4"
M.218.ao Pipa PVC moof 6 m S - 12,5 Ø 6"
M.218.ap Pipa PVC moof 6 m S - 12,5 Ø 8"
M.218.aq Pipa PVC moof 6 m S - 12,5 Ø 2"
M.218.ar Pipa PVC moof 6 m S - 12,5 Ø 2,5"
M.218.as Pipa PVC moof 6 m S - 12,5 Ø 3"
M.219 Pipa Listrik 5/8"
M.219.a RCP Ø 400 mm, Type RJ, Cls-2 AS
M.219.b RCP Ø 500 mm, Type RJ, Cls-2 AS
M.219.c RCP Ø 600 mm, Type RJ, Cls-2 AS
M.219.d RCP Ø 800 mm, Type RJ, Cls-2 AS
M.219.e RCP Ø 1050 mm, Type RJ, Cls-2 AS
M.219.f Pipa Arde
M.219.g Splits Dia 1 "
M.220.a Pipa Ø 80 mm
M.220.b Pipa Ø 100 mm
M.220.c Pipa Ø 150 mm
M.220.d Pipa Ø 200 mm
M.220.e Pipa Ø 250 mm
M.220.f Pipa Ø 300 mm
M.221 Pipa saunding GIP 1" + Asesoris
M.222 Pipa Tanah
M.222.a Pipa Tanah Ø 15 cm
M.223 Tee Ø 150 mm
M.223.a Tee Ø 200 mm
M.223.b Tee Ø 250 mm
M.223.c Tee Ø 300 mm
M.223.n L Bow
M.223.o Knee PVC Ø 3 "
M.223.p Knee PVC Ø 4 "
M.224 Valve Ø 150 mm
M.224.a Valve Ø 200 mm
M.224.b Valve Ø 250 mm
M.224.c Valve Ø 300 mm
M.225 Pipa Porus
M.225.a Water stop PVC lebar 150 mm
M.225.b Water stop PVC lebar 200 mm
M.226 Water stop PVC lebar 230 - 320 mm
M.226.a Waterstop Lebar 150 mm
M.226.b Waterstop Lebar 200 mm
M.226.c Waterstop Lebar 230 mm - 320 mm
M.226.d Stop Kran Ø 1/2"
M.226.e Box Water Meter (plat tebal 1 mm)
M.227 Rubber water stop lebar 150 - 200 mm
M.228 Kran Air
M.228.a Kran Air Ø 1/2"
M.228.b Kran Air Ø 3/4"
M.229 Shock PVC Ø 3 "
M.229.a Shock PVC Ø 4 "
M.230 Sealtape
M.230.a Air
M.230.b Air
M.231 Air test (Air bersih)
M.232 1 buah jerrigen 1 ltr, 2 buah botol 250 ml
M.232.a Bahan Bakar
M.232.b BBM Non Subsidi
M.232.c Solar
M.232.d Solar non subsidi
M.233 Oli (Minyak pelumas)
M.234 Oli mesin (diesel)
M.235 Oli SAE 20
M.235.a Oli SAE 40
M.235.b Oli SAE 90
M.236 Teak oli
M.237 Minyak tanah
M.237.a Minyak Fluks
M.077.b Minyak bekesting
M.237.c Bunker Oil
M.237.d Minyak Cat
M.238 Anchorage
M.239.b Mata Kucing
M.240 Kerosene
M.241 Residu atau Teer
M.242 Resin
M.242.b Cairan Perekat (Epoxy Resin)
M.243.a Thinner
M.244 Sealant
M.244.a Sealant
M.244.b Joint Sealent
M.245 Stempet
M.246.b Lem
M.246.a Lem Pipa PVC
M.247 Lem Kayu
M.248 Filler
M.249 Plamir
M.249.a Plamir Kayu
M.250 Politur
M.250.a Politur Jadi
M.251 Elastomer
M.251.a Elastomer Alam
M.251.b Elastomer Sintesis
M.252 Woodstain
M.253 Cat
M.253.a Cat Dasar
M.253.b Cat Antara
M.253.c Cat Penutup
M.253.d Cat Menie
M.253.e Cat kayu
M.253.f Cat plafon
M.253.g Cat dinding
M.253.h Cat dinding
M.253.i Cat Dasar Kayu
M.253.j Cat Tembok Interior
M.253.k Cat Tembok Eksterior
M.253.l Waterproofing
M.253.m Cat dasar besi
M.253.n Cat besi
M.253.o Cat meni kayu
M.253.p Cat Anti Karat
M.253.q Menie A
M.253.r Menie B
M.253.s Cat dasar tembok
M.254 Menie besi
M.254.a Menie besi
M.255 Cat Marka Thermoplastik
M.255.a Cat Marka Non Thermoplastik
M.256 Ampelas
M.256.a Ampelas halus
M.256.b Ampelas halus + sedang
M.257 Sanding
M.258.a Dempul (wood filler)
M.259.a Melamic
M.260 Kuas/Kwas
M.260.a Kuas 2" - 4"
M.261.e Aspal
M.261.a Aspal Emulsi
M.813 Asbuton Halus
M.261.c Batu Bara
M.261.d Timah
M.262 Aspal Cement (Pelabuhan)
M.263 Beton 1:2:3
M.263.a Patok Beton K-175
M.264 Campuran beton
M.264.a Beton mutu, f1c=14,5 Mpa (K175)
M.264.b Campuran beton fc'=19,3 Mpa
M.264.c Campuran beton, fc'≥ 20 Mpa
M.264.d Campuran beton ready mix
M.264.e Beton K-300
M.264.f Beton K-125
M.264.g Beton K-175
M.264.h Beton K-500
M.264.i Beton K-400
M.264.j Beton K-350
M.264.k Beton mutu fc'=21,7 Mpa (K250) slump (12 ± 2) cm, w/c = 0,56
M.264.l Buis Beton U Ø 0.20 m
M.264.m Buis Beton U Ø 0.30 m
M.264.n Box Culvert monolit 400 x 400 mm
M.264.o Box Culvert monolit 500 x 500 mm
M.264.p Box Culvert monolit 600 x 600 mm
M.264.q Box Culvert monolit 800 x 800 mm
M.264.r Box Culvert monolit 1000 x 1000 mm
M.264.s Box U Beton Bertulang ukuran dalam 40 x 60 cm, tebal 5 cm (U
40/60-120)
M.264.t Tutup Box U Beton Bertulang ukuran 50 x 60 cm, tebal 10 cm
(Cover 50x60x10 Crossing)
M.264.u Tutup Box U Beton Bertulang ukuran 50 x 60 cm, tebal 8 cm (Cover
50x60x8)
M.264.v Box U Beton Bertulang ukuran dalam 50 x 60 cm, tebal 7,5 cm (U
50/60 - 120)
M.264.w Tutup Box U Beton Bertulang ukuran dalam 65 x 60 cm, tebal 12 cm
(Cover 65x60x12 Crossing)
M.264.x Tutup Box U Beton Bertulang ukuran dalam 65 x 60 cm, tebal 10 cm
(Cover 65x60x10)
M.264.y Box U Beton Bertulang ukuran dalam 60 x 60 cm, tebal 7,5 cm (U
60/60-120)
M.264.z Tutup Box U Beton Bertulang ukuran 75 x 60 cm, tebal 12 cm
(Cover 75x60x12 Crossing)
M.264.aa Tutup Box U Beton Bertulang ukuran 75 x 60 cm, tebal 10 cm
(Cover 75x60x10)
M.264.ab Box U Beton Bertulang ukuran dalam 60 x 70 cm, tebal 7,5 cm (U
60/70-120)
M.264.ac Box U Beton Bertulang ukuran dalam 60 x 80 cm, tebal 7,5 cm (U
60/80-120)
M.264.ad Box U Beton Bertulang ukuran dalam 80 x 80 cm, tebal 7,5 cm (U
80/80-120)
M.264.ae Box U Beton Bertulang ukuran dalam 80 x 90 cm, tebal 7,5 cm (U
80/90-120)
M.264.af Tutup Box U Beton Bertulang ukuran 95 x 60 cm, tebal 15 cm
(Cover 95x60x15 Crossing)
M.264.ag Tutup Box U Beton Bertulang ukuran 95 x 60 cm, tebal 10 cm
(Cover 95x60x10)
M.264.ah Box U Beton Bertulang ukuran dalam 100 x 100 cm, tebal 8,5 cm (U
100/100-120)
M.264.ai Box U Beton Bertulang ukuran dalam 100 x 120 cm, tebal 8,5 cm (U
100/120-120)
M.264.aj Tutup Box U Beton Bertulang ukuran 117 x
60 cm, tebal 17 cm (Cover 117x60x17 Crossing)
M.264.ak Tutup Box U Beton Bertulang ukuran 117 x 60 cm, tebal 10 cm
(Cover 117x60x10)
M.264.al Buis Beton dia 30 cm panjang 100 cm
M.264.am Buis Beton dia 40 panjang 100 cm
M.264.an Buis Beton dia 60 panjang 100 cm
M.266 Panel Beton pracetak
M.266 Handle Pintu Dekkson, Solid, SES
M.267 Cerucuk tiang beton Ø 10 - 15 cm
M.267.a Cerucuk
M.268 Floordeck
M.270.a Floor Harderner
M.271 Lantai Kerja t= 10 cm
M.272 Papan Cor
M.275 Patok beton Uk.20x20 cm
M.277.b Tiang Pancang Baja
M.277.d Tiang Pancang Baja diameter 30 cm
M.277.e Tiang Pancang Baja kotak 30 x 30 cm
M.277.f Tiang Pancang Beton Bertulang 30 x 30 cm
M.277.g Tiang Pancang Beton Bertulang 40 x 40 cm
M.277.h Tiang Lengkung Flandess / baut -6", 5", 3"
M.278 Borehole Ø 8 3/4"
M.279 Penjaga Jarak Bekisting/spacer
M.280 Urugan Pilihan (untuk backfill)
M.280.a Urugan Pilihan
M.281 Pengencer
M.281.a Pengencer
M.282 Curing Compound
M.283 Joint Sealant
M.284 Agregat A
M.284.a Agregat Kasar
M.284.b Agregat Pengunci
M.284.c Agregat Penutup
M.284.d Agregat 0-5
M.284.e Agregat 5-10
M.284.f Agregat 10-15
M.284.g Agregat pecah mesin (0-5)
M.284.h Agregat pecah mesin (5-9,5)
M.284.i Agregat pecah mesin (9,5-19)
M.284.j Agregat Halus
M.284.k Bahan Agr.Base Kelas A
M.284.l Bahan Agr.Base Kelas B
M.284.m Bahan Agr.Base Kelas C
M.284.o Agregat Pecah Mesin 5 - 10 & 10 - 20 mm
M.284.p Agregat Pecah Mesin 20 - 30 mm
M.284.q Lolos screen1 ukuran ( 0 - 5)
M.285 Pen kuningan untuk titik acu pengukuran
M.286 Pasangan bata
M.288 Pengelasan
M.289 Las Dop
M.292 Material Pilihan
M.292.a Material Pilihan
M.293 Bahan tambahan kimia
M.293.a Additive
M.293.b Superplastisizer
M.293.c Bahan pengawet (kreosot)
M.293.d Bahan Modifikasi
M.294.a Bahan pengaman tebing galian
M.298 Bengkel
M.299 Gudang, dan lain-lain
M.300 Barak
M.301 Base camp
M.302 Kantor
M.303 Ruang Laboratorium
M.308 Kabel
M.308.a Kabel prestres
M.308.c Ducting (Strand prestress)
M.308.d Kabel isolasi, air accu, besi trip, asetelin H2O dan lain-lain
M.308.e Kabel NYA 2.5 mm
M.308.f Kabel NYA 4.0 mm
M.308.g Kabel NYYHY 3 x 6 mm
M.308.h Kabel NYYHY 3 x 4 mm
M.308.i Kabel NYYHY 3 x 1.5 mm
M.308.j Kabel NYA 2x2.5 mm
M.308.k Kabel Prategang
M.308.p Selongsong
M.308.m Grouting
M.309 MCB
M.310 Saklar
M.310.a Stop kontak
M.310.b Saklar Broco Tunggal
M.310.c Saklar Broco Ganda
M.310.d Lampu Pijar 5 - 40 Watt
M.310.e Lampu Pijar 50 - 100 Watt
M.310.f Lampu TL Komplit 20 Watt
M.310.g Lampu TL Komplit 40 Watt
M.310.h Lampu XL (Lilin) 5 Watt
M.310.i Lampu XL (Lilin) 8 Watt
M.310.j Lampu XL (Lilin) 14 Watt
M.310.k Lampu XL (Lilin) 18 Watt
M.310.l Lampu XL (Lilin) 23 Watt
M.310.m Zekering Kast Lokal 1 Group
M.310.n Zekering Kast Lokal 2 Group
M.310.o Zekering Kast Lokal 3 Group
M.311 T Dus
M.312 Klem
M.312.a Klem Biasa
M.313 Pemantul Cahaya (Reflector)
M.313.a Benang geotekstil (pengikat)
M.313.b Tali rapia/plastik
M.314 Ijuk
M.314.a Ijuk
M.314.b Tambang ijuk
M.315 Alang-Alang
M.317 Gebalan rumput
M.318.a Cuka bibit
M.319 Expansion Cap
M.320 Pelat Rambu (Eng. Grade)
M.320.a Pelat Rambu (High I. Grade)
M.320.b Rel Pengaman
M.321 Plastic Aerator
M.321.a Plastik
M.321.b Kantong plastik (tebal)
M.322 Plastik Filter
M.322.a Karung bagor
M.322.b Karung goni
M.322.c Karung goni
M.322.d Karung plastik
M.324 Karpet
M.326 Formika
M.326.a Formika (90 x 120) cm
M.327 Kalkarium
M.328 Mongkok
M.329 Ramset
M.330 Strorox - 100
M.331 Soda api
M.333 Vernis
M.334 Vynil
M.336 Sabun
M.337 Glass Bead
M.338 Gravel
M.341 Mistar ukur besi / allumunium
M.343 Kotak sampel
M.345 Lc screen 6"
M.345.a Lc screen 8"
M.346 Phenol film 12 mm
M.355.a Kertas HVS atau kalkir (A1)
M.356 Elastomer jenis 1
M.356.a Elastomer jenis 2
M.356.b Elastomer jenis 3
M.357 Expansion Tipe Joint Asphaltic Plug
M.357.a Expansion Join Tipe Rubber
M.357.b Expansion Join Baja Siku
M.358 Kerb Type A
M.358.a Kerb Type B
M.358.b Kerb Type C
M.359 Expansion Joint Tipe Torma
M.360 Strip Bearing
M.361 Joint Socket Pile 35x35
M.361.a Joint Socket Pile 16x16x16
M.361.b Mikro Pile 16x16x16
M.362 Matras Concrete
M.363 Assetilline
M.364 Oxygen
M.365 Formtie
M.366 Elektroda
M.367 Angker Bar
M.367.a Angker Bar F 22 mm
M.368 Pagar Model BRC tinggi 1 m
M.369 Roda Railling
M.370 Tutup Avoor dari Cor Besi Tuang, 60x80 cm (Ex. Ceper)
M.371 Tutup Bak Kontrol Cor Besi Tuang, 100x100 cm (Ex. Ceper)
M.372 Sekrup Segala Ukuran
M.373 Soft Board 60 x 90
M.374 Isolator
M.375 Pembuatan bak sirkulasi
M.376 Pembersihan lokasi
M.377 Pengerasan jalan masuk
M.378 Grease
M.379 Polytene 125 mikron
M.380 Casing
M.381 MCB 1 Phase 6 A
M.382 Armature Tipe A-HPS-T250 W (SONT 250 W)
M.383 Armature Tipe A-HPS-T250 W (SONT 250 W)
M.384 Terminal Block 20 Amp 4 pool
M.385 Terminal Block 20 Amp 4 pool
M.386 Pompa Air
M.386.a Pasang Pompa submersible Q = 3,5 l/det, H = 150 m
M.386.b Pasang Pompa submersible Q = 10 l/det, H = 100 m
M.387 Tandon Air PVC V = 0.5 m3
M.387.a Tandon Air PVC V = 1.0 m3
M.387.b Tandon Air Stainless V = 0.5 m3
M.387.c Tandon Air Stainless V = 1.0 m3
M.388 Rumput Lamur
M.388.a Rumput Manila
M.388.b Semak Hias
M.388.c Pohon Pelindung
M.388.d Rumput Common Bermuda Grass
M.389 Pupuk
M.390 Obat Tanaman
M.391 Gamping
M.392 Mini Timber
M.393 Flange Las Ø 3"
M.393.a Flange Las Ø 4"
M.393.b Flange Gate Valve Ø 2"
M.393.c Flange Gate Valve Ø 3"
M.393.d Flange Gate Valve Ø 4"
M.393.e Bend All Flange Ø 2" x 90º
M.393.f Bend All Flange Ø 2" x 45º
M.393.g Bend All Flange Ø 3" x 90º
M.393.h Bend All Flange Ø 3" x 45º
M.393.i Bend All Flange Ø 4" x 90º
M.393.j Bend All Flange Ø 4" x 45º
M.393.k Flange Socket Ø 2"
M.393.l Flange Socket Ø 3"
M.393.m Flange Socket Ø 4"
M.393.n Flange Spigot Ø 2"
M.393.o Flange Spigot Ø 3"
M.393.p Flange Spigot Ø 4"
M.393.q Straatport Ø 2"
M.393.r Straatport Ø 3"
M.393.s Straatport Ø 4"
M.393.t Straatport Ø 6"
M.393.u Flange Las Ø 2"
M.393.v Flange Drat Ø 2"
M.393.w Flange Drat Ø 3"
M.393.x Flange Drat Ø 4"
M.393.y Flange Buta Ø 2"
M.393.z Flange Buta Ø 3"
M.393.aa Flange Buta Ø 4"
M.394 Pengelasan, plat, packing, baut
M.395 Dop PVC Ø 2"
M.395.a Dop PVC Ø 3"
M.395.b Dop PVC Ø 4"
M.396 Reducer PVC Moof 3" x 2"
M.396.a Reducer PVC Moof 4" x 3"
M.397 Flange Check Valve Ø 2"
M.397.a Flange Check Valve Ø 3"
M.398 Flange Air Valve Ø 1"
M.398.a Flange Air Valve Ø 2"
M.399 Flange Water Meter Ø 2"
M.399.a Flange Water Meter Ø 3"
M.400 Manometer 10 bar
M.401 Water Meter Ø 1/2''
M.402 Clamp Sadle Ø 2" x 1/2"
M.403 Kenie Drat GI Ø 1/2"
M.403.a Kenie Drat GI Ø 2"
M.403.b Kenie Drat GI Ø 3"
M.403.c Kenie Drat GI Ø 4"
M.404 Tee Drat GI Ø 1/2"
M.405 Double Neple Ø 1/2"
M.405.a Double Neple Ø 2"
M.405.b Double Neple Ø 3"
M.405.c Double Neple Ø 4"
M.406 Sock Drat GI Ø 2"
M.406.a Sock Drat GI Ø 3"
M.406.b Sock Drat GI Ø 4"
M.407 Elbow Drat GI Ø 2"
M.407.a Elbow Drat GI Ø 3"
M.407.b Elbow Drat GI Ø 4"
M.408 Giboult Joint Ø 2"
M.408.a Giboult Joint Ø 3"
M.408.b Giboult Joint Ø 4"
M.409 Panel Pompa
M.410 Juction Box
M.411 Elektroda Pompa
M.413 Drilling Fluid (Mud)
M.414 Mata Bor (Bit) Ø 8" 3/4"
M.414.a Mata Bor (Bit) Ø 12"
M.415 Tanah humus setebal 20 cm
M.416 Pupuk
M.417 Pohon
M.418 Ulir Kasar diameter 16 mm
M.418.a Ulir Halus diameter 20 mm
M.419 Stang Ulir Diameter 16 mm + Gear
M.419.a Stang Ulir Diameter 20 mm + Gear
M.420 Jet Shower TOTO
M.421 Avor Stainless Stell
M.429 Motor 4 kW 1350 rpm + Kabel
M.503 Slimar Alumunium sekelas INDAL
M.546.a Besi Polos 10
M.541 Besi Polos 12
M.542 Besi Ulir 13
M.543 Besi Ulir 16
M.550 Cat Tembok Interior Jotun
M.552 Rel Jendela
M.658 Hollow 5/5
M.662 Engsel Pivot
M.667 Baja L 60.60.6
M.683 Cat Duco
M.708 Kusen Alumunium 4" Sekwalitas INDAL (Blak/Brown)
M.710 HPL ex Gramino
M.725 Roof Mast Galvanis (1,8 mx30m)
M.746 Floor Hinge Sekualitas Dekksen, Solid, SES
M.748 sanblas
M.756 Soundproff Panel 60.120 cm
M.763 Terakota/clinker
M.765 Granit tile 100x100 cm
M.768 Rockwoll 3cm
M.769 Casement
M.771 Pipa Hitam SCH 40, 6"
M.772 Pipa Hitam SCH 40, 3"
M.774 GRC (bertulang/membran)
M.775 Kaca Grafir 5mm
M776 Pipa Hitam SCH 40, 2,5"
M777 Pipa Hitam SCH 40, 1,5"
M.778 Pipa Hitam SCH 40, 1"
M.779 Pipa Hitam SCH 40, 1,25"
M.780 Atap Spandek Zincalume t=0,5 mm
M.781 Rel Pintu/Partisi Atas
M.782 Rel Pintu/Partisi Bawah
M.784 Besi Nako/ Virkan dia mm, 12 mm
M.785 Hollow 30 x 60 x 1,7 mm
M.786 Tiang Pancang 25 x 25 K500
M.787 Plat Aluminium 1,2 x 2,4 x 0,9 mm
M.788 MU-200 Acian Plester Beton
M.789 GRC Krawangan
M.791 Kusen 3" INDAL
a Alat Penyuntik Anti Gravitasi
b Anti korosif baja
c Fiber E glass
d Petrolium Jelly
e Bahan Anti Rayap
To.18 Roll Meter
B.22 Bekisting
E.26 Mesin Jahit Geotekstil
M.09 Bahan Pilihan
M.001.d Pasir Tailing
M.810 Polimer
M.811 Aditif anti pengelupasan
M.812 Bahan Pengisi (Filler) Tambahan
M.813.a Asbuton yang diproses
M.814 Anchorage hidup
M.815 Anchorage mati
M.816 Epoxy Bahan Penutup (sealant)
M.214.y Pipa Galvanis Dia 8"
M.001.e Pasir Kasar
M.818 Serat Selulosa
M.819 Zeolit
M.15a Bronjong dengan kawat dilapisi galvanis
M.15b Bronjong dengan kawat dilapisi PVC
M.820 Wax
M.813.b Asbuton B 5/20
M.822 CPHMA
M.813.c Asbuton B 50/20
M.165 Backer rod 3/8 inci
M.166 Cairan Perekat (Epoxy Resin) 2 komponen
M.167 Semen alumina
M.168 Semen (OPC)
M.169 AK-2 (10/20)
M.171 Super plastiziser, maks 0,3 % Sm
M.173 BjTP 280
M.174 Concrete Grouting Non srinkage HWR
M.175 Plastik membrane polyethylene 125 mikron
M.176 Mortar semen cepat mengeras (RSC)
M.177 Mortar pre-packed untuk stiching
M.178 Termoplastik (sealant tuang panas)
M.179 Backer rod 1 1/6 inci
M.180 Termoseting (sealant tuang dingin)
M.181 Bahan grouting tersedia jenis preformed
M.183 Rapid Setting Material (Beton Semen Fast Track < 24 jam)
M.184 Thermocouple
M.185 Beton Struktur fc' 45 MPa
M.186 Beton Struktur fc' 20 MPa
M.187 Baja Struktur Grade 345 (Kuat Leleh 345
MPa)
M.188 Baja Struktur Grade 485 (Kuat Leleh 485 MPa)
M.189 Baja Struktur Grade 690 (Kuat Leleh 690 Mpa untuk Tebal Pelat ≤
2,5
M.190 Baja Struktur Grade 690 (Kuat Leleh 620 Mpa untuk Tebal Pelat >
2,5
M.191 Casing, diameter 800 mm
M.192 Bahan turap kayu tanpa pengawetan
M.196 Bahan Turap Kayu dengan pengawetan
M.198 Bonding Agent
M.20 Bensin
M.200 Cat akhir protektif beton
M.201 Cat akhir dekoratif beton
M.211 Baut Mutu Tinggi A490 Tipe 1 diameter M25
M.216 Elektroda Las SAW
M.226 Perkerasan beton fast track <8 jam
M.227 Silicon Seal
M.230 Sambungan siar muai tipe modular
M.231 Sambungan siar muai tipe finger plate
M.238 Tiang sandaran baja
M.239 Deck Drain
M.240 Pipa PVC
M.242 Sambungan Pipa PVC
M.243 Sambungan Pipa Baja
M.244 Turap Beton
M.246 Plat sepatu tiang pancang / plat sambung
M.247 Beton strukutr bervolome besar, fc'30 MPa
M.248 Beton struktur bervolume besar, fc’25 Mpa
M.249 Beton strukut bervolume besar, fc’20 MPa
M.250 Beton strukutr memadat sendiri, fc'30 MPa
M.251 Beton struktur memadat sendiri, fc’25 Mpa
M.252 Beton strukut memadat sendiri, fc’20 MPa
M.253 Beton Fc' 35 MPa
M.254 BjTS 280
M.256.a accelerator
M.256 Asphaltic plug Moveable
M.257 Insulasi
M.258 Anyaman Kawat Baja Dilas
M.259 Curing membrane
M.25a Pipa Porus diameter 5"
M.25b Pipa Porus diameter 6"
M.25c Pipa Porus diameter 8"
M.26 Agr. Kelas A (analisis)
M.260 Sambungan siar muai tipe Karet (Preformed
T-shape)
M.261 Bridging Plate PL 125 x 6
M.262 Perletakan logam tipe fixed 150 Ton
M.263 Perletakan logam tipe movable 150 Ton
M.264 Elastomer bearing pad; (450x400x45) mm3
M.265 Beton c 10 Mpa
M.269 Grauting berbahan dasar semen
M.27 Agr. Kelas B (analisis)
M.270 Graut berbahan dasar Cellular Plastic
M.214.z Pipa Galvanise Dia 6"
M.276 Lampu penerangan Jalan Tipe Merkuri 400 Watt
M.277 Lampu penerangan Jalan Tipe Merkuri 250 Watt
M.280 Paku jalan Tidak Memantul
M.281 Paku Jalan Memantul Bujur Sangkar
M.282 Paku Jalan Memantul Persegi Panjang
M.29 Arg. Kelas S (analisis)
M.31a Aspal Emulsi CSS-1 atau SS-1
M.31b Aspal Emulsi CRS-1 atau RS-1
M.31c Aspal Emulsi Modifikasi Polimer 1h
M.31d Aspal Emulsi Modifikasi Polimer 2h
M.31d Aspal Emulsi Modifikasi Polimer 2h
M.37 Beton Struktur Fc' 25 Mpa
M.38 Agregat Lolos # 1 "
M.47 Beton Fc' 10 MPa
M.59 Beton Struktur Fc' 30 MPa
M.60 Beton Struktur Fc' 15 MPa
M.68 Beton Struktur Fc' 50 MPa
M.69 Beton Struktur Fc' 40 MPa
M.72 Beton Fc' 35 MPa
M.78 Paving Block
M.89b Lolos screen2 ukuran ( 0 - 5)
M.89c Lolos screen2 ukuran ( 5 - 9,5)
M.89d Lolos screen2 ukuran ( 9.5 - 19,0)
NA.106.a Pipa HDPE Ø 63 mm
NA.106.b Pipa HDPE Ø 100 mm
NA.106.c Pipa HDPE Ø 125 mm
NA.106.d Pipa HDPE Ø 150 mm
NA.106.e Pipa HDPE Ø 200 mm
NA.106.f Pipa HDPE Ø 250 mm
NA.106.g Pipa HDPE Ø 300 mm
NA.106.h Pipa HDPE Ø 400 mm
NA.106.i Pipa HDPE Ø 450 mm
NA.106.j Pipa HDPE Ø 500 mm
NA.106.k Pipa HDPE Ø 800 mm
NA.106.l Pipa HDPE Ø 900 mm
NA.106.m Pipa HDPE Ø 1000 mm
NA.106.n Pipa HDPE Ø 1100 mm
NA.106.o Pipa HDPE Ø 1200 mm
NA.106.p Pipa HDPE Ø 600 mm
NA.106.q Pipa HDPE Ø 63 mm
NA.106.r Pipa HDPE Ø 100 mm
NA.106.s Pipa HDPE Ø 125 mm
NA.106.t Pipa HDPE Ø 150 mm
NA.106.u Pipa HDPE Ø 200 mm
NA.106.v Pipa HDPE Ø 250 mm
NA.106.w Pipa HDPE Ø 300 mm
NA.106.x Pipa HDPE Ø 400 mm
NA.106.y Pipa HDPE Ø 450 mm
NA.106.z Pipa HDPE Ø 500 mm
NA.106.aa Pipa HDPE Ø 600 mm
NA.106.ab Pipa HDPE Ø 800 mm
NA.106.ac Pipa HDPE Ø 900 mm
NA.106.ad Pipa HDPE Ø 1000 mm
NA.106.ae Pipa HDPE Ø 1100 mm
NA.106.af Pipa HDPE Ø 1200 mm
M.806 Lapis Drainase (analisis)
M.805 Plastik Cor
S i r t u (4 ≤ PI ≤10 ; LL ≤ 35 %)
S i r t u (4 ≤ PI ≤15 ; LL ≤ 35 %)
T.01.a Pembersihan Lahan
T.07.a.3 Galian Tanah Sumur
T.06.a.1 Galian Saluran Air Hujan
M.264.ao Buis Beton Tidak Bertulang Uk. 100 x 50 cm
M.264.au Plat Beton Uk 1,05 x 1,05 x 0,1 m
A.8.4.1.7 Pemasangan Pipa PVC
M.264.ar Buis Beton Bertulang Uk. 100 x 50 cm
M.264.as Buis Beton Bertulang Uk. 120 x 50 cm
M.264.at Buis Beton Bertulang Uk. 150 x 50 cm
M.264.ap Buis Beton Tidak Bertulang Uk. 120 x 50 cm
M.264.aq Buis Beton Tidak Bertulang Uk. 150 x 50 cm
M.060.b Kayu Reng Meranti
M.223.q Knee PVC Ø 2 "
MPJU.001 Angkur Baseplate 22" P: 0.5 m
MPJU.002 Beugel Ornament + Baut Galvanis Tebal 5 mm
MPJU.003 Stang Ornament HD Galvanis Ø 2 " bentang
:0.5 m
MPJU.003.a Stang Ornament HD Galvanis Ø 2 " bentang
:1 m
MPJU.003.b Stang Ornament HD Galvanis Ø 2 " bentang
:2 m
MPJU.003.c Stang Ornament HD Galvanis Ø 2 " bentang
:3 m
MPJU.003.d Stang Ornament HD Galvanis Ø 2 " bentang
:4 m
MPJU.003.e Tiang Hole/Bulat Tinggi 7 meter
M.308.l Kabel Twisted 2 x 16 mm
M.308.m Kabel Twisted 2 x 10 mm
M.308.n Kabel NYY 2 x 2,5 mm
M.308.o Kabel NYY 4 x 6 mm
M.381.a MCB 1 Phase 4A
M.381.b MCB 1 Phase 32 A
M.381.c MCB 1 Phase 20 A
M.381.d MCB Box
M.381.e ELCB 1 Phase - 25 A
M.381.f Magnetik Kontaktor 25 A
M.381.g Magnetik Kontaktor LC1D40A
MPJU.004 Timer Swith
MPJU.005 Tap Connector 06-25/35-70 mm2
MPJU.006 Stanless Steel Belt
MPJU.007 Stopping Beugel
MPJU.008 Fix and Dead (15-25)
MPJU.009 Tension Bracket
MPJU.010 Rel Omega
MPJU.011 Terminal Block (Kabel 4 Jalur)
MPJU.012 Terminal Busbar
MPJU.013 Panel Box Tebal 2 mm Ukuran (40x60x20) cm (Berkaca)
MPJU.014 Arde Standart 1,5 m (16mm)
MPJU.015 Arde Standart 2,5 m (16mm)
MPJU.016 Kawat BC 6 mm
MPJU.018 Perakitan Panel
M.222.b Pipa Beton Diameter 30cm
M.222.c Pipa Beton Diameter 40cm
M.222.d Pipa Beton Diameter 50cm
M.027.e Paving Stopper/uskup 6cm
M.028.h Paving block 6 cm Pola 3D
M.028.i Paving block 8 cm Pola 3D
M.222.e Pipa Beton Bertulang Diameter 30cm
M.222.f Pipa Beton Bertulang Diameter 40cm
M.222.g Pipa Beton Bertulang Diameter 50cm
M532 Bend Socket PVC Ø 2" x 45
M531 Bend Socket PVC Ø 2" x 90
M534 Bend Socket PVC Ø 3" x 45
M533 Bend Socket PVC Ø 3" x 90
M.847 Bronze
M.849 Gembok
M.850 Na F + ring
M.851 Nipple
M.852 Roda Gigi
M.853 Sandblasting dan cat
M.854 Seal Karet
M599 Septic Tank Biological Filter V = 1.500 L
M601 Septic Tank Biological Filter V = 2.000 L
M602 Septic Tank Biological Filter V = 3.000 L
M603 Septic Tank Biological Filter V = 4.000 L
M.855 Spei
M.856 Splite pen
M537 Tee All Socket PVC Ø 2" x 2"
M538 Tee All Socket PVC Ø 3" x 2"
M539 Tee All Socket PVC Ø 3" x 3"
M.857 Transport
M.792 Debu Marmer
M.792.a Debu Marmer
M.793 Bahan anti pengelupasan
M.261.b Aspal
M.261.c Aspal Emulsi
M.293.e Bahan pengawet (kreosot)
M.053.h Turap Baja
M.244.a Turap Beton
M.277.i Tiang Pancang Kayu
M.277.j Tiang Pancang Kayu
M.794 Besi untuk sepatu tiang pancang / penyambung
M.052.g Baja tulangan sirip BjTS 280
M.795 Plastricizer
M.796 Anyaman Penulangan Tanah dengan Kawat yang Dilapisi PVC per
meter persegi
M.797 Bout dia 23 mm
M.226.a beton fast track 8 jam
M.798 Expansion Joint Tipe Modular (steel grid)
M.799 Perletakan strip
M.214.x Pipa d = 8.91 cm Galvanised
M.800 Dudukan, mur, baut dll
M.202.c Marmer
M.030.h Adukan Semen
M.801 Deck drain baja diameter 150 mm
M.052.h Baja Tulangan (angkur) penggantung/hanger L60.60.6
M.053.i Baja (ducting, klem)
M.101.d Kawat Las
M.802 Fly ash
M.803 Cetakan diameter 20 cm
M.803.a Cetakan diameter 25 cm
M.803.b Cetakan diameter 30 cm
M.803.c Cetakan diameter 40 cm
M.803.d Cetakan diameter 60 cm
M.803.e Cetakan diameter 80 cm
M.803.f Cetakan diameter 100 cm
M.803.g Cetakan diameter 120 cm
M.803.h Cetakan diameter 150 cm
M.803.i Cetakan ukuran 40 x 40
M.803.j Cetakan ukuran 50 x 50
M.803.k Cetakan ukuran 60 x 60
M.803.l Cetakan ukuran 80 x 80
M.803.m Cetakan ukuran 100 x 100
M.803.n Cetakan ukuran 120 x 120
M.803.o Cetakan ukuran 140 x 140
M.803.p Cetakan ukuran 150 x 150
M.803.q Cetakan ukuran 160 x 160
M.803.r Cetakan ukuran 180 x 180
M.803.s Cetakan ukuran 200 x 200
M.210.w Pipa Baja Glb.
M.198.a Bonding Agent
M.804 Dowel (32mm)
M.030.i Graut Semen
M.795.a Plastricizer
M.807 Water Reducing & Retarder
M.808 Abu Terbang
M.259.a Curing membrane
M.809 Borrow Pit
M.230.c Air
M.823 Grouting non shrinkage wcR 0,45
M.052.i Baja Tulangan Sirip BjTS 420 A
M.052.j Baja Tulangan Sirip BjTS 420 B
M.052.k Baja Tulangan Sirip BjTS 520
M.052.l Baja Tulangan Sirip BjTS 550
M.052.m Baja Tulangan Sirip BjTS 700
M.824 Baja Struktur Grade 250 (Kuat Leleh 250
MPa)
M.825 Baja Struktur Grade 345 (Kuat Leleh 345 MPa)
M.826 Baja Struktur Grade 485 (Kuat Leleh 485 MPa)
M.827 Baja Struktur Grade 690 (Kuat Leleh 690 Mpa untuk Tebal Pelat ≤
2,5
M.828 Baja Struktur Grade 690 (Kuat Leleh 620 Mpa untuk Tebal Pelat >
2,5
M.829 Baja Struktur BJ 37 (Titik Leleh 240 MPa)
M.830 Besi untuk sepatu tiang pancang / penyambung (jika ada)
M.831 Bahan tiang pancang kayu
M.210.x Pipa baja 150 mm
M.832 Berat H Beam per m'
M.833 Vol tiang pancang beton pracetak lengkap (Beton Fc' 40 MPa)
M.834 Strand 1/2 inci
M.165.a Backer rod
M.835 Asphaltic plug (40 x 7,5 x 100) cm3
M.165.b Batang Penyokong (Backer Rod)
M.837 Karet Pengisi Sambungan Strip Seal
M.838 Pelumas PVC
M.837.a Karet Pengisi Sambungan Compression Seal
M.839 Sambungan siar muai tipe modular
M.840 Sambungan siar muai tipe finger plate
M.835.a Asphaltic plug
M.165.a Backer rod 3/8 inci
M.841 Landasan logam berongga (Pot Bearing)
M.842 Landasan logam jenis Spherical
M.218.at Pipa PVC AW Dia 150 mm
(M223) Baut dan Mur
(M211) Baut Mutu Tinggi A490 Tipe 1 diameter M25
M.843 Perancah
(M226) Mortar fast track (8 jam)
(M127) Tabung penyuntik kosong termasuk nipple
(M200) Cat Protektif
(M132) Acuan, Multipleks
M.844 Tabung penyuntik (penyediaan)
M.845 Tabung penyuntik (penggunaan)
(M56) Baja prategang 7 wires/ Strands, 1/2 inci
(M117) Selongsong HDPE
(M195) Scafolding 2 buah uk 3 x 3 x 6 m
(M92) Agregat ukuran 14, 20, 28 mm
(M233) Elastomer karet alam berlapis baja
(M111) Elastomer sintetis berlapis baja
(M112) Landasan karet strip
(M81) Landasan logam jenis Spherical
(M236) Pipa d = 3" cm Galvanised
(M24a) Dudukan, mur, baut dll
(M237) Sandaran Baja Pipa Galvanis 3"
(M24b) Tiang Sandaran Baja
(M241) Pipa Baja
(M25a) Pipa Galvanis Dia. 5"
M.186 Beton Fc 20 Mpa
(M279) Mortar
(M39b) BJTS 32
M277 Lampu LED 100 watt
M.275 Tiang baja galvanis
M.320.b Rel Pengaman ( Termasuk Tiang Blok Baut)
M.284.o Agg Penutup
(M201) Cat Dekoratif
M.846 Selang
M604 Bak Grase Trep
M.264.ao Box Culvert monolit 1200 x 1200 mm
M.264.ap Box Culvert monolit 1500 x 1500 mm
M.015.d Batu Andesit Tebal 6 cm
M.015.e Batu Andesit Dekorasi Jalan Tebal 6 cm
M.030.j Tile Grout MU
M.264.au Buis Beton dia 80 cm panjang 50 cm
M.264.av Buis Beton dia 100 cm panjang 50 cm
M.264.aw Buis Beton dia 20 cm panjang 100 cm
M.264.ax Buis Beton dia 50 cm panjang 100 cm
M.264.ba Box U Beton Bertulang ukuran dalam 30 x 40 cm, tebal 5 cm (U
30/40-120)
M.027.g Kansteen Taman Uk. 40x10x20 cm
M.264.bb Box U Beton Bertulang ukuran dalam 60 x 80 cm, tebal 7,5 cm (U
60/80-120)
M.264.bc Box U Beton Bertulang ukuran dalam 80 x 100 cm, tebal 8,5 cm (U
80/100-120)
M.264.bd Tutup Box U Beton Bertulang ukuran 30 x 60 cm, tebal 7,5 cm
(Cover 30x60x7,5)
M.264.be Tutup Box U Beton Bertulang ukuran 60 x 60 cm, tebal 10 cm
(Cover 60x60x10)
M.264.bf Tutup Box U Beton Bertulang ukuran 80 x 60 cm, tebal 10 cm
(Cover 80x60x10)
M.371.a Tutup Cor Besi Tuang Manhole, 100x100 cm
M.848.a Druklager A
M.848.b Druklager B
M.848.c Druklager C2
M.848.d Druklager C3
M.858 Paku keling 3/4", 5/8" , 7/8"
M.015.f Batu Andesit pedistrian Tebal 3 Cm
ANGUNAN

SATUAN HARGA 2022 HARGA 2022 OVERHEAD 2 % LABA 15%


m3 162,513 138,900 2778 20,835.00
m3 411,840 352,000 7040 52,800.00
m3 344,331 294,300 5886 44,145.00
m3 139,764 119,456 2389.12 17,918.40
m3 325,377 278,100 5562 41,715.00
kg 294 251 5.02 37.65
m3 214,867 183,647 3672.94 27,547.05
kg 102 87 1.74 13.05
m3 325,377 278,100 5562 41,715.00
Kg 13,530 11,564 231.28 1,734.60
m3 190,068 162,451 3249.02 24,367.65
m3 190,068 162,451 3249.02 24,367.65
m3 153,394 131,106 2622.12 19,665.90
m3 172,720 147,624 2952.48 22,143.60
m3 172,720 147,624 2952.48 22,143.60
m3 96,808 82,742 1654.84 12,411.30
m3 63,653 54,404 1088.08 8,160.60
m3 103,148 88,161 1763.22 13,224.15
m3 148,080 126,564 2531.28 18,984.60
m3 134,550 115,000 2300 17,250.00
m3 65,223 55,746 1114.92 8,361.90
m3 2,436,796 2,082,732 41654.64 ###
m3 622,515 532,064 10641.28 79,809.60
kg 14,625 12,500 250 1,875.00
m3 206,601 176,582 3531.64 26,487.30
m3 349,666 298,860 5977.2 44,829.00
m3 278,125 237,714 4754.28 35,657.10
kg 349,666 298,860 5977.2 44,829.00
m3 278,125 237,714 4754.28 35,657.10
m3 278,125 237,714 4754.28 35,657.10
m3 278,125 237,714 4754.28 35,657.10
m3 278,125 237,714 4754.28 35,657.10
m3 278,125 237,714 4754.28 35,657.10
m3 278,125 237,714 4754.28 35,657.10
m3 278,125 237,714 4754.28 35,657.10
m3 278,125 237,714 4754.28 35,657.10
m3 278,125 237,714 4754.28 35,657.10
m3 278,125 237,714 4754.28 35,657.10
m3 278,125 237,714 4754.28 35,657.10
m3 278,125 237,714 4754.28 35,657.10
m3 247,221 211,300 4226 31,695.00
m3 242,424 207,200 4144 31,080.00
m2 129,870 111,000 2220 16,650.00
kg 31,239 26,700 534 4,005.00
m2 139 119 2.38 17.85
bh 2,294 1,961 39.22 294.15
m2 144,940 123,880 2477.6 18,582.00
Kg 11,232 9,600 192 1,440.00
kg 66,430 56,778 1135.56 8,516.70
m3 333,580 285,111 5702.22 42,766.65
m3 349,666 298,860 5977.2 44,829.00
m3 347,369 296,897 5937.94 44,534.55
m3 347,369 296,897 5937.94 44,534.55
m3 347,369 296,897 5937.94 44,534.55
bh 348,005 297,440 5948.8 44,616.00
kg 17,586 15,031 300.62 2,254.65
kg 250 214 4.28 32.10
kg 250 214 4.28 32.10
m3 355,313 303,686 6073.72 45,552.90
m3 355,313 303,686 6073.72 45,552.90
m3 456,300 390,000 7800 58,500.00
m3 410,085 350,500 7010 52,575.00
bh 759 649 12.98 97.35
m3 631,139 539,435 10788.7 80,915.25
bh 24,102 20,600 412 3,090.00
m3 3,187,946 2,724,740 54494.8 ###
bh 12,168 10,400 208 1,560.00
m3 581,449 496,965 9939.3 74,544.75
bh 3,042 2,600 52 390.00
m3 797,004 681,200 13624 ###
bh 9,868 8,434 168.68 1,265.10
bh 3,758 3,212 64.24 481.80
m2 97,720 83,521 1670.42 12,528.15
m' 172,889 147,768 2955.36 22,165.20
m2 112,941 96,531 1930.62 14,479.65
bh 3,978 3,400 68 510.00
bh 4,107 3,510 70.2 526.50
m2 100,538 85,930 1718.6 12,889.50
m2 114,226 97,629 1952.58 14,644.35
m2 135,054 115,431 2308.62 17,314.65
bh 2,691 2,300 46 345.00
bh 2,925 2,500 50 375.00
m2 83,939 71,743 1434.86 10,761.45
m2 97,845 83,628 1672.56 12,544.20
m2 122,776 104,937 2098.74 15,740.55
m3 370,562 316,720 6334.4 47,508.00
Kg 241 206 4.12 30.90
kg 1,973 1,686 33.72 252.90
kg 21,681 18,531 370.62 2,779.65
kg 7,190 6,145 122.9 921.75
kg 15,368 13,135 262.7 1,970.25
m3 323,698 276,665 5533.3 41,499.75
kg 10,530 9,000 180 1,350.00
zak 62,463 53,387 1067.74 8,008.05
Kg 22,226 18,997 379.94 2,849.55
kg 21,137 18,066 361.32 2,709.90
kg 125,010 106,846 2136.92 16,026.90
bh 4,385 3,748 74.96 562.20
bh 6,640 5,675 113.5 851.25
kg 72,470 61,940 1238.8 9,291.00
bh 9,765 8,346 166.92 1,251.90
bh 8,428 7,203 144.06 1,080.45
bh 7,440 6,359 127.18 953.85
m3 110,430 94,385 1887.7 14,157.75
kg 17,035 14,560 291.2 2,184.00
kg 61,448 52,520 1050.4 7,878.00
kg 13,377 11,433 228.66 1,714.95
m 11,880 10,154 203.08 1,523.10
kg 20,686 17,680 353.6 2,652.00
kg 14,714 12,576 251.52 1,886.40
m 20,775 17,756 355.12 2,663.40
kg 169,097 144,527 2890.54 21,679.05
kg 217,409 185,820 3716.4 27,873.00
kg 14,602 12,480 249.6 1,872.00
kg 14,602 12,480 249.6 1,872.00
kg 14,602 12,480 249.6 1,872.00
m 50,366 43,048 860.96 6,457.20
kg 14,717 12,579 251.58 1,886.85
kg 14,908 12,742 254.84 1,911.30
kg 26,770 22,880 457.6 3,432.00
kg 33,970 29,034 580.68 4,355.10
kg 55,215 47,192 943.84 7,078.80
kg 31,206 26,672 533.44 4,000.80
m2 572,036 488,920 9778.4 73,338.00
m2 664,306 567,783 11355.66 85,167.45
kg 26,709 22,828 456.56 3,424.20
kg 2,261,058 1,932,528 38650.56 ###
m2 76,999 65,811 1316.22 9,871.65
kg 33,970 29,034 580.68 4,355.10
kg 18,842 16,104 322.08 2,415.60
kg 15,210 13,000 260 1,950.00
kg 15,210 13,000 260 1,950.00
kg 15,210 13,000 260 1,950.00
Kg 28,052 23,976 479.52 3,596.40
Kg 22,465 19,201 384.02 2,880.15
Kg 28,052 23,976 479.52 3,596.40
Kg 31,675 27,073 541.46 4,060.95
m 85,333 72,934 1458.68 10,940.10
kg 33,970 29,034 580.68 4,355.10
m 785,090 671,017 13420.34 ###
m 301,957 258,083 5161.66 38,712.45
m 392,544 335,508 6710.16 50,326.20
kg 26,770 22,880 457.6 3,432.00
kg 33,970 29,034 580.68 4,355.10
kg 33,970 29,034 580.68 4,355.10
kg 19,821 16,941 338.82 2,541.15
kg 19,821 16,941 338.82 2,541.15
Kg 28,052 23,976 479.52 3,596.40
kg 74,295 63,500 1270 9,525.00
bh 146,147,400 124,912,308 2498246.16 ###
bh 159,433,527 136,267,972 2725359.44 ###
bh 199,291,909 170,334,965 3406699.3 ###
bh 251,107,806 214,622,056 4292441.12 ###
bh 268,645,494 229,611,533 4592230.66 ###
bh 309,204,416 264,277,279 5285545.58 ###
m3 5,764,368 4,926,810 98536.2 ###
Ls 398,624 340,704 6814.08 51,105.60
Ls 398,624 340,704 6814.08 51,105.60
m3 9,777,669 8,356,982 167139.64 ###
m3 4,212,000 3,600,000 72000 ###
m3 8,569,914 7,324,713 146494.26 ###
m3 25,062,467 21,420,912 428418.24 ###
m1 240,600 205,641 4112.82 30,846.15
m3 25,062,467 21,420,912 428418.24 ###
m3 16,442,428 14,053,357 281067.14 ###
m1 255,945 218,756 4375.12 32,813.40
m3 16,442,428 14,053,357 281067.14 ###
m3 9,609,010 8,212,829 164256.58 ###
m1 92,246 78,843 1576.86 11,826.45
m3 9,609,010 8,212,829 164256.58 ###
m3 16,442,428 14,053,357 281067.14 ###
m3 9,609,010 8,212,829 164256.58 ###
m3 14,905,827 12,740,023 254800.46 ###
m3 14,905,827 12,740,023 254800.46 ###
m3 18,216,427 15,569,596 311391.92 ###
m3 19,044,094 16,277,003 325540.06 ###
m3 8,569,914 7,324,713 146494.26 ###
m3 9,609,010 8,212,829 164256.58 ###
m3 11,424,258 9,764,323 195286.46 ###
m3 11,511,894 9,839,226 196784.52 ###
m3 12,907,204 11,031,798 220635.96 ###
m3 10,320,991 8,821,360 176427.2 ###
m3 10,320,991 8,821,360 176427.2 ###
m3 10,816,478 9,244,853 184897.06 ###
m3 11,684,706 9,986,928 199738.56 ###
m3 11,684,706 9,986,928 199738.56 ###
m3 11,684,706 9,986,928 199738.56 ###
m3 15,580,642 13,316,788 266335.76 ###
m3 16,012,833 13,686,182 273723.64 ###
m3 16,072,310 13,737,017 274740.34 ###
m3 19,902,900 17,011,026 340220.52 ###
m3 16,442,428 14,053,357 281067.14 ###
m3 25,062,467 21,420,912 428418.24 ###
m3 5,713,035 4,882,936 97658.72 ###
m3 3,623,489 3,096,999 61939.98 ###
m3 3,623,489 3,096,999 61939.98 ###
m 27,086 23,150 463 3,472.50
m3 6,060,557 5,179,963 103599.26 ###
m3 36,193 30,934 618.68 4,640.10
m3 3,985,838 3,406,699 68133.98 ###
m3 25,062,467 21,420,912 428418.24 ###
m3 16,442,428 14,053,357 281067.14 ###
m3 9,609,010 8,212,829 164256.58 ###
m3 11,069,588 9,461,186 189223.72 ###
m3 25,062,467 21,420,912 428418.24 ###
m3 16,442,428 14,053,357 281067.14 ###
m1 917,347 784,057 15681.14 ###
m3 9,609,010 8,212,829 164256.58 ###
m3 3,079,965 2,632,449 52648.98 ###
m3 27,780,085 23,743,662 474873.24 ###
m3 27,780,085 23,743,662 474873.24 ###
m3 35,047,015 29,954,714 599094.28 ###
m3 27,780,085 23,743,662 474873.24 ###
m3 19,046,781 16,279,300 325586 ###
m3 19,473,235 16,643,791 332875.82 ###
m3 19,902,900 17,011,026 340220.52 ###
m3 11,424,258 9,764,323 195286.46 ###
m3 11,511,894 9,839,226 196784.52 ###
m3 12,907,204 11,031,798 220635.96 ###
m3 29,954,177 25,601,861 512037.22 ###
m3 23,786,225 20,330,107 406602.14 ###
m3 23,786,225 20,330,107 406602.14 ###
m3 22,943,202 19,609,574 392191.48 ###
m3 25,492,313 21,788,302 435766.04 ###
m3 25,492,313 21,788,302 435766.04 ###
m3 27,191,720 23,240,786 464815.72 ###
m3 33,989,787 29,051,100 581022 ###
m3 45,897,531 39,228,659 784573.18 ###
m3 42,487,261 36,313,898 726277.96 ###
m3 28,095,085 24,012,893 480257.86 ###
m3 28,095,085 24,012,893 480257.86 ###
m3 28,095,085 24,012,893 480257.86 ###
m3 35,047,015 29,954,714 599094.28 ###
m3 35,047,015 29,954,714 599094.28 ###
m3 35,047,015 29,954,714 599094.28 ###
m3 35,047,015 29,954,714 599094.28 ###
m3 35,047,015 29,954,714 599094.28 ###
m3 15,205,369 12,996,042 259920.84 ###
m3 9,964,595 8,516,748 170334.96 ###
m3 15,097,872 12,904,164 258083.28 ###
Ls 60,392 51,617 1032.34 7,742.55
m3 2,778,008 2,374,366 47487.32 ###
m2 380,231 324,984 6499.68 48,747.60

btg 49,609 42,401 848.02 6,360.15


btg 109,731 93,787 1875.74 14,068.05
m 301,957 258,083 5161.66 38,712.45
btg 163,903 140,088 2801.76 21,013.20
m 13,154 11,243 224.86 1,686.45
m3 5,248,020 4,485,487 89709.74 ###
m2 1,509,787 1,290,416 25808.32 ###
m3 4,212,000 3,600,000 72000 ###
m3 3,484,124 2,977,884 59557.68 ###
m2 936,068 800,058 16001.16 ###
btg 21,298 18,203 364.06 2,730.45
m 10,297 8,801 176.02 1,320.15
btg 41,188 35,203 704.06 5,280.45
btg 41,188 35,203 704.06 5,280.45
lbr 80,139 68,495 1369.9 10,274.25
m2 164,507 140,604 2812.08 21,090.60
m1 46,013 39,327 786.54 5,899.05
kg 33,970 29,034 580.68 4,355.10
m 222,199 189,914 3798.28 28,487.10
m 42,491 36,317 726.34 5,447.55
kg 561,353 479,789 9595.78 71,968.35
m 34,059 29,110 582.2 4,366.50
lbr 217,409 185,820 3716.4 27,873.00
m2 54,473 46,558 931.16 6,983.70
m 34,515 29,500 590 4,425.00
m2 108,995 93,158 1863.16 13,973.70
m2 143,023 122,242 2444.84 18,336.30
m2 216,615 185,141 3702.82 27,771.15
m2 417,678 356,990 7139.8 53,548.50
m2 605,054 517,140 10342.8 77,571.00
m2 1,024,239 875,418 17508.36 ###
m2 213,330 182,333 3646.66 27,349.95
m2 240,541 205,591 4111.82 30,838.65
m2 638,784 545,969 10919.38 81,895.35
m2 1,027,333 878,062 17561.24 ###
m2 576,581 492,804 9856.08 73,920.60
m2 210,482 179,899 3597.98 26,984.85
m2 317,147 271,066 5421.32 40,659.90
m2 357,009 305,136 6102.72 45,770.40
m2 354,490 302,983 6059.66 45,447.45
m2 453,270 387,410 7748.2 58,111.50
m2 478,904 409,320 8186.4 61,398.00
m2 862,736 737,381 14747.62 ###
m2 2,233,640 1,909,094 38181.88 ###
bh 40,629 34,726 694.52 5,208.90
m2 912,141 779,608 15592.16 ###
kg 33,012 28,215 564.3 4,232.25
m2 26,529 22,674 453.48 3,401.10
kg 33,012 28,215 564.3 4,232.25
bh 11,901 10,172 203.44 1,525.80
kg 70,054 59,875 1197.5 8,981.25
kg 70,054 59,875 1197.5 8,981.25
kg 70,054 59,875 1197.5 8,981.25
kg 70,054 59,875 1197.5 8,981.25
kg 21,902 18,720 374.4 2,808.00
kg 21,902 18,720 374.4 2,808.00
kg 102,665 87,748 1754.96 13,162.20
kg 102,665 87,748 1754.96 13,162.20
dos 131,351 112,266 2245.32 16,839.90
m1 78,507 67,100 1342 10,065.00
lbr 37,564 32,106 642.12 4,815.90
kg 108,976 93,142 1862.84 13,971.30
kg 74,255 63,466 1269.32 9,519.90
m 44,248 37,819 756.38 5,672.85
kg 55,934 47,807 956.14 7,171.05
m2 34,059 29,110 582.2 4,366.50
kg 38,046 32,518 650.36 4,877.70
Paket 12,682 10,839 216.78 1,625.85
m2 78,039 66,700 1334 10,005.00
kg 17,035 14,560 291.2 2,184.00
m2 58,741 50,206 1004.12 7,530.90
kg 19,469 16,640 332.8 2,496.00
kg 19,469 16,640 332.8 2,496.00
kg 19,469 16,640 332.8 2,496.00
kg 20,381 17,420 348.4 2,613.00
kg 20,381 17,420 348.4 2,613.00
kg 20,381 17,420 348.4 2,613.00
kg 19,469 16,640 332.8 2,496.00
kg 20,381 17,420 348.4 2,613.00
kg 20,381 17,420 348.4 2,613.00
kg 20,381 17,420 348.4 2,613.00
kg 20,381 17,420 348.4 2,613.00
kg 20,381 17,420 348.4 2,613.00
kg 20,381 17,420 348.4 2,613.00
bh 21,294 18,200 364 2,730.00
kg 26,309 22,486 449.72 3,372.90
kg 22,237 19,006 380.12 2,850.90
kg 22,237 19,006 380.12 2,850.90
kg 23,490 20,077 401.54 3,011.55
kg 22,237 19,006 380.12 2,850.90
kg 33,503 28,635 572.7 4,295.25
bh 43,602 37,267 745.34 5,590.05
bh 110,013 94,028 1880.56 14,104.20
kg 148,822 127,198 2543.96 19,079.70
kg 257,419 220,016 4400.32 33,002.40
kg 26,770 22,880 457.6 3,432.00
kg 42,588 36,400 728 5,460.00
dus 326,114 278,730 5574.6 41,809.50
kg 42,588 36,400 728 5,460.00
kg 20,895 17,859 357.18 2,678.85
Bh 126,534 108,149 2162.98 16,222.35
bh 212,808 181,887 3637.74 27,283.05
bh 287,579 245,794 4915.88 36,869.10
bh 287,579 245,794 4915.88 36,869.10
bh 431,367 368,690 7373.8 55,303.50
bh 575,157 491,587 9831.74 73,738.05
bh 862,736 737,381 14747.62 ###
bh 1,150,314 983,174 19663.48 ###
bh 1,437,893 1,228,968 24579.36 ###
Bh 287,579 245,794 4915.88 36,869.10
kg 20,895 17,859 357.18 2,678.85
bh 20,895 17,859 357.18 2,678.85
bh 9,300 7,949 158.98 1,192.35
bh 6,281 5,368 107.36 805.20
bh 9,300 7,949 158.98 1,192.35
kg 34,934 29,858 597.16 4,478.70
Kg 28,473 24,336 486.72 3,650.40
bh 14,494 12,388 247.76 1,858.20
bh 11,474 9,807 196.14 1,471.05
bh 12,682 10,839 216.78 1,625.85
bh 19,418 16,597 331.94 2,489.55
bh 19,188 16,400 328 2,460.00
bh 181 155 3.1 23.25
m3 11,897,123 10,168,481 203369.62 ###
m3 11,897,123 10,168,481 203369.62 ###
m3 15,029,816 12,845,997 256919.94 ###
lbr 60,840 52,000 1040 7,800.00
lbr 73,008 62,400 1248 9,360.00
lbr 85,514 73,089 1461.78 10,963.35
lbr 138,996 118,800 2376 17,820.00
lbr 247,243 211,319 4226.38 31,697.85
lbr 304,373 260,148 5202.96 39,022.20
lbr 143,789 122,897 2457.94 18,434.55
lbr 152,187 130,074 2601.48 19,511.10
lbr 16,614 14,200 284 2,130.00
m2 347,251 296,796 5935.92 44,519.40
lbr 199,953 170,900 3418 25,635.00
lbr 25,623 21,900 438 3,285.00
lbr 57,798 49,400 988 7,410.00
lbr 68,796 58,800 1176 8,820.00
lbr 125,615 107,363 2147.26 16,104.45
lbr 131,545 112,432 2248.64 16,864.80
lbr 161,530 138,060 2761.2 20,709.00
lbr 19,188 16,400 328 2,460.00
lbr 67,158 57,400 1148 8,610.00
lbr 144,446 123,458 2469.16 18,518.70
m2 110,497 94,442 1888.84 14,166.30
m 59,063 50,481 1009.62 7,572.15
m 23,006 19,663 393.26 2,949.45
lbr 79,092 67,600 1352 10,140.00
lbr 77,543 66,276 1325.52 9,941.40
lbr 77,543 66,276 1325.52 9,941.40
m3 61,437 52,510 1050.2 7,876.50
m3 71,721 61,300 1226 9,195.00
lbr 115,952 99,104 1982.08 14,865.60
m' 96,325 82,329 1646.58 12,349.35
m' 120,812 103,258 2065.16 15,488.70
lbr 91,260 78,000 1560 11,700.00
kg 78,026 66,689 1333.78 10,003.35

lbr 232,628 198,827 3976.54 29,824.05


lbr 85,823 73,353 1467.06 11,002.95
m2 45,366 38,774 775.48 5,816.10
lbr 115,596 98,800 1976 14,820.00
lbr 161,530 138,060 2761.2 20,709.00
lbr 31,540 26,957 539.14 4,043.55
lbr 34,059 29,110 582.2 4,366.50
lbr 30,335 25,927 518.54 3,889.05
lbr 25,057 21,416 428.32 3,212.40
lbr 17,876 15,279 305.58 2,291.85
lbr 165,473 141,430 2828.6 21,214.50
m2 535,232 457,463 9149.26 68,619.45
lbr 82,288 70,332 1406.64 10,549.80
lbr 87,326 74,638 1492.76 11,195.70
lbr 87,714 74,969 1499.38 11,245.35
bh 3,865 3,303 66.06 495.45
bh 5,918 5,058 101.16 758.70

bh 8,213 7,020 140.4 1,053.00


bh 6,318 5,400 108 810.00
bh 3,978 3,400 68 510.00
bh 7,447 6,365 127.3 954.75
bh 14,011 11,975 239.5 1,796.25
bh 77,301 66,069 1321.38 9,910.35
bh 171,511 146,591 2931.82 21,988.65
lbr 141,316 120,783 2415.66 18,117.45
m2 172,237 147,211 2944.22 22,081.65
m2 179,362 153,301 3066.02 22,995.15
lbr 46,171 39,462 789.24 5,919.30
lbr 70,296 60,082 1201.64 9,012.30
lbr 52,178 44,597 891.94 6,689.55
lbr 46,171 39,462 789.24 5,919.30
bh 39,424 33,696 673.92 5,054.40
bh 7,605 6,500 130 975.00
bh 2,190 1,872 37.44 280.80
bh 2,300 1,966 39.32 294.90
bh 4,982 4,258 85.16 638.70
bh 4,982 4,258 85.16 638.70
bh 6,643 5,678 113.56 851.70
bh 11,595 9,910 198.2 1,486.50
bh 8,093 6,917 138.34 1,037.55
bh 14,018 11,981 239.62 1,797.15
bh 13,455 11,500 230 1,725.00
bh 4,898 4,186 83.72 627.90
bh 5,353 4,575 91.5 686.25
m2 362,349 309,700 6194 46,455.00
m2 194,454 166,200 3324 24,930.00
bh 7,839 6,700 134 1,005.00
bh 8,103 6,926 138.52 1,038.90
bh 4,162 3,557 71.14 533.55
bh 92,395 78,970 1579.4 11,845.50
m 302,418 258,477 5169.54 38,771.55
Unit 606,177 518,100 10362 77,715.00
m2 767,938 656,357 13127.14 98,453.55
m2 2,934,945 2,508,500 50170 ###
m2 3,739,320 3,196,000 63920 ###
bh 211,644 180,892 3617.84 27,133.80
set 296,280 253,231 5064.62 37,984.65
bh 67,509 57,700 1154 8,655.00
bh 40,301 34,445 688.9 5,166.75
bh 18,252 15,600 312 2,340.00
bh 48,514 41,465 829.3 6,219.75
m2 2,132,856 1,822,954 36459.08 ###
set 236,765 202,363 4047.26 30,354.45
daun 38,168 32,622 652.44 4,893.30
bh 301,957 258,083 5161.66 38,712.45
m2 460,183 393,319 7866.38 58,997.85
m2 920,356 786,629 15732.58 ###
bh 41,670 35,615 712.3 5,342.25
bh 58,700 50,171 1003.42 7,525.65
bh 27,444 23,456 469.12 3,518.40
bh 519,558 444,067 8881.34 66,610.05
bh 45,293 38,712 774.24 5,806.80
bh 104,204 89,063 1781.26 13,359.45
bh 192,891 164,864 3297.28 24,729.60
bh 192,891 164,864 3297.28 24,729.60
bh 162,694 139,055 2781.1 20,858.25
bh 159,998 136,750 2735 20,512.50
bh 253,885 216,996 4339.92 32,549.40
set 22,012 18,814 376.28 2,822.10
bh 25,407 21,715 434.3 3,257.25
unit 5,435,234 4,645,499 92909.98 ###
bh 618,743 528,840 10576.8 79,326.00
unit 520,575 444,936 8898.72 66,740.40
unit 480,354 410,559 8211.18 61,583.85
unit 4,227,404 3,613,166 72263.32 ###
bh 60,392 51,617 1032.34 7,742.55
bh 108,705 92,910 1858.2 13,936.50
bh 45,898 39,229 784.58 5,884.35
unit 1,899,267 1,623,305 32466.1 ###
unit 2,713,050 2,318,846 46376.92 ###
unit 2,988,582 2,554,344 51086.88 ###
unit 271,590 232,128 4642.56 34,819.20
Unit 880,476 752,544 15050.88 ###
unit 132,072 112,882 2257.64 16,932.30
unit 759,184 648,875 12977.5 97,331.25
unit 2,473,986 2,114,518 42290.36 ###
bh 54,352 46,455 929.1 6,968.25
bh 2,300 1,966 39.32 294.90
bh 3,723 3,182 63.64 477.30
bh 2,223 1,900 38 285.00
bh 40,301 34,445 688.9 5,166.75
bh 72,325 61,816 1236.32 9,272.40
bh 2,416 2,065 41.3 309.75
bh 60,962 52,104 1042.08 7,815.60
bh 71,083 60,755 1215.1 9,113.25
bh 13,287 11,356 227.12 1,703.40
bh 12,078 10,323 206.46 1,548.45
bh 81,770 69,889 1397.78 10,483.35
bh 93,523 79,934 1598.68 11,990.10
bh 132,620 113,350 2267 17,002.50
bh 5,257 4,493 89.86 673.95
bh 7,447 6,365 127.3 954.75
bh 2,691 2,300 46 345.00
bh 3,833 3,276 65.52 491.40
bh 6,023 5,148 102.96 772.20
bh 7,851 6,710 134.2 1,006.50
dos 57,372 49,036 980.72 7,355.40
dos 71,320 60,957 1219.14 9,143.55
dos 72,470 61,940 1238.8 9,291.00

bh 15,550 13,291 265.82 1,993.65


bh 15,550 13,291 265.82 1,993.65
bh 24,157 20,647 412.94 3,097.05
bh 17,151 14,659 293.18 2,198.85
bh 17,151 14,659 293.18 2,198.85
bh 66,672 56,985 1139.7 8,547.75
bh 3,614 3,089 61.78 463.35
bh 3,978 3,400 68 510.00
bh 3,723 3,182 63.64 477.30
bh 8,103 6,926 138.52 1,038.90
bh 10,622 9,079 181.58 1,361.85
bh 14,783 12,635 252.7 1,895.25
bh 26,121 22,326 446.52 3,348.90

bh 7,971 6,813 136.26 1,021.95

bh 1,811 1,548 30.96 232.20


bh 3,020 2,581 51.62 387.15
bh 11,595 9,910 198.2 1,486.50
bh 22,224 18,995 379.9 2,849.25
bh 1,811 1,548 30.96 232.20
dos 1,533 1,310 26.2 196.50
bh 1,595 1,363 27.26 204.45
bh 1,971 1,685 33.7 252.75
bh 1,753 1,498 29.96 224.70
m2 2,294 1,961 39.22 294.15
bh 1,753 1,498 29.96 224.70
bh 3,723 3,182 63.64 477.30
bh 1,753 1,498 29.96 224.70
m3 370,479 316,649 6332.98 47,497.35
bh 5,913 5,054 101.08 758.10
bh 6,242 5,335 106.7 800.25
bh 5,257 4,493 89.86 673.95
bh 3,159 2,700 54 405.00
bh 4,709 4,025 80.5 603.75
bh 6,242 5,335 106.7 800.25
bh 7,447 6,365 127.3 954.75
bh 10,622 9,079 181.58 1,361.85
bh 17,151 14,659 293.18 2,198.85
bh 25,244 21,576 431.52 3,236.40
bh 30,195 25,808 516.16 3,871.20
bh 30,195 25,808 516.16 3,871.20
bh 36,235 30,970 619.4 4,645.50
bh 106,404 90,944 1818.88 13,641.60
bh 120,783 103,233 2064.66 15,484.95
bh 15,550 13,291 265.82 1,993.65
bh 22,888 19,562 391.24 2,934.30
bh 12,078 10,323 206.46 1,548.45
bh 15,098 12,904 258.08 1,935.60
bh 15,098 12,904 258.08 1,935.60
bh 15,550 13,291 265.82 1,993.65
bh 29,021 24,804 496.08 3,720.60
bh 102,665 87,748 1754.96 13,162.20
bh 699,124 597,542 11950.84 89,631.30
bh 42,274 36,132 722.64 5,419.80
bh 54,352 46,455 929.1 6,968.25
unit 54,352 46,455 929.1 6,968.25
bh 76,895 65,722 1314.44 9,858.30
bh 13,551 11,582 231.64 1,737.30
bh 171,424 146,516 2930.32 21,977.40
lbr 72,487 61,955 1239.1 9,293.25
bh 18,117 15,485 309.7 2,322.75
bh 375,636 321,056 6421.12 48,158.40
m 62,807 53,681 1073.62 8,052.15
kg 17,084 14,602 292.04 2,190.30
bh 933,048 797,477 15949.54 ###
m 155,569 132,965 2659.3 19,944.75
bh 1,500,004 1,282,055 25641.1 ###
m 250,021 213,693 4273.86 32,053.95
bh 1,946,901 1,664,018 33280.36 ###
m 324,483 277,336 5546.72 41,600.40
bh 2,924,638 2,499,691 49993.82 ###
m 487,481 416,650 8333 62,497.50
bh 4,144,910 3,542,658 70853.16 ###
m 690,879 590,495 11809.9 88,574.25
bh 5,485,479 4,688,444 93768.88 ###
m 914,327 781,476 15629.52 ###
bh 10,348,225 8,844,637 176892.74 ###
m 2,797,564 2,391,080 47821.6 ###
bh 725,664 620,226 12404.52 93,033.90
m 181,416 155,056 3101.12 23,258.40
bh 941,624 804,807 16096.14 ###
m 235,406 201,202 4024.04 30,180.30
bh 1,540,224 1,316,431 26328.62 ###
m 385,056 329,108 6582.16 49,366.20
bh 2,400,199 2,051,452 41029.04 ###
m 600,050 512,863 10257.26 76,929.45
bh 3,740,407 3,196,929 63938.58 ###
m 935,101 799,232 15984.64 ###
bh 5,935,759 5,073,298 101465.96 ###
m 1,483,939 1,268,324 25366.48 ###
m 2,587,056 2,211,159 44223.18 ###
m 2,990,816 2,556,253 51125.06 ###
m 335,129 286,435 5728.7 42,965.25
m 3,865,631 3,303,958 66079.16 ###
m 5,174,112 4,422,318 88446.36 ###
m 5,682,552 4,856,882 97137.64 ###
m 6,460,163 5,521,507 110430.14 ###
m 7,096,555 6,065,432 121308.64 ###
m 7,761,169 6,633,478 132669.56 ###
m 21,925 18,739 374.78 2,810.85
m 29,232 24,985 499.7 3,747.75
m 41,761 35,693 713.86 5,353.95
m 183,015 156,423 3128.46 23,463.45
m 183,015 156,423 3128.46 23,463.45
m 183,746 157,048 3140.96 23,557.20
m 261,004 223,080 4461.6 33,462.00
m 174,300 148,974 2979.48 22,346.10
m 189,540 162,000 3240 24,300.00
m 242,190 207,000 4140 31,050.00
m 289,575 247,500 4950 37,125.00
m 326,430 279,000 5580 41,850.00
bh 815,527 697,032 13940.64 ###
m 203,881 174,257 3485.14 26,138.55
bh 1,630,571 1,393,650 27873 ###
m 407,643 348,413 6968.26 52,261.95
bh 2,017,075 1,723,996 34479.92 ###
m 504,269 430,999 8619.98 64,649.85
bh 2,562,562 2,190,224 43804.48 ###
m 653,315 558,389 11167.78 83,758.35
bh 3,708,038 3,169,263 63385.26 ###
m 927,010 792,316 15846.32 ###
bh 4,978,674 4,255,277 85105.54 ###
m 1,244,668 1,063,819 21276.38 ###
bh 8,291,026 7,086,347 141726.94 ###
m 2,072,757 1,771,587 35431.74 ###
bh 175,981 150,411 3008.22 22,561.65
m 23,917 20,442 408.84 3,066.30
m 44,086 37,680 753.6 5,652.00
bh 268,138 229,178 4583.56 34,376.70
m 67,034 57,294 1145.88 8,594.10
bh 414,527 354,297 7085.94 53,144.55
m 103,632 88,574 1771.48 13,286.10
bh 814,802 696,412 13928.24 ###
m 203,761 174,155 3483.1 26,123.25
bh 1,232,228 1,053,186 21063.72 ###
m 308,117 263,348 5266.96 39,502.20
bh 1,877,451 1,604,659 32093.18 ###
m 469,363 401,165 8023.3 60,174.75
bh 2,663,627 2,276,604 45532.08 ###
m 665,997 569,228 11384.56 85,384.20
m 10,267 8,775 175.5 1,316.25
bh 10,647 9,100 182 1,365.00
m 13,043 11,148 222.96 1,672.20
bh 13,689 11,700 234 1,755.00
m 16,161 13,813 276.26 2,071.95
bh 22,815 19,500 390 2,925.00
m 32,245 27,560 551.2 4,134.00
bh 30,420 26,000 520 3,900.00
m 42,588 36,400 728 5,460.00
m 59,319 50,700 1014 7,605.00
m 85,176 72,800 1456 10,920.00
m 120,463 102,960 2059.2 15,444.00
m1 45,528 38,913 778.26 5,836.95
m1 64,795 55,380 1107.6 8,307.00
m1 271,152 231,754 4635.08 34,763.10
m1 360,623 308,225 6164.5 46,233.75
m1 7,254 6,200 124 930.00
m1 11,115 9,500 190 1,425.00
m1 14,391 12,300 246 1,845.00
m1 16,655 14,235 284.7 2,135.25
m1 22,815 19,500 390 2,925.00
m1 31,104 26,585 531.7 3,987.75
m1 45,528 38,913 778.26 5,836.95
m1 64,795 55,380 1107.6 8,307.00
m1 5,476 4,680 93.6 702.00
m1 8,103 6,926 138.52 1,038.90
m1 10,285 8,791 175.82 1,318.65
m1 9,835 8,406 168.12 1,260.90
m1 19,063 16,293 325.86 2,443.95
m1 23,271 19,890 397.8 2,983.50
m1 26,212 22,403 448.06 3,360.45
m1 34,223 29,250 585 4,387.50
Ljr 13,098 11,195 223.9 1,679.25
m1 214,286 183,150 3663 27,472.50
m1 260,401 222,565 4451.3 33,384.75
m1 237,751 203,206 4064.12 30,480.90
m1 158,689 135,632 2712.64 20,344.80
m1 194,805 166,500 3330 24,975.00
m1 554,922 474,292 9485.84 71,143.80
m1 52,080 44,513 890.26 6,676.95
m1 72,651 62,095 1241.9 9,314.25
m1 91,114 77,875 1557.5 11,681.25
btg 14,494 12,388 247.76 1,858.20
m1 920,970 787,154 15743.08 ###
m1 1,520,355 1,299,449 25988.98 ###
m1 1,984,586 1,696,227 33924.54 ###
m1 2,793,106 2,387,270 47745.4 ###
m1 5,246,510 4,484,197 89683.94 ###
m1 606,645 518,500 10370 77,775.00
bh 441,991 377,770 7555.4 56,665.50
bh 14,494 12,388 247.76 1,858.20
bh 24,157 20,647 412.94 3,097.05
bh 73,600 62,906 1258.12 9,435.90
bh 73,600 62,906 1258.12 9,435.90
bh 142,766 122,022 2440.44 18,303.30
bh 191,503 163,678 3273.56 24,551.70
- 144,940 123,880 2477.6 18,582.00
bh 111,121 94,975 1899.5 14,246.25
bh 111,121 94,975 1899.5 14,246.25
bh 1,328,612 1,135,566 22711.32 ###
bh 2,415,659 2,064,666 41293.32 ###
bh 4,831,318 4,129,332 82586.64 ###
bh 6,643,063 5,677,832 113556.64 ###
bh 9,202 7,865 157.3 1,179.75
bh 9,856 8,424 168.48 1,263.60
bh 31,590 27,000 540 4,050.00
bh 2,430,757 2,077,570 41551.4 ###
bh 8,454,808 7,226,332 144526.64 ###
bh 10,870,468 9,290,998 185819.96 ###
bh 15,097,872 12,904,164 258083.28 ###
m 44,689 38,196 763.92 5,729.40
m 143,789 122,897 2457.94 18,434.55
m 201,306 172,056 3441.12 25,808.40
m 150,979 129,042 2580.84 19,356.30
m 74,295 63,500 1270 9,525.00
m 129,238 110,460 2209.2 16,569.00
m 150,979 129,042 2580.84 19,356.30
bh 48,672 41,600 832 6,240.00
bh 150,979 129,042 2580.84 19,356.30
m 87,688 74,947 1498.94 11,242.05
bh 36,241 30,975 619.5 4,646.25
bh 42,588 36,400 728 5,460.00
bh 26,685 22,808 456.16 3,421.20
bh 22,581 19,300 386 2,895.00
bh 27,495 23,500 470 3,525.00
bh 5,835 4,987 99.74 748.05
ltr 16 14 0.28 2.10
m3 15,948 13,631 272.62 2,044.65
m3 1,207 1,032 20.64 154.80
set 30,195 25,808 516.16 3,871.20
ltr 8,761 7,488 149.76 1,123.20
ltr 12,489 10,674 213.48 1,601.10
ltr 6,515 5,568 111.36 835.20
ltr 13,154 11,243 224.86 1,686.45
ltr 52,903 45,216 904.32 6,782.40
ltr 48,072 41,087 821.74 6,163.05
ltr 80,924 69,166 1383.32 10,374.90
ltr 44,789 38,281 765.62 5,742.15
ltr 50,112 42,831 856.62 6,424.65
ltr 8,541 7,300 146 1,095.00
ltr 17,901 15,300 306 2,295.00
Ltr 11,957 10,220 204.4 1,533.00
ltr 5,556 4,749 94.98 712.35
Ltr 4,831 4,129 82.58 619.35
Ltr 35,334 30,200 604 4,530.00
bh 1,195,752 1,022,010 20440.2 ###
bh 100,733 86,097 1721.94 12,914.55
ltr 14,494 12,388 247.76 1,858.20
ltr 56,862 48,600 972 7,290.00
tube 120,783 103,233 2064.66 15,484.95
Kg 34,168 29,203 584.06 4,380.45
Kg 25,553 21,840 436.8 3,276.00
Tube 19,890 17,000 340 2,550.00
kg 181,175 154,850 3097 23,227.50
kg 40,462 34,583 691.66 5,187.45
kg 71,943 61,490 1229.8 9,223.50
kg 24,157 20,647 412.94 3,097.05
kg 54,756 46,800 936 7,020.00
kg 72,072 61,600 1232 9,240.00
kg 43,050 36,795 735.9 5,519.25
kg 35,591 30,420 608.4 4,563.00
kg 39,078 33,400 668 5,010.00
ltr 55,107 47,100 942 7,065.00
ltr 126,822 108,395 2167.9 16,259.25
DM3 193,252 165,173 3303.46 24,775.95
Kg 34,168 29,203 584.06 4,380.45
Kg 34,168 29,203 584.06 4,380.45
kg 107,624 91,986 1839.72 13,797.90
kg 56,946 48,672 973.44 7,300.80
kg 53,442 45,677 913.54 6,851.55
kg 91,916 78,561 1571.22 11,784.15
kg 51,453 43,977 879.54 6,596.55
kg 58,938 50,374 1007.48 7,556.10
kg 96,149 82,179 1643.58 12,326.85
m2 131,049 112,008 2240.16 16,801.20
m2 131,049 112,008 2240.16 16,801.20
kg 40,459 34,580 691.6 5,187.00
kg 62,641 53,539 1070.78 8,030.85
kg 46,139 39,435 788.7 5,915.25
kg 89,159 76,204 1524.08 11,430.60
kg 72,350 61,838 1236.76 9,275.70
Kg 71,183 60,840 1216.8 9,126.00
Kg 91,260 78,000 1560 11,700.00
kg 59,183 50,584 1011.68 7,587.60
kg 69,018 58,990 1179.8 8,848.50
Kg 63,873 54,592 1091.84 8,188.80
Kg 33,857 28,938 578.76 4,340.70
kg 38,086 32,552 651.04 4,882.80
ltr 86,964 74,328 1486.56 11,149.20
kg 57,798 49,400 988 7,410.00
Kg 103,984 88,875 1777.5 13,331.25
Kg 87,697 74,955 1499.1 11,243.25
lbr 8,432 7,207 144.14 1,081.05
m1 62,928 53,785 1075.7 8,067.75
m1 71,020 60,701 1214.02 9,105.15
kg 96,467 82,450 1649 12,367.50
kg 56,946 48,672 973.44 7,300.80
kg 78,509 67,102 1342.04 10,065.30
bh 33,215 28,389 567.78 4,258.35
bh 20,672 17,668 353.36 2,650.20
kg 14,664 12,533 250.66 1,879.95
kg 14,664 12,533 250.66 1,879.95
Ton 440,858 376,802 7536.04 56,520.30
Kg 1,503 1,285 25.7 192.75
kg 360,665 308,261 6165.22 46,239.15
kg 18,299 15,640 312.8 2,346.00
m3 1,407,076 1,202,629 24052.58 ###
bh 125,282 107,079 2141.58 16,061.85
m3 1,407,076 1,202,629 24052.58 ###
m3 1,335,382 1,141,352 22827.04 ###
m3 1,407,076 1,202,629 24052.58 ###
m3 1,264,425 1,080,705 21614.1 ###
m3 1,407,076 1,202,629 24052.58 ###
m3 1,472,526 1,258,569 25171.38 ###
m3 1,256,285 1,073,748 21474.96 ###
m3 1,335,382 1,141,352 22827.04 ###
m3 1,672,844 1,429,781 28595.62 ###
m3 1,503,748 1,285,255 25705.1 ###
m3 1,572,942 1,344,395 26887.9 ###
m3 1,427,174 1,219,807 24396.14 ###
m1 59,355 50,731 1014.62 7,609.65
m1 75,126 64,210 1284.2 9,631.50
m1 1,151,784 984,431 19688.62 ###
m1 1,562,718 1,335,656 26713.12 ###
m1 1,892,136 1,617,210 32344.2 ###
m1 2,961,589 2,531,273 50625.46 ###
m1 3,850,044 3,290,636 65812.72 ###
m1 596,921 510,189 10203.78 76,528.35

m1 306,999 262,392 5247.84 39,358.80

m1 388,274 331,858 6637.16 49,778.70

m1 1,154,075 986,389 19727.78 ###

894,374 764,422 15288.44 ###


m1
m1 589,802 504,104 10082.08 75,615.60

m1 1,122,050 959,017 19180.34 ###


m1 928,484 793,576 15871.52 ###

m1 686,318 586,597 11731.94 87,989.55

m1 1,421,232 1,214,728 24294.56 ###

m1 1,556,016 1,329,928 26598.56 ###

m1 1,802,565 1,540,654 30813.08 ###

m1 1,982,888 1,694,776 33895.52 ###

m1 2,842,934 2,429,858 48597.16 ###

m1 1,837,737 1,570,715 31414.3 ###

m1 2,544,192 2,174,523 43490.46 ###

m1 3,030,596 2,590,253 51805.06 ###

4,077,139 3,484,734 69694.68 ###


m1
m1 2,600,373 2,222,541 44450.82 ###

Bh 89,435 76,440 1528.8 11,466.00


Bh 111,743 95,507 1910.14 14,326.05
Bh 207,909 177,700 3554 26,655.00
lbr 175,135 149,688 2993.76 22,453.20
Unit 570,032 487,207 9744.14 73,081.05
m 24,308 20,776 415.52 3,116.40
m 24,308 20,776 415.52 3,116.40
m2 188,421 161,044 3220.88 24,156.60
kg 53,145 45,423 908.46 6,813.45
m3 15,744,491 13,456,830 269136.6 ###
m3 688,463 588,430 11768.6 88,264.50
bh 125,282 107,079 2141.58 16,061.85
m 884,132 755,668 15113.36 ###
m 1,364,002 1,165,814 23316.28 ###
m 1,384,173 1,183,054 23661.08 ###
m 369,596 315,894 6317.88 47,384.10
m 413,078 353,058 7061.16 52,958.70
bh 5,556,016 4,748,732 94974.64 ###
m 1,509,787 1,290,416 25808.32 ###
bh 1,933 1,652 33.04 247.80
m3 305,943 261,490 5229.8 39,223.50
m3 305,943 261,490 5229.8 39,223.50
kg 32,852 28,079 561.58 4,211.85
ltr 32,852 28,079 561.58 4,211.85
Ltr 12,682 10,839 216.78 1,625.85
kg 208,350 178,077 3561.54 26,711.55
m3 275,313 235,310 4706.2 35,296.50
m3 229,444 196,106 3922.12 29,415.90
m3 266,913 228,131 4562.62 34,219.65
m3 229,444 196,106 3922.12 29,415.90
m3 237,007 202,570 4051.4 30,385.50
m3 237,007 202,570 4051.4 30,385.50
m3 227,931 194,813 3896.26 29,221.95
m3 237,007 202,570 4051.4 30,385.50
m3 231,964 198,260 3965.2 29,739.00
m3 227,931 194,813 3896.26 29,221.95
m3 379,017 323,946 6478.92 48,591.90
m3 275,313 235,310 4706.2 35,296.50
m3 225,742 192,942 3858.84 28,941.30
m3 269,417 230,271 4605.42 34,540.65
m3 231,039 197,469 3949.38 29,620.35
m3 336,924 287,969 5759.38 43,195.35
M3 212,399 181,538 3630.76 27,230.70
bh 30,195 25,808 516.16 3,871.20
m3 211,190 180,504 3610.08 27,075.60
cm 8,454 7,226 144.52 1,083.90
bh 13,287 11,356 227.12 1,703.40
m3 82,133 70,199 1403.98 10,529.85
m3 82,133 70,199 1403.98 10,529.85
ltr 24,157 20,647 412.94 3,097.05
ltr 46,502 39,745 794.9 5,961.75
kg 36,235 30,970 619.4 4,645.50
ltr 6,040 5,162 103.24 774.30
Kg 6,040 5,162 103.24 774.30
Ls 1,574,406 1,345,646 26912.92 ###
m2 30,195 25,808 516.16 3,871.20
m2 30,195 25,808 516.16 3,871.20
m2 54,352 46,455 929.1 6,968.25
m2 60,392 51,617 1032.34 7,742.55
m2 90,587 77,425 1548.5 11,613.75
m2 66,430 56,778 1135.56 8,516.70
m 13,287 11,356 227.12 1,703.40
kg 53,880 46,051 921.02 6,907.65
m3 72,470 61,940 1238.8 9,291.00
Ls 30,195 25,808 516.16 3,871.20
m1 5,959 5,093 101.86 763.95
m1 8,351 7,138 142.76 1,070.70
m1 57,220 48,906 978.12 7,335.90
m1 24,102 20,600 412 3,090.00
m1 14,508 12,400 248 1,860.00
m1 16,910 14,453 289.06 2,167.95
Kg 10,928 9,340 186.8 1,401.00
M' 112,070 95,786 1915.72 14,367.90
M2 7,699 6,580 131.6 987.00
bh 91,727 78,399 1567.98 11,759.85
bh 46,449 39,700 794 5,955.00
bh 4,928 4,212 84.24 631.80
bh 5,913 5,054 101.08 758.10
bh 6,571 5,616 112.32 842.40
bh 32,409 27,700 554 4,155.00
bh 6,264 5,354 107.08 803.10
bh 18,793 16,062 321.24 2,409.30
bh 220,885 188,791 3775.82 28,318.65
bh 53,223 45,490 909.8 6,823.50
bh 54,098 46,238 924.76 6,935.70
bh 61,108 52,229 1044.58 7,834.35
bh 65,597 56,066 1121.32 8,409.90
bh 76,548 65,426 1308.52 9,813.90
Unit 114,659 97,999 1959.98 14,699.85
Unit 21,925 18,739 374.78 2,810.85
Unit 229,209 195,905 3918.1 29,385.75
bh 1,872 1,600 32 240.00
bh 3,833 3,276 65.52 491.40
bh 188 161 3.22 24.15
bh 54,640 46,701 934.02 7,005.15
m 12,682 10,839 216.78 1,625.85
m1 19,929 17,033 340.66 2,554.95
m3 279,371 238,779 4775.58 35,816.85
kg 53,746 45,937 918.74 6,890.55
m 24,157 20,647 412.94 3,097.05
ikat 8,541 7,300 146 1,095.00
m2 29,229 24,982 499.64 3,747.30
m2 19,929 17,033 340.66 2,554.95
m2 46,259 39,538 790.76 5,930.70
bh 327,684 280,072 5601.44 42,010.80
bh 403,294 344,696 6893.92 51,704.40
m 670,949 573,461 11469.22 86,019.15
bh 11,776 10,065 201.3 1,509.75
11,776 10,065 201.3 1,509.75
Paket 30,195 25,808 516.16 3,871.20
m2 30,195 25,808 516.16 3,871.20
bh 10,629 9,085 181.7 1,362.75
bh 6,040 5,162 103.24 774.30
m2 19,204 16,414 328.28 2,462.10
bh 9,602 8,207 164.14 1,231.05
m2 173,277 148,100 2962 22,215.00
lbr 304,977 260,664 5213.28 39,099.60
lbr 287,579 245,794 4915.88 36,869.10
kg 14,857 12,698 253.96 1,904.70
bh 42,274 36,132 722.64 5,419.80
bh 2,114 1,807 36.14 271.05
kg 188,908 161,460 3229.2 24,219.00
kg 20,672 17,668 353.36 2,650.20
ltr 103,896 88,800 1776 13,320.00
Bh 122,445 104,654 2093.08 15,698.10
kg 24,117 20,613 412.26 3,091.95
kg 107,497 91,878 1837.56 13,781.70
m3 348,735 298,064 5961.28 44,709.60
m3 120,783 103,233 2064.66 15,484.95
Paket 60,392 51,617 1032.34 7,742.55
m 260,401 222,565 4451.3 33,384.75
m 346,438 296,101 5922.02 44,415.15
lbr 295,919 252,922 5058.44 37,938.30
lbr 301,957 258,083 5161.66 38,712.45
bh 615,993 526,490 10529.8 78,973.50
bh 724,698 619,400 12388 92,910.00
bh 845,481 722,633 14452.66 ###
M 1,893,273 1,618,182 32363.64 ###
M 2,152,353 1,839,618 36792.36 ###
M 511,516 437,193 8743.86 65,578.95
bh 79,717 68,134 1362.68 10,220.10
bh 84,318 72,067 1441.34 10,810.05
bh 85,469 73,050 1461 10,957.50
M1 2,112,495 1,805,551 36111.02 ###
bh 438,442 374,737 7494.74 56,210.55
Set 1,068,204 912,995 18259.9 ###
Set 119,575 102,201 2044.02 15,330.15
M1 82,133 70,199 1403.98 10,529.85
bh 730,738 624,562 12491.24 93,684.30
btl 414,527 354,297 7085.94 53,144.55
btl 212,578 181,691 3633.82 27,253.65
bh 16,380 14,000 280 2,100.00
kg 63,410 54,197 1083.94 8,129.55
kg 30,558 26,118 522.36 3,917.70
Kg 30,558 26,118 522.36 3,917.70
m2 570,609 487,700 9754 73,155.00
kg 29,652 25,344 506.88 3,801.60
Unit 3,019,575 2,580,833 51616.66 ###
Unit 3,623,489 3,096,999 61939.98 ###
bh 1,207 1,032 20.64 154.80
lbr 128,019 109,418 2188.36 16,412.70
m1 1,570 1,342 26.84 201.30
Ls 1,413,161 1,207,830 24156.6 ###
Ls 392,544 335,508 6710.16 50,326.20
Ls 1,099,125 939,423 18788.46 ###
kg 60,723 51,900 1038 7,785.00
Kg 23,250 19,872 397.44 2,980.80
m2 10,870 9,291 185.82 1,393.65
bh 89,597 76,579 1531.58 11,486.85
Unit 4,861,515 4,155,141 83102.82 ###
Unit 4,861,515 4,155,141 83102.82 ###
bh 43,602 37,267 745.34 5,590.05
bh 43,602 37,267 745.34 5,590.05
Unit 476,071 406,898 8137.96 61,034.70
Unit 73,815,300 63,090,000 1261800 ###
Unit 50,544,000 43,200,000 864000 ###
bh 563,768 481,853 9637.06 72,277.95
bh 2,271,279 1,941,264 38825.28 ###
bh 3,549,941 3,034,138 60682.76 ###
bh 5,944,530 5,080,795 101615.9 ###
m2 1,127,308 963,511 19270.22 ###
m2 33,215 28,389 567.78 4,258.35
m2 21,996 18,800 376 2,820.00
btg 328,646 280,894 5617.88 42,134.10
m2 23,983 20,498 409.96 3,074.70
kg 6,890 5,889 117.78 883.35
Ltr 156,429 133,700 2674 20,055.00
kg 6,133 5,242 104.84 786.30
bh 36,235 30,970 619.4 4,645.50
bh 95,057 81,245 1624.9 12,186.75
bh 124,045 106,021 2120.42 15,903.15
bh 1,069,533 914,131 18282.62 ###
bh 1,622,968 1,387,152 27743.04 ###
bh 1,902,005 1,625,645 32512.9 ###
bh 3,228,528 2,759,426 55188.52 ###
bh 302,924 258,909 5178.18 38,836.35
bh 507,530 433,786 8675.72 65,067.90
bh 399,308 341,289 6825.78 51,193.35
bh 583,140 498,410 9968.2 74,761.50
bh 507,772 433,993 8679.86 65,098.95
bh 233,353 199,447 3988.94 29,917.05
bh 308,238 263,451 5269.02 39,517.65
bh 425,518 363,691 7273.82 54,553.65
bh 208,713 178,387 3567.74 26,758.05
bh 284,565 243,218 4864.36 36,482.70
bh 354,136 302,680 6053.6 45,402.00
bh 101,941 87,129 1742.58 13,069.35
bh 125,493 107,259 2145.18 16,088.85
bh 181,416 155,056 3101.12 23,258.40
bh 253,161 216,377 4327.54 32,456.55
bh 85,756 73,296 1465.92 10,994.40
bh 107,014 91,465 1829.3 13,719.75
bh 118,609 101,375 2027.5 15,206.25
bh 166,801 142,565 2851.3 21,384.75
bh 109,308 93,426 1868.52 14,013.90
bh 177,914 152,063 3041.26 22,809.45
bh 217,289 185,717 3714.34 27,857.55
59,183 50,584 1011.68 7,587.60
bh 26,331 22,505 450.1 3,375.75
bh 41,912 35,822 716.44 5,373.30
bh 68,484 58,533 1170.66 8,779.95
bh 85,031 72,676 1453.52 10,901.40
bh 152,790 130,590 2611.8 19,588.50
bh 1,351,803 1,155,387 23107.74 ###
bh 2,135,323 1,825,062 36501.24 ###
bh 540,746 462,176 9243.52 69,326.40
bh 1,827,567 1,562,023 31240.46 ###
bh 2,464,577 2,106,476 42129.52 ###
bh 2,828,617 2,417,621 48352.42 ###
bh 219,221 187,368 3747.36 28,105.20
bh 173,745 148,500 2970 22,275.00
bh 33,941 29,009 580.18 4,351.35
bh 34,509 29,495 589.9 4,424.25
bh 47,226 40,364 807.28 6,054.60
bh 138,780 118,615 2372.3 17,792.25
bh 204,002 174,361 3487.22 26,154.15
bh 10,025 8,568 171.36 1,285.20
bh 7,367 6,297 125.94 944.55
bh 60,512 51,720 1034.4 7,758.00
bh 159,434 136,268 2725.36 20,440.20
bh 205,210 175,393 3507.86 26,308.95
bh 33,578 28,699 573.98 4,304.85
bh 87,930 75,154 1503.08 11,273.10
bh 138,176 118,099 2361.98 17,714.85
bh 61,358 52,443 1048.86 7,866.45
bh 159,193 136,062 2721.24 20,409.30
bh 205,210 175,393 3507.86 26,308.95
bh 178,517 152,579 3051.58 22,886.85
bh 229,730 196,350 3927 29,452.50
bh 403,294 344,696 6893.92 51,704.40
bh 11,958,710 10,221,120 204422.4 ###
bh 498,229 425,837 8516.74 63,875.55
bh 73,074 62,456 1249.12 9,368.40
m3 483,132 412,933 8258.66 61,939.95
Unit 14,493,956 12,387,997 247759.94 ###
unit 19,731,872 16,864,848 337296.96 ###
m3 24,157 20,647 412.94 3,097.05
kg 6,890 5,889 117.78 883.35
bh 301,957 258,083 5161.66 38,712.45
kg 26,089 22,298 445.96 3,344.70
kg 26,089 22,298 445.96 3,344.70
bh 307,997 263,245 5264.9 39,486.75
set 664,306 567,783 11355.66 85,167.45
Unit 1,115,804 953,679 19073.58 ###
Unit 724,698 619,400 12388 92,910.00
set 5,495,626 4,697,116 93942.32 ###
m1 50,426 43,099 861.98 6,464.85
Kg/Unit 13,401 11,454 229.08 1,718.10
Kg/Unit 14,510 12,402 248.04 1,860.30
Kg 13,141 11,232 224.64 1,684.80
Kg 13,171 11,257 225.14 1,688.55
kg 85,839 73,367 1467.34 11,005.05
Set 236,156 201,843 4036.86 30,276.45
M' 65,773 56,216 1124.32 8,432.40
Set 518,667 443,305 8866.1 66,495.75
Kg 15,940 13,624 272.48 2,043.60
kg 91,260 78,000 1560 11,700.00
M' 216,111 184,710 3694.2 27,706.50
M2 160,707 137,356 2747.12 20,603.40
M2 40,716 34,800 696 5,220.00
set 1,202,705 1,027,953 20559.06 ###
M2 751,690 642,470 12849.4 96,370.50
M2 732,899 626,409 12528.18 93,961.35
M2 244,300 208,803 4176.06 31,320.45
M2 466,048 398,332 7966.64 59,749.80
M2 250,564 214,157 4283.14 32,123.55
Set 1,127,536 963,706 19274.12 ###
Kg 16,914 14,456 289.12 2,168.40
Kg 16,914 14,456 289.12 2,168.40
M2 210,602 180,002 3600.04 27,000.30
M2 902,028 770,964 15419.28 ###
Kg 16,914 14,456 289.12 2,168.40
kg 16,914 14,456 289.12 2,168.40
Kg 16,914 14,456 289.12 2,168.40
Kg 16,914 14,456 289.12 2,168.40
M2 151,277 129,297 2585.94 19,394.55
M' 322,340 275,504 5510.08 41,325.60
M' 135,722 116,002 2320.04 17,400.30
m' 14,379 12,290 245.8 1,843.50
m' 56,376 48,185 963.7 7,227.75
m' 247,430 211,479 4229.58 31,721.85
Lbr 676,521 578,223 11564.46 86,733.45
kg 5,497 4,698 93.96 704.70
m2 977,198 835,212 16704.24 ###
Ltr 161,043 137,644 2752.88 20,646.60
bh 34,509 29,495 589.9 4,424.25
Kg 42,561 36,377 727.54 5,456.55
m 24,117 20,613 412.26 3,091.95
gr 37,927 32,416 648.32 4,862.40
unit 126,534 108,149 2162.98 16,222.35
bh 90,202 77,096 1541.92 11,564.40
m2 25,163 21,507 430.14 3,226.05
Sewa-hari 143,789 122,897 2457.94 18,434.55
M3 237,978 203,400 4068 30,510.00
M3 294,982 252,121 5042.42 37,818.15
51,252 43,805 876.1 6,570.75
Ltr 113,892 97,344 1946.88 14,601.60
Kg 3,075 2,628 52.56 394.20
Kg 34,168 29,203 584.06 4,380.45
bh 854,194 730,080 14601.6 ###
bh 455,570 389,376 7787.52 58,406.40
Kg 38,837 33,194 663.88 4,979.10
M 19,931 17,035 340.7 2,555.25
M3 222,091 189,821 3796.42 28,473.15
KG 25,625 21,902 438.04 3,285.30
KG 6,834 5,841 116.82 876.15
Kg 11,389 9,734 194.68 1,460.10
Kg 23,917 20,442 408.84 3,066.30
KG 36,543 31,233 624.66 4,684.95
KG 1,082 925 18.5 138.75
Ton 1,025,032 876,096 17521.92 ###
KG 1,138 973 19.46 145.95
Kg 12,339 10,546 210.92 1,581.90
Ltr 398,624 340,704 6814.08 51,105.60
Kg 15,368 13,135 262.7 1,970.25
Kg 1,640 1,402 28.04 210.30
M3 267,647 228,758 4575.16 34,313.70
Kg 45,557 38,938 778.76 5,840.70
Kg 10,124 8,653 173.06 1,297.95
Kg 7,699 6,580 131.6 987.00
Kg 72,037 61,570 1231.4 9,235.50
Kg 4,893 4,182 83.64 627.30
Kg 8,086 6,911 138.22 1,036.65
Kg 33,012 28,215 564.3 4,232.25
M1 18,855 16,115 322.3 2,417.25
Kg 74,410 63,598 1271.96 9,539.70
Kg 28,157 24,066 481.32 3,609.90
M3 3,659,622 3,127,882 62557.64 ###
bh 28,473 24,336 486.72 3,650.40
M3 1,650,964 1,411,080 28221.6 ###
M4 2,381,232 2,035,241 40704.82 ###
Kg 19,361 16,548 330.96 2,482.20

Kg 20,501 17,522 350.44 2,628.30


Kg 25,057 21,416 428.32 3,212.40

Kg 21,639 18,495 369.9 2,774.25

Rp/M' 48,364 41,337 826.74 6,200.55


M3/M' 1,480,602 1,265,472 25309.44 ###
M3/M' 1,138,925 973,440 19468.8 ###
Ltr 45,557 38,938 778.76 5,840.70
Ltr 7,972 6,814 136.28 1,022.10
Kg 18,711 15,992 319.84 2,398.80
Kg 22,779 19,469 389.38 2,920.35
bh 22,209 18,982 379.64 2,847.30
Kg 17,084 14,602 292.04 2,190.30
Kg 4,132,921 3,532,411 70648.22 ###
Kg 34,168 29,203 584.06 4,380.45
M' 45,557 38,938 778.76 5,840.70
M' 3,986,237 3,407,040 68140.8 ###
M' 170,839 146,016 2920.32 21,902.40
bh 113,892 97,344 1946.88 14,601.60
M' 85,419 73,008 1460.16 10,951.20
bh 17,084 14,602 292.04 2,190.30
bh 39,862 34,070 681.4 5,110.50
Kg 2,531,823 2,163,951 43279.02 ###
Kg 17,653 15,088 301.76 2,263.20
M3 2,470,530 2,111,564 42231.28 ###
M3 2,355,401 2,013,163 40263.26 ###
M3 2,466,651 2,108,249 42164.98 ###
M3 2,390,684 2,043,320 40866.4 ###
M3 2,329,311 1,990,864 39817.28 ###
M3 2,485,817 2,124,630 42492.6 ###
M3 2,531,823 2,163,951 43279.02 ###
Kg 14,964 12,790 255.8 1,918.50
Kg 19,931 17,035 340.7 2,555.25
Kg 51,252 43,805 876.1 6,570.75
m2 341,677 292,032 5840.64 43,804.80
Kg 36,446 31,150 623 4,672.50
Kg 227,785 194,688 3893.76 29,203.20
M' 87,697 74,955 1499.1 11,243.25
M' 125,281 107,078 2141.56 16,061.70
M' 162,297 138,715 2774.3 20,807.25
M3 275,313 235,310 4706.2 35,296.50
Kg 46,605 39,833 796.66 5,974.95

Kg 17,653 15,088 301.76 2,263.20


bh 1,708,387 1,460,160 29203.2 ###
bh 2,277,850 1,946,880 38937.6 ###
bh 1,219,788 1,042,554 20851.08 ###
M3 2,387,689 2,040,760 40815.2 ###
Kg 398,624 340,704 6814.08 51,105.60
M3 225,742 192,942 3858.84 28,941.30
Kg 398,624 340,704 6814.08 51,105.60
M 497,995 425,637 8512.74 63,845.55
bh 1,081,979 924,768 18495.36 ###
bh 797,247 681,408 13628.16 ###
bh 54,668 46,725 934.5 7,008.75
bh 61,502 52,566 1051.32 7,884.90
bh 75,169 64,247 1284.94 9,637.05
M3 139,290 119,051 2381.02 17,857.65
Ltr 17,996 15,381 307.62 2,307.15
Ltr 17,996 15,381 307.62 2,307.15
Ltr 17,996 15,381 307.62 2,307.15
Ltr 17,996 15,381 307.62 2,307.15
Kg 17,275 14,765 295.3 2,214.75
M3 2,269,981 1,940,155 38803.1 ###
M3 235,363 201,165 4023.3 30,174.75
M3 2,626,457 2,244,835 44896.7 ###
M3 1,429,849 1,222,093 24441.86 ###
M3 1,169,009 999,153 19983.06 ###
M3 2,918,179 2,494,170 49883.4 ###
M3 2,666,111 2,278,727 45574.54 ###
M3 2,531,823 2,163,951 43279.02 ###
bh 3,986 3,407 68.14 511.05
M3 251,396 214,868 4297.36 32,230.20
M3 235,363 201,165 4023.3 30,174.75
M3 222,538 190,203 3804.06 28,530.45
bh 67,652 57,822 1156.44 8,673.30
bh 90,202 77,096 1541.92 11,564.40
bh 148,835 127,209 2544.18 19,081.35
bh 187,923 160,618 3212.36 24,092.70
bh 375,845 321,235 6424.7 48,185.25
bh 3,149,330 2,691,735 53834.7 ###
bh 5,002,486 4,275,629 85512.58 ###
bh 8,006,531 6,843,189 136863.78 ###
bh 10,124,029 8,653,016 173060.32 ###
bh 12,487,925 10,673,440 213468.8 ###
bh 59,026,986 50,450,415 1009008.3 ###
bh 74,921,334 64,035,328 1280706.56 ###
bh 92,285,094 78,876,149 1577522.98 ###
bh 109,873,856 93,909,279 1878185.58 ###
bh 127,462,619 108,942,409 2178848.18 ###
bh 30,669,559 26,213,298 524265.96 ###
m 62,116 53,091 1061.82 7,963.65
m 104,391 89,223 1784.46 13,383.45
m 131,884 112,721 2254.42 16,908.15
m 272,279 232,717 4654.34 34,907.55
m 423,028 361,562 7231.24 54,234.30
m 524,888 448,622 8972.44 67,293.30
m 833,748 712,605 14252.1 ###
m 1,334,421 1,140,531 22810.62 ###
m 1,687,338 1,442,169 28843.38 ###
m 375,845 321,235 6424.7 48,185.25
m 5,111,593 4,368,883 87377.66 ###
m 9,837,830 8,408,402 168168.04 ###
m 12,486,889 10,672,555 213451.1 ###
m 15,380,849 13,146,025 262920.5 ###
m 18,312,310 15,651,547 313030.94 ###
m 21,243,770 18,157,068 363141.36 ###
M3 288,720 246,769 4935.38 37,015.35
M2 2,146 1,834 36.68 275.10
M3 203,298 173,759 3475.18 26,063.85
M3 134,393 114,866 2297.32 17,229.90
m2 7,282 6,224 124.48 933.60
m3 200,270 171,171 3423.42 25,675.65
m3 68,335 58,406 1168.12 8,760.90
bh 395,940 338,410 6768.2 50,761.50
unit 178,681 152,719 3054.38 22,907.85
m 930,130 794,983 15899.66 ###
bh 558,090 477,000 9540 71,550.00
bh 889,785 760,500 15210 ###
bh 1,283,607 1,097,100 21942 ###
bh 645,655 551,842 11036.84 82,776.30
bh 829,724 709,166 14183.32 ###
m3 6,697,447 5,724,314 114486.28 ###
bh 16,799 14,358 287.16 2,153.70
bh 45,784 39,132 782.64 5,869.80
bh 75,453 64,490 1289.8 9,673.50
set 379,831 324,642 6492.84 48,696.30

set 589,393 503,755 10075.1 75,563.25

set 785,859 671,674 13433.48 ###

set 956,128 817,203 16344.06 ###

set 1,126,396 962,732 19254.64 ###

set 2,291,516 1,958,561 39171.22 ###


m' 15,176 12,971 259.42 1,945.65
m' 9,365 8,004 160.08 1,200.60
m' 20,007 17,100 342 2,565.00
m' 74,100 63,333 1266.66 9,499.95
bh 131,909 112,743 2254.86 16,911.45
bh 111,946 95,680 1913.6 14,352.00
bh 77,358 66,118 1322.36 9,917.70
bh 5,894 5,038 100.76 755.70
bh 628,883 537,507 10750.14 80,626.05
bh 492,866 421,253 8425.06 63,187.95
bh 1,239,984 1,059,815 21196.3 ###
bh 781,696 668,116 13362.32 ###
bh 18,250 15,598 311.96 2,339.70
m' 11,133 9,515 190.3 1,427.25
bh 2,620 2,239 44.78 335.85
bh 30,882 26,395 527.9 3,959.25
bh 21,245 18,158 363.16 2,723.70
bh 23,051 19,702 394.04 2,955.30
bh 18,336 15,672 313.44 2,350.80
bh 52,390 44,778 895.56 6,716.70
bh 1,315,458 1,124,323 22486.46 ###
m' 45,842 39,181 783.62 5,877.15
m' 98,232 83,959 1679.18 12,593.85
m' 11,133 9,515 190.3 1,427.25
set 854,194 730,080 14601.6 ###
bh 62,548 53,460 1069.2 8,019.00
bh 79,151 67,650 1353 10,147.50
bh 133,205 113,850 2277 17,077.50
m2 114,075 97,500 1950 14,625.00
m2 133,634 114,217 2284.34 17,132.55
m2 146,162 124,925 2498.5 18,738.75
bh 392,664 335,610 6712.2 50,341.50
bh 544,401 465,300 9306 69,795.00
bh 755,212 645,480 12909.6 96,822.00
bh 93,243 79,695 1593.9 11,954.25
bh 93,243 79,695 1593.9 11,954.25
bh 119,884 102,465 2049.3 15,369.75
bh 119,884 102,465 2049.3 15,369.75
kg 61,776 52,800 1056 7,920.00
bh 90,821 77,625 1552.5 11,643.75
bh 587,867 502,450 10049 75,367.50
bh 13,572 11,600 232 1,740.00
ps 8,178,359 6,990,050 139801 ###
m2 234,000 200,000 4000 30,000.00
m 263,250 225,000 4500 33,750.00
Unit 7,760,610 6,633,000 132660 ###
Unit 11,814,660 10,098,000 201960 ###
Unit 21,428,550 18,315,000 366300 ###
Unit 27,246,375 23,287,500 465750 ###
bh 26,325 22,500 450 3,375.00
bh 118,112 100,950 2019 15,142.50
bh 25,483 21,780 435.6 3,267.00
bh 31,853 27,225 544.5 4,083.75
bh 34,402 29,403 588.06 4,410.45
kg 4,095 3,500 70 525.00
M3 546 467 9.34 70.05
Kg 546 467 9.34 70.05
Kg 113,892 97,344 1946.88 14,601.60
Ltr 15,250 13,034 260.68 1,955.10
Ltr 15,250 13,034 260.68 1,955.10
Kg 11,389 9,734 194.68 1,460.10
Kg 17,084 14,602 292.04 2,190.30
M3 2,098,259 1,793,384 35867.68 ###
M3 1,138,925 973,440 19468.8 ###
m 1,138,925 973,440 19468.8 ###
Kg 19,469 16,640 332.8 2,496.00
Kg 17,157 14,664 293.28 2,199.60
Kg 45,557 38,938 778.76 5,840.70
Kg 23,917 20,442 408.84 3,066.30

Kg 14,806 12,655 253.1 1,898.25


m3 3,608,329 3,084,042 61680.84 ###
Kg 45,557 38,938 778.76 5,840.70
bh 261,383 223,404 4468.08 33,510.60
M 19,931 17,035 340.7 2,555.25
M 28,473 24,336 486.72 3,650.40
m2 227,785 194,688 3893.76 29,203.20
m3 1,810 1,547 30.94 232.05
Unit 113,892 97,344 1946.88 14,601.60
Kg 28,473 24,336 486.72 3,650.40
Kg 16,670 14,248 284.96 2,137.20
m' 18,223 15,575 311.5 2,336.25
Kg 546 467 9.34 70.05
bh/M' 1,715 1,466 29.32 219.90
bh/M' 536 458 9.16 68.70
bh/M' 620 530 10.6 79.50
bh/M' 37,786 32,296 645.92 4,844.40
bh/M' 47,146 40,296 805.92 6,044.40
bh/M' 109,774 93,824 1876.48 14,073.60
bh/M' 130,180 111,265 2225.3 16,689.75
bh/M' 91,478 78,186 1563.72 11,727.90
bh/M' 114,348 97,733 1954.66 14,659.95
bh/M' 67,225 57,457 1149.14 8,618.55
bh/M' 67,225 57,457 1149.14 8,618.55
bh/M' 67,225 57,457 1149.14 8,618.55
bh/M' 67,225 57,457 1149.14 8,618.55
bh/M' 67,225 57,457 1149.14 8,618.55
bh/M' 67,225 57,457 1149.14 8,618.55
bh/M' 67,225 57,457 1149.14 8,618.55
bh/M' 67,225 57,457 1149.14 8,618.55
bh/M' 67,225 57,457 1149.14 8,618.55
bh/M' 67,225 57,457 1149.14 8,618.55
bh/M' 67,225 57,457 1149.14 8,618.55
Kg 16,427 14,040 280.8 2,106.00
Kg 51,365 43,902 878.04 6,585.30
Kg 10,124 8,653 173.06 1,297.95
Ltr 398,624 340,704 6814.08 51,105.60
M3 45,557 38,938 778.76 5,840.70
Kg 19,931 17,035 340.7 2,555.25
Kg 546 467 9.34 70.05
M2 227,785 194,688 3893.76 29,203.20
M3 28,473 24,336 486.72 3,650.40
Kg 61 52 1.04 7.80
Kg 7,699 6,580 131.6 987.00
Kg 23,400 20,000 400 3,000.00
Kg 23,400 20,000 400 3,000.00
Kg 23,400 20,000 400 3,000.00
Kg 23,400 20,000 400 3,000.00
Kg 23,400 20,000 400 3,000.00
bh 19,361 16,548 330.96 2,482.20

bh 19,361 16,548 330.96 2,482.20


bh 20,501 17,522 350.44 2,628.30
bh 25,057 21,416 428.32 3,212.40

bh 21,639 18,495 369.9 2,774.25

bh 17,084 14,602 292.04 2,190.30


Kg 19,469 16,640 332.8 2,496.00
M1 1,138,925 973,440 19468.8 ###
batang/m' 455,570 389,376 7787.52 58,406.40
Kg 10,011 8,556 171.12 1,283.40
m3 2,110,345 1,803,714 36074.28 ###
Kg 21,847 18,673 373.46 2,800.95
m1 12,339 10,546 210.92 1,581.90
Kg 46,696 39,911 798.22 5,986.65
m3 12,339 10,546 210.92 1,581.90
m 1,366,710 1,168,128 23362.56 ###
kg 47,834 40,884 817.68 6,132.60
m 1,366,710 1,168,128 23362.56 ###
m3 45,557 38,938 778.76 5,840.70
m3 3,986,237 3,407,040 68140.8 ###
Kg 46,696 39,911 798.22 5,986.65
m' 12,339 10,546 210.92 1,581.90
bh 3,794,463 3,243,131 64862.62 ###
bh 5,125,162 4,380,480 87609.6 ###
btg 85,419 73,008 1460.16 10,951.20
bh 14,806 12,655 253.1 1,898.25
bh 22,209 18,982 379.64 2,847.30
m2 51,252 43,805 876.1 6,570.75
M3 3,608,329 3,084,042 61680.84 ###
bh 153,754 131,414 2628.28 19,712.10
kg 18,711 15,992 319.84 2,398.80
M3 19,931 17,035 340.7 2,555.25
bh 97,914 83,687 1673.74 12,553.05
bh 110,852 94,745 1894.9 14,211.75
kg 434,137 371,057 7421.14 55,658.55
m 112,070 95,786 1915.72 14,367.90
bh 51,252 43,805 876.1 6,570.75
M3 348,503 297,866 5957.32 44,679.90
bh 34,168 29,203 584.06 4,380.45
bh 34,168 29,203 584.06 4,380.45
bh 261,383 223,404 4468.08 33,510.60
bh 5,125,162 4,380,480 87609.6 ###
M 22,779 19,469 389.38 2,920.35
M 51,252 43,805 876.1 6,570.75
m 22,779 19,469 389.38 2,920.35
kg 170,839 146,016 2920.32 21,902.40
m 455,570 389,376 7787.52 58,406.40
btg 87,697 74,955 1499.1 11,243.25
M3 1,168,824 998,995 19979.9 ###
M3 32,829 28,059 561.18 4,208.85
kg 26,770 22,880 457.6 3,432.00
bh 2,294,934 1,961,482 39229.64 ###
M 517,072 441,942 8838.84 66,291.30
M' 2,854,601 2,439,830 48796.6 ###
Kg 348,503 297,866 5957.32 44,679.90
kg 22,779 19,469 389.38 2,920.35
Ls 6,318 5,400 108 810.00
Unit 226,395 193,500 3870 29,025.00
m1 5,600,684 4,786,909 95738.18 ###
m1 8,276,630 7,074,043 141480.86 ###
m2 547,560 468,000 9360 70,200.00
m2 790,920 676,000 13520 ###
kg 6,483 5,541 110.82 831.15
Bh 183,939 157,213 3144.26 23,581.95
Bh 426,793 364,780 7295.6 54,717.00
Bh 37,964 32,448 648.96 4,867.20
Bh 197,122 168,480 3369.6 25,272.00
m1 463,570 396,214 7924.28 59,432.10

bh 35,044 29,952 599.04 4,492.80


m1 1,574,539 1,345,760 26915.2 ###

m1 2,203,625 1,883,440 37668.8 ###

m1 238,736 204,048 4080.96 30,607.20

m1 600,978 513,656 10273.12 77,048.40

m1 783,619 669,760 13395.2 ###

Unit 4,587,336 3,920,800 78416 ###


bh 293,963 251,250 5025 37,687.50
bh 236,165 201,850 4037 30,277.50
bh 118,112 100,950 2019 15,142.50
bh 118,112 100,950 2019 15,142.50
kg 18,486 15,800 316 2,370.00
m2 401,544 343,200 6864 51,480.00
HARGA SATUAN BIAYA TENAGA KERJA
TAHUN 2022

KODE URAIAN SATUAN


L.01 Pekerja OH
L.01 Pekerja Jam
L.01.a Pekerja penganyam OH
L.01.b Pekerja pengisi batu OH
L.01.c Tenaga kerja pekerja (memantau mengalirnya air) OH
L.01.d Pekerja (memantau mengalirnya air) OH
L.01.e Pekerja Pengisi OH
L.02 Tukang OH
L.02 Tukang Jam
L.02.a Tukang Kayu OH
L.02.aa Tukang Listrik OH
L.02.ab Tukang Taman OH
L.02.ac Tukang Tebas OH
L.02.ad Tukang Gali OH
L.02.b Tukang Batu OH
L.02.b Tukang Batu Jam
L.02.c Tukang penganyam OH
L.02.d Tukang foto OH
L.02.e Tukang Besi OH
L.02.f Tukang Ereksi OH
L.02.g Tukang Vibrator OH
L.02.h Tukang Cat OH
L.02.i Tukang Pipa OH
L.02.j Tukang Las Konstruksi OH
L.02.k Tukang Las Biasa OH
L.02.l Tukang Las OH
L.02.m Tukang Besi Konstruksi OH
L.02.n Tukang Khusus Alumunium OH
L.02.o Tukang Allumunium/kaca OH
L.02.p Tukang tembok / gali OH
L.02.q Tukang batu / tembok OH
L.02.r Tukang batu / kayu / pipa OH
L.02.s Tukang las listrik OH
L.02.t Tukang las OH
L.02.u Tukang Bor OH
L.02.v Tukang cat dan tulis OH
L.02.w Tukang Pancang OH
L.02.x Tukang pancang dan las listrik OH
L.02.y Tukang Jahit OH
L.02.z Tukang Tembok OH
L.03 Kepala Tukang OH
L.03 Kepala Tukang Jam
L.03.a Kepala Tukang Kayu OH
L.03.b Kepala Tukang batu OH
L.03.c Kepala Tukang besi OH
L.03.d Kepala Tukang Listrik OH
L.04 Mandor OH
L.04 Mandor Jam
L.04.a Mandor/Supervisor/Penyelia OH
L.04.b Mandor Penganyam OH
L.04.c Mandor Pengisi OH
L.05 Juru ukur OH
L.06 Pembantu juru ukur OH
L.07 Staf (kontraktor) OH
L.08 Operator OH
L.08 Operator Jam
L.08.a Operator Alat Berat OH
L.08.a Operator Alat Berat Jam
L.08.b Operator Crane OH
L.08.c Operator pompa OH
L.08.d Operator Tripod / Crane OH
L.08.e Operator, driver speedboad OH
L.09 Pembantu Operator Crane OH
L.09 Pembantu Operator Crane Jam
L.12 Drafter OH
L.12.a Drafter CAD OH
L.13 Operator printer OH
L.14 Ahli alat berat (ahli madya) OH
L.14.a Engineer (sipil/geologi)/Ahli madya OH
L.14.b Ahli madya (sipil / hidrologi) OH
L.14.c Ahli madya geologist OH
L.16 Teknisi sampling kualitas air OH
L.17 Desain Engineer OH
L.18 Pelaksana kegiatan (pemberi tugas) OH
L.19 Petugas/Tenaga Ahli K3 OH
L.20 Dokter OH
L.23 Pembantu Sopir/ Kernet OH
L.23 Pembantu Sopir/ Kernet Jam
L.24 Engineer dan Crew Ls
L.25 Tenaga Ahli Geolistrik OH
L.26 Tenaga Ahli Geofisika OH
L.27 Mekanik OH
L.27 Mekanik Jam
L.27.a Pembantu Mekanik OH
L.27.a Pembantu Mekanik Jam
L.28 Penjaga Malam OH
L.28 Penjaga Malam Jam
L.29 Supir/Driver OH
L.29 Supir/Driver Jam
L.30 Perakitan Panel Ls
L.01 Pekerja OB
L.31 Pengatur (Setara Kepala Tukang) OB
L.35 Ongkos kerja konst kg
L.36 Ongkos kerja mesin kg
L.37 Pemasangan kg
L.32 Kepala Tim Jam
L.33 Ahli Mekanikal Jam
L.34 Assisten tenaga Ahli Jam
AYA TENAGA KERJA
UN 2022

HARGA + OVERHEAD + LABA 2022 HARGA 2022 OVER HEAD 2% Keuntungan 15%
143,190 122,385 2447.7 18,357.75
20,456 17,484 349.68 2,622.60
143,190 122,385 2447.7 18,357.75
143,190 122,385 2447.7 18,357.75
143,190 122,385 2447.7 18,357.75
143,190 122,385 2447.7 18,357.75
143,190 122,385 2447.7 18,357.75
174,740 149,350 2987 22,402.50
24,963 21,336 426.72 3,200.40
174,740 149,350 2987 22,402.50
174,740 149,350 2987 22,402.50
174,740 149,350 2987 22,402.50
174,740 149,350 2987 22,402.50
174,740 149,350 2987 22,402.50
174,740 149,350 2987 22,402.50
29,325 25,064 501.28 3,759.60
174,740 149,350 2987 22,402.50
174,740 149,350 2987 22,402.50
174,740 149,350 2987 22,402.50
174,740 149,350 2987 22,402.50
174,740 149,350 2987 22,402.50
174,740 149,350 2987 22,402.50
174,740 149,350 2987 22,402.50
174,740 149,350 2987 22,402.50
174,740 149,350 2987 22,402.50
174,740 149,350 2987 22,402.50
174,740 149,350 2987 22,402.50
174,740 149,350 2987 22,402.50
174,740 149,350 2987 22,402.50
174,740 149,350 2987 22,402.50
174,740 149,350 2987 22,402.50
174,740 149,350 2987 22,402.50
174,740 149,350 2987 22,402.50
174,740 149,350 2987 22,402.50
174,740 149,350 2987 22,402.50
174,740 149,350 2987 22,402.50
174,740 149,350 2987 22,402.50
174,740 149,350 2987 22,402.50
174,740 149,350 2987 22,402.50
174,740 149,350 2987 22,402.50
184,100 157,350 3147 23,602.50
26,340 22,513 450.26 3,376.95
184,380 157,590 3151.8 23,638.50
184,380 157,590 3151.8 23,638.50
184,380 157,590 3151.8 23,638.50
184,380 157,590 3151.8 23,638.50
194,021 165,830 3316.6 24,874.50
27,717 23,690 473.8 3,553.50
194,021 165,830 3316.6 24,874.50
194,021 165,830 3316.6 24,874.50
194,021 165,830 3316.6 24,874.50
263,500 225,214 4504.28 33,782.10
143,190 122,385 2447.7 18,357.75
143,441 122,599 2451.98 18,389.85
200,816 171,638 3432.76 25,745.70
25,744 22,003 440.06 3,300.45
161,371 137,924 2758.48 20,688.60
20,491 17,514 350.28 2,627.10
143,441 122,599 2451.98 18,389.85
143,441 122,599 2451.98 18,389.85
143,441 122,599 2451.98 18,389.85
143,441 122,599 2451.98 18,389.85
143,190 122,385 2447.7 18,357.75
17,418 14,887 297.74 2,233.05
143,441 122,599 2451.98 18,389.85
213,072 182,113 3642.26 27,316.95
143,190 122,385 2447.7 18,357.75
645,483 551,695 11033.9 82,754.25
645,483 551,695 11033.9 82,754.25
645,483 551,695 11033.9 82,754.25
645,483 551,695 11033.9 82,754.25
143,441 122,599 2451.98 18,389.85
502,042 429,096 8581.92 64,364.40
502,042 429,096 8581.92 64,364.40
502,042 429,096 8581.92 64,364.40
710,936 607,638 12152.76 91,145.70
143,190 122,385 2447.7 18,357.75
16,905 14,449 288.98 2,167.35
889,332 760,113 15202.26 114,016.95
358,601 306,497 6129.94 45,974.55
358,601 306,497 6129.94 45,974.55
157,785 134,859 2697.18 20,228.85
22,541 19,266 385.32 2,889.90
143,190 122,385 2447.7 18,357.75
20,456 17,484 349.68 2,622.60
143,190 122,385 2447.7 18,357.75
16,905 14,449 288.98 2,167.35
215,161 183,898 3677.96 27,584.70
30,737 26,271 525.42 3,940.65
1,024,576 875,706 17514.12 131,355.90
3,579,752 3,059,617 61192.34 458,942.55
4,609,508 3,939,750 78795 590,962.50
12,654 10,815 216.3 1,622.25
26,512 22,660 453.2 3,399.00
7,231 6,180 123.6 927.00
38,989 33,324 666.48 4,998.60
22,541 19,266 385.32 2,889.90
35,061 29,967 599.34 4,495.05
No. Nama Pekerjaan Jumlah Satuan No.
1. Pembuatan septictank 2 buah 1.
2. Pembuatan sumur resapan 2 buah 2.
3. Pembuatan bak kontrol 6 buah
4. Pemasangan kloset dan bak mandi
-Kloset duduk 3 buah
- Kloset jongkok 1 buah
- Bak mandi 2 buah
5. Pemasangan kran 3.
- Kamar mandi 6 buah
- Dapur 1 buah
- R.makan 1 buah 4.
- Taman 2 buah
- Carport 1 buah No
6. Pemasangan pipa air bersih 1.
- Lantai 1 46.61 m 2.
- Lantai 2 17.2 m 3.
7. Pemasangan pipa air kotor 4.
- Lantai 1 12 m 5.
- Lantai 2 6.5 m 6.
8. Pemasangan pipa pembuangan 9.8 m 7.
8.
9.
10.
11.
12.
Nama Pekerjaan Jumlah Satuan
Stop kontak 12 titik
Lampu
- Soft light 17 titik
- Tube light 4 titik
- Bohlam light 9 titik Pekerjaan engsel pintu
- Plafond light 11 titik PJ 1
- Down light 6 titik PJ 2
Saklar PJ 4
- Saklar tunggal 7 titik P1
- Saklar ganda 15 titik P2
Pemasangan Kabel 58.88 m PL

Kaca Jumlah Satuan


PJ 1 5 buah
PJ 2 12 buah
PJ 3 8 buah Pekerjaan
PJ 4 3 buah PJ 1
P2 3 buah PJ 2
J1 4 buah PJ 3
J2 10 buah PJ 4
J3 6 buah P1
J4 3 buah P2
BV 1 6 buah PL
BV 2 5 buah TOTAL
BV 3 2 buah
Pekerjaan engsel jendela Jumlah Satuan
J1 4 buah
J2 5 buah
Jumlah Satuan J3 3 buah
1 buah J4 3 buah
3 buah TOTAL 15 buah
1 buah
5 buah
3 buah
1 buah
Pekerjaan Grendel Jumlah Satuan
PJ 1 1 buah
PJ 2 3 buah
PJ 4 1 buah
Jumlah Satuan P1 5 buah
1 buah P2 3 buah
3 buah J1 4 buah
1 buah J2 5 buah
1 buah J3 3 buah
5 buah J4 3 buah
3 buah TOTAL 56 buah
1 buah
15 buah
Analisa Harga Satuan (AHSP)
Pekerjaan Pembersihan Lapangan
Harga Jumlah
No Uraian Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja OH 0,10 143,190 14,319
Mandor OH 0,005 194,021 970.11
JUMLAH HARGA TENAGA
15,289
KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 15,289


Biaya Umum dan Keuntungan
E ....% x D
(Maksimum 15%)
F Harga Satuan Pekerjaan (D+E) 15,289

Pekerjaan Pembuatan Bouwplank


Harga Jumlah
No Uraian Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja OH 0,10 143,190 14,319
Tukang kayu OH 0,10 174,740 17,474
Kepala tukang OH 0,01 184,100 1,841
Mandor OH 0,005 194,021 970.11
JUMLAH HARGA TENAGA
34,604
KERJA
B BAHAN
Kayu balok 5/7 m3 0,012 4,212,000 50,544
Paku 2”-3” Kg 0,02 26,309 526
Kayu papan 3/20 m3 0,007
15,205,369 106,438
JUMLAH HARGA BAHAN 157,508
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 192,112
Biaya Umum dan Keuntungan
E ....% x D
(Maksimum 15%) 28,817
Harga Satuan Pekerjaan
F
(D+E) 220,929

Pembuatan Bedeng
Harga Jumlah
No Uraian Satuan Koefisien Satuan Harga
(Rp) (Rp)
A. Tenaga Kerja
1 Pekerja OH 1,20 143,190 171,829
2 Tukang tembok/batu OH 0,40 174,740 69,896
3 Kepala tukang batu OH 0,04 184,380 7,375
4 Mandor OH 0,12 194,021 23,283
Jumlah Harga Tenaga Kerja 272,382
B. Bahan
1 Kaso 5/7 m3 0,35 16,442,428 #VALUE!
2 Dinding triplek 4mm lembar 1,00 85,514 #VALUE!
3 Fondasi pasangan batu m3 0,17 1,189,081 #VALUE!
GRC pelat, t=4mm, uk
4 Lembar 1,24 #VALUE!
122x244 cm 210,602
6 Paku kg 0,75 19,469 #VALUE!
7 Asbes gelombang Lembar 0,30 115,596 #VALUE!
8 Paku asbes kg 0,10 42,588 #VALUE!
Floor lantai ( lantai
9 m3 0,15 #VALUE!
kerja) 15,744,491
Pintu Double teakwood
10 m2 0,10 767,938 #VALUE!
rangka kayu
11 Frame besi Kaca Nako daun 1,00 38,168 #VALUE!
12 Cat dinding/plafon m2 16,50 131,049 #VALUE!

Jumlah Harga Bahan 10,996,143


C Peralatan
Jumlah Harga Peralatan
Jumlah Harga Tenaga Kerja,
D
Bahan dan Peralatan (A+B+C) 11,268,525

Pekerjaan Galian Tanah


Harga Jumlah
No Uraian Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja OH 0,750 143,190 107,393
Mandor OH 0,025 194,021 4,851
JUMLAH TENAGA KERJA 112,243
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
112,243
Biaya Umum dan Keuntungan
E 15% x D
(Maksimum 15%) 16,837
F Harga Satuan Pekerjaan (D+E) 129,080

Pekerjaan Pengurugan Tanah Kembali


Harga Jumlah
No Uraian Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja OH 0,500 143,190 71,595
Mandor OH 0,050 194,021 9,701
JUMLAH HARGA TENAGA
81,296
KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 81,296
Biaya Umum dan Keuntungan
E ....% x D 12,194
(Maksimum 15%)
Harga Satuan Pekerjaan
F 93,491
(D+E)

Pekerjaan Pengurugan Pasir Urug


Harga Jumlah
No Uraian Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja OH 0,300 143,190 42,957
Mandor OH 0,010 194,021 1,940
JUMLAH HARGA TENAGA
44,897
KERJA
B BAHAN
Pasir urug 1,200
162,513
JUMLAH HARGA BAHAN 162,513
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 207,410


Biaya Umum dan Keuntungan
E ....% x D
(Maksimum 15%)
31,112
F Harga Satuan Pekerjaan (D+E) 238,522

Pekerjaan Pemasangan Batu Kosong (aanstamping)


Harga Jumlah
No Uraian Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja OH 0,780 143,190 111,689
Tukang batu OH 0,390 174,740 68,148
Kepala tukang OH 0,039 184,100 7,180
Mandor OH 0,039 194,021 7,567
Jumlah Harga Tenaga
194,584
Kerja
B BAHAN
Batu belah 1,200 206,601
Pasir urug 0,432 162,513
Jumlah Harga Bahan 369,114
C PERALATAN
Jumlah Harga Peralatan
D Jumlah (A+B+C) 563,698
Biaya Umum dan Keuntungan
E 15% x D
(Maksimum 15%) 84,555

F Harga Satuan Pekerjaan (D+E)


648,252

Pekerjaan Pasangan pondasi batu kali


Harga Jumlah
No Uraian Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja OH 1.50 143,190 214,786
Tukang batu OH 0.750 174,740 131,055
Kepala tukang OH 0.075 184,100 13,807
Mandor OH 0.075 194,021 14,552
Jumlah Harga Tenaga
Kerja 374,199
B BAHAN
Batu Kali m3 1,200 247,221 296,665
Semen Portland kg 91 1,973 179,508
Pasir Pasang m3 0.548 214,867 117,747
Jumlah Harga Bahan 593,921
C PERALATAN
Jumlah Harga Peralatan
D Jumlah (A+B+C) 968,120
Biaya Umum dan Keuntungan
E 15% x D
(Maksimum15%)
145,218
F Harga Satuan Pekerjaan (D+E)
1,113,338

Pemasangan batu bata 1/2 1pc:6ps


Jumlah
Harga Satuan
No Uraian Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA KERJA
Pekerja OH 0.300 143,190 42,957
Tukang batu OH 0,100 174,740 17,474
Kepala tukang OH 0,010 184,100 1,841
Mandor OH 0 194,021 2,910
JUMLAH HARGA TENAGA
65,182
KERJA
B BAHAN
Semen Portlan Kg 8.32 1,973 16,412
Bata merah buah 70 759 53,153
Pasir pasang m3 0.049 214,867 10,528
JUMLAH HARGA BAHAN 80,094

C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 145,276

Biaya Umum dan Keuntungan


E ....% x D 21,791
(Maksimum 15%)

F Harga Satuan Pekerjaan (D+E) 167,068


Pekerjaan Plesteran bata
Jumlah
Harga Satuan
No Uraian Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA KERJA
Pekerja OH 0.300 143,190 42,957
Tukang batu OH 0.150 174,740 26,211
Kepala tukang OH 0.015 184,100 2,761
Mandor OH 0.015 194,021 2,910
JUMLAH HARGA TENAGA
KERJA 74,840
B BAHAN
Semen Portlan kg 7.776 1,973 15,339
Pasir pasang m3 0.023 214,867
JUMLAH HARGA BAHAN
15,339
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 90,179
Biaya Umum dan Keuntungan
E ....% x D
(Maksimum 15%) 13,527

F Harga Satuan Pekerjaan (D+E)


103,706

Pekerjaan Plesteran trasram


Jumlah
Harga Satuan
No Uraian Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA KERJA
Pekerja OH 0.300 143,190 42,957
Tukang batu OH 0.150 174,740 26,211
Kepala tukang OH 0.015 184,100 2,761
Mandor OH 0.015 194,021 2,910
JUMLAH HARGA TENAGA
74,840
KERJA
B BAHAN
Semen Portlan kg 4.416 1,973 8,711
Pasir pasang m3 0.027 214,867 5,801

JUMLAH HARGA BAHAN


14,512
C PERALATAN
JUMLAH
HARGA
ALAT
D Jumlah (A+B+C) 89,352
Biaya Umum danKeuntungan
E ....% x D
(Maksimum 15%) 13,403
F Harga Satuan Pekerjaan (D+E)
102,755

Pekerjaan Acian
Jumlah
Harga Satuan
No Uraian Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA KERJA
Pekerja OH 0,200 143,190 28,638
Tukang batu OH 0,100 174,740 17,474
Kepala tukang OH 0,010 184,100 1,841
Mandor OH 0,010 194,021 1,940
JUMLAH HARGA TENAGA
KERJA 49,893
B BAHAN
Semen Portlan kg 3,250 1,973 6,411
JUMLAH HARGA BAHAN 6,411
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 56,304
Biaya Umum dan Keuntungan
E ....% x D
(Maksimum 15%) 8,446
F Harga Satuan Pekerjaan (D+E)
64,750

Pekerjaan Nok dan gording


Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 2.400 143,190 343,657
Tukang kayu OH 7.200 174,740 1,258,124
Kepala tukang OH 0.720 184,100 132,552
Mandor OH 0,120 194,021 23,283
Jumlah Harga Tenaga Kerja
1,757,616
B Bahan
Balok M3 1 10,816,478 11,898,126
Besi strip kg 15 14,602 219,024
Paku kayu kg 3 22,237 66,711
Jumlah Harga Bahan 12,183,861
C Peralatan
Jumlah Harga Peralatan
Jumlah Harga Tenaga Kerja,
D
Bahan dan Peralatan (A+B+C) 13,941,477
Biaya umum dan Keuntungan
E 15% x D
(Maksimum 15%) 2,091,221

F Harga Satuan Pekerjaan (D+E)


16,032,698

Pekerjaan Jurai
Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 0.400 143,190 57,276
Tukang kayu OH 0.200 174,740 34,948
Kepala tukang OH 0.020 184,100 3,682
Mandor OH 0.002 194,021 388
Jumlah Harga Tenaga Kerja 96,294
B Bahan
Bubungan genteng bh 5 3,865 19,323
Portlan cement kg 8 1,973 15,781
Pasir pasang m3 0 214,867 6,876
Jumlah Harga Bahan 41,979
C Peralatan
Jumlah Harga Peralatan
Jumlah Harga Tenaga Kerja,
D
Bahan dan Peralatan (A+B+C) 138,273
Biaya umum dan Keuntungan
E 15% x D
(Maksimum 15%) 20,741

F Harga Satuan Pekerjaan (D+E)


159,014

Pekerjaan Kuda-kuda
Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 4.000 143,190 572,762
Tukang kayu OH 12.000 174,740 2,096,874
Kepala tukang OH 1.200 184,100 220,919
Mandor OH 0.200 194,021 38,804
Jumlah Harga Tenaga Kerja 2,929,359
B Bahan
Kayu jati balok bh 1
14,905,827 16,396,410
Besi strip kg 15 14,602 219,024
Paku kayu m3 6 206,601 22,237
Jumlah Harga Bahan 16,637,671
C Peralatan
Jumlah Harga Peralatan
Jumlah Harga Tenaga Kerja,
D
Bahan dan Peralatan (A+B+C) 19,567,030
Biaya umum dan Keuntungan
E 15% x D
(Maksimum 15%) 2,935,055

F Harga Satuan Pekerjaan (D+E)


22,502,085

Pekerjaan Plafon
Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 0.150 143,190 21,479
Tukang kayu OH 0.300 174,740 52,422
Kepala tukang OH 0.030 184,100 5,523
Mandor OH 0.075 194,021 14,552
Jumlah Harga Tenaga Kerja 93,975
B Bahan
Usuk 5/7 M3 0 16,012,833 240,192
Paku kayu kg 0 22,237 4,447
Jumlah Harga Bahan 244,640
C Peralatan
Jumlah Harga Peralatan
Jumlah Harga Tenaga Kerja,
D
Bahan dan Peralatan (A+B+C) 338,615
Biaya umum dan Keuntungan
E 15% x D
(Maksimum 15%) 50,792
F Harga Satuan Pekerjaan (D+E)
389,407
Pekerjaan Penutup Plafon
Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 0.100 143,190 14,319
Tukang kayu OH 0.100 174,740 17,474
Kepala tukang OH 0.010 184,100 1,841
Mandor OH 0.005 194,021 970
Jumlah Harga Tenaga Kerja 34,604
B Bahan
Plywood 30 x 60 lbr 6 16,614 96,361
Paku kayu kg 0 22,237 1,112
Jumlah Harga Bahan 97,473
C Peralatan
Jumlah Harga Peralatan
Jumlah Harga Tenaga Kerja,
D
Bahan dan Peralatan (A+B+C) 132,077
Biaya umum dan Keuntungan
E 15% x D
(Maksimum 15%) 19,812
F Harga Satuan Pekerjaan (D+E)
151,889

Pekerjaan Kusen Pintu dan Jendela Kayu Jati


Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 7.00 143,190 1,002,333
Tukang kayu OH 21.00 174,740 3,669,530
Kepala tukang OH 2.10 184,100 386,609
Mandor OH 0.35 194,021 67,907
Jumlah Harga Tenaga Kerja 5,126,379
B Bahan
Balok M3 1 10,816,478 11,898,126
Paku kayu kg 1 22,237 27,796
Lem kayu kg 1 72,072 72,072
Jumlah Harga Bahan 11,925,922
C Peralatan
Jumlah Harga Peralatan
Jumlah Harga Tenaga Kerja,
D
Bahan dan Peralatan (A+B+C) 17,052,301
Biaya umum dan Keuntungan
E 15% x D
(Maksimum 15%)
2,557,845

F Harga Satuan Pekerjaan (D+E)


19,610,146

Pekerjaan Daun Pintu dan jendela


Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 0.350 143,190 50,117
Tukang kayu OH 1.050 174,740 183,476
Kepala tukang OH 0.105 184,100 19,330
Mandor OH 0.018 194,021 3,492
Jumlah Harga Tenaga Kerja 256,416
B Bahan
Papan 3 x 30 cm M3 0 29,954,177 1,198,167
Paku kayu kg 1 22,237 11,119
Jumlah Harga Bahan
1,209,286
C Peralatan
Jumlah Harga Peralatan
Jumlah Harga Tenaga Kerja,
D
Bahan dan Peralatan (A+B+C) 1,465,702
Biaya umum dan Keuntungan
E 15% x D
(Maksimum 15%) 219,855
F Harga Satuan Pekerjaan (D+E) 1,685,557

Pemasangan Kaca
Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 0.015 143,190 2,148
Tukang kayu OH 0.150 174,740 26,211
Kepala tukang OH 0.015 184,100 2,761
Mandor OH 0.001 194,021 194
Jumlah Harga Tenaga Kerja 31,314
B Bahan
Kaca Rayben t= 5mm M3 1 240,541 240,541
Jumlah Harga Bahan 240,541
C Peralatan
Jumlah Harga Peralatan
Jumlah Harga Tenaga Kerja,
D
Bahan dan Peralatan (A+B+C) 271,856
Biaya umum dan Keuntungan
E 15% x D
(Maksimum 15%) 40,778
F Harga Satuan Pekerjaan (D+E) 312,634

Pekerjaan Pintu Kamar Mandi


Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 0.100 143,190 14,319
Tukang kayu OH 0.200 174,740 34,948
Kepala tukang OH 0.020 184,100 3,682
Mandor OH 0.005 194,021 970
Jumlah Harga Tenaga Kerja 53,919
B Bahan
Pintu Fiber KM Unit 1 606,177 606,177

Jumlah Harga Bahan


606,177
C Peralatan
Jumlah Harga Peralatan
Jumlah Harga Tenaga Kerja,
D
Bahan dan Peralatan (A+B+C) 660,096
Biaya umum dan Keuntungan
E 15% x D
(Maksimum 15%) 99,014
F Harga Satuan Pekerjaan (D+E) 759,110

Pemasangan Engsel Pintu


Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 0.015 143,190 2,148
Tukang OH 0.150 174,740 26,211
Kepala tukang OH 0.015 184,100 2,761
Mandor OH 0.001 194,021 194
Jumlah Harga Tenaga Kerja 31,314
B Bahan
Engsel pintu bh 1 58,700 58,700
Jumlah Harga Bahan 58,700
C Peralatan
Jumlah Harga Peralatan
Jumlah Harga Tenaga Kerja,
D
Bahan dan Peralatan (A+B+C) 90,014
Biaya umum dan Keuntungan
E 15% x D
(Maksimum 15%) 13,502
F Harga Satuan Pekerjaan (D+E) 103,517

Pemasangan Engsel Jendela


Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 0.0150 143,190 2,148
Tukang OH 0.1500 174,740 26,211
Kepala tukang OH 0.0150 184,100 2,761
Mandor OH 0.0010 194,021 194
Jumlah Harga Tenaga Kerja
31,314
B Bahan
Engsel jendela bh 1 45,293 45,293
Jumlah Harga Bahan
45,293
C Peralatan
Jumlah Harga Peralatan
Jumlah Harga Tenaga Kerja,
D
Bahan dan Peralatan (A+B+C) 76,607
Biaya umum dan Keuntungan
E 15% x D
(Maksimum 15%) 11,491

F Harga Satuan Pekerjaan (D+E)


88,098

Pemasangan Kunci
Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 0.0100 143,190 1,432
Tukang OH 0.5000 174,740 87,370
Kepala tukang OH 0.0100 184,100 1,841
Mandor OH 0.0050 194,021 970
Jumlah Harga Tenaga Kerja 91,613
B Bahan
Kunci Tanam bh 1 192,891 192,891
Jumlah Harga Bahan 192,891
C Peralatan
Jumlah Harga Peralatan
Jumlah Harga Tenaga Kerja,
D
Bahan dan Peralatan (A+B+C) 284,504
Biaya umum dan Keuntungan
E 15% x D
(Maksimum 15%) 42,676

F Harga Satuan Pekerjaan (D+E)


327,179

Pemasangan Grendel jendela


Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 0.0150 143,190 2,148
Tukang OH 0.1500 174,740 26,211
Kepala tukang OH 0.0150 184,100 2,761
Mandor OH 0.0010 194,021 194
Jumlah Harga Tenaga Kerja 31,314
B Bahan
Grendel jendela bh 1 18,252 18,252
Jumlah Harga Bahan 18,252
C Peralatan
Jumlah Harga Peralatan
Jumlah Harga Tenaga Kerja,
D
Bahan dan Peralatan (A+B+C) 49,566
Biaya umum dan Keuntungan
E 15% x D
(Maksimum 15%) 7,435

F Harga Satuan Pekerjaan (D+E)


57,001

Pemasangan Grendel Pintu


Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 0.0150 143,190 2,148
Tukang OH 0.1500 174,740 26,211
Kepala tukang OH 0.0150 184,100 2,761
Mandor OH 0.0010 194,021 194
Jumlah Harga Tenaga Kerja 31,314
B Bahan
Grendel pintu bh 1 40,301 40,301
Jumlah Harga Bahan 40,301
C Peralatan
Jumlah Harga Peralatan

Jumlah Harga Tenaga Kerja,


D
Bahan dan Peralatan (A+B+C)
71,615
Biaya umum dan Keuntungan
E 15% x D
(Maksimum 15%) 10,742
F Harga Satuan Pekerjaan (D+E) 82,357

Pemasangan Keramik 20 x 20
Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 0.700 143,190 100,233
Tukang OH 0.350 174,740 61,159
Kepala tukang OH 0.035 184,100 6,443
Mandor OH 0.035 194,021 6,791
Jumlah Harga Tenaga Kerja 174,626
B Bahan
Keramik lantai 20x 20
kg 27 3,723 98,658
cm
Portland Cement kg 10 1,973 20,515
Pasir pasang kg 0 214,867 9,669
Portland Cement warna kg 2 21,681 35,124
Jumlah Harga Bahan 163,966
C Peralatan
Jumlah Harga Peralatan
Jumlah Harga Tenaga Kerja,
D
Bahan dan Peralatan (A+B+C)
338,592

Biaya umum dan Keuntungan


E 15% x D
(Maksimum 15%)
50,789
F Harga Satuan Pekerjaan (D+E) 389,381

Pemasangan Keramik 30 x 30
Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 0.700 143,190 100,233
Tukang OH 0.350 174,740 61,159
Kepala tukang OH 0.035 184,100 6,443
Mandor OH 0.035 194,021 6,791
Jumlah Harga Tenaga Kerja 174,626
B Bahan
Keramik lantai 30x 30
kg 12 8,103 96,188
cm
Portland Cement kg 10 1,973 19,726
Pasir pasang kg 0 214,867 9,669
Portland Cement warna kg 2 21,681 35,124
Jumlah Harga Bahan 160,706
C Peralatan
Jumlah Harga Peralatan
Jumlah Harga Tenaga Kerja,
D
Bahan dan Peralatan (A+B+C) 335,333
Biaya umum dan Keuntungan
E 15% x D
(Maksimum 15%)
50,300
F Harga Satuan Pekerjaan (D+E) 385,633

Pemasangan Keramik 40 x 40
Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 0.700 143,190 100,233
Tukang OH 0.350 174,740 61,159
Kepala tukang OH 0.035 184,100 6,443
Mandor OH Jumlah
0.035 194,021 6,791
Harga 174,626
Tenaga
B Bahan Kerja
Keramik lantai 40x 40
kg 7 14,783 102,446
cm
Portland Cement kg 10 1,973 19,332
Pasir pasang kg 0 214,867 4,727
Portland Cement warna kg 1 21,681 28,186
Jumlah Harga Bahan 154,690
C Peralatan
Jumlah Harga Peralatan
Jumlah Harga Tenaga Kerja,
D 329,317
Bahan dan Peralatan (A+B+C)
Biaya umum dan Keuntungan
E 15% x D
(Maksimum 15%) 49,397
F Harga Satuan Pekerjaan (D+E) 378,714

Pemasangan Bak Mandi


Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 2.1000 143,190.4500 300,700
Tukang OH 0.7500 174,739.5000 131,055
Kepala tukang OH 0.0700 184,099.5000 12,887
Mandor OH 0.1100 194,021.1000 21,342
Jumlah Harga Tenaga Kerja 465,984
B Bahan
Bata merah buah 0.4000 759.3300 304
Portland cement kg 120.0000 1,972.6200 236,714
Pasir pasang m3 0.3000 214,866.9900 64,460
Porselin 10 x 20 Warna buah 220.0000 1,752.6600 385,585
Portland cement warna kg 6.0000 21,681.2700 130,088
Jumlah Harga Bahan 817,151
C Peralatan
Jumlah Harga Peralatan
Jumlah Harga Tenaga Kerja,
D
Bahan dan Peralatan (A+B+C) 1,283,135
Biaya umum dan Keuntungan
E 15% x D
(Maksimum 15%) 192,470

F Harga Satuan Pekerjaan (D+E)


1,475,605

Pemasangan Kloset duduk


Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 3.3000 143,190.4500 472,528
Tukang OH 1.1000 174,739.5000 192,213
Kepala tukang OH 0.0010 184,099.5000 184
Mandor OH 0.1600 194,021.1000 31,043
Jumlah Harga Tenaga Kerja 695,969
B Bahan
Kloset duduk lux buah 1.0000 2,988,582.4800 2,988,582
Jumlah Harga Bahan 2,988,582
C Peralatan
Jumlah Harga Peralatan
Jumlah Harga Tenaga Kerja,
D
Bahan dan Peralatan (A+B+C) 3,684,552
Biaya umum dan Keuntungan
E 15% x D
(Maksimum 15%) 552,683

F Harga Satuan Pekerjaan (D+E)


4,237,235

Pemasangan Kloset jongkok


Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 1.0000 143,190.4500 143,190
Tukang OH 1.5000 174,739.5000 262,109
Kepala tukang OH 1.5000 184,099.5000 276,149
Mandor OH 0.1600 194,021.1000 31,043
Jumlah Harga Tenaga Kerja 712,492
B Bahan
Kloset jongkok porselin buah 1.0000 271,589.7600 271,590
Portland cement kg 6.0000 1,972.6200 11,836
Pasir pasang m3 0.0100 214,866.9900 2,149
Jumlah Harga Bahan 285,574
C Peralatan
Jumlah Harga Peralatan
Jumlah Harga Tenaga Kerja,
D
Bahan dan Peralatan (A+B+C) 998,066
Biaya umum dan Keuntungan
E 15% x D
(Maksimum 15%) 149,710

F Harga Satuan Pekerjaan (D+E)


1,147,776

Pemasangan Pipa Air Bersih 3/4"


Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 0.0600 143,190.4500 8,591
Tukang OH 0.0300 174,739.5000 5,242
Kepala tukang OH 0.0030 184,099.5000 552
Mandor OH 0.0020 194,021.1000 388
Jumlah Harga Tenaga Kerja
14,774
B Bahan
Pipa plastik PVC tipe D kg 0.3000 11,115.0000 3,335
Sealtape kg 0.1050 11,115.0000 1,167
Jumlah Harga Bahan 4,502
C Peralatan
Jumlah Harga Peralatan
Jumlah Harga Tenaga Kerja,
D
Bahan dan Peralatan (A+B+C) 19,276
Biaya umum dan Keuntungan
E 15% x D
(Maksimum 15%) 2,891

F Harga Satuan Pekerjaan (D+E)


22,167

Pemasangan Pipa air kotor dan pembuangan 4"


Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 0.0600 143,190.4500 8,591
Tukang OH 0.0300 174,739.5000 5,242
Kepala tukang OH 0.0030 184,099.5000 552
Mandor OH 0.0020 194,021.1000 388
Jumlah Harga Tenaga Kerja
14,774
B Bahan
Pipa plastik PVC tipe D kg 0.3000 64,794.6000 19,438
Pipa plastik PVC tipe D kg 0.1050 64,794.6000 6,803
Jumlah Harga Bahan 26,242
C Peralatan
Jumlah Harga Peralatan
Jumlah Harga Tenaga Kerja,
D
Bahan dan Peralatan (A+B+C) 41,016
Biaya umum dan Keuntungan
E 15% x D
(Maksimum 15%)
6,152

F Harga Satuan Pekerjaan (D+E)


47,168
Pembuatan Septictank dan resapan
Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 3.3000 143,190.4500 472,528
Tukang OH 1.1000 174,739.5000 192,213
Jumlah Harga Tenaga Kerja 664,742
B Bahan
Buis beton septictank buah 2.0000 889,785.0000 1,779,570
Jumlah Harga Bahan
1,779,570
C Peralatan
Jumlah Harga Peralatan
Jumlah Harga Tenaga Kerja,
D
Bahan dan Peralatan (A+B+C) 2,444,312
Biaya umum dan Keuntungan
E 15% x D
(Maksimum 15%)
366,647
F Harga Satuan Pekerjaan (D+E)
2,810,959

Pemasangan Bak kontrol


Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 1.4200 143,190.4500 203,330
Tukang OH 0.4730 174,739.5000 82,652
Kepala tukang OH 0.0470 184,099.5000 8,653
Mandor OH 0.0710 194,021.1000 13,775
Jumlah Harga Tenaga Kerja 308,410
B Bahan
Bata merah buah 112.5000 759.3300 85,425
Portland cement kg 77.0000 1,972.6200 151,892
Pasir pasang m3 0.1300 214,866.9900 27,933
Batu pecah 2/3 m3 0.0200 349,666.2000 6,993
Besi beton polos kg 2.6000 13,376.6100 34,779
Pasir cor m3 0.0900
325,377.0000 29,284
Jumlah Harga Bahan 336,306
C Peralatan
Jumlah Harga Peralatan
Jumlah Harga Tenaga Kerja,
D
Bahan dan Peralatan (A+B+C) 644,716
Biaya umum dan Keuntungan
E 15% x D
(Maksimum 15%) 96,707
F Harga Satuan Pekerjaan (D+E)
741,423

Pemasangan Kran
Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 0.0300 143,190.4500 4,296
Tukang OH 0.3000 174,739.5000 52,422
Kepala tukang OH 0.0300 184,099.5000 5,523
Mandor OH 0.0010 194,021.1000 194
Jumlah Harga Tenaga Kerja 62,435
B Bahan
Kran air buah 1.0000 42,588.0000 42,588
Seal tape/TBA buah 0.0250 5,834.7900 146
Jumlah Harga Bahan 42,734
C Peralatan Jumlah
Harga
Jumlah Harga Tenaga Kerja, Peralatan
D
Bahan dan Peralatan (A+B+C) 105,168
Biaya umum dan Keuntungan
E 15% x D
(Maksimum 15%) 15,775

F Harga Satuan Pekerjaan (D+E)


120,944

Pemasangan Stop kontak


Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 0.5000 143,190.4500 71,595
Tukang listrik OH 0.5000 174,739.5000 87,370
Kepala tukang OH 0.0500 184,099.5000 9,205
Mandor OH 0.0500 194,021.1000 9,701
Jumlah Harga Tenaga Kerja
177,871
B Bahan
Kabel NYA 2.5 mm m 10.0000 5,958.8100 59,588
Stop kontak buah 1.0000 4,928.0400 4,928
T dos PVC buah 1.0000 1,872.0000 1,872
Pipa pvc 5/8" ljr 0.6500 13,098.1500 8,514
Las doof buah 3.0000 13,286.5200 39,860
Jumlah Harga Bahan
114,761
C Peralatan
Jumlah Harga Peralatan
Jumlah Harga Tenaga Kerja,
D
Bahan dan Peralatan (A+B+C) 292,633
Biaya umum dan Keuntungan
E 15% x D
(Maksimum 15%) 43,895
F Harga Satuan Pekerjaan (D+E) 336,527

Pemasangan Saklar tunggal


Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 0.5000 143,190.4500 71,595
Tukang listrik OH 0.5000 174,739.5000 87,370
Kepala tukang OH 0.0500 184,099.5000 9,205
Mandor OH 0.0500 194,021.1000 9,701
Jumlah Harga Tenaga Kerja 177,871
B Bahan
Kabel NYA 2.5 mm m 10.0000 5,958.8100 59,588
Saklar broco tunggal buah 1.0000 5,913.1800 5,913
T dos PVC buah 1.0000 1,872.0000 1,872
Pipa pvc 5/8" ljr 0.6500 13,098.1500 8,514
Las doof buah 3.0000 13,286.5200 39,860
Jumlah Harga Bahan 115,747
C Peralatan
Jumlah Harga Peralatan

Jumlah Harga Tenaga Kerja,


D
Bahan dan Peralatan (A+B+C)
293,618
Biaya umum dan Keuntungan
E 15% x D
(Maksimum 15%) 44,043
F Harga Satuan Pekerjaan (D+E)
337,660

Pemasangan Saklar ganda


Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 0.5000 143,190.4500 71,595
Tukang listrik OH 0.5000 174,739.5000 87,370
Kepala tukang OH 0.0500 184,099.5000 9,205
Mandor OH 0.0500 194,021.1000 9,701
Jumlah Harga Tenaga Kerja 177,871
B Bahan
Kabel NYA 2.5 mm m 10.0000 5,958.8100 59,588
Saklar broco ganda buah 1.0000 279,371.4300 279,371
T dos PVC buah 1.0000 1,872.0000 1,872
Pipa pvc 5/8" ljr 0.6500 13,098.1500 8,514
Las doof buah 3.0000 13,286.5200 39,860
Jumlah Harga Bahan 389,205
C Peralatan
Jumlah Harga Peralatan

Jumlah Harga Tenaga Kerja,


D
Bahan dan Peralatan (A+B+C) 567,076
Biaya umum dan Keuntungan
E 15% x D
(Maksimum 15%) 85,061
F Harga Satuan Pekerjaan (D+E) 652,137

Pemasangan Lampu XL 18 wat


Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 0.2500 143,190.4500 35,798
Tukang listrik OH 0.2500 174,739.5000 43,685
Kepala tukang OH 0.0250 184,099.5000 4,602
Mandor OH 0.0250 194,021.1000 4,851
Jumlah Harga Tenaga Kerja 88,936
B Bahan
Kabel NYA 2.5 mm m 10.0000 5,958.8100 59,588
Lampu XL 18 watt buah 1.0000 65,597.2200 65,597
Isolator buah 4.0000 1,570.1400 6,281
Las doof buah 2.0000 13,286.5200 26,573
Fitting flafond m 1.0000 19,188.0000 19,188
Jumlah Harga Bahan 177,227
C Peralatan
Jumlah Harga Peralatan
Jumlah Harga Tenaga Kerja,
D
Bahan dan Peralatan (A+B+C) 266,162
Biaya umum dan Keuntungan
E 15% x D
(Maksimum 15%) 39,924
F Harga Satuan Pekerjaan (D+E) 306,087

Pemasangan Lampu TL 20 watt


Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 0.2500 143,190.4500 35,798
Tukang listrik OH 0.2500 174,739.5000 43,685
Kepala tukang OH 0.0250 184,099.5000 4,602
Mandor OH 0.0250 194,021.1000 4,851
Jumlah Harga Tenaga Kerja 88,936
B Bahan
Kabel NYA 2.5 mm m 10.0000 5,958.8100 59,588
Lampu TL 20 watt buah 1.0000 18,792.5400 18,793
Isolator buah 4.0000 1,570.1400 6,281
Las doof buah 2.0000 13,286.5200 26,573
Jumlah Harga Bahan 111,234
C Peralatan
Jumlah Harga Peralatan
Jumlah Harga Tenaga Kerja,
D
Bahan dan Peralatan (A+B+C) 200,170
Biaya umum dan Keuntungan
E 15% x D 30,025
(Maksimum 15%)
F Harga Satuan Pekerjaan (D+E)
230,195

Pemasangan Kabel
Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 0.2500 143,190.4500 35,798
Tukang listrik OH 0.2500 174,739.5000 43,685
Kepala tukang OH 0.0250 184,099.5000 4,602
Mandor OH 0.0250 194,021.1000 4,851
Jumlah Harga Tenaga Kerja 88,936
B Bahan
Kabel m 1.0000 13,286.5200 13,287
Jumlah Harga Bahan
13,287
C Peralatan
Jumlah Harga Peralatan

Jumlah Harga Tenaga Kerja,


D
Bahan dan Peralatan (A+B+C) 102,222

Biaya umum dan Keuntungan


E 15% x D
(Maksimum 15%)
15,333
F Harga Satuan Pekerjaan (D+E)
117,555
Lantai kerja
Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 1,200 143,190 171,828.54
Tukang batu OH 0,200 174,740 34,947.90
Kepala tukang batu OH 0,020 174,740 3,494.79
Mandor OH 0,120 194,021 23,282.53

Jumlah Harga Tenaga Kerja


233,553.76
B Bahan
Portland cement kg 227 1,973 447,784.74
PB / Pasir beton kg 869 294 255,199.2
Kr / Kerikil kg 1,000 250 250,380.00
Air Liter 215 16 3,521.70
Jumlah Harga Bahan 956,885.67
C Peralatan

Jumlah Harga Peralatan

Jumlah Harga Tenaga Kerja,


D
Bahan dan Peralatan (A+B+C)
1,190,439.43
Biaya umum dan Keuntungan
E 15% x D
(Maksimum 15%) 178,565.91
F Harga Satuan Pekerjaan (D+E)
1,369,005.35

Pengecoran pondasi footplat


Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 5.3 143,190 758,909.39
Tukang batu OH 0.275 174,740 48,053.36
Tukang kayu OH 1.3 174,740 227,161.35
Tukang besi OH 1.05 174,740 183,476.48
Kepala tukang OH 0.262 184,100 48,234.07
Mandor OH 0.265 194,021 51,415.59
Jumlah Harga Tenaga Kerja 1,317,250.23
B Bahan
Paku usuk kg 19,469 19,468.80
Playwood Uk.
lmbr 0.35
122x244x9 mm 131,545.44 46,040.90
Kayu meranti
m3 0.040
bekesting 4,212,000 168,480.00
Kayu meranti balok
m3 0.015
4/6,5/7 9,777,669 146,665.03
Minyak bekesting ltr 0.2 5,556 1,111.27
Besi beton ulir kg 1.05 14,714 15,449.62
Kawat beton lmbr 0.015 21,902 328.54
Semen PC 40 kg zak 9.6 62,463 599,642.78
Pasir cor m3 0.432 325,377 140,562.86
Batu pecah mesin
m3 0.5468
1/2 347,369 189,941.64
Air ltr 215 16 3,521.70

Jumlah Harga Bahan 1,331,213.14

C Peralatan
Jumlah Harga Peralatan

Jumlah Harga Tenaga Kerja,


D 2,648,463.37
Bahan dan Peralatan (A+B+C)

Biaya umum dan Keuntungan


E 15% x D 397,269.51
(Maksimum 15%)

F Harga Satuan Pekerjaan (D+E) 3,045,732.88

Pengecoran sloof
Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 5.7 143,190 816,185.57
Tukang batu OH 0.277 174,740 48,402.84
Tukang kayu OH 1.5 174,740 262,109.25
Tukang besi OH 1.4 174,740 244,635.30
Kepala tukang OH 0.3 184,100 55,229.85
Mandor OH 0.3 194,021 58,206.33
Jumlah Harga Tenaga Kerja 1,484,769.14

B Bahan
Paku usuk kg 2.000 19,469 19,468.80
Kayu meranti
m3 0.2700
bekesting 4,212,000 1,137,240.00
Minyak bekesting ltr 0.6000 5,556 3,333.80
Besi beton polos kg 210.000 13,377 2,809,088.10
Kawat beton lmbr 3.000 21,902 65,707.20
Semen PC 40 kg zak 8.400 62,463 524,687.44
Pasir cor m3 0.540 278,125 150,187.71
Batu pecah mesin
m3 0.810
1/2 347,369 281,369.29

Jumlah Harga Bahan 4,991,082.33

C Peralatan
Jumlah Harga Peralatan

Jumlah Harga Tenaga Kerja,


D 6,475,851.46
Bahan dan Peralatan (A+B+C)

Biaya umum dan Keuntungan


E 15% x D 971,377.72
(Maksimum 15%)

F Harga Satuan Pekerjaan (D+E) 7,447,229.18

Pengecoran balok
Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 6.4 143,190 916,418.88
Tukang batu OH 0.277 174,740 48,402.84
Tukang kayu OH 1.6 174,740 279,583.20
Tukang besi OH 1.4 174,740 244,635.30
Kepala tukang OH 0.3 184,100 55,229.85
Mandor OH 0.3 194,021 58,206.33

Jumlah Harga Tenaga Kerja 1,602,476.40

B Bahan
Paku usuk kg 3.2 19,469 19,468.80
Playwood Uk.
lmbr 2.8 131,545.44 368,327.23
122x244x9 mm
Kayu meranti
m3 0.320 4,212,000 1,347,840.00
bekesting
Kayu meranti balok
m3 0.14 9,777,669 1,368,873.65
5/7
Minyak bekesting ltr 1.6 5,556 8,890.13
Besi beton polos kg 210 13,377 2,809,088.10
Kawat beton lmbr 3 21,902 65,707.20

Semen PC 40 kg zak 8.4 62,463 524,687.44

Pasir cor m3 0.54 278,125 150,187.71

Batu pecah mesin


m3 0.81 347,369 281,369.29
1/2

Jumlah Harga Bahan 6,944,439.54

C Peralatan

Jumlah Harga Peralatan

Jumlah Harga Tenaga Kerja,


D 8,546,915.94
Bahan dan Peralatan (A+B+C)

Biaya umum dan Keuntungan


E 15% x D 1,282,037.39
(Maksimum 15%)
Harga Satuan Pekerjaan per
F 9,828,953.33
(D+E)

Pengecoran ringbalk
Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 0.3 143,190 42,957.14
Tukang batu OH 0.033 174,740 5,766.40
Tukang kayu OH 0.033 174,740 5,766.40
Tukang besi OH 0.033 174,740 5,766.40
Kepala tukang OH 0.01 184,100 1,841.00
Mandor OH 0.01 194,021 1,940.21
Jumlah Harga Tenaga Kerja 64,037.55
B Bahan
Paku usuk kg 0.4 19,469 19,468.80
Playwood Uk.
lmbr 0.35 131,545.44 46,040.90
122x244x9 mm
Kayu meranti
m3 0.040 4,212,000 168,480.00
bekesting
Kayu meranti balok
m3 0.018 9,777,669 175,998.04
4/6
Minyak bekesting ltr 0.2 5,556 1,111.27
Besi beton ulir kg 1.05 14,714 15,449.62
Kawat beton lmbr 0.015 21,902 328.54
Semen PC 40 kg zak 0.1375 62,463 8,588.63

Pasir cor m3 0.009 278,125 2,503.13

Batu pecah mesin


m3 0.015 347,369 5,210.54
1/2

Besi beton polos kg 3.6 14,714 52970.112


Jumlah Harga Bahan 496,149.58
C Peralatan
Jumlah Harga Peralatan
Jumlah Harga Tenaga Kerja,
D 560,187.13
Bahan dan Peralatan (A+B+C)

Biaya umum dan Keuntungan


E 15% x D 84,028.07
(Maksimum 15%)
F Harga Satuan Pekerjaa (D+E) 644,215.20

Pengecoran kolom
Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 5.7 143,190 816,185.57
Tukang batu OH 0.277 174,740 48,402.84
Tukang kayu OH 1.5 174,740 262,109.25
Tukang besi OH 1.4 174,740 244,635.30
Kepala tukang OH 0.3 184,100 55,229.85
Mandor OH 0.3 194,021 58,206.33
Jumlah Harga Tenaga Kerja 1,484,769.14
B Bahan
Paku usuk kg 4 19,469 19,468.80
Playwood Uk.
lmbr 3.5
122x244x9 mm 131,545.44 460,409.04
Kayu meranti
m3 0.400
bekesting 4,212,000 1,684,800.00
Kayu meranti balok
m3 0.15
4/6 9,777,669 1,466,650.34
Minyak bekesting ltr 2 5,556 11,112.66
Besi beton polos kg 315 14,714 4,634,884.80
Kawat beton lmbr 4.5 21,902 98,560.80
Semen PC 40 kg zak 8.4 62,463 524,687.44
Pasir cor m3 0.54 278,125 150,187.71
Batu pecah mesin
m3 0.81
1/2 347,369 281,369.29
Jumlah Harga Bahan 9,332,130.87
C Peralatan
Jumlah Harga Peralatan
Jumlah Harga Tenaga Kerja,
D 10,816,900.01
Bahan dan Peralatan (A+B+C)

Biaya umum dan Keuntungan


E 15% x D 1,622,535.00
(Maksimum 15%)
F Harga Satuan Pekerjaan (D+E) 12,439,435.01

Pengecoran kolom praktis


Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 0.18 143,190 25,774.28
Tukang batu OH 0.02 174,740 3,494.79
Tukang kayu OH 0.02 174,740 3,494.79
Tukang besi OH 0.02 174,740 3,494.79
Kepala tukang OH 0.006 184,100 1,104.60
Mandor OH 0.006 194,021 1,164.13
Jumlah Harga Tenaga Kerja 38,527.37
B Bahan
Paku usuk kg 19,469 19,468.80
Playwood Uk.
lmbr 0.35
122x244x9 mm 131,545.44 46,040.90
Kayu meranti
m3 0.040
bekesting 4,212,000 168,480.00
Kayu meranti balok
m3 0.015
4/6 9,777,669 146,665.03
Minyak bekesting ltr 0.2 5,556 1,111.27
Besi beton ulir kg 1.05 14,714 15,449.62
Kawat beton lmbr 0.015 21,902 328.54
Semen PC 40 kg zak 0.1 62,463 6,246.28
Pasir cor m3 0.006 278,125 1,668.75
Batu pecah mesin
m3 0.009
1/2 347,369 3,126.33
Besi beton polos kg 3 14,714 44,141.76
Paku usuk kg 0.01 19,469 194.69
Kawat beton lmbr 0.045 21,902 985.61
Kayu meranti
kg 0.002
bekesting 1,509,787 3,019.57
Jumlah Harga Bahan 456,927.14
C Peralatan
Jumlah Harga Peralatan
Jumlah Harga Tenaga Kerja,
D 495,454.52
Bahan dan Peralatan (A+B+C)

Biaya umum dan Keuntungan


E 15% x D 74,318.18
(Maksimum 15%)

F Harga Satuan Pekerjaan (D+E) 569,772.69

Pengecoran tangga
Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 1.6 143,190 229,104.72
Tukang batu OH 0.277 174,740 48,402.84
Kepala tukang OH 0.0282 174,740 4,927.65
Mandor OH 0.0282 194,021 5,471.40

Jumlah Harga Tenaga Kerja 287,906.61

B Bahan
Semen PC 40 kg zak 9.6 62,463 599,642.78
Pasir cor m3 0.43 278,125 119,593.91
Batu pecah mesin
m3 0.5
1/2 347,369 173,684.75
Biaya air ltr 215 16 3,521.70
Jumlah Harga Bahan 896,443.14
C Peralatan
Jumlah Harga Peralatan
Jumlah Harga Tenaga Kerja,
D 1,184,349.75
Bahan dan Peralatan (A+B+C)

Biaya umum dan Keuntungan


E 15% x D 177,652.46
(Maksimum 15%)

F Harga Satuan Pekerjaan (D+E) 1,362,002.22


Pembesian Footplat,Sloof,Balok,Ringbalk,Kolom,Kolom Praktis,Plat lantai
Harga
Jumlah Harga
No Uraian Satuan Koefisien Satuan
(Rp)
(Rp)
A Tenaga Kerja
Pekerja OH 1.6 143,190 229,104.72
Tukang besi OH 1.6 174,740 279,583.20
Kepala tukang OH 0.16 184,100 29,455.92
Mandor OH 0.16 194,021 31,043.38
Jumlah Harga Tenaga Kerja 569,187.22
B Bahan
Besi beton polos kg 105 14,714 1,544,961.60
Kawat beton lmbr 2.8 21,902 61,326.72
Jumlah Harga Bahan 1,606,288.32
C Peralatan
Jumlah Harga Peralatan
Jumlah Harga Tenaga Kerja,
D 2,175,475.54
Bahan dan Peralatan (A+B+C)

Biaya umum dan Keuntungan


E 15% x D 326,321.33
(Maksimum 15%)

F Harga Satuan Pekerjaan (D+E) 25,017.97

Bekesting Footplat,Sloof,Balok,Ringbalk,Kolom,Kolom Praktis,Plat lantai


Harga Jumlah
No Uraian Satuan Koefisien Satuan Harga
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja OH 0.6 143,190 85,914.27
2 Tukang besi OH 0.3 174,740 52,421.85
3 Kepala tukang OH 0.03 184,100 5,522.99
4 Mandor OH 0.03 194,021 5,820.63
Jumlah Harga Tenaga Kerja 149,679.74
B Bahan
1 Paku usuk kg 0.4 19,469 7,787.52
Plywood Uk
2 lmbr 0.35 131,545 46,040.90
122x244x9mm
Kayu meranti
m3 0.03 4,212,000 126,360.00
bekesting
Kayu meranti balok
m3 0.015 9,777,669 146,665.0
4/6
Minyak bekesting ltr 0.15 5,556 833.4495
Jumlah Harga Bahan 327,686.91
C Peralatan
Jumlah Harga Peralatan
Jumlah Harga Tenaga Kerja,
D 477,366.65
Bahan dan Peralatan (A+B+C)

Biaya umum dan Keuntungan


E 15% x D 71,605.00
(Maksimum 15%)

F Harga Satuan Pekerjaan (D+E) 548,971.64


HARGA
URAIAN HARGA RP
KODE INDEX SATUAN SATUAN
PEKERJAAN
RP BAHAN
A Pekerjaan Tanah
1 Pembersihan Lokasi
0.100 OH Pekerja 143,190
0.005 OH Mandor 194,021

2 Pengkuruan dan Perhitungan Bouwplank


0.100 OH Pekerja 143,190
0.100 OH Tukang Kayu 174,740
0.010 OH Kepala Tukang 184,100
0.005 OH Mandor 194,021

0.012 m³ Kayu Balok 5/7 4,212,000 50,544


0.020 Kg Paku 2"-3" 26,309 526.17
0.007 m³ Kayu Papan 3/20 15,205,369 106,438
157,508
3 Pembuatan Bedeng
1.20 OH Pekerja 143,190
0.40 OH Tukang Batu 174,740
0.04 OH Kepala Tukang Batu 184,380
0.12 OH Mandor 194,021

0.35 m³ Kaso 5/7 16,442,428 5,754,850


1.00 lembar Dinding Triplek 4mm 85,514 85,514
0.17 m³ Pondasi Pasang Batu 1,189,081 202,144
1.24 Lembar GRC Pelat, t= 4mm,
Uk 122x224 cm 210,602 261,147
0.75 Kg Paku 19,469 14,602
0.30 Lembar Asbes Gelombang 115,596 34,679
0.10 Kg Paku Asbes 42,588 4,259
0.15 m³ Floor Lantai 15,744,491 2,361,674
0.10 m² Pintu Rangka Kayu 767,938 76,794
1.00 daun Frame Besi Kaca Nako 38,168 38,168
16.50 m² Cat dinding/Plafon 131,049 2,162,314
10,996,143
B Pekerjaan Galian dan Urugan
1 Pekerjaan Galian Tanah
0.750 OH Pekerja 143,190
0.025 OH Mandor 194,021

2 Pekerjaan Pengurugan Tanah Kembali


0.50 OH Pekerja 143,190
0.05 OH Mandor 194,021

3 Pekerjaan Pengurugan Pasir Urug


0.30 OH Pekerja 143,190
0.01 OH Mandor 194,021

1,200 m³ Pasir Urug 162,513 195,016


195,016
C Pekerjaan Pasangan
1 Pekerjaan Aanstamping
0.780 OH Pekerja 143,190
0.390 OH Tukang Batu 174,740
0.039 OH Kepala Tukang 184,100
0.039 OH Mandor 194,021

1.200 m³ Batu Belah 206,601 247,921


0.432 m³ Pasir Urug 162,513 70,206
318,127
2 Pekerjaan Pondasi Batu Kali
1.500 OH Pekerja 143,190
0.750 OH Tukang batu 174,740
0.075 OH Kepala tukang 184,100
0.075 OH Mandor 194,021

1.2 m³ Batu Kali 247,221 296,665


91 Kg Semen Portland 1,973 179,508
0.548 m³ Pasir Pasang 214,867 117,747
593,921
3 Pemasangan Batu Bata 1/2 1pc:6ps
0.300 OH Pekerja 143,190
0,100 OH Tukang batu 174,740
0,010 OH Kepala tukang 184,100
0.015 OH Mandor 194,021

8.32 Kg Semen Portlan 1,973 16,412


70.00 buah Bata merah 759 53,153
0.05 m³ Pasir pasang 214,867 10,528
80,094
D Pekerjaan Plester dan Acian
1 Pekerjaan Plester Bata
0.300 OH Pekerja 143,190
0.150 OH Tukang batu 174,740
0.015 OH Kepala tukang 184,100
0.015 OH Mandor 194,021

7.776 Kg Semen Portlan 1,973 15,339


0.023 m³ Pasir pasang 214,867 4,942
20,281
2 Plester Trasram
0.300 OH Pekerja 143,190
0.150 OH Tukang batu 174,740
0.015 OH Kepala tukang 184,100
0.015 OH Mandor 194,021

4.416 Kg Semen Portlan 1,973 8,711


0.027 m³ Pasir pasang 214,867 5,801
14,512
3 Pekerjaan Acian
0,200 OH Pekerja 143,190
0,100 OH Tukang batu 174,740
0,010 OH Kepala tukang 184,100
0,010 OH Mandor 194,021

3,250 Kg Semen Portlan 1,973 6,411


6,411
E Pekerjaan Beton
1 Lantai Kerja
1,200 OH Pekerja 143,190
0,200 OH Tukang batu 174,740
0,020 OH Kepala tukang batu 174,740
0,120 OH Mandor 194,021

227 Kg Portland cement 1,973 447,785


869 Kg PB / Pasir beton 294 255,199
1000 Kg Kr / Kerikil 250 250,380
215 liter Air 16 3,522
956,886
2 Pengecoran Pondasi Footplat
5.300 OH Pekerja 143,190
0.275 OH Tukang batu 174,740
1.300 OH Tukang kayu 174,740
1.050 OH Tukang besi 174,740
0.262 OH Kepala tukang 184,100
0.265 OH Mandor 194,021

kg Paku usuk 19,469 19,469


0.350 lembar Playwood Uk. 122x244x9 mm 131,545 46,041
0.040 m³ Kayu meranti bekesting 4,212,000 168,480
0.015 m³ Kayu meranti balok 4/6,5/7 9,777,669 146,665
0.200 liter Minyak bekesting 5,556 1,111
1.050 kg Besi beton ulir 14,714 15,450
0.015 lmbr Kawat beton 21,902 329
9.600 zak Semen PC 40 kg 62,463 599,643
0.432 m³ Pasir cor 325,377 140,563
0.5468 m³ Batu pecah mesin 1/2 347,369 189,942
215 liter Air 16 3,522
1,331,213
3 Pengecoran Sloof
5.7 OH Pekerja 143,190
0.277 OH Tukang batu 174,740
1.5 OH Tukang kayu 174,740
1.4 OH Tukang besi 174,740
0.3 OH Kepala tukang 184,100
0.3 OH Mandor 194,021

2.00 Kg Paku usuk 19,469 38,938


0.27 m³ Kayu meranti bekesting 4,212,000 1,137,240
0.60 liter Minyak bekesting 5,556 3,334
210 Kg Besi beton polos 13,377 2,809,088
3.00 Lembar Kawat beton 21,902 65,707
8.40 Zak Semen PC 40 kg 62,463 524,687
0.54 m³ Pasir cor 278,125 150,188
0.81 m³ Batu pecah mesin 1/2 347,369 281,369
5,010,551
4 Pengecoran Balok
6.400 OH Pekerja 143,190
0.277 OH Tukang batu 174,740
1.600 OH Tukang kayu 174,740
1.400 OH Tukang besi 174,740
0.300 OH Kepala tukang 184,100
0.300 OH Mandor 194,021

3.20 Kg Paku usuk 19,469 62,300


2.80 lembar Playwood Uk. 122x244x9 mm 131,545 368,327
0.32 m³ Kayu meranti bekesting 4,212,000 1,347,840
0.14 m³ Kayu meranti balok 5/7 9,777,669 1,368,874
1.60 liter Minyak bekesting 5,556 8,890
210 Kg Besi beton polos 13,377 2,809,088
3.00 lembar Kawat beton 21,902 65,707
8.40 zak Semen PC 40 kg 62,463 524,687
0.54 m³ Pasir cor 278,125 150,188
0.81 m³ Batu pecah mesin 1/2 347,369 281,369
6,987,271
5 Pengecoran Ringbalk
0.300 OH Pekerja 143,190
0.033 OH Tukang batu 174,740
0.033 OH Tukang kayu 174,740
0.033 OH Tukang besi 174,740
0.010 OH Kepala tukang 184,100
0.010 OH Mandor 194,021

0.400 Kg Paku usuk 19,469 7,788


0.350 lembar Playwood Uk. 122x244x9 mm 131,545 46,041
0.040 m³ Kayu meranti bekesting 4,212,000 168,480
0.018 m³ Kayu meranti balok 4/6 9,777,669 175,998
0.200 liter Minyak bekesting 5,556 1,111
1.050 Kg Besi beton ulir 14,714 15,450
0.015 lembar Kawat beton 21,902 329
0.138 zak Semen PC 40 kg 62,463 8,589
0.009 m³ Pasir cor 278,125 2,503
0.015 m³ Batu pecah mesin 1/2 347,369 5,211
431,498
6 Pengecoran Kolom
5.700 OH Pekerja 143,190
0.277 OH Tukang batu 174,740
1.500 OH Tukang kayu 174,740
1.400 OH Tukang besi 174,740
0.300 OH Kepala tukang 184,100
0.300 OH Mandor 194,021

4.000 Kg Paku usuk 19,469 77,875


3.500 lembar Playwood Uk. 122x244x9 mm 131,545 460,409
0.400 m³ Kayu meranti bekesting 4,212,000 1,684,800
0.150 m³ Kayu meranti balok 4/6 9,777,669 1,466,650
2.000 liter Minyak bekesting 5,556 11,113
315 Kg Besi beton polos 14,714 4,634,885
4.500 lembar Kawat beton 21,902 98,561
8.400 zak Semen PC 40 kg 62,463 524,687
0.540 m³ Pasir cor 278,125 150,188
0.810 m³ Batu pecah mesin 1/2 347,369 281,369
9,390,537
7 Pengeceron Kolom Praktis
0.180 OH Pekerja 143,190
0.020 OH Tukang batu 174,740
0.020 OH Tukang kayu 174,740
0.020 OH Tukang besi 174,740
0.006 OH Kepala tukang 184,100
0.006 OH Mandor 194,021

0.01 Kg Paku usuk 19,469 195


0.35 lembar Playwood Uk. 122x244x9 mm 131,545 46,041
0.04 m³ Kayu meranti bekesting 4,212,000 168,480
0.015 m³ Kayu meranti balok 4/6 9,777,669 146,665
0.2 liter Minyak bekesting 5,556 1,111
1.05 Kg Besi beton ulir 14,714 15,450
0.015 lembar Kawat beton 21,902 329
0.1 zak Semen PC 40 kg 62,463 6,246
0.006 m³ Pasir cor 278,125 1,669
0.009 m³ Batu pecah mesin 1/2 347,369 3,126
389,311
8 Pengecoran Plat Lantai
1.6000 OH Pekerja 143,190
0.2770 OH Tukang batu 174,740
0.0282 OH Kepala tukang 174,740
0.0282 OH Mandor 194,021
9.60 zak Semen PC 40 kg 62,463 599,643
0.43 m³ Pasir cor 278,125 119,594
0.50 m³ Batu pecah mesin 1/2 347,369 173,685
215 liter Biaya air 16 3,522
896,443
9 Pengecoran Tangga
1.6000 OH Pekerja 143,190
0.2770 OH Tukang batu 174,740
0.0282 OH Kepala tukang 174,740
0.0282 OH Mandor 194,021

9.60 zak Semen PC 40 kg 62,463 599,643


0.43 m³ Pasir cor 278,125 119,594
0.50 m³ Batu pecah mesin 1/2 347,369 173,685
215 liter Biaya air 16 3,522
896,443
F Pembesian dan Bekisiting
1 Pembesian Footplat,Sloof,Kolom,Balok,Plat
1.60 OH Pekerja 143,190
1.60 OH Tukang besi 174,740
0.16 OH Kepala tukang 184,100
0.16 OH Mandor 194,021

105 Kg Besi beton polos 14,714 1,544,962


2.8 lembar Kawat beton 21,902 61,327
1,606,288
2 Bekisting Footplat,Sloof,Kolom,Balok,Plat
0.60 OH Pekerja 143,190
0.30 OH Tukang besi 174,740
0.03 OH Kepala tukang 184,100
0.03 OH Mandor 194,021

0.400 Kg Paku usuk 19,469 7,788


0.350 lembar Plywood Uk 122x244x9mm 131,545 46,041
0.030 m³ Kayu meranti bekesting 4,212,000 126,360
0.015 m³ Kayu meranti balok 4/6 9,777,669 146,665
0.150 liter Minyak bekesting 5,556 833
327,687
G Pekeraan Atap
1 Pekerjaan Nok dan Gording
2.40 OH Pekerja 143,190
7.20 OH Tukang kayu 174,740
0.720 OH Kepala tukang 184,100
0,120 OH Mandor 194,021

1.100 m³ Balok 10,816,478 11,898,126


15.000 Kg Besi strip 14,602 219,024
3.000 Kg Paku kayu 22,237 66,711
12,183,861
2 Pekerjaan Jurai
0.400 OH Pekerja 143,190
0.200 OH Tukang kayu 174,740
0.020 OH Kepala tukang 184,100
0.002 OH Mandor 194,021

5.0000 buah Bubungan genteng 3,865 19,323


8.0000 kg Portlan cement 1,973 15,781
0.0320 m³ Pasir pasang 214,867 6,876
41,979
3 Pekerjaan Kuda-Kuda
4.00 OH Pekerja 143,190
12.00 OH Tukang kayu 174,740
1.200 OH Kepala tukang 184,100
0.200 OH Mandor 194,021

1.100 buah Kayu jati balok 14,905,827 16,396,410


15.000 Kg Besi strip 14,602 219,024
5.6000 m³ Paku kayu 206,601 1,156,965
17,772,399
4 Pekerjaan Genteng
0.200 OH Pekerja 143,190
0.100 OH Tukang kayu 174,740
0.010 OH Kepala tukang 184,100
0.001 OH Mandor 194,021

2.00 Lembar Genteng Metal 78,970 157,940


0.20 Kg Paku 19,469 3,894
161,834
H Pekerjaan Plafon
1 Pekerjaan Rangka Plafon
0.150 OH Pekerja 143,190
0.300 OH Tukang kayu 174,740
0.030 OH Kepala tukang 184,100
0.075 OH Mandor 194,021

0.015 m³ Usuk 5/7 16,012,833 240,192


0.200 Kg Paku kayu 22,237 4,447
244,640
2 Penutup Plafon
0.100 OH Pekerja 143,190
0.100 OH Tukang kayu 174,740
0.010 OH Kepala tukang 184,100
0.005 OH Mandor 194,021

5.800 lembar Plywood 30 x 60 16,614 96361.2


0.050 Kg Paku kayu 22,237 1111.851
97473.051
I Pekerjaan Kusen Pintu dan Jendela
1 Pekerjaan Kusen Pintu dan Jendela Kayu Jati
7.00 OH Pekerja 143,190
21.00 OH Tukang kayu 174,740
2.10 OH Kepala tukang 184,100
0.35 OH Mandor 194,021

1.10 m³ Balok 10,816,478 11,898,126


1.25 Kg Paku kayu 22,237 27,796
1.00 Kg Lem kayu 72,072 72,072
11,997,994
2 Pekerjaan Daun Pintu dan Jendela
0.35 OH Pekerja 143,190
1.05 OH Tukang kayu 174,740
0.105 OH Kepala tukang 184,100
0.018 OH Mandor 194,021

0.040 m³ Papan 3 x 30 cm 29,954,177 1,198,167


0.500 Kg Paku kayu 22,237 11,119
1,209,286
3 Pemasangan Kaca
0.015 OH Pekerja 143,190
0.15 OH Tukang kayu 174,740
0.015 OH Kepala tukang 184,100
0.001 OH Mandor 194,021

1.00 m³ Kaca Rayben t= 5mm 240,541 240,541


240,541
4 Pekerjaan Pintu Kamar Mandi
0.100 OH Pekerja 143,190
0.200 OH Tukang kayu 174,740
0.020 OH Kepala tukang 184,100
0.005 OH Mandor 194,021

1 Unit Pintu Fiber KM 606,177 606,177


606,177
J Pekerjaan Gantungan
1 Pemasangan Engsel Pintu
0.015 OH Pekerja 143,190
0.150 OH Tukang 174,740
0.015 OH Kepala tukang 184,100
0.001 OH Mandor 194,021

1 buah Engsel pintu 58,700 58,700


58,700
2 Pemasangan Engsel Jendela
0.015 OH Pekerja 143,190
0.150 OH Tukang 174,740
0.015 OH Kepala tukang 184,100
0.001 OH Mandor 194,021

1 buah Engsel jendela 45,293 45,293.04


45,293.04
3 Pemasangan Kunci
0.010 OH Pekerja 143,190
0.500 OH Tukang 174,740
0.010 OH Kepala tukang 184,100
0.005 OH Mandor 194,021

1 buah Kunci Tanam 192,891 192,891


192,891
4 Pemasangan Grendel Pintu
0.015 OH Pekerja 143,190
0.150 OH Tukang 174,740
0.015 OH Kepala tukang 184,100
0.001 OH Mandor 194,021

1 buah Grendel pintu 40,301 40300.65


40300.65
5 Pemasangan Grendel Jendela
0.015 OH Pekerja 143,190
0.150 OH Tukang 174,740
0.015 OH Kepala tukang 184,100
0.001 OH Mandor 194,021

1 buah Grendel jendela 18,252 18252


18252
K Pemasangan Keramik
1 Pemasangan Keramik 20 x 20
0.700 OH Pekerja 143,190
0.350 OH Tukang 174,740
0.035 OH Kepala tukang 184,100
0.035 OH Mandor 194,021

26.500 Kg Keramik lantai 20x 20 cm 3,723 98,658


10.400 Kg Portland Cement 1,973 20,515
0.045 Kg Pasir pasang 214,867 9,669
1.620 Kg Portland Cement warna 21,681 35,124
163,966
2 Pemasangan Keramik 30 x 30
0.700 OH Pekerja 143,190
0.350 OH Tukang 174,740
0.035 OH Kepala tukang 184,100
0.035 OH Mandor 194,021
11.870 Kg Keramik lantai 30x 30 cm 8,103 96187.5954
10.000 Kg Portland Cement 1,973 19726.2
0.045 Kg Pasir pasang 214,867 9669.01455
1.620 Kg Portland Cement warna 21,681 35123.6574
160,706
3 Pemasangan Keramik 40 x 40
0.700 OH Pekerja 143,190
0.350 OH Tukang 174,740
0.035 OH Kepala tukang 184,100
0.035 OH Mandor 194,021

6.930 Kg Keramik lantai 40x 40 cm 14,783 102,446


9.800 Kg Portland Cement 1,973 19,332
0.022 Kg Pasir pasang 214,867 4,727
1.300 Kg Portland Cement warna 21,681 28,186
154,690
L Pekerjaan Sanitasi dan Drainase
1 Pemasangan Bak Mandi
2.10 OH Pekerja 143,190
0.75 OH Tukang 174,740
0.07 OH Kepala tukang 184,100
0.11 OH Mandor 194,021

0.40 buah Bata merah 759.33 304


120 Kg Portland cement 1972.62 236,714
0.30 m³ Pasir pasang 214866.99 64,460
220 buah Porselin 10 x 20 Warna 1752.66 385,585
6 Kg Portland cement warna 21681.27 130,088
817,151
2 Pemasangan Kloset Duduk
3.300 OH Pekerja 143,190
1.100 OH Tukang 174,740
0.001 OH Kepala tukang 184,100
0.160 OH Mandor 194,021

1 buah Kloset duduk lux 2,988,582 2,988,582


2,988,582
3 Pemasangan Kloset Jongkok
1.00 OH Pekerja 143,190
1.50 OH Tukang 174,740
1.50 OH Kepala tukang 184,100
0.16 OH Mandor 194,021

1 buah Kloset jongkok porselin 271,590 271,590


6 Kg Portland cement 1,973 11,836
0.01 m³ Pasir pasang 214,867 2,149
285,574
4 Pemasangan Pipa Air Bersih 3/4"
0.06 OH Pekerja 143,190
0.03 OH Tukang 174,740
0.003 OH Kepala tukang 184,100
0.002 OH Mandor 194,021

0.405 Kg Pipa plastik PVC tipe D 11,115 4,502


4,502
5 Pemasangan Pipa Air Kotor dan Pembuangan 4"
0.060 OH Pekerja 143,190
0.030 OH Tukang 174,740
0.003 OH Kepala tukang 184,100
0.002 OH Mandor 194,021

0.405 Kg Pipa plastik PVC tipe D 64,795 26,242


26,242
6 Pembuatan Septitank dan Resapan
3.3 OH Pekerja 143,190
1.1 OH Tukang 174,740

2 buah Buis beton septictank 889,785 1,779,570


1,779,570
7 Pembuatan Bak Kontrol
1.420 OH Pekerja 143,190
0.473 OH Tukang 174,740
0.047 OH Kepala tukang 184,100
0.071 OH Mandor 194,021

112.500 buah Bata merah 759.33 85424.625


77.00 Kg Portland cement 1972.62 151891.74
0.13 m³ Pasir pasang 214866.99 27932.7087
0.02 m³ Batu pecah 2/3 349666.2 6993.324
2.60 Kg Besi beton polos 13376.61 34779.186
0.09 m³ Pasir cor 325377 29283.93
336,306
8 Pemasangan Kran
0.030 OH Pekerja 143,190
0.300 OH Tukang 174,740
0.030 OH Kepala tukang 184,100
0.001 OH Mandor 194,021

1.000 buah Kran air 42,588 42,588


0.025 buah Seal tape/TBA 5,835 146
42,734
M Pekerjaan Instalasi Listrik
1 Pemasangan Stop Kontak
0.50 OH Pekerja 143,190
0.50 OH Tukang listrik 174,740
0.05 OH Kepala tukang 184,100
0.05 OH Mandor 194,021

10.00 m Kabel NYA 2.5 mm 5,959 59,588


1.00 buah Stop kontak 4,928 4,928
1.00 buah T dos PVC 1,872 1,872
0.65 Lonjot Pipa pvc 5/8" 13,098 8,514
3.00 buah Las doof 13,287 39,860
114,761
2 Pemasangan Saklar Tunggal
0.50 OH Pekerja 143,190
0.50 OH Tukang listrik 174,740
0.05 OH Kepala tukang 184,100
0.05 OH Mandor 194,021

10.00 m Kabel NYA 2.5 mm 5,959 59,588.1


1.00 buah Saklar broco tunggal 5,913 5,913.2
1.00 buah T dos PVC 1,872 1,872.0
0.65 Lonjot Pipa pvc 5/8" 13,098 8,513.8
3.00 buah Las doof 13,287 39,859.6
115,746.6
3 Pemasangan Saklar Ganda
0.50 OH Pekerja 143,190
0.50 OH Tukang listrik 174,740
0.05 OH Kepala tukang 184,100
0.05 OH Mandor 194,021

10.00 m Kabel NYA 2.5 mm 5,959 59,588


1.00 buah Saklar broco ganda 279,371 279,371
1.00 buah T dos PVC 1,872 1,872
0.65 Lonjot Pipa pvc 5/8" 13,098 8,514
3.00 buah Las doof 13,287 39,860
389,205
4 Pemasangan Lampu XL 18 Watt
0.250 OH Pekerja 143,190
0.250 OH Tukang listrik 174,740
0.025 OH Kepala tukang 184,100
0.025 OH Mandor 194,021

10.00 m Kabel NYA 2.5 mm 5,959 59,588


1.00 buah Lampu XL 18 watt 65,597 65,597
4.00 buah Isolator 1,570 6,281
2.00 buah Las doof 13,287 26,573
1.00 m Fitting flafond 19,188 19,188
177,227
5 Pemasangan Lampu TL 20 Watt
0.250 OH Pekerja 143,190
0.250 OH Tukang listrik 174,740
0.025 OH Kepala tukang 184,100
0.025 OH Mandor 194,021

10.00 m Kabel NYA 2.5 mm 5,959 59,588


1.00 buah Lampu TL 20 watt 18,793 18,793
4.00 buah Isolator 1,570 6,281
2.00 buah Las doof 13,287 26,573
111,234
6 Pemasangan Kabel
0.25 OH Pekerja 143,190
0.25 OH Tukang listrik 174,740
0.025 OH Kepala tukang 184,100
0.025 OH Mandor 194,021

1 m Kabel 13,287 13,287


13,287
N Pengecatan Dinding
0.0200 OH Pekerja 143,190
0.0630 OH Tukang cat 174,740
0.0063 OH Kepala tukang 184,100
0.0030 OH Mandor 194,021

0.10 Kg Plamuur 35,591 3,559


0.10 Kg Cat dasar 53,442 5,344
0.26 Kg Cat penutup 51,453 13,378
22,281
HARGA RP JUMLAH
HARGA
UPAH

14,319
970.11
15,289

14,319
17,474
1,841
970.11

34,604 192,112

171,829
69,896
7,375
23,283

272,382 11,268,525

107,393
4,851
112,243

71,595
9,701
81,296
42,957
1,940

44,897 239,913

111,689
68,148
7,180
7,567

194,584 512,710

214,786
131,055
13,807
14,552

374,199 968,120

42,957
17,473,950
1,840,995
2,910

65,182 145,276

42,957
26,211
2,761
2,910

74,840 95,121

42,957
26,211
2,761
2,910

74,840 89,352

28,638
17,473,950
1,840,995
1,940,211

49,893 56,304

171,829
34,947,900
3,494,790
23,282,532

233,554 1,190,439

758,909
48,053
227,161
183,476
48,234
51,416

1,317,250 2,648,463

816,186
48,403
262,109
244,635
55,230
58,206

1,484,769 6,495,320

916,419
48,403
279,583
244,635
55,230
58,206

1,602,476 8,589,747

42,957
5,766
5,766
5,766
1,841
1,940
64,038 495,536

816,186
48,403
262,109
244,635
55,230
58,206

1,484,769 10,875,306

25,774
3,495
3,495
3,495
1,105
1,164

38,527 427,839

229,105
48,403
4,928
5,471
287,907 1,184,350

229,105
48,403
4,928
5,471

287,907 1,184,350

229,105
279,583
29,456
31,043

569,187 21,755

85,914
52,422
5,523
5,821

149,680 477,367

343,657
1,258,124
132,552
23,282,532
1,757,616 13,941,477

57,276
34,948
3,682
388

96,294 138,273

572,762
2,096,874
220,919
38,804

2,929,359 20,701,758

28,638
17,474
1,841
194

48,147 209,981

21,479
52,422
5,523
14,552

93,975 338,615

14,319
17,474
1,841
970
34,604 132,077

1,002,333
3,669,530
386,609
67,907

5,126,379 17,124,373

50,117
183,476
19,330
3,492

256,416 1,465,702

2,148
26,211
2,761
194

31,314 271,856

14,319
34,948
3,682
970

53,919 660,096

2,148
26,211
2,761
194

31,314 90,014
2,148
26,211
2,761
194

31,314 76,607.34

1,432
87,370
1,841
970

91,613 284,504

2,148
26,211
2,761
194

31,314 71,615

2,148
26,211
2,761
194

31,314 49,566

100,233
61,159
6,443
6,791

174,626 338,592

100,233
61,159
6,443
6,791
174,626 335,333

100,233
61,159
6,443
6,791

174,626 329,317

300,700
131,055
12,887
21,342

465,984 1,283,135

472,528
192,213
184
31,043

695,969 3,684,552

143,190
262,109
276,149
31,043

712,492 998,066
8,591
5,242
552
388

14,774 19,276

8,591
5,242
552
388

14,774 41,016

472,528
192,213

664,742 2,444,312

203,330
82,652
8,653
13,775

308,410 644,716

4,296
52,422
5,523
194

62,435 105,168

71,595
87,370
9,205
9,701

177,871 292,633

71,595
87,370
9,205
9,701

177,871 293,617.6

71,595
87,370
9,205
9,701

177,871 567,076

35,798
43,685
4,602
4,851

88,936 266,162

35,798
43,685
4,602
4,851

88,936 200,170

35,798
43,685
4,602
4,851

88,936 102,222

2,864
11,009
1,160
582

15,614 37,895
RENCANA ANGGARAN BIAYA (RAB)

NO. PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA

A Pekerjaan Tanah
1 Pekerjaan Persiapan
A. Pembersihan Lokasi m² 308.00 Rp 15,289 Rp 4,709,058
B. Pengukuran dan perhitungan bouwplank m 72.00 Rp 192,112 Rp 13,832,053
C. Direksi Keet & Gudang (Lantai Plesteran) m² 8.75 Rp 11,268,525 Rp 98,599,597
2 Galian dan Urugan
A. Galian pondasi menerus m³ 168.39 Rp 112,243 Rp 18,900,660
B. Galian pondasi setempat m³ 200.86 Rp 112,243 Rp 22,545,202
C. Urugan tanah kembali m³ 246.507 Rp 81,296 Rp 20,040,102
D. Urugan tanah bawah lantai m³ 110.42 Rp 81,296 Rp 8,977,060
E. Urugan pasir Bawah Pondasi m³ 18.47 Rp 239,913 Rp 4,431,192
F. Urugan pasir bawah kantai m³ 13.45 Rp 239,913 Rp 3,226,829
B Pekerjaan Pasangan
3 Pondasi
A. Pekerjaan aanstamping m² 28.34 Rp 512,710 Rp 14,530,213
B. Pasangan pondasi batu kali m² 26.47 Rp 968,120 Rp 25,626,138
4 Dinding
C. Bata merah 1/2 bata 1 Pc : 6 Ps m² 443.883 Rp 145,276 Rp 64,485,625
D. Plesteran dinding bata m² 787.666 Rp 95,121 Rp 74,923,501
E. Plesteran dinding trasram m² 483.82 Rp 89,352 Rp 43,230,463
F. Acian m² 1271.00 Rp 56,304 Rp 71,562,716
C Pekerjaan Beton
5 Lower ground
A. Pekerjaan lantai kerja m³ 7.034 Rp 1,190,439 Rp 8,373,551
B. Pondasi footplat m³ 26.8458 Rp 2,648,463 Rp 71,100,118
6 Upper ground
C. Sloof m³ 4.95 Rp 6,495,320 Rp 32,151,835
D. Balok m³ 7.016 Rp 8,589,747 Rp 60,265,667
E. Ring balok m³ 3.78 Rp 495,536 Rp 1,873,125
F. Kolom m³ 14.444 Rp 10,875,306 Rp 157,082,926
G. Tangga m³ 0.924915 Rp 1,184,350 Rp 1,095,423
H. Plat Lantai m³ 2.0988 Rp 1,184,350 Rp 2,485,713
D Pekerjaan Pembesian
7 Lower ground
A. Pembesian footplat kg 216.813 Rp 21,755 Rp 4,716,714
B. Bekesting footplat m² 19.992 Rp 477,367 Rp 9,543,514
8 Upper ground
C. Pembesian sloof kg 45.8789 Rp 21,755 Rp 998,084
D. Bekesting sloof m² 79.748 Rp 477,367 Rp 38,069,035
E. Pembesian balok kg 2,043.36 Rp 21,755 Rp 44,452,862
F. Bekesting balok m² 151.228 Rp 477,367 Rp 72,191,203
G. Pembesian kolom kg 156.43 Rp 21,755 Rp 3,403,096
H. Bekesting kolom m² 13.06 Rp 477,367 Rp 6,234,408
I. Pembesian kolom praktis kg 13.79 Rp 21,755 Rp 299,998
J. Bekestng kolom praktis m² 0.888 Rp 477,367 Rp 423,902
K. Pembesian ringbalk kg 157.87 Rp 21,755 Rp 3,434,401
L. Bekesting ringbalk m² 71.480 Rp 477,367 Rp 34,122,168
M. Pembesian plat lantai kg 18.698 Rp 21,755 Rp 406,770
N. Bekesting plat lantai m² 7.450 Rp 477,367 Rp 3,556,382
E Pekerjaan Atap
6 A. Nok 8/12 m² 0.0756 Rp 13,941,477 Rp 1,053,976
B. Jurai 8/12 m² 0.3167 Rp 138,273 Rp 43,791
C. Kuda-kuda 8/12 m² 1.39 Rp 20,701,758 Rp 28,775,444
D. Gording 8/1 m² 0.8906 Rp 13,941,477 Rp 12,416,279
E Genteng m² 1,237 Rp 209,980.82 Rp 259,746,270
F Peekerjaan Plafond
7 A. Rangka Plafond Kayu Jati lt 1 m² 42 Rp 338,615 Rp 14,221,825
B. Rangka Plafond Kayu Jati lt 2 m² 100.5 Rp 338,615 Rp 34,030,796
C. Penutup Plafond Plywood 30 x 60 cm m² 142.5 Rp 132,077 Rp 18,820,993
G PEKERJAAN PINTU, JENDELA & BV
8 A. Pekerjaan kusen pintu kayu jati kelas I m³ 1.03449 Rp 17,124,373 Rp 17,714,993
B. Pekerjaan kusen jendela kayu jati kelas I m³ 0.83996 Rp 17,124,373 Rp 14,383,788
C. Pekerjaan daun pintu m² 39.801 Rp 1,465,702 Rp 58,336,388
D. Pekerjaan daun jendela m² 31.1004 Rp 1,465,702 Rp 45,583,905
E. Pekerjaan kaca buah 67.00 Rp 271,856 Rp 18,214,336
F. Pekerjaan pintu kamar mandi m³ 0.1604 Rp 660,096 Rp 105,879
G. Pekerjaan engsel pintu buah 15 Rp 90,014 Rp 1,350,215
H. Pekerjaan engsel jendela buah 15 Rp 76,607 Rp 1,149,110
I. Pemasangan kunci buah 15 Rp 284,504 Rp 4,267,555
J. Pemasangan grendel pintu buah 15 Rp 71,615 Rp 1,074,224
K. Pemasangan grendel jendela buah 15 Rp 49,566 Rp 743,494
H PEKERJAAN LANTAI
9 A. Pas. Kramik Lantai 30 x 30 cm m² 14.31 Rp 335,333 Rp 4,798,613
B. Pas. Kramik Lantai 20 x 20 cm m² 9.5 Rp 338,592 Rp 3,216,626
C. Pas. Kramik Lantai 40 x 40 cm m² 177 Rp 329,317 Rp 58,289,039
I PEKERJAAN LISTRIK
10 A. Stop Kontak titik 12 Rp 292,633 Rp 3,511,590
C. Saklar Tunggal titik 7 Rp 293,618 Rp 2,055,323
D. Saklar Ganda titik 15 Rp 567,076 Rp 8,506,138
E. Lampu Xl18 Watt titik 43 Rp 266,162 Rp 11,444,984
F. Lampu TL20 Watt titik 4 Rp 200,170 Rp 800,679
G. Kabel m 58.88 Rp 102,222 Rp 6,018,833
J PEKERJAAN KAMAR MANDI DAN SANITAR
11 A. Bak Mandi Batu Bata Vol.0.3 m buah 2 Rp 1,283,135 Rp 2,566,270
B. kloset duduk buah 3 Rp 3,684,552 Rp 11,053,656
C. kloset Jongkok buah 1 Rp 998,066 Rp 998,066
D. Pipa air bersih 3/4" m 63.81 Rp 19,276 Rp 1,229,971
E. Pipa air kotor 4" m 18.5 Rp 41,016 Rp 758,792
F. Pipa air pembuangan 4" m 9.8 Rp 41,016 Rp 401,955
G. Septictank dan resapan buah 4 Rp 2,444,312 Rp 9,777,248
H. Bak Kontrol buah 6 Rp 644,716 Rp 3,868,295
I. Kran buah 12 Rp 105,168 Rp 1,262,021
K PEKERJAAN PENGECATAN
12 A. Cat dinding m² 1271.00 37,895.44 Rp 48,165,104
TOTAL Rp 1,756,657,773
No URAIAN PEKERJAAN PERHITUNGAN
I Pekerjaan Persiapan Volume Satuan
1 Pembersihan Lahan 308 m²
2 Pemasangan Bouwplank 72 m
3 Direksi keet dan bedeng 8.75 m²
II Pekerjaan Tanah
II.a Pekerjaan Galian
1 Galian Pondasi Menerus 168.39 m³
2 Galian Pondasi Setempat 200.86 m³
II.b Pekerjaan Urugan
1 Urugan Tanah Kembali 246.507 m³
2 Urugan Tanah Bawah Lantai 110.42 m³
3 Urugan Pasir Bawah Pondasi 18.47 m³
4 Urugan Pasir Bawah Lantai 13.45 m³
III Pekerjaan Pasangan
III.a Pondasi
1 Pasangan Pondasi 26.47 m²
2 Aanstamping 28.34 m²
III.b Dinding
1 Trasram 55.84 m²
2 Pasangan Dinding Bata 443.883 m²
IV Pekerjaan Plesteran dan Acian
1 Plesteran bata 787.666 m²
2 Plesteran trasram 483.82 m² 1271.486
3 Acian 1271 m²
V Pekerjaan Beton
V.a Lower Ground
1 Lantai Kerja 7.034 m³
2 Footplat 26.8458 m³
V.b Upper Ground
1 Sloof 4.95 m³
2 Kolom 14.444 m³
3 Balok 7.016 m³
4 Tangga 0.924915 m³
5 Ringbalk 3.78 m³
6 Kolom praktis 1.629 m³
7 Plat Lantai 2.0988
VI Pembesian dan Bekisting
VI.a Lower Ground
1 Pembesian Footplat 216.813 kg
2 Bekesting Footplat 19.992 m²
VI.b Upper Ground
1 Pembesian Sloof 45.8789 kg
Bekesting Sloof 79.748 m²
2 Pembesian Balok 2043.363 kg
Bekesting balok 151.228 m²
3 Pembesian Ringbalk 157.869 kg
Bekesting Ringbalk 71.48 m²
4 Pembesian Kolom 156.43 kg
Bekesting Kolom 13.06 m²
5 Pembesian Kolom Praktis 13.79 kg
Bekesting kolom praktis 0.888 m²
6 Pembesian Plat Lantai 18.698 kg
Bekesting Plat Lantai 7.45 m²
VII Pekerjaan Atap
1 Nok 8/12 0.0756 m²
2 Jurai 8/12 0.3167 m²
3 Kuda - kuda 8/12 1.39 m²
4 Gording 8/12 0.8906 m²
5 Genteng 1,237 m²
VIII Pekerjaan Plafond
1 Rangka Plafond lt 1 42 m²
2 Rangka Plafond lt 2 100.5 m²
3 Penutup Plafond 142.5 m²
IX Pekerjaan Kusen
1 Kusen Pintu 1.03449 m³
2 Kusen Jendela 0.83996 m³
X Daun Pintu dan Jendela, Kaca
1 Daun Pintu 39.801 m²
2 Daun Jendela 31.1004 m²
2 Kaca 67 buah
XI Pekerjaan Gantungan
1 Engsel Pintu 15 buah
2 Kunci Pintu 15 buah
3 Grendel Pintu 15 buah
4 Engsel Jendela 15 buah
5 Grendel Jendela 15 buah
XII Pekerjaan Keramik
1 Keramik 40 x 40 177 m²
2 Keramik 30 x 30 14.31 m²
3 Keramik 20 x 20 9.5 m²
XIII Pekerjaan Sanitasi dan Drainase
1 Pembuatan Septictank 2 buah
2 Pembuatan Sumur Resapan 2 buah
3 Pembuatan Bak Kontrol 6 buah
4 Pemasangan Kloset duduk 3 buah
5 Pemasangan Kloset jongkok 1 buah
6 Pemasangan Bak Mandi 2 buah
7 Pemasangan Kran 12 buah
8 Pipa Air bersih 3/4" 63.81 m
9 Pipa Air Kotor 4" 18.5 m
10 Pipa PVC pembuangan 4" 9.8 m
XIV Pekerjaan Instalasi Listrik
1 Stop Kontak 12 titik
2 Lampu Xl18 Watt 43 titik
3 Lampu TL20 Watt 4 titik
4 Saklar tunggal 7 titik
5 Saklar ganda 15 titik
XV Pekerjaan Pengecatan
1 Cat Dinding 1271 m²
Ketergantungan Kegiatan
Kode Kegiatan Predecessor Sucsecor
A Persiapan - B
B Galian dan Urugan A C
C Pekerjaan Pasangan B E,J
D Pekerjaan Beton C,E F,G
E Pekerjaan Pembesian dan Bekisting C D
F Pekerjaan Atap C,D G
G Pekerjaan Plafon C,F H,I,J
H Pekerjaan Kusen dan Jendela C -
I Pekerjaan Keramik D -
J Pekerjaan MEP C -
Aulia Kharisma Nabila P
2131310036 / 05
Produktivitas dan Durasi Pekerjaan
Jumlah Koefisien Durasi Pembulatan
No. Uraian Pekerjaan Volume Satuan Produktivitas
Pekerja Pekerja Pekerjaan Durasi
Pekerjaan Persiapan
1 Pembersihan Lokasi 308 m² 4 0.10 40.00 7.70 8
2 Pengukuran Bouwplank 72 m 3 0.10 30.00 2.40 3
3 Direksi Keet dan Gudang 8.75 m² 4 1.2 3.33 2.63 3
Pekerjaan Galian dan Urugan
4 Galian pondasi menerus 168.39 m³ 20 0.75 26.67 6.31 7
5 Galian pondasi setempat 200.86 m³ 20 0.75 26.67 7.53 8
6 Urugan tanah kembali 246.507 m³ 20 0.5 40.00 6.16 7
7 Urugan tanah bawah lantai 110.42 m³ 20 0.5 40.00 2.76 3
8 Urugan pasir Bawah Pondasi 18.47 m³ 4 0.3 13.33 1.39 2
9 Urugan pasir bawah kantai 13.45 m³ 4 0.3 13.33 1.01 1
Pekerjaan Pasangan
10 Pekerjaan aanstamping 28.43 m² 6 0.78 7.69 3.70 4
11 Pasangan pondasi batu kali 26.47 m 4 1.5 2.67 9.93 10
12 Bata merah 1/2 bata 1 Pc : 6 Ps 443.883 m² 10 0.3 33.33 13.32 14
13 Plesteran dinding bata 787.66 m² 15 0.3 50.00 15.75 16
14 Plesteran dinding trasram 483.82 m 15 0.3 50.00 9.68 10
15 Acian 1271 m² 15 0.2 75.00 17 17
Pekerjaan Beton
16 Pekerjaan lantai kerja 7.034 m³ 3 1.2 2.50 2.81 3
17 Pondasi footplat 26.8458 m³ 12 5.3 2.26 11.86 12
18 Sloof 4.95 m³ 7 5.7 1.23 4.03 4
19 Balok 7.016 m³ 7 6.4 1.09 6.41 7
20 Ring balok 3.78 m³ 2 0.3 6.67 1 1
21 Kolom 14.444 m³ 7 5.7 1.23 11.76 12
22 Tangga 0.9249 m³ 2 1.6 1.25 1 1
23 Plat Lantai 2.0988 m³ 2 1.6 1.25 1.6790 2
Pekerjaan Pembesian
21 Pembesian footplat 216.813 kg 20 1.6 12.50 17.35 17
22 Bekesting footplat 19.992 m² 5 0.6 8.33 2.40 3
23 Pembesian sloof 45.8789 kg 20 1.6 12.50 3.67 4
24 Bekesting sloof 79.748 m² 5 0.6 8.33 9.57 10
25 Pembesian balok 204.336 kg 20 1.6 12.50 16.35 16
26 Bekesting balok 151.228 m² 5 0.6 8.33 18.15 18
27 Pembesian kolom 156.43 kg 20 1.6 12.50 12.51 13
28 Bekesting kolom 13.06 m² 5 0.6 8.33 1.5672 2
29 Pembesian kolom praktis 13.79 kg 20 1.6 12.50 1.10 1
30 Bekestng kolom praktis 0.888 m² 5 0.6 8.33 0.11 1
31 Pembesian ringbalk 157.87 kg 20 1.6 12.50 12.63 13
32 Bekesting ringbalk 71.48 m² 5 0.6 8.33 8.58 9
33 Pembesian plat lantai 18.698 kg 20 1.6 12.50 1.50 2
34 Bekesting plat lantai 7.45 m² 5 0.6 8.33 0.89 1
Pekerjaan Atap
35 Nok 8/12 0.0756 m² 2 2.4 0.833 0.09 1
36 Jurai 8/12 0.3167 m² 2 0.4 5.00 0.06 1
37 Kuda-kuda 8/12 1.39 m² 4 4 1.00 1.39 2
38 Gording 8/1 0.8906 m² 3 2.4 1.25 1 1
39 Genteng 1,237 m² 15 0.2 75 16 16
Pekerjaan Plafond
39 Rangka Plafond Kayu Jati lt 1 42 m² 3 0.15 20.00 2.10 3
40 Rangka Plafond Kayu Jati lt 2 100.5 m² 3 0.15 20.00 5.03 5
41 Penutup Plafond Plywood 30 x 60 cm 142.5 m² 3 0.1 30.00 4.75 5
Pekerjaan Pintu,Jendela & BV
42 Pekerjaan kusen pintu kayu jati kelas I 1.03449 m³ 3 7 0.43 2.41 3
43 Pekerjaan kusen jendela kayu jati kelas I 0.893996 m³ 3 7 0.43 2.09 3
44 Pekerjaan daun pintu 39.801 m² 2 0.35 5.71 6.97 7
45 Pekerjaan daun jendela 31.1004 m² 2 0.35 5.71 5.44 6
46 Pekerjaan kaca 67 buah 2 0.015 133.33 0.50 1
47 Pekerjaan pintu kamar mandi 0.1604 m³ 2 0.1 20.00 0.01 1
48 Pekerjaan engsel pintu 15 buah 1 0.015 66.67 0.23 1
49 Pekerjaan engsel jendela 15 buah 1 0.015 66.67 0.23 1
50 Pemasangan kunci 15 buah 1 0.01 100 0.15 1
51 Pemasangan grendel pintu 15 buah 1 0.015 66.67 0.23 1
52 Pemasangan grendel jendela 15 buah 1 0.015 66.67 0.23 1
Pekerjaan Lantai
53 Pas. Kramik Lantai 30 x 30 cm 14.31 m² 5 0.7 7.14 2.00 2
54 Pas. Kramik Lantai 20 x 20 cm 9.5 m² 5 0.7 7.14 1.33 2
55 Pas. Kramik Lantai 40 x 40 cm 177 m² 7 0.7 10.00 17.70 18
Pekerjaan Listrik
56 Stop Kontak 12 titik 3 0.5 6.00 2.00 2
57 Saklar Tunggal 7 titik 3 0.5 6.00 1.17 2
58 Saklar Ganda 15 titik 3 0.5 6.00 2.50 3
59 Lampu Xl18 Watt 43 titik 3 0.25 12.00 3.58 4
60 Lampu TL20 Watt 4 titik 3 0.25 12.00 0.33 1
61 Kabel 58.88 m 3 0.25 12.00 4.91 5
Pekerjaan Kamar Mandi dan Sanitar
62 Bak Mandi Batu Bata Vol.0.3 m 2 buah 2 2.1 0.95 2.10 3
63 kloset duduk 3 buah 2 3.3 0.61 4.95 5
64 kloset Jongkok 1 buah 2 1 2.00 0.50 1
65 Pipa air bersih 3/4" 63.81 m 4 0.06 66.67 0.96 1
66 Pipa air kotor 4" 18.5 m 4 0.06 66.67 0.28 1
67 Pipa air pembuangan 4" 9.8 m 4 0.06 66.67 0.15 1
68 Septictank dan resapan 4 buah 4 3.3 1.21 3.30 4
69 Bak Kontrol 6 buah 4 1.42 2.82 2.13 3
70 Kran 12 buah 3 0.03 100 0.12 1
Pekerjaan Pengecatan
1 Cat dinding 1271 m² 6 0.02 300 4.24 7
No. Pekerjaan Durasi Pekerjaan Volume Harga Satuan Bobot
1 Pekerjaan Persiapan 14 388.75 Rp 11,475,926.39 333%
2 Pekerjaan Tanah 28 758.101 Rp 78,121,046.28 4417.7%
3 Pekerjaan Pasangan 28 554.533 Rp 104,641,976.69 4328.5%
4 Pekerjaan Plesteran dan Acian 43 2542.486 Rp 189,716,679.34 35980.4%
5 Pekerjaan Beton 42 66.623715 Rp 331,942,645.05 1649.7%
6 Pembesian dan Bekisting 110 2996.6879 Rp 221,852,538.17 49591.6%
7 Pekerjaan Atap 21 2.6729 Rp 42,289,489.81 8.4%
8 Pekerjaan Plafond 13 285 Rp 67,073,614.22 1425.9%
9 Pekerjaan Kusen 20 72.77585 Rp 136,124,953.42 739.0%
10 Pekerjaan Gantungan 6 75 Rp 26,798,934.92 149.9%
12 Pekerjaan Keramik 22 200.81 Rp 66,304,277.72 993.2%
13 Pekerjaan Sanitasi dan Drainase 20 120.11 Rp 31,916,274.03 286.0%
14 Pekerjaan Instalasi Listrik 17 81 Rp 32,337,547.74 195.4%
Rp 1,340,595,903.78 1000.98420206
Bar Chart dan Kurva S
Biaya Bobot Durasi
No. Kegiatan
(Rp) (%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 Pekerjaan Persiapan Rp 117,140,708.86 6.68 3.34 3.34
2 Pekerjaan Tanah Rp 78,121,046.28 4.45 1.11 1.11 1.11 1.11
3 Pekerjaan Pasangan Rp 104,641,976.69 5.97 1.49 1.49 1.49 1.49
4 Pekerjaan Plesteran dan Acian Rp 189,716,679.34 10.82 1.80 1.80 1.80 1.80 1.80 1.80
5 Pekerjaan Beton Pembesian dan Bekistin Rp 553,795,183.21 31.57 5.26 5.26 5.26 5.26 5.26 5.26
6 Pekerjaan Atap Rp 302,035,759.32 17.22 5.74 5.74 5.74
7 Pekerjaan Plafond Rp 67,073,614.22 3.82 1.91 1.91
8 Pekerjaan Kusen Rp 32,204,660.51 1.84 1.84
9 Daun Pintu dan Jendela, Kaca Rp 122,134,629.19 6.96 2.32 2.32 2.3208
10 Pekerjaan Gantungan Rp 8,584,598.65 0.49 0.49
11 Pekerjaan Keramik Rp 66,304,277.72 3.78 1.26 1.26 1.26
12 Pekerjaan Sanitasi dan Drainase Rp 31,916,274.03 1.82 0.61 0.61 0.61
13 Pekerjaan Instalasi Listrik Rp 32,337,547.74 1.84 0.61 0.61 0.61
14 Pekerjaan Pengecatan Rp 48,165,104 2.75 2.75
Total Rp 1,754,172,060.06 100.00
% Bobot 3.34 3.34 1.11 1.73 9.09 9.09 9.20 9.07 9.39 9.87 8.80 8.80 8.80 3.71 4.66
% Komulatif Bobot 3.34 6.68 7.79 9.52 18.61 27.69 36.89 45.96 55.35 65.22 74.02 82.83 91.63 95.34 100.00
NO. PEKERJAAN VOLUME HARGA SATUAN TOTAL

1 Pembersihan Lokasi 308.00 Rp 15,289 Rp 4,709,058


2 Pengukuran dan perhitungan bouwplank 72.00 Rp 220,929 Rp 15,906,861
3 Direksi Keet & Gudang (Lantai Plesteran) 8.75 Rp 11,268,525 Rp 98,599,597
4 Galian pondasi menerus 168.39 Rp 129,080 Rp 21,735,759
5 Galian pondasi setempat 200.86 Rp 129,080 Rp 25,926,983
6 Urugan tanah kembali 246.507 Rp 93,491 Rp 23,046,117
7 Urugan tanah bawah lantai 110.42 Rp 93,491 Rp 10,323,619
8 Urugan pasir Bawah Pondasi 18.47 Rp 238,522 Rp 4,405,499
9 Urugan pasir bawah kantai 13.45 Rp 238,522 Rp 3,208,120
10 Pekerjaan aanstamping 28.34 Rp 648,252 Rp 18,371,468
11 Pasangan pondasi batu kali 26.47 Rp 1,113,338 Rp 29,470,059
12 Bata merah 1/2 bata 1 Pc : 6 Ps 443.883 Rp 167,068 Rp 74,158,469
13 Plesteran dinding bata 787.666 Rp 103,706 Rp 81,685,538
14 Plesteran dinding trasram 483.82 Rp 102,755 Rp 49,715,032
15 Acian 1271.00 Rp 64,750 Rp 82,297,123
16 Pekerjaan lantai kerja 7.034 Rp 1,369,005 Rp 9,629,584
17 Pondasi footplat 26.8458 Rp 3,045,733 Rp 81,765,136
18 Sloof 4.95 Rp 7,447,229 Rp 36,863,784
19 Balok 7.016 Rp 9,828,953 Rp 68,959,937
20 Ring balok 3.78 Rp 644,215 Rp 2,435,133
21 Kolom 14.444 Rp 456,927 Rp 6,599,856
22 Tangga 0.924915 Rp 1,362,002 Rp 1,259,736
23 Pembesian footplat 216.813 Rp 25,018 Rp 5,424,221
24 Bekesting footplat 19.992 Rp 548,972 Rp 10,975,041
25 Pembesian sloof 45.8789 Rp 25,018 Rp 1,147,797
26 Bekesting sloof 79.748 Rp 548,972 Rp 43,779,391
27 Pembesian balok 2,043.36 Rp 25,018 Rp 51,120,792
28 Bekesting balok 151.228 Rp 548,972 Rp 83,019,884
29 Pembesian kolom 156.43 Rp 25,018 Rp 3,913,561
30 Bekesting kolom 13.06 Rp 548,972 Rp 7,169,570
31 Pembesian kolom praktis 13.79 Rp 25,018 Rp 344,998
32 Bekestng kolom praktis 0.888 Rp 548,972 Rp 487,487
33 Pembesian ringbalk 157.87 Rp 25,018 Rp 3,949,562
34 Bekesting ringbalk 71.480 Rp 548,972 Rp 39,240,493
35 Pembesian plat lantai 18.698 Rp 25,018 Rp 467,786
36 Bekesting plat lantai 7.450 Rp 548,972 Rp 4,089,839
37 Nok 8/12 0.0756 Rp 16,032,698 Rp 1,212,072
38 Jurai 8/12 0.3167 Rp 159,014 Rp 50,360
39 Kuda-kuda 8/12 1.39 Rp 22,502,085 Rp 31,277,898
40 Gording 8/1 0.8906 Rp 16,032,698 Rp 14,278,721
41 Rangka Plafond Kayu Jati lt 1 42 Rp 389,407 Rp 16,355,099
42 Rangka Plafond Kayu Jati lt 2 100.5 Rp 389,407 Rp 39,135,415
43 Penutup Plafond Plywood 30 x 60 cm 142.5 Rp 151,889 Rp 21,644,142
44 Pekerjaan kusen pintu kayu jati kelas I 1.03449 Rp 19,610,146 Rp 20,286,500
45 Pekerjaan kusen jendela kayu jati kelas I 0.83996 Rp 19,610,146 Rp 16,471,738
46 Pekerjaan daun pintu 39.801 Rp 1,685,557 Rp 67,086,846
47 Pekerjaan daun jendela 31.1004 Rp 1,685,557 Rp 52,421,491
48 Pekerjaan kaca 67.00 Rp 312,634 Rp 20,946,487
49 Pekerjaan pintu kamar mandi 0.1604 Rp 759,110 Rp 121,761
50 Pekerjaan engsel pintu 15 Rp 103,517 Rp 1,552,748
51 Pekerjaan engsel jendela 15 Rp 88,098 Rp 1,321,477
52 Pemasangan kunci 15 Rp 327,179 Rp 4,907,688
53 Pemasangan grendel pintu 15 Rp 82,357 Rp 1,235,358
54 Pemasangan grendel jendela 15 Rp 57,001 Rp 855,019
55 Pas. Kramik Lantai 30 x 30 cm 14.31 Rp 385,633 Rp 5,518,405
56 Pas. Kramik Lantai 20 x 20 cm 9.5 Rp 389,381 Rp 3,699,120
57 Pas. Kramik Lantai 40 x 40 cm 177 Rp 378,714 Rp 67,032,395
58 Stop Kontak 12 Rp 336,527 Rp 4,038,329
59 Saklar Tunggal 7 Rp 337,660 Rp 2,363,622
60 Saklar Ganda 15 Rp 652,137 Rp 9,782,059
61 Lampu Xl18 Watt 43 Rp 306,087 Rp 13,161,732
62 Lampu TL20 Watt 4 Rp 230,195 Rp 920,781
63 Kabel 58.88 Rp 117,555 Rp 6,921,658
64 Bak Mandi Batu Bata Vol.0.3 m 2 Rp 1,475,605 Rp 2,951,210
65 kloset duduk 3 Rp 4,237,235 Rp 12,711,704
66 kloset Jongkok 1 Rp 1,147,776 Rp 1,147,776
67 Pipa air bersih 3/4" 63.81 Rp 22,167 Rp 1,414,467
68 Pipa air kotor 4" 18.5 Rp 47,168 Rp 872,610
69 Pipa air pembuangan 4" 9.8 Rp 47,168 Rp 462,248
70 Septictank dan resapan 4 Rp 2,810,959 Rp 11,243,835
71 Bak Kontrol 6 Rp 741,423 Rp 4,448,540
72 Kran 12 Rp 120,944 Rp 1,451,324
TOTAL Rp 1,467,505,522