DEE Quality - Manual
DEE Quality - Manual
QUALITY REV: 0
MANUAL ISSUE: A
PAGE 1 of 29
Electrical engineering services including design, manufacture, repair, rewind, installations, supply and
stock electrical equipment and components for hazardous and non-hazardous areas.
Copy No…………
Issue A
Table of Contents
QA Manual Control
He shall ensure that the distribution control page and revision log sheets are complete for all
controlled copies of the QA Manual.
All holders of controlled copies of the QA Manual shall receive updated pages from the QA
Manager. They shall acknowledge receipt of these and destroy the superseded page(s).
The complete QA Manual shall be re-issued after a practical number of changes have been made.
Uncontrolled copies of the QA Manual shall not be subject to updating and can only be taken as
reflecting the Company’s Quality System at time of issue.
DOC: QM
QUALITY REV: 0
MANUAL ISSUE: A
PAGE 5 of 29
Distribution Control
List of holders
Each QA Manual shall be uniquely numbered on the title sheet of the Manual prior to issue to the
recipient.
Revisions
Revisions to the QA Manual shall be published as and when required. The revisions shall be made by
replacement of the applicable page(s). Each amended page shall be identified by a revision number.
The Revision Log Sheet shall indicate the revisions to the latest issue of the QA Manual and a
description of each change shall be noted on the log sheet.
Revisions are numbered consecutively until a new issue of the QA Manual incorporates all changes.
The QA Manual shall be formally reviewed at intervals of (12) months by the QA Manager to re-
affirm its adequacy to current Company requirements.
Introduction
Deebridge Electrical Engineers Limited, hereafter know as the “Company” was established in 1947
to provide an electrical engineering service to the industry in general.
The Company Management fully recognises the need to provide customers with the highest levels of
confidence in the products and service the Company provides and have therefore committed
themselves to implementing a Quality Management System. This manual describes the Quality
Assurance aspects of the Management System and complies with the requirements of the BS EN ISO
9001:2000.
The purpose of the Management System is to ensure that customer requirements are achieved in a
systematic, efficient and cost effective manner while observing the Company’s responsibilities
towards Health, Safety and the Environment.
DOC: QM
QUALITY REV: 0
MANUAL ISSUE: A
PAGE 8 of 29
Section 3
3.1 The following terms used in the QA Manual to describe the supply chain have been
changed to reflect the vocabulary used in the Quality Standard BS EN ISO
9001:2000
The term organisation replaces the term supplier used in ISO 9001:1994 and refers to the
unit which the standard applies.
The term ‘supplier’ now replaces the term ‘subcontractor’ and ‘vendors’.
DOC: QM
QUALITY REV: 0
MANUAL ISSUE: A
PAGE 9 of 29
Section 4
4.1.1 The Company shall establish, document, implement and maintain a Quality Management
System and continually improve its effectiveness in accordance with the requirements of BS
EN ISO 9001:2000.
4.1.2 Processes shall be identified and the sequence and their interaction mapped out. All
processes shall be planned, monitored and acceptance criteria determined using all necessary
resources and information to support these processes.
4.2.1 General
Level 1 QA Manual
b) The Company shall maintain a technical library of national and international standards
and specifications, manufacturers service manuals, plant and equipment manuals and
any other appropriate reference documents.
The QA Manual is a Level 1 document which shall address the specific requirements of the
Quality Standards BS EN ISO 9001:2000 and also meets the requirements of the Company’s
scope of work. The QA Manual will identify the Quality Procedures necessary to complete
the Quality System and provide confidence that the Company can fulfil its Quality Policy and
Objectives.
The Company can validate all processes and activities before the product is despatched,
therefore justifying the omission of section 7.5.2 from the QA Manual and Quality System.
Quality System documentation shall be approved by the QA Manager who shall ensure that
only current documents are distributed to and used by the relevant personnel.
A Document Master List and a Distribution List shall be maintained by the QA Manager who
shall ensure that listed documents are controlled.
Documents whether new or amended, shall be distributed by Transmittal Form which details
the document and page which has been amended.
Senior management shall approve all changes and or revisions to the Quality System. The
nature of the change and or revision shall be detailed on the Revision Log Sheet and shall
accompany the revised documents.
The QA Manager shall regularly audit all documentation and revisions to ensure that only
valid documents are being used. As per procedure QAP 04
DOC: QM
QUALITY REV: 0
MANUAL ISSUE: A
PAGE 11 of 29
Records are maintained in the department most suited to them in an environment, which
shall provide for maximum protection from damage, loss or deterioration and allow suitable
access for retrieval.
A procedure exists for the identification, storage, protection, retrieval, retention time and
disposition of records.
DOC: QM
QUALITY REV: 0
MANUAL ISSUE: A
PAGE 12 of 29
Section 5
It is the Managing Directors responsibility to ensure that the customers needs and
expectations have been determined and translated into customer requirements.
Management shall ensure that customer orders are reviewed to ascertain that the customers
needs and requirements can be fully satisfied. Where there are doubts the customer shall be
contacted and the problem resolved to the mutual satisfaction of both customer and the
Company.
DOC: QM
QUALITY REV: 0
MANUAL ISSUE: A
PAGE 13 of 29
It is Deebridge Electrical Engineers Ltd prime objective to continually improve the quality of
our performance, safely and reliability at all levels within the Company to ensure that our
product meets or exceeds customer requirements to their satisfaction, and meets the
objectives of ATEX Directive 1999 / 92 / EC.
The QA Manual has been formulated to serve as a reference base for the Quality Policy and
Objectives of Deebridge Electrical Engineers Ltd.
The Policy provides the framework for establishing Quality Objectives and shall be regularly
reviewed for suitability and effectiveness.
The Quality Assurance System based on the requirements of Quality Standard BS EN ISO
9001:2000 is designed to improve efficiency and reliability within our workplace so that our
customers have confidence that we can deliver products and service fit for purpose, on time
and compliant with stipulated codes and standards.
The QA Manager is responsible for the day-to-day running of the Quality System.
The Company shall provide adequate resources and well-maintained equipment to ensure the
Company’s objectives can be achieved.
The Company shall ensure that all employees are adequately trained and are directed towards
to compliance with the QA Manual and procedures as appropriate to their work activities.
It shall be the responsibility of the Managing Director to ensure that this Policy is understood
and implemented at all levels within the Company.
Managing Director
DOC: QM
QUALITY REV: 0
MANUAL ISSUE: A
PAGE 14 of 29
5.4 Planning
The Managing Director shall set out Quality Objectives, which in principle are to:
Detailed measurable objectives are set at the annual Management Review Meeting.
Management shall ensure that sufficient planning is in place to ensure that all activities,
processes and their interactions meet the requirements of the Quality Management System.
Worksheets are issued to specify which work has to be done and in what sequence,
identifying production processes, repairs, inspection and testing.
Suitable skilled resources and equipment have been identified.
Sales Orders, Worksheets, Jobsheets and Delivery Notes are maintained.
The Branch Manager shall establish and maintain a Company Organisation Chart shown in
Appendix A of this manual, which shows staff positions and lines of responsibility.
Job descriptions for each position shown on the organisation chart will be maintained. Job
descriptions shall clearly define general and specific quality responsibilities.
The Managing Director shall appoint a QA Manager who shall be responsible for the
administration of the Quality System on a day to day basis.
The QA Manager shall identify in-house verification requirements and ensure that there are
adequate resource in terms of documentation, procedures and work instructions for
managing performance of work and verification activities.
DOC: QM
QUALITY REV: 0
MANUAL ISSUE: A
PAGE 15 of 29
The QA Manager shall ensure that on request, such facilities and access is provided to
customers representatives as is necessary to ensure that the Quality System established is in
compliance with BS EN ISO 9001:2000
The Branch Manager shall ensure that all employees are aware of the Company Quality
Policy and have access to controlled copies of the QA Manual and quality procedures and
their responsibilities and authorities have been communicated to them to ensure the
effectiveness of the Quality Management System.
5.6.1 General
Management Review Meetings shall be held at intervals not exceeding twelve months to
review the operation and effectiveness of the Company Quality System.
The meeting shall be conducted in accordance with an agenda, which is detailed in the
‘Management Review Procedure’ and attended, by the Company’s top management.
Minutes of the meeting shall be maintained and held on file by the QA Manager.
During the Management Review Meeting the following information shall be reviewed.
a) The QA Manager will present the results of internal and external audits.
b) Customer feedback (including complaints).
c) Process performance (non-conformances).
d) Preventive and corrective actions taken.
e) Actions raised from the last management review.
f) Changes to the Quality System and any improvements.
g) Objectives
DOC: QM
QUALITY REV: 0
MANUAL ISSUE: A
PAGE 16 of 29
Follow the review of input information, management will decide and take actions where
necessary to:
a) Improve the effectiveness of the Quality System and any amendments necessary to
Quality Policy, Objectives, QA Manual and Procedures this shall be carried out by the
QA Manager to reflect the decisions of the Management Review Meeting.
d) Assess the needs of resources and any additional plant & equipment.
DOC: QM
QUALITY REV: 0
MANUAL ISSUE: A
PAGE 17 of 29
Section 6
The Company shall ensure that there are adequate resources in trained personnel for
managing performance of work and verification activities including internal quality audits.
6.2.1 General
All employees will be given the necessary training to fit their job description whether it be
education, on the job training or previous experience.
For each work activity the Company shall determine the level of competence necessary for
that activity and train staff accordingly, this can be by external courses or arrange for the
trainee to work alongside someone with required skills.
All new employees shall be given an induction on the Company’s H & S and Quality Systems
and made aware of their individual responsibilities.
Employees training records and annual appraisal of competence are maintained by the Branch
Manager.
Training records of ex-employees shall be retained.
6.3 Infrastructure
The Company has offices and workshops sufficient to perform the activities as described in
the Company’s scope of work. A well equiped workshop together with adequate mechanical
handling and transport facilities which can satisfy all customers requirements and needs.
Management recognises that the inbuilt qualities of its service are not solely the responsibility
of the quality organisation but it is a consequence of every employee’s activity and the
environment he or she works in. Suitable welfare facilities and personnel protective
equipment are provided, in keeping with the requirements of the Health and Safety at Work
Act 1974.
Safety audits and periodic reviews shall be carried out to ensure requirements are maintained.
Section 7
DOC: QM
QUALITY REV: 0
MANUAL ISSUE: A
PAGE 18 of 29
All activities, which are under taken to obtain product realisation, are planned from contract
review through to despatch.
Workshop Worksheet detail the requirements, and identifies production processes, repair,
inspection and testing. Inspection records, test certificates and delivery notes are prepared
and maintained to provide evidence that the product meets the customer requirements.
The Company shall identify the extent of the customer’s requirements, unspecified
requirements shall be addressed to ensure that the product is fit for purpose and meets EC
Directive requirements.
The Company shall ensure that all legal and regulatory requirements are met and included in
the specification. Updates are through SELECT, AEMT, trade magazines and professional
bodies.
The Company shall ensure that each order / contract is reviewed in accordance with the
contract review procedure to ascertain that the requirements are adequately defined and
documented. Where differences between requirements of the contract and those of the
tender exist, the customer shall be made aware of the differences, any problems being
resolved to the mutual satisfaction of both the Company and the customer.
The Company shall ensure it has the capability to meet contractual requirements and shall
identify any additional controls, equipment and skills that maybe required to satisfy the
contract.
Records of all contract reviews shall be maintained.
Tender / Quotation and any amendments are either faxed, e-mailed or posted to the
customer.
Any correspondence with a customer relating to a particular contract or job shall be kept in
the customer’s file.
All customer complaints shall be dealt with correctly and expeditiously
The results of the complaint investigation shall be recorded on a Customer Complaint Form
and communicated to the customer (if required).
Within Deebridge Electrical design refers to the manufacture of electrical control equipment
customised to meet clients requirements. Planning begins at the enquiry stage where
components are identified to meet the the clients specification.
Input requirements shall include the funtional and performance requirements for the
equipment specified. The Company shall ensure all statutory and regulatory requirements are
included in the design where necessary. Similar design information can be used to complete
design input.
From the inputs received, circuit drawing and and route sheets are prepared which will
monitor and control the process. Purchases and services required to develop the product
shall be specified. Acceptance criteria shall be as per inspection and tests specified on the
route sheet. Each piece of equipment will be despatched with a statement on the proper and
safe use of equipment.
During the assembly, continous inspection is carried out, each activity on the route sheet is
inspected and signed off by the person responsible for the next operation. Any problems shall
be reported and the necessary action taken.
DOC: QM
QUALITY REV: 0
MANUAL ISSUE: A
PAGE 20 of 29
A workshop checklist shall verify that all assembly activities, inspections and testing been
completed satisfactory, the checklist shall be signed by the Branch Manager or nominee.
A manufacture products shall be given a final test prior to despatch, to ensure the completed
product meets the requirements specified and the use which the client has requested.
Any changes to specifications or circuit drawings occuring during the production stages, shall
be recorded and only authorised after the change has been reviewed, verified and evaluated
against the effect of the change.
7.4 Purchasing
The QA Manager shall ensure that a formal Quality System is maintained for the purchasing
function, which includes evaluation of suppliers, review of purchasing data, receiving,
inspection and verification of purchased products and services.
The QA Manager shall ensure that a register of approved suppliers is maintained within the
Company.
Suppliers shall be accepted for approval if they satisfy any one of the criteria.
All purchases shall be made by an official Company purchase order, which contains all
relevant information to ensure that the supplier provides product or services in accordance
with the Company requirements.
The QA Manager shall periodically review purchase orders to ensure they contain data
clearly describing the product or service ordered and where appropriate any requirements for
approval or qualification of product.
DOC: QM
QUALITY REV: 0
MANUAL ISSUE: A
PAGE 21 of 29
All incoming material, which directly effects the quality of the product or service, shall be
segregated until their inspection status has been established. All equipment and materials shall
receive a goods inwards inspection to establish that accompanying documentation is correct,
that it matches the materials as specified on the purchase order and there is no apparent
damage.
An inspection criteria for goods received shall be established.
Where specified in the contract the customer or his representative shall be given the right to
verify that the sub-contracted service or product provided conforms to specified
requirements.
Where the Company’s customer specifies that the source inspection is required prior to
despatch the QA Manager shall liase with the supplier to arrange a timetable of inspection at
the suppliers premises.
Where source inspection is required it must be stated on the purchase order detailing type
and extent of inspection to be performed.
Management recognise that the inbuilt quality of its product and service is not solely the
responsibility of the quality department but it is a consequence of every employee’s activity.
Therefore it is a requirement of the management that the whole organisation shall be
responsible for providing a product and service to meet the customers requirements.
All orders received shall subject to a contract review before given a unique works order
number. For every works order number given a Job Sheet and Work Sheet shall be prepared
detailing all process activities required for completion of the required work.
The use of suitable equipment and the availability and use of monitoring and measuring
devices within a suitable working environment shall be provided to meet the requirements of
the order.
The work is carried out in compliance with relevant reference standards, specifications and
codes of practice.
Acceptance criteria for workmanship, which is stipulated to the greatest practical extent,
shall be written into procedures and drawings issued.
Equipment shall be well maintained to ensure continued process capability, reliability and
safety.
DOC: QM
QUALITY REV: 0
MANUAL ISSUE: A
PAGE 22 of 29
Delivery note shall be raised for all items being shipped describing the goods and delivery
instructions and signed by person responsible for the despatch of the goods.
The Company can validate all processes before the equipment leaves the Company premises.
All equipment is checked, inspected and or tested before being despatched, therefore this
clause does not apply.
Customers products are identified by a unique Works Order Number with labels attached to
the equipment. Traceability is maintained by recording the number on all applicable
documents.
All inspection and test records which give evidence that the product has passed inspection
and or test with defined acceptable criteria shall be placed in the relevant customers file.
All records shall identify the Company inspection authority responsible for the release of the
product.
Identification of the product status is by the signings the Work Sheet. Inspection, measuring
and test equipment status is by markings on the equipment and entry in the calibration
register.
Customer property in product owned by the customer and furnished to the Company for use
in meeting the requirements of the contract and is processed through the Company.
Customer property received for servicing, inspection, testing and or repair shall be allocated a
works order number, labelled and stored separately.
Any property received damaged or found unsuitable for repair, the customer shall be formally
notified.
The Company shall ensure products and equipment are handled, stored, packed, preserved
and delivered in such a way as not to adversely affect the conformity of the product and or
equipment.
Delivery note shall be raised for all items being shipped, describing the goods and clear
delivery instructions and signed by the person responsible for the despatch of the goods.
DOC: QM
QUALITY REV: 0
MANUAL ISSUE: A
PAGE 23 of 29
The Company shall control all inspection, measuring and test equipment, which is utilised to
control the quality of the product or service. All measuring equipment is logged in the
Measuring Equipment Register and a unique number allocated to each device.
A Calibration Record Card with a cross-reference to the register will show historical records
of the equipment control. Measuring equipment shall be calibrate at specific intervals, or
prior to use, against measurement standards traceable to international or national recognised
standards.
Equipment found to be out of calibration, the Company should assess and record the
validity of any previous inspection or test and its effect, a Failed Calibration Report
shall be raised detailing the deficiency and the faulty equipment quarantined until
repair, re-calibration or replacement.
Each hired or leased piece of measuring and test equipment that will effect the quality must
have a valid test certificate from the hiring company, a copy of which will be retained.
DOC: QM
QUALITY REV: 0
MANUAL ISSUE: A
PAGE 24 of 29
Section 8
8.1 General
The Company shall carry out inspection and testing activities in order to verify that the
customer’s requirements have been fully met. The Quality Management System shall be
reviewed to ensure conformity to the Quality Standard BS EN ISO 9001:2000.
The Company will monitor customer satisfaction through customer complaints or by job
completion questionnaire.
At every opportunity the Company’s Management and Sales Department will seek the option
of customers on the level of performance in meeting their requirements.
All findings shall be recorded and analysed.
The QA Manager shall ensure that a yearly quality Audit Plan is formatted to enable a
thorough review of all aspects of the Quality Management System, to ascertain that the QA
Policy, QA Manual and processes comply with the requirements of the Quality Standard BS
EN ISO 9001:2000 and the system is effectively implemented and maintained. Previous audit
results shall be compared to see if there are any trends.
The Audit Plan can be adjusted on an ongoing basis, as necessary, this enables weaker
elements of the Quality System to be audited more frequently.
a) Process to be audited.
c) Audit performed
The QA Manager shall prepare a checklist of those elements / activities to be audited. The
checklist shall be based on the requirements of the Quality Standard, QA Manual, Procedures
and Processes.
DOC: QM
QUALITY REV: 0
MANUAL ISSUE: A
PAGE 25 of 29
The findings of the audit shall be contained in the Audit Report and shall note any non-
conformances observed.
The auditee shall propose corrective action and submit it to auditor or the QA Manager for
approval.
e) Present audit reports and any corrective actions to the Management Review Meeting
The Company conducts regular audits to demonstrate that the requirements of the Quality
Standard are being complied with.
All processes can be monitored throughout therefore statistical process control is not
required.
Goods Receiving, in-process, final inspection and testing is carried out by the Company to
verify that the customer’s requirements have been met.
a) Receiving Inspection
All incoming equipment and materials which directly affects the quality of the product or
service shall be segregated and be given a goods inward inspection to establish that the
goods received are as per the purchase order and accompanying documentation. A check
shall be done for any apparent transit damage.
Where incoming products is released for urgent requirement prior to verification it shall
be positively identified, the minimum amount of inspection / testing established,
conducted and recorded, that the equipment may be recalled if proven necessary.
DOC: QM
QUALITY REV: 0
MANUAL ISSUE: A
PAGE 26 of 29
In-process inspections and tests are defined, as those needed to ensure that the in-
process activities have been completed satisfactorily. The inspection and tests to be
carried out shall be recorded on the Workshop Checklist.
Final inspections shall be carried out to ensure all previous inspections and test, including
those specified either on receipt of product or in process have completed.
Inspection and test shall be carried out against the appropriate work instructions,
National and International Standards, or customer specifications.
All inspection and test records which give evidence that the product has passed inspection
and or test with defined acceptance criteria shall be placed in the relevant customer file.
All non-conforming products from both external and internal sources shall be reported on a
Non-Conformance Report and logged in the Non-Conformance Register.
All non-conformities shall be quarantined, segregated (where possible) and labelled and an
investigation carried out as to how the non-conformance occurred.
The Branch Manager is responsible for all materials held in the quarantine and may only
remove the material under the following conditions and after informing the QA Manager.
a) When the corrective action related to the item has been cleared
b) When goods are returned to the supplier for replacement or credit
c) Under cover on concession
d) When the material is scrapped
e) When the appropriate certification becomes available
f) After suitable in-house repair and re-inspection
As per Procedure QAP 13
The Company will gather and analyse data from several sources to determine the
effectiveness of the Quality Management System and the system compliance to specified
requirements.
Data sources:
DOC: QM
QUALITY REV: 0
MANUAL ISSUE: A
PAGE 27 of 29
• Internal Audits
• Non-Conformances
• Customer Complaints
• Suppliers Performances
• Customer Satisfaction Questionnaire
• Process Operation Trends
8.5 Improvement
The Company shall strive to continually improve the effectiveness of the Quality
Management System through the use of:
• Quality Policy
• Quality Objectives
• Audit Results
• Corrective and Preventive Actions
• Management Review
The Management shall determine what action is necessary to eliminate the causes of potential
non-conformities. This is achieved by continuous training and retraining, carrying out risk
assessments on all activities, toolbox talks with employees and to ensure maintenance
schedules are up to date for all plant and equipment.
Result of all corrective and preventive actions shall be summarised and presented as part of
the Management Review of the Quality System by the QA Manager.
CODE TITLE
QAP 06 Purchasing
QAP 18 Training