The document provides a tentative cement consumption statement for construction of various buildings and structures for a new district jail. It lists 107 items with descriptions, quantities, cement factors, and theoretical cement consumption for each. The total estimated cement consumption is over 100,000 bags.

Uploaded by

Pratik Diyora
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
140 views9 pages

53 CC District Jail at Shahera

The document provides a tentative cement consumption statement for construction of various buildings and structures for a new district jail. It lists 107 items with descriptions, quantities, cement factors, and theoretical cement consumption for each. The total estimated cement consumption is over 100,000 bags.

Uploaded by

Pratik Diyora
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

GUJARAT STATE POLICE HOUSING CORPORATION LTD.

DIVISION : GODHRA

NAME OF WORK : Construction of Residential & Non Residential Building Such As Male
Barrack(G+2) (2 Nos), Female Barrack, Main Entry Gate with Guard Room, Watch Tower,
S.R.P. Barrack with Kitchen & Dinning, Hospital Building, RO Plant, Cat. B-36, C-12 & D-02,
Hardcore Cell, 21’, 18’ & 14’ RCC Compound wall, Kitchen Grain Store, Loundry, Cloths
Store & Barber Shop, Admin Office, Sump & Pump Room, Flag post, Wellfare Office,
Visitor, Nagrik Suvidha Kendra, Toilet Block, RO Plant Room, Rain Water Storm System,
External Water Supply Distribution, Drainage Network, UG Sump, Over Head Water Tank
of RB & NRB Building, Study Center, Library & Indoor Games, Cultural/Meditation,
Vocational Training Hall, Santri Box (2 Nos), Generator Room, Anganwadi, Mentron office,
Legal Aid Clinic & Vocational Training, Canteen, Open Air Theator Audotorium, Industrial
Shed, RCC Trimix Road, Area Development, Barrack Concrete (Inside), Paver Block,
Cutting and Filling for Plot & Remaining Compound Wall, Pipe Culvert , Fire Fighting
System, Parking Shed, Sewage Treatment Plant & Rain Water Harvesting in New District
Jail at Shahera, Dist. Panchmahal. [Including Electrical Works] [Two Cover Bid]

Tentative Cement Consumption Statement

It. Description of Item Qty Cement Theoriticaul


No Factor Consumption

18 1:5:10 F & P Stone Aggregate 661.75 2.60 1720.55

19 1:4:8 F & P 2229.00 3.40 7578.60

20 1:3:6 F & P Stone Aggregate 1029.00 4.40 4527.60

21 1:2:4 F & P 40.00 5.80 232.00

22 RMC M-150 F & P 745.40 5.80 4323.32

23 RMC M-150 Wall 347.75 5.80 2016.95

24 RMC M-200 Coping 173.25 7.20 1247.40

25 RMC M-200 Column upto Plinth 4.00 7.20 28.80

26 1:4:8 Column for Any Height 4.00 3.40 13.60

27 RMC M-200 F & P 2227.00 7.20 16034.40


It. Description of Item Qty Cement Theoriticaul
No Factor Consumption

28 RMC M-200 Column Ground Floor 395.90 7.20 2850.48

29 RMC M-200 Column 1st Floor 160.80 7.20 1157.76

30 RMC M-200 Column 2nd Floor 130.50 7.20 939.60

31 RMC M-200 Column 3rd Floor 20.50 7.20 147.60

32 RMC M-200 Column 4th Floor 5.50 7.20 39.60

33 RMC M-200 Beam Ground Floor 517.60 7.20 3726.72

34 RMC M-200 Beam 1st Floor 215.00 7.20 1548.00

35 RMC M-200 Beam 2nd Floor 166.00 7.20 1195.20

36 RMC M-200 Beam 3rd Floor 22.50 7.20 162.00

37 RMC M-200 Beam 4th Floor 10.50 7.20 75.60

38 RMC M-200 Slab Ground Floor 10-13 446.70 7.20 3216.24

39 RMC M-200 Slab 1st Floor 10cm to 122.00 7.20 878.40


13cm
40 RMC M-200 Slab 2nd Floor 10cm to 92.00 7.20 662.40
13cm
41 RMC M-200 Slab 3rd Floor 10cm to 16.50 7.20 118.80
13cm
42 RMC M-200 Slab 4th Floor 10cm to 19.50 7.20 140.40
13cm
43 RMC M-200 Slab Ground Floor 13cm- 333.50 7.20 2401.20
15cm
44 RMC M-200 Slab 1st Floor 13cm-15cm 170.90 7.20 1230.48

45 RMC M-200 Slab 2nd Floor 13cm- 143.00 7.20 1029.60


15cm
46 RMC M-200 Slab 3rd Floor 13cm- 13.00 7.20 93.60
15cm
47 RMC M-200 Lintel Ground Floor 313.80 7.20 2259.36
It. Description of Item Qty Cement Theoriticaul
No Factor Consumption

48 RMC M-200 Lintel 1st Floor 37.50 7.20 270.00

49 RMC M-200 Lintel 2nd Floor 32.50 7.20 234.00

50 RMC M-200 Lintel 3rd Floor 7.50 7.20 54.00

51 RMC M-200 Lintel Bend Ground Floor 89.00 7.20 640.80

52 RMC M-200 Lintel Bend 1st Floor 9.00 7.20 64.80

53 RMC M-200 Lintel Bend 2nd Floor 2.00 7.20 14.40

54 RMC M-200 Chhajja 127.60 8.66 1105.02


G+1
55 RMC M-200 Staircase Floor G+1 59.50 7.20 428.40

56 RMC M-200 Wall G+1 3477.00 7.20 25034.40

57 RMC M-200 Fins All Floor 32.50 7.20 234.00

58 RMC M-250 Footing 3845.05 7.60 29222.38

59 RMC M-250 Col. Upto plinth 390.40 7.60 2967.04

60 RMC M-250 Plinth Beam 581.80 7.60 4421.68

61 RMC M-250 Coping 37.00 7.60 281.20

62 RMC M-250 Col. Ground Floor 93.60 7.60 711.36

63 RMC M-250 Col. 1st Floor 88.00 7.60 668.80

64 RMC M-250 Col. 2nd Floor 88.00 7.60 668.80

65 RMC M-250 Col. 3rd Floor 88.00 7.60 668.80

66 RMC M-250 Col. 4th Floor 15.00 7.60 114.00

67 RMC M-250 Col. 5th Floor 4.00 7.60 30.40


It. Description of Item Qty Cement Theoriticaul
No Factor Consumption

68 RMC M-250 Beam GF 109.00 7.60 828.40

69 RMC M-250 Beam 1st Floor 112.00 7.60 851.20

70 RMC M-250 Beam 2nd Floor 112.00 7.60 851.20

71 RMC M-250 Beam 3rd Floor 112.00 7.60 851.20

72 RMC M-250 Beam 4th Floor 14.00 7.60 106.40

73 RMC M-250 Slab GF 10 to 13 405.11 7.60 3078.84

74 RMC M-250 Slab 1st Floor 10 to 13 210.00 7.60 1596.00

75 RMC M-250 Slab 2nd Floor 10 to 13 210.00 7.60 1596.00

76 RMC M-250 Slab 3rd Floor 10 to 13 210.00 7.60 1596.00

77 RMC M-250 Slab 4th Floor 10 to 13 15.00 7.60 114.00

78 RMC M-250 Slab GF 13 to 15 15.00 7.60 114.00

79 RMC M-250 Slab 1st Floor 13 to 15 8.00 7.60 60.80

80 RMC M-250 Slab 2nd Floor 13 to 15 8.00 7.60 60.80

81 RMC M-250 Slab 3rd Floor 13 to 15 8.00 7.60 60.80

82 RMC M-250 Slab 4th Floor 13 to 15 15.00 7.60 114.00

83 RMC M-250 Lintel GF 0.10 7.60 0.76

84 RMC M-250 Lintel 1st Floor 6.00 7.60 45.60

85 RMC M-250 Lintel 2nd Floor 6.00 7.60 45.60

86 RMC M-250 Lintel 3rd Floor 6.00 7.60 45.60

87 RMC M-250 Lintel Bend GF 0.60 7.60 4.56


It. Description of Item Qty Cement Theoriticaul
No Factor Consumption

88 RMC M-250 Chhajja 0.60 9.06 5.44

89 RMC M-250 Staircase 57.00 7.60 433.20

90 RMC M-250 Wall 3053.30 7.60 23205.08

91 RMC M-300 Footing 128.83 8.20 1056.41

92 RMC M-300 Foundation Wall 200.96 8.20 1647.87

93 RMC M-300 Column upto Plinth 7.74 8.20 63.47

94 RMC M-300 GF Slab 13 to 15cm thick 47.55 8.20 389.91

95 RMC M-300 GF beam 14.08 8.20 115.46

96 RMC M-300 Staicase 2.50 8.20 20.50

97 RMC M-300 Dom Slab 8.20 8.20 67.24

100 BW F & P 2424.30 1.20 2909.16

101 BW GF 2620.80 1.20 3144.96

102 BW 1st Floor 1201.00 1.20 1441.20

103 BW 2nd Floor 1087.00 1.20 1304.40

104 BW 3rd Floor 463.00 1.20 555.60

105 BW 4th Floor 150.00 1.20 180.00

106 BW 5th Floor 14.00 1.20 16.80

107 Half BW F & P 3.00 0.21 0.63

108 Half BW GF 1037.00 0.21 217.77

109 half BW 1st Floor 1232.00 0.21 258.72


It. Description of Item Qty Cement Theoriticaul
No Factor Consumption

110 half BW 2nd Floor 1207.00 0.21 253.47

111 half BW 3rd Floor 1065.00 0.21 223.65

112 10mm thick Ceilling Plaster in CM 1:3 7190.00 0.16 1150.40


for GF
113 10mm thick Ceilling Plaster in CM 1:3 3103.00 0.16 496.48
for 1st Floor
114 10mm thick Ceilling Plaster in CM 1:3 2654.00 0.16 424.64
for 2nd Floor
115 10mm thick Ceilling Plaster in CM 1:3 1404.00 0.16 224.64
for 3rd Floor
116 10mm thick Ceilling Plaster in CM 1:3 127.00 0.16 20.32
for 4th Floor
117 10mm thick Ceilling Plaster in CM 1:3 36.00 0.16 5.76
for 5th Floor
118 15mm thick Wall Plaster GF 18760.00 0.17 3189.20

119 15mm thick Wall Plaster 1st Floor 9085.00 0.17 1544.45

120 15mm thick Wall Plaster 2nd Floor 7987.00 0.17 1357.79

121 15mm thick Wall Plaster 3rd Floor 4825.00 0.17 820.25

122 15mm thick Wall Plaster 4th Floor 933.00 0.17 158.61

123 20mm sand faced plaster 7178.00 0.34 2440.52

124 Texture Plaster 35806.00 0.23 8235.38

125 10 mm thick cement PLASTER in 1534.00 0.16 245.44


WATER PROFFING for 1st Floor
128 Cement VATA 2972.70 0.05 148.64

129 IPS 50mm thick 546.00 0.36 196.56

130 P & Fixing Telphonic Granite 18mm 1268.60 0.24 304.46


thick for Sill & Jamb
It. Description of Item Qty Cement Theoriticaul
No Factor Consumption

131 Telephone Black Granite Flooring 130.00 0.24 31.20

132 Telephone Black Granite Riser 53.00 0.25 13.25

133 Granite Shelves 2.00 0.05 0.10

134 Granite Takti 11.00 0.05 0.55

135 P & L 24" x 24" Double Charge 6666.00 0.21 1399.86


Vitrified Tiles 8 to 10 mm thick
Flooring
136 P & L 24" x 24" Double Charge 715.00 0.19 135.85
Vitrified Tiles 8 to 10 mm thick
Skirting
137 Anti Skid Vitrified Tiles Flooring 7.00 0.21 1.47

138 ANTI SKID Ceramic Tiles FLOORING 948.00 0.21 199.08

139 Printed / Coloured Glazed TILES for 4853.00 0.19 922.07


DADO
140 P & Laying 25mm thick PRE 4143.80 0.24 994.51
POLISHED KOTA STONE Flooring
141 P & Fixing 25mm thick PRE POLISHED 491.00 0.25 122.75
KOTA STONE for Skirting

142 P & Fixing Double Side Polished Kota 981.00 0.05 49.05
Stone Shelves
143 Rough Kota Stone Flooring 2411.00 0.24 578.64

146 China Mosaic with Brick Bat 6688.00 0.80 5350.40

147 China Mosaic Acrylic Polymer 318.50 0.47 149.70

186 Nanhi Trap 21.00 0.05 1.05

187 Multi Trap 421.00 0.05 21.05

188 Gully trap 190.00 0.46 87.40

189 IC 455 X 610 195.00 2.26 440.70


It. Description of Item Qty Cement Theoriticaul
No Factor Consumption

190 IC 600X 850 86.00 3.28 282.08

191 Extra over above item 455 x 610 168.00 0.26 43.68

192 Extra over above item 600 x 850 mm 112.00 0.34 38.08

193 NP2 Pipe 150mm dia 83.00 0.05 4.15

194 NP2 Pipe 600mm dia 600.00 0.06 36.00

195 NP3 Pipe 900mm dia 78.00 0.09 7.02

196 NP3 Pipe 300mm dia 1450.00 0.05 72.50

199 Wall Hung WC 207.00 0.05 10.35

200 Orriss type WC Pan 30.00 0.75 22.50

201 urinal 48.00 0.05 2.40

202 Wash Basin Category C & Above 173.00 0.05 8.65

203 Wash Basin Categor B 108.00 0.05 5.40

232 Kerb Stone 30cm Height 15cm thick 1311.00 0.05 65.55

249 RMC M-300 for Trimix Road 4040.00 8.20 33128.00

294 Providing and casting in situ mass


Cement Concrete in Grade M 10
With Formwork 4.00 4.40 17.60

Without Formwork 133.16 4.40 585.90

301 20mm Water Proof Plaster 345.00 0.23 79.35

316 Constructing manhole with A Type

Manhole A Type 1200mm dia upto 61.00 6.30 384.30


1.00 mt Depth
It. Description of Item Qty Cement Theoriticaul
No Factor Consumption

Extra Over Manhole A Type 1200mm 15.21 2.04 31.03


dia upto 1.50 me Depth
317 Constructing manhole with B Type

Manhole B Type 1500mm dia from 25.00 8.88 222.00


1.50mt to 3.0mt Depth
Extra Manhole B Type 1500mm dia 14.75 2.54 37.47
from 1.50mt to 3.0mt Depth
318 Constructing manhole with C Type

Manhole C Type 1500mm dia from 12.00 12.25 147.00


4.00mt to 6.0mt Depth
Extra Over Manhole C Type 1500mm 16.79 3.05 51.21
dia from 4.00mt to 6.0mt Depth
319 P & Constructing Vertical Drop
Manhole
Vertical Drop arr. Above upto 0.60m 10.00 15.76 157.60
ht
Extra over Above for Add. Drop 13.15 3.40 44.71
beyond 0.6m

Total Bags of Cement. 245909.96

Say Bags of Cement. 245910.00

Deputy Executive Engineer, I/C Executive Engineer,


Gujarat State Police Housing Corp. Ltd. Gujarat State Police Housing Corp. Ltd.
Godhra Godhra