User Manual
Contents
1. Safety Introductions ………………………………………………… 01
2. Product instructions ………………………………………………… 01-04
2.1 Product Overview
2.2 Product Size
2.3 Product Features
2.4 Basic System Architecture
3. Installation …………………………………………………………… 05-25
3.1 Parts list
3.2 Mounting instructions
3.3 Battery connection
3.4 Grid connection and backup load connection
3.5 PV Connection
3.6 CT Connection
3.6.1 Meter Connection
3.7 Earth Connection(mandatory)
3.8 WIFI Connection
3.9 Wiring System for Inverter
3.10 Wiring diagram
3.11 Typical application diagram of diesel generator
3.12 phase parallel connection diagram
4. OPERATION …………………………………………………………… 26
4.1 Power ON/OFF
4.2 Operation and Display Panel
5. LCD Display Icons …………………………………………………… 27-39
5.1 Main Screen
5.2 Solar Power Curve
5.3 Curve Page-Solar & Load & Grid
5.4 System Setup Menu
5.5 Basic Setup Menu
5.6 Battery Setup Menu
5.7 System Work Mode Setup Menu
5.8 Grid Setup Menu
5.9 Generator Port Use Setup Menu
5.10 Advanced Function Setup Menu
5.11 Device Info Setup Menu
6. Mode …………………………………………………………………… 39-40
7. Limitation of Liability ……………………………………………… 40-44
8. Datasheet ……………………………………………………………… 45-46
9. Appendix I …………………………………………………………… 47-48
10. Appendix II …………………………………………………………… 49
About This Manual
The manual mainly describes the product informa�on, guidelines for installa�on, opera�on and
maintenance. The manual cannot include complete informa�on about the photovoltaic (PV)
system.
1. Safety Introduc�ons
· This chapter contains important safety and opera�ng instruc�ons. Read and keep this manual
for future reference.
· Before using the inverter, please read the instruc�ons and warning signs of the ba�ery and
corresponding sec�ons in the instruc�on manual.
· Do not disassemble the inverter. If you need maintenance or repair, take it to a professional
service center.
· Improper reassembly may result in electric shock or fire.
· To reduce risk of electric shock, disconnect all wires before a�emp�ng any maintenance or
cleaning. Turning off the unit will not reduce this risk.
· Cau�on: Only qualified personnel can install this device with ba�ery.
· Never charge a frozen ba�ery.
· For op�mum opera�on of this inverter, please follow required specifica�on to select appropriate
cable size. It is very important to correctly operate this inverter.
· Be very cau�ous when working with metal tools on or around ba�eries. Dropping a tool may
cause a spark or short circuit in ba�eries or other electrical parts, even cause an explosion.
· Please strictly follow installa�on procedure when you want to disconnect AC or DC terminals.
Please refer to "Installa�on" sec�on of this manual for the details.
· Grounding instruc�ons - this inverter should be connected to a permanent grounded wiring
system. Be sure to comply with local requirements and regula�on to install this inverter.
· Never cause AC output and DC input short circuited. Do not connect to the mains when DC
input short circuits.
2. Product Introduc�on
This is a mul�func�onal inverter, combining func�ons of inverter, solar charger and ba�ery
charger to offer uninterrup�ble power support with portable size. Its comprehensive LCD display
offers user configurable and easy accessible bu�on opera�on such as ba�ery charging, AC/solar
charging, and acceptable input voltage based on different applica�ons.
- 01 -
2.1 Product Overview
1
2
3
4
5 8
6 9
7 10
11
14
12
15 13
18 17
16
- 02 -
2.2 Product Size
Inverter Size
Moun�ng bracket
- 03 -
2.3 Product Features
- 230V/400V Three phase Pure sine wave inverter.
- Self-consump�on and feed-in to the grid.
- Auto restart while AC is recovering.
- Programmable supply priority for ba�ery or grid.
- Programmable mul�ple opera�on modes: On grid, off grid and UPS.
- Configurable ba�ery charging current/voltage based on applica�ons by LCD se�ng.
- Configurable AC/Solar/Generator Charger priority by LCD se�ng.
- Compa�ble with mains voltage or generator power.
- Overload/over temperature/short circuit protec�on.
- Smart ba�ery charger design for op�mized ba�ery performance
- With limit func�on, prevent excess power overflow to the grid.
- Suppor�ng WIFI monitoring and build-in 2 strings for 1 MPP tracker, 1 string for 1 MPP tracker.
- Smart se�able three stages MPPT charging for op�mized ba�ery performance.
- Time of use func�on.
- Smart Load Func�on.
AC cable DC cable
WiFI
GPRS
CT
- 04 -
3. Installa�on
3.1 Parts List
Check the equipment before installa�on. Please make sure nothing is damaged in the package.
You should have received the items in the following package:
SET ESC
User
manual
- 05 -
3.2 Moun�ng instruc�ons
Installa�on Precau�on
This Hybrid inverter is designed for outdoor use(IP65), Please make sure the installa�on site
meets below condi�ons:
· Not in direct sunlight
· Not in areas where highly flammable materials are stored.
· Not in poten�al explosive areas.
· Not in the cool air directly.
· Not near the television Antenna or antenna cable.
· Not higher than al�tude of about 2000 meters above sea level.
· Not in environment of precipita�on or humidity(>95%)
Please AVOID direct sunlight, rain exposure, snow laying up during installa�on and
opera�on. Before connec�ng all wires, please take off the metal cover by removing
screws as shown below:
- 06 -
≥500mm
≥500mm
For proper air circula�on to dissipate heat, allow a clearance of approx. 50cm to the side and
approx. 50cm above and below the unit. And 100cm to the front.
- 07 -
3.3 Ba�ery connec�on
For safe opera�on and compliance, a separate DC over-current protector or disconnect device is
required between the ba�ery and the inverter. In some applica�ons, switching devices may not
be required but over-current protectors are s�ll required. Refer to the typical amperage in the
table below for the required fuse or circuit breaker size.
Orange Black
Pic 3.1 BAT+ plug connector Pic 3.2 BAT- plug connector
Safety Hint:
Please use approved DC cable for ba�ery system.
Cross section(mm )
Model
Range Recommended value
25/30/40/50KW 16.0~25.0
16.0(6AWG)
(6~4AWG)
Chart 3-2
The steps to assemble the ba�ery plug connectors are listed as follows:
a) Pass the cable through the terminal. (as shown in picture 3.3)
Pic 3.3
- 08 -
b) Put on the rubber ring. (as shown in picture 3.4)
Pic 3.4
Pic 3.5
Pic 3.6
e)Fasten the terminal with outer cover. (as shown in picture 3.7)
Pic 3.7
- 09 -
3.3.2 Func�on port defini�on
Inverter
CN1 CN2
Meter Parallel_1 Parallel_2 CAN DRM BMS1 BMS2 RS485
1 2 3 4 5 6 7 8 9 10 1112 1 2 3 4 5 6 7 8 9 10 1112
SHUT DOWN
B B
CN2:
G-start (1,2): dry contact signal for startup the
diesel generator.
When the "GEN signal" is ac�ve, the open contact coil
(GS) will switch on (no voltage output). open
relay
DRY-1 (3,4): reserved. contact
DRY-2 (5,6): reserved.
RSD (7,8): When ba�ery is connected and the G S
inverter is in "ON" status, it will provide 12Vdc.
GS (diesel generator startup signal)
- 10 -
3.4 Grid connec�on and backup load connec�on
· Before connec�ng to grid, please install a separate AC breaker between inverter and grid. Also,
it is recommended that installs an AC breaker between backup load and inverter.This will ensure
the inverter can be securely disconnected during maintenance and fully protected from over
current. For the 25/30/40/50KW model, the recommended AC breaker for backup load is
180A. For the 25/30/40/50KW model, the recommended AC breaker for grid is 180A.
· There are three terminal blocks with "Grid" "Load"and "GEN" markings. Please do not misconnect
input and output connectors.
Grid connec�on
Cross section(mm )
Model
Range Recommended value
70~95
25/30/40/50KW 70(2/0AWG)
(2/0~3/0AWG)
Please follow below steps to implement Grid, load and Gen port connec�on:
1. Before making Grid, load and Gen port connec�on, be sure to turn off AC breaker or
disconnector first.
2. Remove insula�on sleeve 10mm length, insert the wires according to polari�es indicated on
the terminal block. Make sure the connec�on is complete.
L3
L2 GEN
N L1
GRID
E-BAR
PE
LOAD E-BAR
- 11 -
Be sure that AC power source is disconnected before a�emp�ng to wire it to the
unit.
3. Then, insert AC output wires according to polari�es indicated on the terminal block and �ghten
terminal. Be sure to connect corresponding N wires and PE wires to related terminals as well.
4. Make sure the wires are securely connected.
5. Appliances such as air condi�oner are required at least 2-3 minutes to restart because it is
required to have enough �me to balance refrigerant gas inside of circuit. If a power shortage
occurs and recovers in short �me, it will cause damage to your connected appliances. To
prevent this kind of damage, please check manufacturer of air condi�oner if it is equipped with
�me-delay func�on before installa�on. Otherwise, this inverter will trigger overload fault and
cut off output to protect your appliance but some�mes it s�ll causes internal damage to the air
condi�oner
3.5 PV Connec�on
Before connec�ng to PV modules, please install a separately DC circuit breaker between
inverter and PV modules. It is very important for system safety and efficient opera�on to
use appropriate cable for PV module connec�on.
To avoid any malfunc�on, do not connect any PV modules with possible leakage
current to the inverter. For example, grounded PV modules will cause leakage
current to the inverter. When using PV modules, please ensure the PV+ & PV-
of solar panel is not connected to the system ground bar.
It is requested to use PV junc�on box with surge protec�on. Otherwise, it will
cause damage on inverter when lightning occurs on PV modules.
- 12 -
3.5.1 PV Module Selec�on:
When selec�ng proper PV modules, please be sure to consider below parameters:
1) Open circuit Voltage (Voc) of PV modules can not exceed max. PV array open circuit voltage of
inverter.
2) Open circuit Voltage (Voc) of PV modules should be higher than min. start voltage.
3) The PV modules used to connected to this inverter shall be Class A ra�ng cer�fied according
to lEC 61730.
Safety Hint:
When using PV modules, please ensure the PV+ & PV- of solar panel is not
connected to the system ground bar.
Safety Hint:
Before connec�on, please make sure the polarity of PV array matches the
“DC+” and “DC-” symbols.
Safety Hint:
Before connec�ng inverter, please make sure the PV array open circuit voltage is
within the 1000V of the inverter.
Pic 5.1 DC+ male connector Pic 5.2 DC- female connector
- 13 -
Safety Hint:
Please use approved DC cable for PV system.
Cross section(mm )
Cable type
Range Recommended value
Industry generic PV cable 2.5~4
2.5(12AWG)
(model: PV1-F) (12~10AWG)
Chart 3-6
7mm
7mm
Pic 5.3 Disassemble the connector cap nut
c) Insert the contact pin to the top part of the connector and screw up the cap nut to the top
part of the connector. (as shown in picture 5.5).
- 14 -
Pic 5.5 connector with cap nut screwed on
d) Finally insert the DC connector into the posi�ve and nega�ve input of the inverter, shown as
picture 5.6
Warning:
Sunlight shines on the panel will generate voltage, high voltage in series may
cause danger to life. Therefore, before connec�ng the DC input line, the solar
panel needs to be blocked by the opaque material and the DC switch should
be 'OFF', otherwise, the high voltage of the inverter may lead to life-
threatening condi�ons. Please do not switch off DC isolator when the DC
current when there is high voltage or current.Technicians need to wait un�l
night to keep safety.
Warning:
Use the DC power connector of the accessories. Do not interconnect the
connectors of different manufacturers.
- 15 -
3.6 CT Connec�on
GRID
L3
L2
N L1
Inverter
1 2 3 4 5 6 7 8 9 10 1112
CT
Arrow pointing
to inverter L3
CT3
L2
CT2
L1
CT1
N
Grid PE
*Note:when the reading of the load power on the LCD is not correct, please
reverse the CT arrow.
- 16 -
3.6.1 Meter Connec�on
GRID
L3
L2
N L1
Inverter
Meter Parallel_1 Parallel_2 PE
N
3 6 9 10 L1
RS485A
Three-Phase Smart Meter
L2
RS485B
SET ESC L3 Grid
3 6 9 10
24 25
L1 1 4 7 10
SET ESC
RS 485
24 25
1 4 7 10
GRID
L3
L2
N L1
Inverter
8
N L3 L2 L1
7 6 5
RS485B
RS485A
GND Eastron
PE
1 2 3 4 5 6 7 8 L1
L1
L2
L2 L3
Eastron
L3 L2 L3
L1
N
(1,2,3,4) (5,6,7,8) Grid
B A G
5 6 7 8
RS 485
RS 485 B RS 485 A GND
- 17 -
GRID
Inverter L2
L3
N L1
AC Breaker
PE
RS485A RS485B N
L1
L2
L3
AC Breaker Home Load
3 6 9 10
2 5 8 11 12
SET ESC
13 14 16 17 19 21 24 25
1 4 7 10 PE
N
L1
CT1
L2
CT2
L3 Grid
CT3
Red line
Black line
Red line
Black line
Red line
Note: the arrow direction towards
Black line the inverter
3 6 9 10
2 5 8 10 1 3 4 6 7 9
2 5 8 1112
L1
Three-Phase Smart Meter
L2
(2,5,8,10) L3
SET ESC
1 4 7 10
Phase B current =5.001A
- 18 -
GRID
Inverter L2
L3
N L1
RS485A
AC Breaker
PE
N
L1
RS485B
L2
L3
GND
NA LA L1 L2 L3 N
8 7 6 5 4 3 2 1
PE
E N
L1
meter
P
CT1
L2
M
Black line
Red line
Black line
Red line
Black line
Note: the arrow direction towards
Red line the inverter
9 1 0 11 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0
3 PHASE 4 WIRE
P2 P1
L1
L2
P2 P1 S2 S1
Eastron U/IESC
L3
P2 P1 S2 S1
M S2 S1
N
P
1 2 3 4 5 6 15 16 17 18 19 20
E
Grid voltage Auxiliary Current inputs
sampling power supply
1 2 3 4 5 6 7 8
14 13 12
RS 485
RS 485 A RS 485 B GND
Eastron SDM630MCT Eastron meter
- 19 -
Note:
When the inverter is in the off-grid state, the N line needs to be connected to the
earth.
Note:
In final installa�on,breaker cer�fied according to IEC 60947-1 and IEC 60947-2
shall be installed with the equipment.
- 20 -
PV This diagram is an example for an applica�on that neutral connects with the
PE in a distribu�on box.
For countries such as Australia, New Zealand, South Africa, etc., please follow
DC Breaker local wiring regula�ons!
BMS
N N
L1 L1
L2 RCD L2
Load
L3 L3
Battery AC Breaker
PE or PE
3.9 Wiring System for Inverter
Hybrid Inverter
CT
N N
N
L1 L1
- 21 -
CT1
L1 L2 L2 Grid
GEN L2 CT2
L3 L3 L3
CT3
PORT
PE AC Breaker AC Breaker
AC Breaker PE
Grid
PE
E-BAR E-BAR
N L1 L2 L3 PE
Home Loads
This diagram is an example for an applica�on in which neutral is separated from the PE in the distribu�on box.
For countries such as China, Germany,the Czech Republic, Italy, etc., please follow local wiring regua�ons!
Note:Backup func�on is op�onal in German market.please leave backup side empty if backup func�on is not
available in the inverter.
When the inverter is working in backup mode, neutral and PE on the backup side are connected via the internal
relay. Also,this internal relay will be open when the inverter is working in grid �ed mode.
N
3.10 Wiring diagram
PE
Distribution box
L1 L1
BMS
L2 L2
L3 RCD L3
Backup
N N
Battery Loads
PE or PE
Backup
Hybrid Inverter CT
- 22 -
L1 L1
CT1
L2 L2
CT2
L3 L3 Grid
Solar CT3
N N
Array
PE PE
On-Grid
L1 L2 L3 N PE
Home Loads
CAN L wire N wire PE wire
BMS1 BMS2
Inverter Ground
①DC
Breaker
③AC Breaker
Backup Load
PE NL1 L2 L3
④AC Breaker
N
L1
L2
① DC Breaker for battery L3
SUN 25K-SG-EU: 100A DC breaker Home Load PE
SUN 30K-SG-EU: 100A DC breaker
SUN 40K-SG-EU: 100A DC breaker CT3
SUN 50K-SG-EU: 100A DC breaker CT2
CT1
② AC Breaker for backup load
SUN 25K-SG-EU: 180A AC breaker
SUN 30K-SG-EU: 180A AC breaker L3
SUN 40K-SG-EU: 180A AC breaker L2
L1
SUN 50K-SG-EU: 180A AC breaker N
PE
③ AC Breaker for grid
SUN 25K-SG-EU: 180A AC breaker
SUN 30K-SG-EU: 180A AC breaker
SUN 40K-SG-EU: 180A AC breaker
SUN 50K-SG-EU: 180A AC breaker
- 23 -
3.11 Typical applica�on diagram of diesel generator
CAN L wire N wire PE wire
Remotely control signal line
PE
coil
relay N
open
contact L1
L2
L3
G S ②AC Generator
GS (diesel generator startup signal) Breaker
G-start (1,2): dry contact signal for startup
the diesel generator.
1 2 3 4 5 6 7 8 9 10 1112
SHUT DOWN
B B
BMS1 BMS2
Ground
Inverter
①DC
Breaker
③AC Breaker
Battery pack
- 24 -
3.12 Three phase parallel connec�on diagram
Max. 10pcs parallel for on-grid and off-grid opera�on.
CAN L wire N wire PE wire
No.3
(slave)
① Ground
Battery pack
Inverter
Inverter
Note: unlike cases of other hybrid ④ ⑤
inverter with LV ba�ery, HV ba�ery No.2
can only be connected separately to (slave)
HV hybrid inverters.
Ground
② ⑦
④⑥⑧ AC Breaker for grid port
SUN 25K-SG-EU: 180A AC breaker
SUN 30K-SG-EU: 180A AC breaker ⑥
SUN 40K-SG-EU: 180A AC breaker Battery pack
SUN 50K-SG-EU:180A AC breaker
Battery pack ⑧
Backup Load
CT
PE NL1 L2 L3
⑩ CT3
Home Load CT2
Arrow pointing CT1
to inverter
L3
Master inverter Slave Inverter Slave Inverter L2
L1
Advanced Function Advanced Function Advanced Function N
PE
Parallel Modbus SN Parallel Modbus SN Parallel Modbus SN
Grid
- 25 -
4. OPERATION
4.1 Power ON/OFF
Once the unit has been properly installed and the ba�eries are connected well, simply press
On/Off bu�on(located on the le� side of the case) to turn on the unit. When system without
ba�ery connected, but connect with either PV or grid, and ON/OFF bu�on is switched off, LCD
will s�ll light up(Display will show OFF), In this condi�on, when switch on ON/OFF bu�on and
select NO ba�ery,system can s�ll working.
Up To go to previous selec�on
- 26 -
5. LCD Display Icons
5.1 Main Screen
The LCD is touchscreen, below screen shows the overall informa�on of the inverter.
0 8.30 30 0 -3.00 30
KW KW
ON
0 -2.00
KW
30 0 3.00
KW
30
1.The icon in the center of the home screen indicates that the system is Normal opera�on. If it
turns into "comm./F01~F64" , it means the inverter has communica�on errors or other errors,
the error message will display under this icon(F01-F64 errors, detail error info can be viewed in
the System Alarms menu).
3.System Setup Icon, Press this set bu�on,you can enter into the system setup screen which
including Basic Setup, Ba�ery Setup, Grid Setup, System Work Mode, Generator port use,
Advanced func�on and Li-Ba� info.
4.The main screen showing the info including Solar, Grid, Load and Ba�ery. Its also displaying the
energy flow direc�on by arrow. When the power is approximate to high level, the color on the
panels will changing from green to red so system info showing vividly on the main screen.
- 27-
5.1.1 LCD opera�on flow chart
Inverter Page
Main Screen
Battery Page BMS Page
Battery Setting
Grid Setting
System Setup
Gen Port Use
Basic Setting
Advanced Function
Device info
- 28 -
5.2 Solar Power Curve
Today=8.0 KWH ③
Power: 1560W
Total =12.00 KWH Energy Press the “Energy “bu�on will enter into the power
① curve page.
1166w
1244w
50Hz
-81w
50Hz
① This is Inverter detail page.
222v 0.8w 222v 0.1A
221v 0w 229v 5.0w 230v 0.1A
① Inverter Genera�on.
229v 1166w 229v 0.9w 223v 0.1A Voltage, Current, Power for each Phase.
225v 0w HM: LD: INV_P:
-10W 28W -30W
AC-T: mean Heat-sink temperature.
Load 5W 1192W -26W AC_T:
0W 24W -25W 38.8C
21w
0w 0w Grid Inverter
150V 150V 0W 0W 0W 0W
-0.41A -0.41A 0V 0V 0V 0V
27.0C 27.0C 0.0A 0.0A 0.0A 0.0A
Battery PV
Energy
L1: 0V L2: 0V L3: 0V Energy Press the “Energy “ bu�on will enter into the power
curve page.
- 29 -
Li-BMS
U:170V
I:2.04A
Li-BMS
Power: 101W Volt Curr Temp SOC Energy Charge Fault
Volt Curr
1 150.3V 19.70A 30.6C 52.0% 26.0Ah 0.0V 0.0A 0|0|0
Temp:25.0C
Energy 2
3
4
150.2V
150.1V
0.00V
19.10A
16.90A
0.00A
31.0C
30.2C
0.0C
51.0%
12.0%
0.0%
25.5Ah
6.0Ah
0.0Ah
153.2V
153.2V
0.0V
25.0A
25.0A
0.0A
0|0|0
0|0|0
0|0|0
Sum
Data
5 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
6 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
7 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
8 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
This is Ba�ery detail page. 9 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
10 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0 Details
11 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0 Data
if you use Lithium Ba�ery, you can enter BMS page. 12 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
13 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
14 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
15 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
CANCEL Day Month Year Total CANCEL Day Month Year Total
CANCEL Day Month Year Total CANCEL Day Month Year Total
Solar power curve for daily, monthly, yearly and total can be roughly checked on the LCD, for more
accuracy power genera�on, pls check on the monitoring system. Click the up and down arrow to
check power curve of different period.
- 30 -
5.4 System Setup Menu
System Setup
This is System Setup page.
Basic Advanced
Setting Function Device Info.
Basic Setting
Factory Reset: Reset all parameters of the inverter.
Time Syncs Beep Auto Dim Lock out all changes: Enable this menu for se�ng
Year Month Day Basic parameters that require locking and cannot be set up.
2019 03 17
Set Before performing a successful factory reset and locking
the systems, to keep all changes you need to type in a
Hour Minute password to enable the se�ng.
24-Hour 09 15 The password for factory se�ngs is 9999 and for lock
out is 7777.
Factory Reset Lock out all changes
PassWord
Factory Reset PassWork: 9999
X--X--X--X DEL Lock out all changes PassWork: 7777
1 2 3
4 5 6
7 8 9
CANCEL 0 OK
- 31-
5.6 Ba�ery Setup Menu
Battery Setting
Ba�ery capacity: it shows your ba�ery bank size to
Batt Mode Deye hybrid inverter.
Lithium Batt Capacity 0Ah Use Ba� V: Use Ba�ery Voltage for all the se�ngs (V).
Batt
Use Batt V Max A Charge 0A
Mode Use Ba� %: Use Ba�ery SOC for all the se�ngs (%).
Use Batt % Max. A charge/discharge: Max ba�ery charge/discharge
Max A Discharge 0A
current(0-50A for 25/30/40/50KW model).
No Batt
For AGM and Flooded, we recommend Ah ba�ery
Activate Battery1 Parallel bat1&bat2 size x 20%= Charge/Discharge amps.
Activate Battery2 . For Lithium, we recommend Ah ba�ery size x 50% =
Charge/Discharge amps.
. For Gel, follow manufacturer' s instruc�ons.
No Ba�: �ck this item if no ba�ery is connected
to the system.
Ac�ve ba�ery: This feature will help recover a
ba�ery that is over discharged by slowly charging
from the solar array or grid.
- 32-
08/06/2022 16:31:10 Sat
This page tells the PV and diesel generator
power the load and ba�ery.
0 2.00 30 0 0.00 30
KW KW
ON
Signal
on
0.00
KW
0 -1.39
KW
30 0 2.00
KW 30
Generator
This page tells generator output voltage, frequency,
Power: 6000W Today=10 KWH power. And, how much energy is used from generator.
Total =10 KWH
Battery Setting
Lithium Mode: This is BMS protocol.Please reference
the document(Approved Ba�ery).
Lithium Mode 00
Shutdown 10%: It indicates the inverter will shutdown
Batt
Shutdown 10% Set3 if the SOC below this value.
Low Ba� 20%: It indicates the inverter will alarm if the
Low Batt 20%
SOC below this value.
Restart 40% Restart 40%: Ba�ery SOC at 40% AC output will
resume.
- 33 -
Recommended ba�ery se�ngs
Torque value
Battery Type Absorption Stage Float Stage (every 30 days 3hr )
Lithium Follow its BMS voltage parameters
Zero Export To Load: Hybrid inverter will only provide power to the backup load connected. The hybrid
inverter will neither provide power to the home load nor sell power to grid. The built-in CT will detect
power flowing back to the grid and will reduce the power of the inverter only to supply the local load and
charge the ba�ery.
Battery
Zero Export To CT: Hybrid inverter will not only provide power to the backup load connected but also give
power to the home load connected. If PV power and ba�ery power is insufficient, it will take grid energy
as supplement. The hybrid inverter will not sell power to grid. In this mode, a CT is needed. The installa�on
method of the CT please refer to chapter 3.6 CT Connec�on. The external CT will detect power flowing back
to the grid and will reduce the power of the inverter only to supply the local load, charge ba�ery and home
load.
CT
Battery
- 34 -
Solar Sell: “Solar sell” is for Zero export to load or Zero export to CT: when this item is ac�ve, the surplus
energy can be sold back to grid. When it is ac�ve, PV Power source priority usage is as follows: load
consump�on and charge ba�ery and feed into grid.
Max. sell power: Allowed the maximum output power to flow to grid.
Zero-export Power: for zero-export mode, it tells the grid output power. Recommend to set it as 20-100W
to ensure the hybrid inverter won' t feed power to grid.
Energy Pa�ern: PV Power source priority.
Ba� First: PV power is firstly used to charge the ba�ery and then used to power the load. If PV power is
insufficient, grid will make supplement for ba�ery and load simultaneously.
Load First: PV power is firstly used to power the load and then used to charge the ba�ery. If PV power is
insufficient, Grid will provide power to load.
Max Solar Power: allowed the maximum DC input power.
Grid Peak-shaving: when it is ac�ve, grid output power will be limited within the set value. If the load
power exceeds the allowed value, it will take PV energy and ba�ery as supplement. If s�ll can’t meet the
load requirement, grid power will increase to meet the load needs.
- 35 -
5.8 Grid Setup Menu
U
V
W
N
220VAC 220VAC 220VAC
Rz
Rz: Large resistance ground resistor. Or the system doesn’t have Neutral line
- 36 -
Grid Setting/F(W) FW: this series inverter is able to adjust inverter output
F(W) power according to grid frequency.
Over frequency Droop F 40%P/Hz
Droop F: percentage of nominal power per Hz
Grid For example, “Start freq F>50.2Hz, Stop freq F<51.5,
Start freq F Stop freq F Set4
50.20Hz 51.5Hz
Droop F=40%P/Hz” when the grid frequency reaches
Start delay F 0.00s Stop delay F 0.00s 50.2Hz, the inverter will decrease its ac�ve power at
Droop F of 40%. And then when grid system frequency
Under frequency Droop F 40%PE/Hz is less than 50.1Hz, the inverter will stop decreasing
Start freq F 49.80Hz Stop freq F 49.80Hz output power.
For the detailed setup values, please follow the local
Start delay F Stop delay F 0.00s
0.00s
grid code.
For example: V2=110%, P2=80%. When the grid voltage reaches the 110% �mes of rated grid voltage,
inverter output power will reduce its ac�ve output power to 80% rated power.
For example: V1=94%, Q1=44%. When the grid voltage reaches the 94% �mes of rated grid voltage,
inverter output power will output 44% reac�ve output power.
For the detailed setup values, please follow the local grid code.
Grid Setting/P(Q) P(PF) P(Q): It is used to adjust the inverter reac�ve power
according to the set ac�ve power.
P(Q) P(PF)
P(PF): It is used to adjust the inverter PF according
Lock-in/Pn Lock-out/Pn
Grid to the set ac�ve power.
0.3% 5.0% Set6
For the detailed setup values, please follow the local
P1 0% Q1 2% P1 0% PF1 -0.000 grid code.
P2 2% Q2 0% P2 0% PF2 -0.000
- 37 -
5.9 Generator Port Use Setup Menu
GEN PORT USE Generator input rated power: allowed Max. power from diesel
generator.
Mode GEN connect to grid input: connect the diesel generator to the
Generator Input GEN connect to Grid input
grid input port.
Rated Power PORT
Set1
Smart Load Output: This mode u�lizes the Gen input connec�on
8000W
as an output which only receives power when the ba�ery SOC
SmartLoad Output On Grid always on and PV power is above a user programmable threshold.
AC Couple Fre High e.g. ON: 100%, OFF: 95%: When the PV power
55.00Hz exceeds 500W, and ba�ery bank SOC reaches 100%, Smart Load
OFF 161.0V
Port will switch on automa�cally and power the load connected.
Micro Inv Input ON 164.0V When the ba�ery bank SOC < 95% , the Smart Load Port will
Ml export to Grid cutoff switch off automa�cally.
Relay
Asymmetric phase feeding: The power that the inverter of PV feeds into the grid will be balanced.
- 38 -
Advanced Function
Ex_Meter For CT: when using zero-export to CT mode,
Parallel Modbus SN the hybrid inverter can select EX_Meter For CT func�on
Master 00 and use the different meters.e.g.CHNT and Eastron.
Paral.
Slave Set3
EX_Meter For CT
Meter Select
No Meter 0/3
CHNT
Eastron
6. Mode
Mode I:Basic
AC cable DC cable COM cable
Solar
CT
Battery
Grid
Grid
CT
Battery
Generator
- 39 -
Mode III: With Smart-Load
AC cable DC cable
Grid
CT
Battery
Smart Load
Grid
CT
Battery
On-Grid Inverter
The 1st priority power of the system is always the PV power, then 2nd and
3rd priority power will be the ba�ery bank or grid according to the se�ngs.
The last power backup will be the Generator if it is available.
7. Limita�on of Liability
In addi�on to the product warranty described above, the state and local laws and regula�ons
provide financial compensa�on for the product's power connec�on (including viola�on of implied
terms and warran�es). The company hereby declares that the terms and condi�ons of the
product and the policy cannot and can only legally exclude all liability within a limited scope.
- 40 -
Error code Description Solutions
1. When the grid type and frequency changed it will report F13;
2. When the battery mode was changed to “No battery”
mode,it will report F13;
3. For some old FW version, it will report F13 when the
system work mode changed;
F13 Working_Mode_change 4, Generally, it will disappear automatically when shows F13;
5. If it remains same, turn on DC and AC switch for one minute,
then turn on the DC and AC switch.;
6. Seek help from us, if can not go back to normal state.
- 41 -
Error code Description Solutions
BUS over current.
F21 Tz_HV_Overcurr_fault 1, Check the PV input current and battery current setting
2. Restart the system 2~3 times.
3. If the fault still exists, please contact us for help.
Remotely shutdown
F22 Tz_EmergStop_Fault 1, it tells the inverter is remotely controlled.
- 42 -
Error code Description Solutions
Grid frequency out of range
1. Check the frequency is in the range of specification or not;
F47 AC_OverFreq_Fault 2. Check whether AC cables are firmly and correctly connected;
3. Seek help from us, if can not go back to normal state.
- 43-
Under the guidance of our company, customers return our products so that our company can
provide service of maintenance or replacement of products of the same value. Customers need to
pay the necessary freight and other related costs. Any replacement or repair of the product will
cover the remaining warranty period of the product. If any part of the product or product is
replaced by the company itself during the warranty period, all rights and interests of the
replacement product or component belong to the company.
Factory warranty does not include damage due to the following reasons:
· Damage during transporta�on of equipment;
· Damage caused by incorrect installa�on or commissioning;
· Damage caused by failure to comply with opera�on instruc�ons, installa�on instruc�ons or
maintenance instruc�ons;
· Damage caused by a�empts to modify, alter or repair products;
· Damage caused by incorrect use or opera�on;
· Damage caused by insufficient ven�la�on of equipment;
· Damage caused by failure to comply with applicable safety standards or regula�ons;
· Damage caused by natural disasters or force majeure (e.g. floods, lightning, overvoltage, storms,
fires, etc.)
In addi�on, normal wear or any other failure will not affect the basic opera�on of the product.
Any external scratches, stains or natural mechanical wear does not represent a defect in the
product.
- 44 -
8. Datasheet
SUN-25K-SG01HP3 SUN-30K-SG01HP3 SUN-40K-SG01HP3 SUN-50K-SG01HP3
Model
-EU-BM2 -EU-BM3 -EU-BM4 -EU-BM4
Battery Input Date
Ba�ery Type Li-lon
Ba�ery Voltage Range(V) 160~800
Max. Charging Current(A) 50+50
Max. Discharging Current(A) 50+50
Number of ba�ery input 2
Charging Strategy for Li-lon Ba�ery Self-adap�on to BMS
PV String Input Data
Max. DC Input Power(W) 32500 39000 52000 65000
Max. DC Input Voltage (V) 1000
Start-up Voltage(V) 180
MPPT Range(V) 150-850
Full Load DC Voltage Range (V) 450-850 360-850 360-850 450-850
Rated DC Input Voltage (V) 600
PV Input Current(A) 36+36 36+36+36 36+36+36+36
Max.PV Isc(A) 55+55 55+55+55 55+55+55+55
No. of MPPT Trackers 2 3 4
No. of Strings Per MPPT Tracker 2+2 2+2+2 2+2+2+2
AC Output Data
Rated AC Output and UPS Power(W) 25000 30000 40000 50000
Max. AC Output Power(W) 27500 33000 44000 55000
Peak Power(off grid) 1.5 �me of rated power, 10 S
AC Output Rated Current(A) 37.9/36.3 45.5/43.5 60.7/58.0 75.8/72.5
Max. AC Current(A) 41.7/39.9 50/47.9 66.7/63.8 83.4/79.8
Max. Three-phase Unbalanced
Output Current(A) 50 60 70 83.3
Max. Con�nuous AC Passthrough(A) 150
Power Factor 0.8 leading to 0.8 lagging
Output Frequency and Voltage 50/60Hz; 3L/N/PE 220/380, 230/400Vac
Grid Type Three Phase
Total Harmonic Distor�on (THD) <3% (of nominal power)
DC current injec�on <0.5% ln
Efficiency
Max. Efficiency 97.60%
Euro Efficiency 97.00%
MPPT Efficiency >99%
Protection
PV Input Lightning Protec�on Integrated
An�-islanding Protec�on Integrated
PV String Input Reverse Polarity Protec�on Integrated
Insula�on Resistor Detec�on Integrated
Residual Current Monitoring Unit Integrated
Output Over Current Protec�on Integrated
Output Shorted Protec�on Integrated
Output Over Voltage Protec�on DC Type II / AC Type III
Ba�ery Over Current Protec�on Fuses
- 45 -
Certifications and Standards
VDE4105,IEC61727/62116,VDE0126,AS4777.2,CEI 0 21,EN50549-1,
Grid Regula�on
G98,G99,C10-11,UNE217002,NBR16149/NBR16150
EMC/Safety Regula�on
IEC62109-1/-2, NBT32004-2018, EN61000-6-1,EN61000-6-2,
EN61000-6-3, EN61000-6-4
General Data
Opera�ng Temperature Rande(℃) -40~60℃, >45℃ Dera�ng
Cooling Intelligent air cooling
Noise(dB) ≤45 dB
Communica�on with BMS RS485; CAN
Weight(kg) 75
Size(mm) 527W×894H×294D
Protec�on Degree IP65
Installa�on Style Wall-mounted
Warranty 5 years
- 46 -
9. Appendix I
21
87 65 43
Defini�on of RJ45 Port Pin for BMS1
12345678
- 47 -
Defini�on of RJ45 Port Pin for RS485
21
87 65 43
12345678
RS232
No. WIFI/RS232
1
2 TX
3 RX
4
5 D-GND
6
7
8
9 12Vdc
5 4 3 2 1
9 8 7 6
WIFI/RS232
This RS232 port is used to connect the wifi datalogger
- 48 -
10. Appendix II
1. Split Core Current Transformer (CT) dimension: (mm)
2. Secondary output cable length is 4m.
- 49 -