Northern Railway
Office of the
Dy. Chief Engineer/Constn.
State Entry Road, New Delhi
No. 220-W/1/Works-Review/Pt-II Date: 04.05.2018
Dy. Chief Engineer/Constn/Plg-II
Northern Railway,
Kashmere Gate, Delhi
Sub:- Works Review Meeting and fixing of targets for FY 2018-19
Ref:- CE/C/Spl. Letter No. 167-W/10/2/Plg/Pt-XIII dated 03.05.2018
Reference above, the details are as under:-
1. Status of achievement of targets of works for 2017-18-Not required-Available with Plg. Cell
2. Status of deletion of completed works from IRPSM
S.No PH Name of work proposed to be deleted during 2018-19 Status
.
1. NIL NIL NIL
3. Status of updation of works on IRPSM upto 7th April 2018 and now
SN PH No. of works No. Of works updated Remarks, if any
1 16 3 2 1 Nos. Updated by Dy.
CE/C-I/CSB
2. 30 4 4 -
3. 32 1 1 -
4. 42 1 1 -
5. 51 1 1 -
6. 52 3 3 -
7. 4 1 1 Three Nos. updated by
Dy.CEE/C/CSB
8. 64 2 2
4. Status of deletion of work sanctioned in 2013-14 or earlier, where detailed estimate not
sanctioned.
S.No PH Name of work sanctioned in Status of deletion of work
. before 2013-14 where detailed
estimate not sanctioned
1. 16 Adarsh Nagar – Addl. loop line Work has been proposed to be deletion in
August 2014 due to abnormal increase in
the cost over original cost. E not
sanctioned.
2. 64 New Delhi (Baroda House) – Addl. Proposed for deletion of work have
accommodation & parking submitted to construction Hd.Qrs.
New Delhi-B.House Add. Proposed for deletion of work have
Accommodation & Parking
(extension of A-1 building towards submitted to construction Hd.Qrs. Railway
India Gate) Board as advised to deletion of work in
September 2012.
5. Proposed works targeted for completion FY 2018-19-Not required-Action plan of NR/Const
already circulated vide letter No. 167-W/10/1/Action plan/18-19 dt.19.04.2018
6. Status of GAD/ESPs/Drawings of targeted work 2018-10.
S.No PH Name of targeted work in 2018-19 as per Status of pending
action plan GAD/ESPs/Drawings
1. 91 ROB connecting Narela-Bawana sub city to NH-1 Sub-structure and super
over MP road of Railway km 24/20-18 on Delhi- structure drawing required
Ambala section near Anaj Mandi Narela
from Hd. Qrs. Office.
2. 30 Khurja-Meerut City-Road over bridge in lieu of Sub-structure and super
level crossing Nos. 26 structure drawing required
from Hd. Qrs. Office.
3. 32 Delhi-Shahdara - New Bridge over Yamuna in lieu of Sub-structure and super
bridge No. 249 structure drawing required
from Hd. Qrs. Office. (Not
targeted).
Dy . Chief Engineer/C/SE Rd
Copy to: Dy.CE/C/D-I/K.Gate for information