0% found this document useful (0 votes)
126 views337 pages

JNK India Pvt. LTD.: Radiographic Examination Report

This 3 sentence summary provides the key details from the given radiographic examination report: The report details the results of radiographic testing on 4 welded joints from lines JNKI-046-ATM2B-MC-DG-157 Rev.02, including joint numbers, welding details, observed defects, and acceptance or rejection decisions for each test segment. Most segments were accepted with some observations of excess penetration, root undercut, or indications noted.

Uploaded by

Avishek Gupta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
126 views337 pages

JNK India Pvt. LTD.: Radiographic Examination Report

This 3 sentence summary provides the key details from the given radiographic examination report: The report details the results of radiographic testing on 4 welded joints from lines JNKI-046-ATM2B-MC-DG-157 Rev.02, including joint numbers, welding details, observed defects, and acceptance or rejection decisions for each test segment. Most segments were accepted with some observations of excess penetration, root undercut, or indications noted.

Uploaded by

Avishek Gupta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 337

JNK INDIA PVT. LTD.

Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : FUGIFILM IX 50XD Sensitivity 6th Wire
SFD : 5.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD ACC


JNKI-046-ATM2B-MC-DG-157
1 Rev.02 3 J-326 CXR-1861 5" X 6.55mm W-82 B-C RC ACC
C-A RUC ACC
A-B NSD ACC
2 JNKI-046-ATM2B-MC-DG-157 4 J-425 CXR-1862 5" X 6.55mm W-60 B-C NSD ACC
Rev.02
C-A RC ACC
A-B RC ACC
JNKI-046-ATM2B-MC-DG-157
3 4 J-426 CXR-1863 5" X 6.55mm W-60 B-C NSD ACC
Rev.02
C-A NSD ACC

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : FUGIFILM IX 50XD Sensitivity 6th Wire
SFD : 5.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD ACC


JNKI-046-ATM2B-MC-DG-157
1 Rev.02 1 J-125 CXR-1858 5" X 6.55mm W-60 B-C EP ACC
C-A EP ACC
A-B RC,Ti ACC
2 JNKI-046-ATM2B-MC-DG-157 1 J-156 CXR-1859 5" X 6.55mm W-60 B-C NSD,FM ACC
Rev.02
C-A RC ACC
A-B RUC, EP ACC
JNKI-046-ATM2B-MC-DG-157
3 3 J-323 CXR-1769 5" X 6.55mm W-45 B-C EP ACC
Rev.02
C-A RUC ACC
A-B EP ACC
4 JNKI-046-ATM2B-MC-DG-157 3 J-325 CXR-1860 5" X 6.55mm W-60 B-C Ti ACC
Rev.02
C-A EP ACC
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : FUGIFILM IX 50XD Sensitivity 6th Wire
SFD : 5.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-157
1 Rev.02 4 J-401 CXR-1779 5" X 6.55mm W-12 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-157 4 J-403 CXR-1833 3" X 7.62mm W-60 B-C
Rev.02
C-A
A-B
JNKI-046-ATM2B-MC-DG-157
3 4 J-408 CXR-1856 5" X 6.55mm W-55 B-C
Rev.02
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-157 4 J-409 CXR-1857 5" X 6.55mm W-55 B-C
Rev.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : FUGIFILM IX 50XD Sensitivity 6th Wire
SFD : 5.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-157
1 Rev.02 4 J-401 CXR-1779 5" X 6.55mm W-12 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-157 4 J-403 CXR-1833 3" X 7.62mm W-60 B-C
Rev.02
C-A
A-B
JNKI-046-ATM2B-MC-DG-157
3 4 J-408 CXR-1856 5" X 6.55mm W-55 B-C
Rev.02
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-157 4 J-409 CXR-1857 5" X 6.55mm W-55 B-C
Rev.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : FUGIFILM IX 50XD Sensitivity 6th Wire
SFD : 5.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-157
1 Rev.02 2 J-214 CXR-1838 5" X 6.55mm W-37 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-157 3 J-301 CXR-1778 5" X 6.55mm W-12 B-C
Rev.02
C-A
A-B
JNKI-046-ATM2B-MC-DG-157
3 3 J-303 CXR-1832 3" X 7.62mm W-60 B-C
Rev.02
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-157 3 J-309 CXR-1855 5" X 6.55mm W-82 B-C
Rev.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : FUGIFILM IX 50XD Sensitivity 6th Wire
SFD : 5.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-157
1 Rev.02 1 J-101 CXR-1776 5" X 6.55mm W-45 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-157 1 J-103 CXR-1830 3" X 7.62mm W-60 B-C
Rev.02
C-A
A-B
JNKI-046-ATM2B-MC-DG-157
3 2 J-201 CXR-1777 5" X 6.55mm W-45 B-C
Rev.02
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-157 2 J-203 CXR-1831 3" X 7.62mm W-60 B-C
Rev.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : FUGIFILM IX 50XD Sensitivity 6th Wire
SFD : 5.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-157
1 Rev.02 1 J-108 CXR-1850 5" X 6.55mm W-82 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-157 1 J-109 CXR-1851 5" X 6.55mm W-82 B-C
Rev.02
C-A
A-B
JNKI-046-ATM2B-MC-DG-157
3 1 J-114 CXR-1834 5" X 6.55mm W-60 B-C
Rev.02
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-157 1 J-117 CXR-1835 5" X 6.55mm W-60 B-C
Rev.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" & 3.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-158
1 REV. 04 3 J-303 CXR-1756 3" X 7.62mm W-37 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-158 3 J-311 CXR-1799 6" X 7.11mm W-55 B-C
REV. 04
C-A
A-B
JNKI-046-CDU2B-MC-DG-158
3 3 J-312 CXR-1800 6" X 7.11mm W-55 B-C
REV. 04
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-158 4 J-403 CXR-1757 3" X 7.62mm W-37 B-C
REV. 04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" & 3.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-158
1 REV. 04 8 J-812 CXR-1810 6" X 7.11mm W-45 B-C
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" & 3.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-158
1 REV. 04 7 J-711 CXR-1807 6" X 7.11mm W-12 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-158 7 J-712 CXR-1808 6" X 7.11mm W-12 B-C
REV. 04
C-A
A-B
JNKI-046-CDU2B-MC-DG-158
3 8 J-803 CXR-1761 3" X 7.62mm W-37 B-C
REV. 04
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-158 8 J-811 CXR-1809 6" X 7.11mm W-45 B-C
REV. 04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" & 3.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-158
1 REV. 04 6 J-603 CXR-1759 3" X 7.62mm W-37 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-158 6 J-611 CXR-1805 6" X 7.11mm W-45 B-C
REV. 04
C-A
A-B
JNKI-046-CDU2B-MC-DG-158
3 6 J-612 CXR-1806 6" X 7.11mm W-45 B-C
REV. 04
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-158 7 J-703 CXR-1760 3" X 7.62mm W-37 B-C
REV. 04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" & 3.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-158
1 REV. 04 5 J-508 CXR-887 6" X 7.11mm W-55 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-158 5 J-509 CXR-883 6" X 7.11mm W-55 B-C
REV. 04
C-A
A-B
JNKI-046-CDU2B-MC-DG-158
3 5 J-511 CXR-1803 6" X 7.11mm W-12 B-C
REV. 04
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-158 5 J-512 CXR-1804 6" X 7.11mm W-12 B-C
REV. 04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" & 3.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-158
1 REV. 04 5 J-508 CXR-887 6" X 7.11mm W-55 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-158 5 J-509 CXR-883 6" X 7.11mm W-55 B-C
REV. 04
C-A
A-B
JNKI-046-CDU2B-MC-DG-158
3 5 J-511 CXR-1803 6" X 7.11mm W-12 B-C
REV. 04
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-158 5 J-512 CXR-1804 6" X 7.11mm W-12 B-C
REV. 04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" & 3.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-158
1 REV. 04 4 J-410 CXR-1383 6" X 7.11mm W-33 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-158 4 J-411 CXR-1801 6" X 7.11mm W-55 B-C
REV. 04
C-A
A-B
JNKI-046-CDU2B-MC-DG-158
3 4 J-412 CXR-1802 6" X 7.11mm W-55 B-C
REV. 04
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-158 5 J-503 CXR-1758 3" X 7.62mm W-37 B-C
REV. 04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" & 3.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-158
1 REV. 04 3 J-303 CXR-1756 3" X 7.62mm W-37 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-158 3 J-311 CXR-1799 6" X 7.11mm W-55 B-C
REV. 04
C-A
A-B
JNKI-046-CDU2B-MC-DG-158
3 3 J-312 CXR-1800 6" X 7.11mm W-55 B-C
REV. 04
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-158 4 J-403 CXR-1757 3" X 7.62mm W-37 B-C
REV. 04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" & 3.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-158
1 REV. 04 2 J-210 CXR-1375 6" X 7.11mm W-33 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-158 2 J-211 CXR-1797 6" X 7.11mm W-82 B-C
REV. 04
C-A
A-B
JNKI-046-CDU2B-MC-DG-158
3 2 J-212 CXR-1798 6" X 7.11mm W-82 B-C
REV. 04
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-158 2 J-213 CXR-758 6" X 7.11mm W-33 B-C
REV. 04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" & 3.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-158
1 REV. 04 1 J-103 CXR-1754 3" X 7.62mm W-37 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-158 1 J-111 CXR-1795 6" X 7.11mm W-82 B-C
REV. 04
C-A
A-B
JNKI-046-CDU2B-MC-DG-158
3 1 J-112 CXR-1796 6" X 7.11mm W-82 B-C
REV. 04
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-158 2 J-203 CXR-1755 3" X 7.62mm W-37 B-C
REV. 04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-158
1 REV. 04 1 J-130 CXR-1780 6" X 7.11mm W-12 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-158 8 J-823 CXR-1738 6" X 7.11mm W-45 B-C
REV. 04
C-A
A-B
JNKI-046-CDU2B-MC-DG-158
3 8 J-829 CXR-896 6" X 7.11mm W-33 B-C
REV. 04
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-158
1 REV. 04 7 J-721 CXR-1785 6" X 7.11mm W-12 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-158 8 J-821 CXR-1786 6" X 7.11mm W-12 B-C
REV. 04
C-A
A-B
JNKI-046-CDU2B-MC-DG-158 J-825
3 8 CXR-752 6" X 7.11mm W-85 B-C
REV. 04 CRW
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-158 8 J-827 CXR-1787 6" X 7.11mm W-12 B-C
REV. 04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-158
1 REV. 04 6 J-622 CXR-1782 6" X 7.11mm W-45 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-158 6 J-623 CXR-1783 6" X 7.11mm W-45 B-C
REV. 04
C-A
A-B
JNKI-046-CDU2B-MC-DG-158 J-632
3 6 CXR-1738 6" X 7.11mm W-33 B-C
REV. 04 CRW
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-158 6 J-630 CXR-1784 6" X 7.11mm W-45 B-C
REV. 04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 18.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-158
1 REV. 04 5 J-521 CXR-1315 6" X 7.11mm W-12 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-158 5 J-530 CXR-795 6" X 7.11mm W-55 B-C
REV. 04
C-A
A-B
JNKI-046-CDU2B-MC-DG-158
3 5 J-533 CXR-1794 6" X 7.11mm W-33 B-C
REV. 04
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-158 6 J-621 CXR-1781 6" X 7.11mm W-12 B-C
REV. 04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 17.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-158
1 REV. 04 3 J-330 CXR-794 6" X 7.11mm W-55 B-C
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 17.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-158
1 REV. 04 1 J-121 CXR-844 6" X 7.11mm W-45 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-158 1 J-129 CXR-1056 6" X 7.11mm W-55 B-C
REV. 04
C-A
A-B
JNKI-046-CDU2B-MC-DG-158
3 2 J-222 CXR-854 6" X 7.11mm W-33 B-C
REV. 04
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-158 3 J-322 CXR-856 6" X 7.11mm W-33 B-C
REV. 04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 17.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 5.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-157
1 REV.02 4 J-428 CXR-1770 5" X 6.55mm W-45 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-157 4 J-429 CXR-1771 5" X 6.55mm W-45 B-C
REV.02
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 17.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 5.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-157
1 REV.02 3 J-328 CXR-1764 5" X 6.55mm W-45 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-157 3 J-329 CXR-1765 5" X 6.55mm W-45 B-C
REV.02
C-A
A-B
JNKI-046-ATM2B-MC-DG-157
3 4 J-422 CXR-1774 5" X 6.55mm W-45 B-C
REV.02
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-157 4 J-423 CXR-1775 5" X 6.55mm W-45 B-C
REV.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 17.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 5.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-157
1 REV.02 2 J-222 CXR-1772 5" X 6.55mm W-12 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-157 2 J-223 CXR-1773 5" X 6.55mm W-12 B-C
REV.02
C-A
A-B
JNKI-046-ATM2B-MC-DG-157
3 3 J-322 CXR-1768 5" X 6.55mm W-45 B-C
REV.02
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-157 3 J-323 CXR-1769 5" X 6.55mm W-45 B-C
REV.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 17.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 5.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-157
1 REV.02 1 J-122 CXR-1766 5" X 6.55mm W-55 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-157 1 J-123 CXR-1767 5" X 6.55mm W-55 B-C
REV.02
C-A
A-B
JNKI-046-ATM2B-MC-DG-157
3 1 J-128 CXR-1762 5" X 6.55mm W-55 B-C
REV.02
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-157 1 J-129 CXR-1763 5" X 6.55mm W-55 B-C
REV.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 17.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

JNKI-046-CDU2B-MC-DG-158 A-B
1 8 J-825 CXR-1752 6" X 7.11mm W-82 B-C
Rev-04 C-A

JNKI-046-CDU2B-MC-DG-158 A-B
2 8 J-826 CXR-1753 6" X 7.11mm W-82 B-C
Rev-04 C-A

JNKI-046-CDU2B-MC-DG-158 A-B
3 8 J-832 CXR-1740 6" X 7.11mm W-55 B-C
Rev-04 C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 17.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

JNKI-046-CDU2B-MC-DG-158 A-B
1 6 J-632 CXR-1738 6" X 7.11mm W-55 B-C
Rev-04 C-A

JNKI-046-CDU2B-MC-DG-158 A-B
2 7 J-725 CXR-1750 6" X 7.11mm W-55 B-C
Rev-04 C-A

JNKI-046-CDU2B-MC-DG-158 A-B
3 7 J-726 CXR-1751 6" X 7.11mm W-55 B-C
Rev-04 C-A

JNKI-046-CDU2B-MC-DG-158 A-B
4 7 J-732 CXR-1739 6" X 7.11mm W-55 B-C
Rev-04 C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 17.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

JNKI-046-CDU2B-MC-DG-158 A-B
1 5 J-525 CXR-1746 6" X 7.11mm W-12 B-C
Rev-04 C-A

JNKI-046-CDU2B-MC-DG-158 A-B
2 5 J-526 CXR-1747 6" X 7.11mm W-12 B-C
Rev-04 C-A

JNKI-046-CDU2B-MC-DG-158 A-B
3 6 J-625 CXR-1748 6" X 7.11mm W-45 B-C
Rev-04 C-A

JNKI-046-CDU2B-MC-DG-158 A-B
4 6 J-626 CXR-1749 6" X 7.11mm W-45 B-C
Rev-04 C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 17.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

JNKI-046-CDU2B-MC-DG-158 A-B
1 3 J-325 CXR-1722 6" X 7.11mm W-82 B-C
Rev-04 C-A

JNKI-046-CDU2B-MC-DG-158 A-B
2 3 J-326 CXR-1723 6" X 7.11mm W-82 B-C
Rev-04 C-A

JNKI-046-CDU2B-MC-DG-158 A-B
3 4 J-425 CXR-1744 6" X 7.11mm W-82 B-C
Rev-04 C-A

JNKI-046-CDU2B-MC-DG-158 A-B
4 4 J-426 CXR-1745 6" X 7.11mm W-82 B-C
Rev-04 C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 17.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

JNKI-046-CDU2B-MC-DG-158 A-B
1 1 J-125 CXR-1720 6" X 7.11mm W-55 B-C
Rev-04 C-A

JNKI-046-CDU2B-MC-DG-158 A-B
2 1 J-126 CXR-1721 6" X 7.11mm W-55 B-C
Rev-04 C-A

JNKI-046-CDU2B-MC-DG-158 A-B
3 2 J-225 CXR-1742 6" X 7.11mm W-55 B-C
Rev-04 C-A

JNKI-046-CDU2B-MC-DG-158 A-B
4 2 J-226 CXR-1743 6" X 7.11mm W-55 B-C
Rev-04 C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB:
Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 17.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 5.25" & 2.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2A-MC-DG-158
1 Rev.03 4 J-3A AXR-56 5" X 6.55mm W-39 B-C
C-A

LEGENDS: ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process
Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 17.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 5.25" & 2.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2A-MC-DG-158
1 Rev.03 2 J-15 AXR-25 2" X 5.54mm W-10 B-C
C-A
A-B
2 JNKI-046-ATM2A-MC-DG-158 3 J-3A AXR-55 5" X 6.55mm W-39 B-C
Rev.03
C-A
A-B
JNKI-046-ATM2A-MC-DG-158
3 3 J-5 AXR-30 5" X 6.55mm W-11 B-C
Rev.03
C-A
A-B
4 JNKI-046-ATM2A-MC-DG-158 3 J-13 AXR-37 5" X 6.55mm W-39 B-C
Rev.03
C-A

LEGENDS: ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process
Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 17.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 5.25" & 2.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2A-MC-DG-158
1 Rev.03 1 J-3A AXR-53 5" X 6.55mm W-39 B-C
C-A
A-B
2 JNKI-046-ATM2A-MC-DG-158 2 J-16 AXR-13 2" X 5.54mm W-10 B-C
Rev.03
C-A
A-B
JNKI-046-ATM2A-MC-DG-158
3 2 J-3A AXR-54 5" X 6.55mm W-39 B-C
Rev.03
C-A
A-B
4 JNKI-046-ATM2A-MC-DG-158 2 J-13 AXR-24 5" X 6.55mm W-39 B-C
Rev.03
C-A

LEGENDS: ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process
Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 17.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 5.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-158
1 Rev.03 3 J-3A AXR-55 5" X 6.55mm W-39 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-158 3 J-8 AXR-33 5" X 6.55mm W-11 B-C
Rev.03
C-A
A-B
JNKI-046-ATM2B-MC-DG-158
3 4 J-3A AXR-56 5" X 6.55mm W-39 B-C
Rev.03
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-158 4 J-13 AXR-50 5" X 6.55mm W-39 B-C
Rev.03
C-A

LEGENDS: ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process
Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 17.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 5.25" & 2.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-158
1 Rev.03 1 J-3A AXR-53 5" X 6.55mm W-39 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-158 1 J-13 AXR-11 5" X 6.55mm W-39 B-C
Rev.03
C-A
A-B
JNKI-046-ATM2B-MC-DG-158
3 2 J-3A AXR-54 5" X 6.55mm W-39 B-C
Rev.03
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-158 2 J-16 AXR-26 2" X 5.54mm W-10 B-C
Rev.03
C-A

LEGENDS: ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process
Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 12.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : FUGIFILM D IX 50 Sensitivity 6th Wire
SFD : 5.625" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-156
1 Rev.03 4 J-33 AXR-1A65 5" X 6.55mm W-47 B-C
C-A

LEGENDS: ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process
Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 12.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : FUGIFILM D IX 50 Sensitivity 6th Wire
SFD : 5.625" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-156
1 Rev.03 3 J-50 AXR-1A182 5" X 6.55mm W-50 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-156 3 J-67 AXR-199 5" X 6.55mm W-86 B-C
Rev.03
C-A
A-B
JNKI-046-ATM2B-MC-DG-156
3 3 J-73 AXR-205 5" X 6.55mm W-75 B-C
Rev.03
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-156 4 J-12 AXR-217 5" X 6.55mm W-47 B-C
Rev.03
C-A

LEGENDS: ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process
Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 12.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : FUGIFILM D IX 50 Sensitivity 6th Wire
SFD : 5.625" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-156
1 Rev.03 1 J-36 AXR-1A106 5" X 6.55mm W-42 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-156 2 J-73 AXR-132 5" X 6.55mm W-75 B-C
Rev.03
C-A
A-B
JNKI-046-ATM2B-MC-DG-156
3 3 J-42 AXR-174 5" X 6.55mm W-85 B-C
Rev.03
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-156 3 W-59 AXR-1A191 5" X 6.55mm W-75 B-C
Rev.03
C-A

LEGENDS: ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process
Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 12.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.625" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-158
1 Rev.04 2 J-215 CXR-802 6" X 7.11mm W-33 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-158 3 J-307 CXR-1376 6" X 7.11mm W-33 B-C
Rev.04
C-A
A-B
JNKI-046-CDU2B-MC-DG-158
3 3 J-314 CXR-807 6" X 7.11mm W-33 B-C
Rev.04
C-A

LEGENDS: ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process
Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 12.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.625" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-158
1 Rev.04 1 J-107 CXR-1371 6" X 7.11mm W-33 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-158 1 J-114 CXR-800 6" X 7.11mm W-55 B-C
Rev.04
C-A
A-B
JNKI-046-CDU2B-MC-DG-158
3 1 J-115 CXR-799 6" X 7.11mm W-55 B-C
Rev.04
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-158 1 J-116 CXR-757 6" X 7.11mm W-55 B-C
Rev.04
C-A

LEGENDS: ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process
Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 12.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.625" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-158
1 Rev.03 7 J-708 CXR-732 6" X 7.11mm W-45 B-C
C-A

LEGENDS: ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process
Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 12.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.625" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-158
1 Rev.03 1 J-113 CXR-623 6" X 7.11mm W-45 B-C
C-A
A-B
2 JNKI-046-CDU2A-MC-DG-158 2 J-210 CXR-625 6" X 7.11mm W-45 B-C
Rev.03
C-A
A-B
JNKI-046-CDU2A-MC-DG-158
3 3 J-307 CXR-627 6" X 7.11mm W-12 B-C
Rev.03
C-A
A-B
4 JNKI-046-CDU2A-MC-DG-158 5 J-509 CXR-721 6" X 7.11mm W-33 B-C
Rev.03
C-A

LEGENDS: ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process
Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 12.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.625" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-157
1 Rev.02 2 J-228 CXR-1649 5" X 6.55mm W-82 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-157 2 J-229 CXR-1650 5" X 6.55mm W-82 B-C
Rev.02
C-A
A-B
JNKI-046-ATM2B-MC-DG-157
3 2 J-232 CXR-1647 5" X 6.55mm W-82 B-C
Rev.02
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-157 4 W-432 CXR-1648 5" X 6.55mm W-82 B-C
Rev.02
C-A

LEGENDS: ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process
Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 12.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.625" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-159
1 Rev.02 2 J-12 CXR-1664 6" X 7.11mm W-45 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-159 3 J-6 CXR-1663 6" X 7.11mm W-33 B-C
Rev.02
C-A
A-B
JNKI-046-CDU2B-MC-DG-159
3 6 J-9 CXR-1665 6" X 7.11mm W-33 B-C
Rev.02
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-159 6 J-10 CXR-1666 6" X 7.11mm W-33 B-C
Rev.02
C-A

LEGENDS: ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process
Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 10.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2A-MC-DG-157
1 REV-02 4 J-401 CXR-1610 5" x 6.55mm W-55 B-C
C-A
A-B
2 JNKI-046-ATM2A-MC-DG-157 4 J-414 CXR-1617 5" x 6.55mm W-55 B-C
REV-02
C-A
A-B
JNKI-046-ATM2A-MC-DG-157
3 4 J-428 CXR-1560 5" x 6.55mm W-12 B-C
REV-02
C-A
A-B
4 JNKI-046-ATM2A-MC-DG-157 4 J-429 CXR-1561 5" x 6.55mm W-12 B-C
REV-02
C-A

LEGENDS: ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process
Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 10.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2A-MC-DG-157
1 REV-02 4 J-401 CXR-1610 5" x 6.55mm W-55 B-C
C-A
A-B
2 JNKI-046-ATM2A-MC-DG-157 4 J-414 CXR-1617 5" x 6.55mm W-55 B-C
REV-02
C-A
A-B
JNKI-046-ATM2A-MC-DG-157
3 4 J-428 CXR-1560 5" x 6.55mm W-12 B-C
REV-02
C-A
A-B
4 JNKI-046-ATM2A-MC-DG-157 4 J-429 CXR-1561 5" x 6.55mm W-12 B-C
REV-02
C-A

LEGENDS: ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process
Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 10.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2A-MC-DG-157
1 REV-02 2 J-229 CXR-1559 5" x 6.55mm W-45 B-C
C-A
A-B
2 JNKI-046-ATM2A-MC-DG-157 3 J-301 CXR-1609 5" x 6.55mm W-55 B-C
REV-02
C-A
A-B
JNKI-046-ATM2A-MC-DG-157
3 3 J-308 CXR-1645 5" x 6.55mm W-12 B-C
REV-02
C-A
A-B
4 JNKI-046-ATM2A-MC-DG-157 3 J-309 CXR-1646 5" x 6.55mm W-12 B-C
REV-02
C-A

LEGENDS: ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process
Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 10.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2A-MC-DG-157
1 REV-02 2 J-217 CXR-1616 5" x 6.55mm W-55 B-C
C-A
A-B
2 JNKI-046-ATM2A-MC-DG-157 2 J-222 CXR-1570 5" x 6.55mm W-45 B-C
REV-02
C-A
A-B
JNKI-046-ATM2A-MC-DG-157
3 2 J-223 CXR-1571 5" x 6.55mm W-45 B-C
REV-02
C-A
A-B
4 JNKI-046-ATM2A-MC-DG-157 2 J-228 CXR-1558 5" x 6.55mm W-45 B-C
REV-02
C-A

LEGENDS: ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process
Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158 3" X
1 REV-06 7 J-03 CXR-1581 7.62MM W-12 B-C
"C"
A-B
2 JNKI-046-CDU1A-MC-DG-158 8 J-01 CXR-1585 6" X W-12 B-C
REV-06 7.11MM
C-A
A-B
JNKI-046-CDU1A-MC-DG-158 3" X
3 8 J-03 CXR-1589 W-12 B-C
REV-06 7.62MM
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158 6" X
1 REV-06 6 J-01 CXR-1584 7.11MM W-12 B-C
"C"
A-B
2 JNKI-046-CDU1A-MC-DG-158 6 J-03 CXR-1588 3" X W-12 B-C
REV-06 7.62MM
C-A
A-B
JNKI-046-CDU1A-MC-DG-158 6" X
3 6 J-06 CXR-1531 W-45 B-C
REV-06 7.11MM
C-A
A-B
4 JNKI-046-CDU1A-MC-DG-158 7 J-01 CXR-1577 6" X W-12 B-C
REV-06 7.11MM
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158 6" X
1 REV-06 4 J-01 CXR-1583 7.11MM W-12 B-C
"C"
A-B
2 JNKI-046-CDU1A-MC-DG-158 4 J-03 CXR-1587 3" X W-12 B-C
REV-06 7.62MM
C-A
A-B
JNKI-046-CDU1A-MC-DG-158 6" X
3 4 J-12 CXR-1504 W-12 B-C
REV-06 7.11MM
C-A
A-B
4 JNKI-046-CDU1A-MC-DG-158 5 J-03 CXR-1580 6" X W-12 B-C
REV-06 7.11MM
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158 6" X
1 REV-06 1 J-01 CXR-1574 7.11MM W-12 B-C
"C"
A-B
2 JNKI-046-CDU1A-MC-DG-158 2 J-01 CXR-1582 6" X W-12 B-C
REV-06 7.11MM
C-A
A-B
JNKI-046-CDU1A-MC-DG-158 3" X
3 2 J-03 CXR-1586 W-12 B-C
REV-06 7.62MM
C-A
A-B
4 JNKI-046-CDU1A-MC-DG-158 3 J-01 CXR-1575 6" X W-12 B-C
REV-06 7.11MM
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-159 6" X
1 Rev. 02 7 J-02 CXR-1105 7.11MM W-55 B-C
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-159 6" X
1 Rev. 02 5 J-02 CXR-1111 7.11MM W-55 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-159 5 J-08 CXR-1084 6" X W-33 B-C
Rev. 02 7.11MM
C-A
A-B
JNKI-046-CDU2B-MC-DG-159 6" X
3 5 J-10 CXR-1052 W-33 B-C
Rev. 02 7.11MM
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-159 6 J-03 CXR-1085 6" X W-55 B-C
Rev. 02 7.11MM
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-159 6" X
1 Rev. 02 1 J-03 CXR-1082 7.11MM W-55 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-159 1 J-05 CXR-1094 6" X W-55 B-C
Rev. 02 7.11MM
C-A
A-B
JNKI-046-CDU2B-MC-DG-159 6" X
3 3 J-02 CXR-1078 W-55 B-C
Rev. 02 7.11MM
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-159 4 J-03 CXR-1079 6" X W-55 B-C
Rev. 02 7.11MM
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2A-MC-DG-157 6" X
1 Rev. 02 1 J-128 CXR-1507 7.11MM W-45 B-C
C-A
A-B
2 JNKI-046-ATM2A-MC-DG-157 1 J-129 CXR-1508 6" X W-45 B-C
Rev. 02 7.11MM
C-A
A-B
JNKI-046-ATM2A-MC-DG-157 6" X
3 3 J-312 CXR-1301 W-55 B-C
Rev. 02 7.11MM
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-159 6" X
1 Rev. 02 7 J-05 CXR-954 7.11MM W-55 B-C
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-159 6" X
1 Rev. 02 1 J-08 CXR-963 7.11MM W-12 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-159 2 J-08 CXR-969 6" X W-55 B-C
Rev. 02 7.11MM
C-A
A-B
JNKI-046-CDU2B-MC-DG-159 6" X
3 3 J-02 CXR-1081 W-55 B-C
Rev. 02 7.11MM
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-159 5 J-09 CXR-1049 6" X W-33 B-C
Rev. 02 7.11MM
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158 6" X
1 Rev. 06 1 J-12 CXR-1475 7.11MM W-33 B-C
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-159 6" X
1 Rev. 02 2 J-6 CXR-1590 7.11MM W-55 B-C
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-156
1 Rev. 03 1 J-62 AXR-53 5" X 6.55mm W-39 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-156 1 J-64 AXR-55 5" X 6.55mm W-10 B-C
Rev. 03
C-A
A-B
JNKI-046-ATM2B-MC-DG-156
3 2 J-58 AXR-116 5" X 6.55mm W-75 B-C
Rev. 03
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-156 2 J-59 AXR-117 5" X 6.55mm W-75 B-C
Rev. 03
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-156
1 Rev. 03 Pass No. - 01 J-45 AXR-40 5" X 6.55mm W-10 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-156 Pass No. - 01 J-48 AXR-43 5" X 6.55mm W-10 B-C
Rev. 03
C-A
A-B
JNKI-046-ATM2B-MC-DG-156
3 Pass No. - 01 J-53 AXR-46 5" X 6.55mm W-10 B-C
Rev. 03
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-156 Pass No. - 01 J-54 AXR-47 5" X 6.55mm W-39 B-C
Rev. 03
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-156
1 Rev. 03 1 J-55 AXR-48 5" X 6.55mm W-39 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-156 1 J-56 AXR-49 5" X 6.55mm W-10 B-C
Rev. 03
C-A
A-B
JNKI-046-ATM2B-MC-DG-156
3 1 J-61 AXR-52 5" X 6.55mm W-10 B-C
Rev. 03
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-156 1 J-63 AXR-54 5" X 6.55mm W-39 B-C
Rev. 03
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157
1 Rev. 02 Pass No. - 07 J-25 XR-459 6" X 7.11mm W-78 B-C
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157
1 Rev. 02 Pass No. - 05 J-5 XR-287 6" X 7.11mm W-11 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. - 05 J-26 XR-308 6" X 7.11mm W-11 B-C
Rev. 02
C-A
A-B
JNKI-046-CDU2B-MC-DG-157
3 Pass No. - 05 J-73 XR-355 6" X 7.11mm W-47 B-C
Rev. 02
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. - 07 J-18 XR-425 6" X 7.11mm W-11 B-C
Rev. 02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 08.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1B-MC-DG-158
1 Rev.04 Pass No. -6 J-633 CXR-1579 6" X 7.11mm W-37 B-C
C-A
A-B
2 JNKI-046-CDU1B-MC-DG-158 Pass No. -7 J-733 CXR-1580 6" X 7.11mm W-37 B-C
Rev.04
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 08.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1B-MC-DG-158
1 Rev.04 Pass No. -2 J-226 CXR-1535 6" X 7.11mm W-119 B-C
C-A
A-B
2 JNKI-046-CDU1B-MC-DG-158 Pass No. -2 J-233 CXR-1575 6" X 7.11mm W-37 B-C
Rev.04
C-A
A-B
JNKI-046-CDU1B-MC-DG-158
3 Pass No. -3 J-333 CXR-1576 6" X 7.11mm W-37 B-C
Rev.04
C-A
A-B
4 JNKI-046-CDU1B-MC-DG-158 Pass No. -6 J-626 CXR-1533 6" X 7.11mm W-32 B-C
Rev.04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 08.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1B-MC-DG-158
1 Rev.04 Pass No. -2 J-226 CXR-1535 6" X 7.11mm W-119 B-C
C-A
A-B
2 JNKI-046-CDU1B-MC-DG-158 Pass No. -2 J-233 CXR-1575 6" X 7.11mm W-37 B-C
Rev.04
C-A
A-B
JNKI-046-CDU1B-MC-DG-158
3 Pass No. -3 J-333 CXR-1576 6" X 7.11mm W-37 B-C
Rev.04
C-A
A-B
4 JNKI-046-CDU1B-MC-DG-158 Pass No. -6 J-626 CXR-1533 6" X 7.11mm W-32 B-C
Rev.04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 08.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158
1 Rev.06 Pass No. -8 J-6 CXR-1500 6" X 7.11mm W-12 B-C
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 08.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158
1 Rev.06 Pass No. -1 J-12 CXR-1475 6" X 7.11mm W-33 B-C
C-A
A-B
2 JNKI-046-CDU1A-MC-DG-158 Pass No. -5 J-12 CXR-1479 6" X 7.11mm W-45 B-C
Rev.06
C-A
A-B
JNKI-046-CDU1A-MC-DG-158
3 Pass No. - 6 J-12 CXR-1502 6" X 7.11mm W-12 B-C
Rev.06
C-A
A-B
4 JNKI-046-CDU1A-MC-DG-158 Pass No. 7 J-11 CXR-1480 6" X 7.11mm W-45 B-C
Rev.06
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 08.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2A-MC-DG-157
1 Rev.02 Pass No. -1 J-107 XR-1463 5" X 6.55mm W-33 B-C
C-A
A-B
2 JNKI-046-ATM2A-MC-DG-157 Pass No. -2 J-233 CXR-1217 5" X 6.55mm W-55 B-C
Rev.02
C-A
A-B
JNKI-046-ATM2A-MC-DG-157
3 Pass No. - 3 J-307 CXR-1465 5" X 6.55mm W-33 B-C
Rev.02
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 08.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25' Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157
1 Rev.02 Pass No. -7 J-71 XR-505 6" X 7.11mm W-11 B-C
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 08.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25' Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157
1 Rev.02 Pass No. -7 J-10 XR-444 6" X 7.11mm W-11 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. -7 J-13 XR-447 6" X 7.11mm W-11 B-C
Rev.02
C-A
A-B
JNKI-046-CDU2B-MC-DG-157
3 Pass No. -7 J-18 XR-452 6" X 7.11mm W-11 B-C
Rev.02
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. -7 J-21 XR-455 6" X 7.11mm W-11 B-C
Rev.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 08.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25' Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157
1 Rev.02 Pass No. -5 J-45 XR-327 6" X 7.11mm W-11 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. -5 J-68 XR-350 6" X 7.11mm W-11 B-C
Rev.02
C-A
A-B
JNKI-046-CDU2B-MC-DG-157
3 Pass No. -5 J-71 XR-353 6" X 7.11mm W-11 B-C
Rev.02
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. -7 J-5 XR-439 6" X 7.11mm W-11 B-C
Rev.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 08.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25' Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157
1 Rev.02 Pass No. -5 J-21 XR-303 6" X 7.11mm W-11 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. -5 J-26 XR-308 6" X 7.11mm W-11 B-C
Rev.02
C-A
A-B
JNKI-046-CDU2B-MC-DG-157
3 Pass No. -5 J-29 XR-311 6" X 7.11mm W-11 B-C
Rev.02
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. -5 J-34 XR-316 6" X 7.11mm W-11 B-C
Rev.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 08.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA TESTIX D4 Sensitivity 6th Wire
SFD : 6.25' Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157
1 Rev.02 Pass No. -5 J-5 XR-287 6" X 7.11mm W-11 B-C
C-A

2 JNKI-046-CDU2B-MC-DG-157 Pass No. -5 J-10 XR-292 6" X 7.11mm W-11


Rev.02

JNKI-046-CDU2B-MC-DG-157
3 Pass No. -5 J-13 XR-295 6" X 7.11mm W-11
Rev.02

4 JNKI-046-CDU2B-MC-DG-157 Pass No. -5 J-18 XR-300 6" X 7.11mm W-11


Rev.02

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-157
1 Rev.02 Pass No. -1 J-115 CXR-1148 5" X 6.55mm W-33 B-C
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2A-MC-DG-157
1 Rev.02 Pass No. -3 J-315 CXR-1053 5" X 6.55mm W-45 B-C
C-A
A-B
2 JNKI-046-ATM2A-MC-DG-157 Pass No. -3 J-316 CXR-1326 5"X 6.55mm W-45 B-C
Rev.02
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-159
1 Rev.02 Pass No. -6 J-6 CXR-771 6" X 6.11mm W-12 B-C
C-A
A-B
2 JNKI-046-CDU2A-MC-DG-159 Pass No. -6 J-9 CXR-829 6" X 6.11mm W-33 B-C
Rev.02
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A center
JNKI-046-CDU1B-MC-DG-158
1 Rev.04 Pass No. -6 J-608 CXR-253 6" X 6.11mm W-33

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU2B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158
1 Rev.06 Pass No. -3 J-12A CXR-1477 6" X 6.11mm W-33 B-C
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU2B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157
1 Rev.02 Pass No. -8 J-27 XR-540 6" X 6.11mm W-10 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. -8 J-62 XR-575 6" X 7.11mm W-10 B-C
Rev.02
C-A
A-B
JNKI-046-CDU2B-MC-DG-157 3" X
3 Pass No. -8 J-67 XR-580 W-10 B-C
Rev.02 7.682mm
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. -8 J-72 XR-585 3" X 7.62mm W-10 B-C
Rev.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU2B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157
1 Rev.02 Pass No. -8 J-3 XR-516 6" X 6.11mm W-10 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. -8 J-6 XR-519 6" X 7.11mm W-10 B-C
Rev.02
C-A
A-B
JNKI-046-CDU2B-MC-DG-157 3" X
3 Pass No. -8 J-11 XR-524 W-10 B-C
Rev.02 7.682mm
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. -8 J-14 XR-527 3" X 7.62mm W-10 B-C
Rev.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU2B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157
1 Rev.02 Pass No. -7 J-60 XR-494 6" X 6.11mm W-42 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. -7 J-69 XR-503 6" X 7.11mm W-47 B-C
Rev.02
C-A
A-B
JNKI-046-CDU2B-MC-DG-157 3" X
3 Pass No. -7 J-70 XR-504 W-47 B-C
Rev.02 7.682mm
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. -8 F-01A XR-514 3" X 7.62mm W-46 B-C
Rev.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU2B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157
1 Rev.02 Pass No. -6 J-67 XR-428 6" X 6.11mm W-10 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. -6 J-72 XR-433 6" X 7.11mm W-10 B-C
Rev.02
C-A
A-B
JNKI-046-CDU2B-MC-DG-157 3" X
3 Pass No. -7 F-01A XR-435 W-47 B-C
Rev.02 7.682mm
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. -7 J-59 XR-493 6" X 7.11mm W-47 B-C
Rev.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU2B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157
1 Rev.02 Pass No. -6 J-46 XR-407 6" X 6.11mm W-10 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. -6 J-51 XR-412 6" X 7.11mm W-10 B-C
Rev.02
C-A
A-B
JNKI-046-CDU2B-MC-DG-157
3 Pass No. -6 J-54 XR-415 6" X 7.11mm W-10 B-C
Rev.02
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. -6 J-62 XR-423 6" X 7.11mm W-10 B-C
Rev.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU2B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157
1 Rev.02 Pass No. -6 F-01A XR-362 3" X 7.62mm W-46 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. -6 J-27 XR-388 6" X 7.11mm W-10 B-C
Rev.02
C-A
A-B
JNKI-046-CDU2B-MC-DG-157
3 Pass No. -6 J-35 XR-396 6" X 7.11mm W-10 B-C
Rev.02
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. -6 J-38 XR-399 6" X 7.11mm W-10 B-C
Rev.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU2B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157
1 Rev.02 Pass No. -5 J-66 XR-348 6" X 7.11mm W-10 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. -5 J-69 XR-351 6" X 7.11mm W-47 B-C
Rev.02
C-A
A-B
JNKI-046-CDU2B-MC-DG-157
3 Pass No. -5 J-70 XR-352 6" X 7.11mm W-47 B-C
Rev.02
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. -5 J-73 XR-355 6" X 7.11mm W-47 B-C
Rev.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU2B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157
1 Rev.02 Pass No. -5 J-50 XR-332 6" X 7.11mm W-11 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. -5 J-53 XR-335 6" X 7.11mm W-11 B-C
Rev.02
C-A
A-B
JNKI-046-CDU2B-MC-DG-157
3 Pass No. -5 J-58 XR-340 6" X 7.11mm W-11 B-C
Rev.02
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. -5 J-61 XR-343 6" X 7.11mm W-11 B-C
Rev.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU2B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157
1 Rev.02 Pass No. -5 F-01A XR-283 3" X 7.62mm W-47 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. -5 J-37 XR-319 6" X 7.11mm W-11 B-C
Rev.02
C-A
A-B
JNKI-046-CDU2B-MC-DG-157
3 Pass No. -5 J-42 XR-324 6" X 7.11mm W-11 B-C
Rev.02
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. -5 J-45 XR-327 6" X 7.11mm W-11 B-C
Rev.02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158
1 Rev.06 Pass No. -5 J-1 CXR-1576 6" X 7.11mm W-12 B-C
C-A
A-B
2 JNKI-046-CDU1A-MC-DG-158 Pass No. -5 J-3 CXR-1580 3" X 7.62mm W-12 B-C
Rev.06
C-A
A-B
JNKI-046-CDU1A-MC-DG-158
3 Pass No. -7 J-1 CXR-1577 6" X 7.11mm W-12 B-C
Rev.06
C-A
A-B
4 JNKI-046-CDU1A-MC-DG-158 Pass No. -7 J-3 CXR-1581 3" X 7.62mm W-12 B-C
Rev.06
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158
1 Rev.06 Pass No. -1 J-1 CXR-1574 6" X 7.11mm W-12 B-C
C-A
A-B
2 JNKI-046-CDU1A-MC-DG-158 Pass No. -1 J-3 CXR-1578 3" X 7.62mm W-12 B-C
Rev.06
C-A
A-B
JNKI-046-CDU1A-MC-DG-158
3 Pass No. -3 J-1 CXR-1575 6" X 7.11mm W-12 B-C
Rev.06
C-A
A-B
4 JNKI-046-CDU1A-MC-DG-158 Pass No. -3 J-3 CXR-1579 3" X 7.62mm W-12 B-C
Rev.06
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2A-MC-DG-157
1 Rev.02 Pass No. -1 J-112 CXR-1537 5" X 6.55mm W-37 B-C
C-A
A-B
2 JNKI-046-ATM2A-MC-DG-157 Pass No. -4 J-422 CXR-1572 5" X 6.55mm W-12 B-C
Rev.02
C-A
A-B
JNKI-046-ATM2A-MC-DG-157
3 Pass No. -4 J-423 CXR-1573 5" X 6.55mm W-12 B-C
Rev.02
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2A-MC-DG-157
1 Rev.02 Pass No. -1 J-112 CXR-1537 5" X 6.55mm W-37 B-C
C-A
A-B
2 JNKI-046-ATM2A-MC-DG-157 Pass No. -4 J-422 CXR-1572 5" X 6.55mm W-12 B-C
Rev.02
C-A
A-B
JNKI-046-ATM2A-MC-DG-157
3 Pass No. -4 J-423 CXR-1573 5" X 6.55mm W-12 B-C
Rev.02
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-157
1 Rev.02 Pass No. -1 J-111 CXR-1536 5" X 6.55mm W-37 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-157 Pass No. -2 J-211 CXR-1516 5" X 6.55mm W-37 B-C
Rev.02
C-A
A-B
JNKI-046-ATM2B-MC-DG-157
3 Pass No. -2 J-212 CXR-1517 5" X 6.55mm W-37 B-C
Rev.02
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1B-MC-DG-158
1 Rev.04 Pass No. -5 J-533 CXR-1578 6" X 7.11mm W-45 B-C
C-A
A-B
2 JNKI-046-CDU1B-MC-DG-158 Pass No. -6 J-633 CXR-1579 6" X 7.11mm W-60 B-C
Rev.04
C-A
A-B
JNKI-046-CDU1B-MC-DG-158
3 Pass No. -7 J-733 CXR-1580 6" X 7.11mm W-45 B-C
Rev.04
C-A
A-B
4 JNKI-046-CDU1B-MC-DG-158 Pass No. -8 J-833 CXR-1581 6" X 7.11mm W-60 B-C
Rev.04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :______________ CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1B-MC-DG-158
1 Rev.04 Pass No. -1 J-133 CXR-1574 6" X 7.11mm W-37 B-C
C-A
A-B
2 JNKI-046-CDU1B-MC-DG-158 Pass No. -2 J-233 CXR-1575 6" X 7.11mm W-37 B-C
Rev.04
C-A
A-B
JNKI-046-CDU1B-MC-DG-158
3 Pass No. -3 J-333 CXR-1576 6" X 7.11mm W-37 B-C
Rev.04
C-A
A-B
4 JNKI-046-CDU1B-MC-DG-158 Pass No. -4 J-433 CXR-1577 6" X 7.11mm W-37 B-C
Rev.04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1B-MC-DG-158
1 Rev.04 Pass No. -7 J-725 CXR-1556 6" X 7.11mm W-119 B-C
C-A
A-B
2 JNKI-046-CDU1B-MC-DG-158 Pass No. -7 J-726 CXR-1557 6" X 7.11mm W-119 B-C
Rev.04
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1B-MC-DG-158
1 Rev.04 Pass No. -5 J-525 CXR-1554 6" X 7.11mm W-119 B-C
C-A
A-B
2 JNKI-046-CDU1B-MC-DG-158 Pass No. -5 J-526 CXR-1555 6" X 7.11mm W-119 B-C
Rev.04
C-A
A-B
JNKI-046-CDU1B-MC-DG-158
3 Pass No. -6 J-625 CXR-1532 6" X 7.11mm W-32 B-C
Rev.04
C-A
A-B
4 JNKI-046-CDU1B-MC-DG-158 Pass No. -6 J-626 CXR-1533 6" X 7.11mm W-32 B-C
Rev.04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1B-MC-DG-158
1 Rev.04 Pass No. -3 J-325 CXR-1552 6" X 7.11mm W-32 B-C
C-A
A-B
2 JNKI-046-CDU1B-MC-DG-158 Pass No. -3 J-326 CXR-1553 6" X 7.11mm W-32 B-C
Rev.04
C-A
A-B
JNKI-046-CDU1B-MC-DG-158
3 Pass No. -4 J-425 CXR-1524 6" X 7.11mm W-32 B-C
Rev.04
C-A
A-B
4 JNKI-046-CDU1B-MC-DG-158 Pass No. -4 J-426 CXR-1525 6" X 7.11mm W-32 B-C
Rev.04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1B-MC-DG-158
1 Rev.04 Pass No. -1 J-125 CXR-1550 6" X 7.11mm W-32 B-C
C-A
A-B
2 JNKI-046-CDU1B-MC-DG-158 Pass No. -1 J-126 CXR-1551 6" X 7.11mm W-32 B-C
Rev.04
C-A
A-B
JNKI-046-CDU1B-MC-DG-158
3 Pass No. -2 J-225 CXR-1534 6" X 7.11mm W-119 B-C
Rev.04
C-A
A-B
4 JNKI-046-CDU1B-MC-DG-158 Pass No. -2 J-226 CXR-1535 6" X 7.11mm W-119 B-C
Rev.04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU2B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157
1 Rev. 02 Pass No. 7 J-58 XR-492 6" X 7.11mm W-11 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. 7 J-61 XR-495 6" X 7.11mm W-11 B-C
Rev. 02
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU2B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157
1 Rev. 02 Pass No. 7 J-26 XR-460 6" X 7.11mm W-11 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. 7 J-29 XR-463 6" X 7.11mm W-11 B-C
Rev. 02
C-A
A-B
JNKI-046-CDU2B-MC-DG-157
3 Pass No. 7 J-34 XR-468 6" X 7.11mm W-11 B-C
Rev. 02
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. 7 J-37 XR-471 6" X 7.11mm W-11 B-C
Rev. 02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158
1 Rev. 06 Pass 5 J-06 CXR-1482 6" X 7.11mm W-45 B-C
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158
1 Rev. 06 Pass 1 J-12 CXR-1475 6" X 7.11mm W-33 B-C
C-A
A-B
2 JNKI-046-CDU1A-MC-DG-158 Pass 3 J-12 CXR-1477 6" X 7.11mm W-33 B-C
Rev. 06
C-A
A-B
JNKI-046-CDU1A-MC-DG-158
3 Pass 3 J-5 CXR-1486 6" X 7.11mm W-33 B-C
Rev. 06
C-A
A-B
4 JNKI-046-CDU1A-MC-DG-158 Pass 5 J-5 CXR-1483 6" X 7.11mm W-45 B-C
Rev. 06
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU2A/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-159
1 Rev. 02 Pass 1 J-10 CXR-769 6" X 7.11mm W-45 B-C
C-A
A-B
2 JNKI-046-CDU2A-MC-DG-159 Pass 2 J-7 CXR-772 6" X 7.11mm W-45 B-C
Rev. 02
C-A
A-B
JNKI-046-CDU2A-MC-DG-159
3 Pass 2 J-9 CXR-774 6" X 7.11mm W-45 B-C
Rev. 02
C-A
A-B
4 JNKI-046-CDU2A-MC-DG-159 Pass 5 J-6 CXR-832 6" X 7.11mm W-45 B-C
Rev. 02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/ATM2B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 5.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-157
1 Rev. 03 Pass 3 J-305 CXR-1444 5" X 6.55mm W-33 B-C
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158
1 Rev. 06 Pass 8 J-11 CXR-1490 6" X 7.11mm W-45 B-C
C-A
A-B
2 JNKI-046-CDU1A-MC-DG-158 Pass 8 J-12 CXR-1491 6" X 7.11mm W-45 B-C
Rev. 06
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158
1 Rev. 06 Pass 7 J-11 CXR-1480 6" X 7.11mm W-45 B-C
C-A
A-B
2 JNKI-046-CDU1A-MC-DG-158 Pass 7 J-12 CXR-1481 6" X 7.11mm W-45 B-C
Rev. 06
C-A
A-B
JNKI-046-CDU1A-MC-DG-158
3 Pass 8 J-5 CXR-1499 6" X 7.11mm W-12 B-C
Rev. 06
C-A
A-B
4 JNKI-046-CDU1A-MC-DG-158 Pass 8 J-6 CXR-1500 6" X 7.11mm W-12 B-C
Rev. 06
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158
1 Rev. 06 Pass 6 J-11 CXR-1501 6" X 7.11mm W-12 B-C
C-A
A-B
2 JNKI-046-CDU1A-MC-DG-158 Pass 6 J-12 CXR-1502 6" X 7.11mm W-12 B-C
Rev. 06
C-A
A-B
JNKI-046-CDU1A-MC-DG-158
3 Pass 7 J-5 CXR-1488 6" X 7.11mm W-45 B-C
Rev. 06
C-A
A-B
4 JNKI-046-CDU1A-MC-DG-158 Pass 7 J-6 CXR-1489 6" X 7.11mm W-45 B-C
Rev. 06
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158
1 Rev. 06 Pass 5 J-11 CXR-1478 6" X 7.11mm W-45 B-C
C-A
A-B
2 JNKI-046-CDU1A-MC-DG-158 Pass 5 J-12 CXR-1479 6" X 7.11mm W-45 B-C
Rev. 06
C-A
A-B
JNKI-046-CDU1A-MC-DG-158
3 Pass 6 J-5 CXR-1530 6" X 7.11mm W-45 B-C
Rev. 06
C-A
A-B
4 JNKI-046-CDU1A-MC-DG-158 Pass 6 J-6 CXR-1531 6" X 7.11mm W-45 B-C
Rev. 06
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158
1 Rev. 06 Pass 4 J-6 CXR-1529 6" X 7.11mm W-12 B-C
C-A
A-B
2 JNKI-046-CDU1A-MC-DG-158 Pass 4 J-11 CXR-1503 6" X 7.11mm W-12 B-C
Rev. 06
C-A
A-B
JNKI-046-CDU1A-MC-DG-158
3 Pass 4 J-12 CXR-1504 6" X 7.11mm W-12 B-C
Rev. 06
C-A
A-B
4 JNKI-046-CDU1A-MC-DG-158 Pass 5 J-6 CXR-1482 6" X 7.11mm W-45 B-C
Rev. 06
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 6.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158
1 Rev. 06 Pass 2 J-5 CXR-1526 6" X 7.11mm W-12 B-C
C-A
A-B
2 JNKI-046-CDU1A-MC-DG-158 Pass 2 J-6 CXR-1527 6" X 7.11mm W-12 B-C
Rev. 06
C-A
A-B
JNKI-046-CDU1A-MC-DG-158
3 Pass 3 J-5 CXR-1486 6" X 7.11mm W-33 B-C
Rev. 06
C-A
A-B
4 JNKI-046-CDU1A-MC-DG-158 Pass 4 J-5 CXR-1528 6" X 7.11mm W-12 B-C
Rev. 06
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/ATM2B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 5.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-157
1 Rev. 02 Pass 4 J-411 CXR-1548 5" X 6.55mm W-60 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-157 Pass 4 J-412 CXR-1515 5" X 6.55mm W-60 B-C
Rev. 02
C-A
A-B
JNKI-046-ATM2B-MC-DG-157
3 Pass 4 J-419 CXR-1544 5" X 6.55mm W-60 B-C
Rev. 02
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-157 Pass 4 J-420 CXR-1545 5" X 6.55mm W-60 B-C
Rev. 02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/ATM2B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 5.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-157
1 Rev. 02 Pass 3 J-320 CXR-1543 5" X 6.55mm W-60 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-157 Pass 3 J-324 CXR-1515 5" X 6.55mm W-33 B-C
Rev. 02
C-A
A-B
JNKI-046-ATM2B-MC-DG-157
3 Pass 4 J-405 CXR-1513 5" X 6.55mm W-82 B-C
Rev. 02
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-157 Pass 4 J-406 CXR-1514 5" X 6.55mm W-82 B-C
Rev. 02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/ATM2B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 5.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-157
1 Rev. 02 Pass 3 J-305 CXR-1444 5" X 6.55mm W-33 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-157 Pass 3 J-311 CXR-1540 5" X 6.55mm W-86 B-C
Rev. 02
C-A
A-B
JNKI-046-ATM2B-MC-DG-157
3 Pass 3 J-312 CXR-1541 5" X 6.55mm W-86 B-C
Rev. 02
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-157 Pass 3 J-319 CXR-1542 5" X 6.55mm W-60 B-C
Rev. 02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/ATM2B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 5.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-157
1 Rev. 02 Pass 2 J-219 CXR-1546 5" X 6.55mm W-37 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-157 Pass 2 J-220 CXR-1547 5" X 6.55mm W-37 B-C
Rev. 02
C-A
A-B
JNKI-046-ATM2B-MC-DG-157
3 Pass 2 J-225 CXR-1466 5" X 6.55mm W-33 B-C
Rev. 02
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-157 Pass 2 J-226 CXR-1467 5" X 6.55mm W-33 B-C
Rev. 02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/ATM2B/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.06.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :20 CU Developing Temp : 5 Min At 20 Deg. C
Film : AGFA D4 STRUCTRIX Sensitivity 6th Wire
SFD : 5.25" Density : 2 to 4
Screen : Lead (0.15mm) Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-157
1 Rev. 02 Pass 1 J-105 CXR-1492 5" X 6.55mm W-33 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-157 Pass 1 J-106 CXR-1493 5" X 6.55mm W-33 B-C
Rev. 02
C-A
A-B
JNKI-046-ATM2B-MC-DG-157
3 Pass 2 J-105 CXR-1511 5" X 6.55mm W-82 B-C
Rev. 02
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-157 Pass 2 J-206 CXR-1512 5" X 6.55mm W-82 B-C
Rev. 02
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE
JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-156 5" Ø X
1 Rev 03 Pass No. - 02 J-50 AXR-108 6.55 mm W-75 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-156 Pass No. - 02 J-51 AXR-109 5" Ø X W-75 B-C
Rev 03 6.55 mm
C-A
A-B
JNKI-046-ATM2B-MC-DG-156 5" Ø X
3 Pass No. - 02 J-66 AXR-125 W-86 B-C
Rev 03 6.55 mm
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-156 Pass No. - 02 J-67 AXR-126 5" Ø X W-86 B-C
Rev 03 6.55 mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-156 5" Ø X
1 Rev 03 Pass No. - 02 J-26 AXR-84 6.55 mm W-75 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-156 Pass No. - 02 J-27 AXR-85 5" Ø X W-75 B-C
Rev 03 6.55 mm
C-A
A-B
JNKI-046-ATM2B-MC-DG-156 5" Ø X
3 Pass No. - 02 J-42 AXR-100 W-85 B-C
Rev 03 6.55 mm
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-156 Pass No. - 02 J-43 AXR-101 5" Ø X W-85 B-C
Rev 03 6.55 mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-156 5" Ø X
1 Rev 03 Pass No. - 03 J-66 AXR-198 6.55 mm W-86 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-156 Pass No. - 03 J-67 AXR-199 5" Ø X W-86 B-C
Rev 03 6.55 mm
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-156 5" Ø X
1 Rev 03 Pass No. - 01 J-18 AXR-19 6.55 mm W-85 B-C
C-A
A-B
2 JNKI-046-ATM2B-MC-DG-156 Pass No. - 01 J-19 AXR-20 5" Ø X W-85 B-C
Rev 03 6.55 mm
C-A
A-B
JNKI-046-ATM2B-MC-DG-156 5" Ø X
3 Pass No. - 01 J-50 AXR-44 W-86 B-C
Rev 03 6.55 mm
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-157 6" Ø X
1 Rev 03 Pass No. - 06 J-35 XR-420 7.11 mm W-47 B-C
C-A
A-B
2 JNKI-046-CDU2A-MC-DG-157 Pass No. - 06 J-38 XR-423 6" Ø X W-47 B-C
Rev 03 7.11 mm
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-157 6" Ø X
1 Rev 03 Pass No. - 06 J-19 XR-403 7.11 mm W-10 B-C
C-A
A-B
2 JNKI-046-CDU2A-MC-DG-157 Pass No. - 06 J-22 XR-406 6" Ø X W-10 B-C
Rev 03 7.11 mm
C-A
A-B
JNKI-046-CDU2A-MC-DG-157 6" Ø X
3 Pass No. - 06 J-27 XR-412 W-10 B-C
Rev 03 7.11 mm
C-A
A-B
4 JNKI-046-CDU2A-MC-DG-157 Pass No. - 06 J-30 XR-415 6" Ø X W-10 B-C
Rev 03 7.11 mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-157 6" Ø X
1 Rev 03 Pass No. - 06 J-3 XR-387 7.11 mm W-10 B-C
C-A
A-B
2 JNKI-046-CDU2A-MC-DG-157 Pass No. - 06 J-6 XR-390 6" Ø X W-10 B-C
Rev 03 7.11 mm
C-A
A-B
JNKI-046-CDU2A-MC-DG-157 6" Ø X
3 Pass No. - 06 J-11 XR-395 W-10 B-C
Rev 03 7.11 mm
C-A
A-B
4 JNKI-046-CDU2A-MC-DG-157 Pass No. - 06 J-14 XR-398 6" Ø X W-10 B-C
Rev 03 7.11 mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-157 6" Ø X
1 Rev 03 Pass No. - 05 J-61 XR-366 7.11 mm W-11 B-C
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-157 6" Ø X
1 Rev 03 Pass No. - 05 J-45 XR-350 7.11 mm W-11 B-C
C-A
A-B
2 JNKI-046-CDU2A-MC-DG-157 Pass No. - 05 J-50 XR-355 6" Ø X W-11 B-C
Rev 03 7.11 mm
C-A
A-B
JNKI-046-CDU2A-MC-DG-157 6" Ø X
3 Pass No. - 05 J-53 XR-358 W-11 B-C
Rev 03 7.11 mm
C-A
A-B
4 JNKI-046-CDU2A-MC-DG-157 Pass No. - 05 J-58 XR-363 6" Ø X W-11 B-C
Rev 03 7.11 mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-157 6" Ø X
1 Rev 03 Pass No. - 05 J-29 XR-334 7.11 mm W-11 B-C
C-A
A-B
2 JNKI-046-CDU2A-MC-DG-157 Pass No. - 05 J-34 XR-339 6" Ø X W-11 B-C
Rev 03 7.11 mm
C-A
A-B
JNKI-046-CDU2A-MC-DG-157 6" Ø X
3 Pass No. - 05 J-37 XR-342 W-11 B-C
Rev 03 7.11 mm
C-A
A-B
4 JNKI-046-CDU2A-MC-DG-157 Pass No. - 05 J-42 XR-347 6" Ø X W-11 B-C
Rev 03 7.11 mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-158 6" Ø X
1 Rev 03 Pass No. - 07 J-732 CXR-1461 7.11 mm W-33 B-C
C-A
A-B
2 JNKI-046-CDU2A-MC-DG-158 Pass No. - 07 J-832 CXR-1462 6" Ø X W-33 B-C
Rev 03 7.11 mm
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-158 6" Ø X
1 Rev 03 Pass No. - 03 J-332 CXR-1457 7.11 mm W-45 B-C
C-A
A-B
2 JNKI-046-CDU2A-MC-DG-158 Pass No. - 04 J-432 CXR-1458 6" Ø X W-45 B-C
Rev 03 7.11 mm
C-A
A-B
JNKI-046-CDU2A-MC-DG-158 6" Ø X
3 Pass No. - 05 J-532 CXR-1459 W-33 B-C
Rev 03 7.11 mm
C-A
A-B
4 JNKI-046-CDU2A-MC-DG-158 Pass No. - 06 J-632 CXR-1460 6" Ø X W-33 B-C
Rev 03 7.11 mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-158 6" Ø X
1 Rev 03 Pass No. - 01 J-132 CXR-1455 7.11 mm W-45 B-C
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-158 6" Ø X
1 Rev 03 Pass No. - 05 J-525 CXR-1451 7.11 mm W-33 B-C
C-A
A-B
2 JNKI-046-CDU2A-MC-DG-158 Pass No. - 05 J-526 CXR-1452 6" Ø X W-33 B-C
Rev 03 7.11 mm
C-A
A-B
JNKI-046-CDU2A-MC-DG-158 6" Ø X
3 Pass No. - 07 J-725 CXR-1453 W-33 B-C
Rev 03 7.11 mm
C-A
A-B
4 JNKI-046-CDU2A-MC-DG-158 Pass No. - 07 J-726 CXR-1454 6" Ø X W-33 B-C
Rev 03 7.11 mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-158 6" Ø X
1 Rev 03 Pass No. - 01 J-125 CXR-1447 7.11 mm W-45 B-C
C-A
A-B
2 JNKI-046-CDU2A-MC-DG-158 Pass No. - 01 J-126 CXR-1448 6" Ø X W-45 B-C
Rev 03 7.11 mm
C-A
A-B
JNKI-046-CDU2A-MC-DG-158 6" Ø X
3 Pass No. - 03 J-325 CXR-1449 W-45 B-C
Rev 03 7.11 mm
C-A
A-B
4 JNKI-046-CDU2A-MC-DG-158 Pass No. - 08 J-326 CXR-1450 6" Ø X W-45 B-C
Rev 03 7.11 mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-158 6" Ø X
1 Rev 03 Pass No. - 04 J-425 CXR-1443 7.11 mm W-45 B-C
C-A
A-B
2 JNKI-046-CDU2A-MC-DG-158 Pass No. - 04 J-426 CXR-1444 6" Ø X W-33 B-C
Rev 03 7.11 mm
C-A
A-B
JNKI-046-CDU2A-MC-DG-158 6" Ø X
3 Pass No. - 08 J-825 CXR-1445 W-33 B-C
Rev 03 7.11 mm
C-A
A-B
4 JNKI-046-CDU2A-MC-DG-158 Pass No. - 08 J-826 CXR-1446 6" Ø X W-33 B-C
Rev 03 7.11 mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 6th Wire
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-158 6" Ø X
1 Rev 03 Pass No. - 06 J-626 CXR-1422 7.11 mm W-33 B-C
C-A
A-B
2 JNKI-046-CDU2A-MC-DG-158 Pass No. - 06 J-625 CXR-1423 6" Ø X W-33 B-C
Rev 03 7.11 mm
C-A
A-B
JNKI-046-CDU2A-MC-DG-158 6" Ø X
3 Pass No. - 02 J-226 CXR-1424 W-45 B-C
Rev 03 7.11 mm
C-A
A-B
4 JNKI-046-CDU2A-MC-DG-158 Pass No. - 02 J-225 CXR-1425 6" Ø X W-45 B-C
Rev 03 7.11 mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 2 to 4
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-157 6" Ø X
1 Rev 03 Pass No. - 07 J-26 XR-484 7.11 mm W-11 B-C
C-A
A-B
2 JNKI-046-CDU2A-MC-DG-157 Pass No. - 07 J-52 XR-510 6" Ø X W-60 B-C
Rev 03 7.11 mm
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 2 to 4
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-157 6" Ø X
1 Rev 03 Pass No. - 07 J-10 XR-468 7.11 mm W-11 B-C
C-A
A-B
2 JNKI-046-CDU2A-MC-DG-157 Pass No. - 07 J-13 XR-471 6" Ø X W-11 B-C
Rev 03 7.11 mm
C-A
A-B
JNKI-046-CDU2A-MC-DG-157 6" Ø X
3 Pass No. - 07 J-18 XR-476 W-11 B-C
Rev 03 7.11 mm
C-A
A-B
4 JNKI-046-CDU2A-MC-DG-157 Pass No. - 07 J-21 XR-479 6" Ø X W-11 B-C
Rev 03 7.11 mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 2 to 4
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-157 6" Ø X
1 Rev 03 Pass No. - 06 J-43 XR-428 7.11 mm W-47 B-C
C-A
A-B
2 JNKI-046-CDU2A-MC-DG-157 Pass No. - 06 J-46 XR-431 6" Ø X W-47 B-C
Rev 03 7.11 mm
C-A
A-B
JNKI-046-CDU2A-MC-DG-157 6" Ø X
3 Pass No. - 06 J-51 XR-436 W-47 B-C
Rev 03 7.11 mm
C-A
A-B
4 JNKI-046-CDU2A-MC-DG-157 Pass No. - 06 J-54 XR-439 6" Ø X W-47 B-C
Rev 03 7.11 mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 28.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity 2 to 4
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2A-MC-DG-157 5" Ø X
1 Rev 02 Pass No. - 01 J-107 CXR-1463 6.55 mm W-33 B-C
C-A
A-B
2 JNKI-046-ATM2A-MC-DG-157 Pass No. - 02 J-204 CXR-1464 5" Ø X W-33 B-C
Rev 02 6.55 mm
C-A
A-B
JNKI-046-ATM2A-MC-DG-157 5" Ø X
3 Pass No. - 03 J-307 CXR-1465 W-33 B-C
Rev 02 6.55 mm
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 23.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157 6" Ø x
1 Rev 03 Pass No. - 02 J-58 XR-109A 7.11mm W-10 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. - 02 J-61 XR-112 6" Ø x W-10 B-C
Rev 03 7.11mm
C-A
A-B
JNKI-046-CDU2B-MC-DG-157 6" Ø x
3 Pass No. - 02 J-68 XR-119A W-10 B-C
Rev 03 7.11mm
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. - 02 J-71 XR-122A 6" Ø x W-10 B-C
Rev 03 7.11mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 23.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157 6" Ø x
1 Rev 03 Pass No. - 02 J-42 XR-97 7.11mm W-10 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. - 02 J-45 XR-100A 6" Ø x W-10 B-C
Rev 03 7.11mm
C-A
A-B
JNKI-046-CDU2B-MC-DG-157 6" Ø x
3 Pass No. - 02 J-50 XR-103 W-10 B-C
Rev 03 7.11mm
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. - 02 J-53 XR-106 6" Ø x W-10 B-C
Rev 03 7.11mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 23.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157 6" Ø x
1 Rev 03 Pass No. - 02 J-26 XR-84A 7.11mm W-10 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. - 02 J-29 XR-87 6" Ø x W-10 B-C
Rev 03 7.11mm
C-A
A-B
JNKI-046-CDU2B-MC-DG-157 6" Ø x
3 Pass No. - 02 J-34 XR-91 W-10 B-C
Rev 03 7.11mm
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. - 02 J-37 XR-94 6" Ø x W-10 B-C
Rev 03 7.11mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 23.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157 6" Ø x
1 Rev 03 Pass No. - 02 J-26 XR-84A 7.11mm W-10 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. - 02 J-29 XR-87 6" Ø x W-10 B-C
Rev 03 7.11mm
C-A
A-B
JNKI-046-CDU2B-MC-DG-157 6" Ø x
3 Pass No. - 02 J-34 XR-91 W-10 B-C
Rev 03 7.11mm
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. - 02 J-37 XR-94 6" Ø x W-10 B-C
Rev 03 7.11mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 23.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157 6" Ø x
1 Rev 03 Pass No. - 02 J-10 XR-68 7.11mm W-10 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. - 02 J-13 XR-71 6" Ø x W-10 B-C
Rev 03 7.11mm
C-A
A-B
JNKI-046-CDU2B-MC-DG-157 6" Ø x
3 Pass No. - 01 J-18 XR-76 W-10 B-C
Rev 03 7.11mm
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. - 02 J-21 XR-79 6" Ø x W-10 B-C
Rev 03 7.11mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 23.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157 6" Ø x
1 Rev 03 Pass No. - 02 J-10 XR-68 7.11mm W-10 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. - 02 J-13 XR-71 6" Ø x W-10 B-C
Rev 03 7.11mm
C-A
A-B
JNKI-046-CDU2B-MC-DG-157 6" Ø x
3 Pass No. - 01 J-18 XR-76 W-10 B-C
Rev 03 7.11mm
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. - 02 J-21 XR-79 6" Ø x W-10 B-C
Rev 03 7.11mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 23.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157 6" Ø x
1 Rev 03 Pass No. - 01 J-46 XR-33 7.11mm W-47 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. - 01 J-51 XR-36 6" Ø x W-47 B-C
Rev 03 7.11mm
C-A
A-B
JNKI-046-CDU2B-MC-DG-157 6" Ø x
3 Pass No. - 01 J-54 XR-39A W-47 B-C
Rev 03 7.11mm
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. - 02 J-05 XR-63 6" Ø x W-10 B-C
Rev 03 7.11mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 23.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2A-MC-DG-158 6" Ø x
1 Rev 03 Pass No. - 07 J-722 XR-1409 7.11mm W-33 B-C
C-A
A-B
2 JNKI-046-CDU2A-MC-DG-158 Pass No. - 07 J-723 XR-1410 6" Ø x W-33 B-C
Rev 03 7.11mm
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 23.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU2B-MC-DG-157 3" Ø x
1 Rev 03 Pass No. - 02 J-F-01A XR-059 7.62mm W-10 B-C
C-A
A-B
2 JNKI-046-CDU2B-MC-DG-157 Pass No. - 01 J-19 XR-14 6" Ø x W-47 B-C
Rev 03 7.11mm
C-A
A-B
JNKI-046-CDU2B-MC-DG-157 6" Ø x
3 Pass No. - 01 J-27 XR-20 W-47 B-C
Rev 03 7.11mm
C-A
A-B
4 JNKI-046-CDU2B-MC-DG-157 Pass No. - 01 J-30 XR-12 6" Ø x W-47 B-C
Rev 03 7.11mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 23.05.2022
EPC/PMC: ICA FLUOR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time :
Source Strength :___________________CU Developing Temp : 5 Min At 20 Deg. C
Film : Sensitivity
SFD : Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-ATM2B-MC-DG-156 5" Ø x
1 Rev 03 Pass No. - 01 J-65 R AXR-143 6.55mm W-11 -
-
-
2 JNKI-046-ATM2B-MC-DG-156 Pass No. - 04 J-44 R AXR-246 5" Ø x W-47 -
Rev 03 6.55mm
C-A
-
JNKI-046-ATM2B-MC-DG-156 5" Ø x
3 Pass No. - 04 J-28 R AXR-1A63 W-47 -
Rev 03 6.55mm
C-A
A-B
4 JNKI-046-ATM2B-MC-DG-156 Pass No. - 01 J-25 AXR-1A98 5" Ø x W-42 B-C
Rev 03 6.55mm
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/WQT


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.01.2022
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 3 Min
Source Strength : 11 CU Developing Temp : 5 Min At 20 Deg. C
Film : Kodak MS125 Sensitivity 6th Wire
SFD : 5.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

RUC
JNKI/MUNDRA/WPS-6
1 ARUN KUMAR WQT-95 - - 6" x 7.11mm - NSD
NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/ATM1A-CONV97


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 07.01.2022
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 3 Min
Source Strength : 11 CU Developing Temp : 5 Min At 20 Deg. C
Film : Kodak MS125 Sensitivity 6th Wire
SFD : 5.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-ATM1A-MC-DG-157 5" X
1 Rev.05 3 J-319 CXR-336 6.55MM W-33 B-C NSD
C-A RUC
A-B NSD

2 JNKI-046-ATM1A-MC-DG-157 3 J-320 CXR-337 5" X W-33 B-C NSD


Rev.05 6.55MM
C-A NSD

A-B NSD
JNKI-046-ATM1A-MC-DG-157 5" X
3 2 J-219 CXR-334 W-33 B-C RUC
Rev.05 6.55MM
C-A NSD

A-B NSD

4 JNKI-046-ATM1A-MC-DG-157 2 J-220 CXR-335 5" X W-33 B-C NSD


Rev.05 6.55MM
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/ATM1A-CONV89


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 03.01.2022
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 3 Min
Source Strength : 11 CU Developing Temp : 5 Min At 20 Deg. C
Film : Kodak MS125 Sensitivity 2%
SFD : 5.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-ATM1A-MC-DG-157 5" X
1 Rev.05 4 J-425 CXR-316 6.55MM W-55 B-C EP
C-A NSD
A-B NSD

2 JNKI-046-ATM1A-MC-DG-157 4 J-426 CXR-317 5" X W-55 B-C NSD


Rev.05 6.55MM
C-A NSD D

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/ATM1A-CONV88


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 03.01.2022
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 3 Min
Source Strength : 11 CU Developing Temp : 5 Min At 20 Deg. C
Film : Kodak MS125 Sensitivity 2%
SFD : 5.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-ATM1A-MC-DG-157 5" X
1 Rev.05 2 J-225 CXR-312 6.55MM W-55 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-ATM1A-MC-DG-157 2 J-226 CXR-313 5" X W-55 B-C NSD


Rev.05 6.55MM
C-A NSD

A-B NSD
JNKI-046-ATM1A-MC-DG-157 5" X
3 3 J-325 CXR-314 W-55 B-C NSD
Rev.05 6.55MM
C-A NSD

A-B NSD

4 JNKI-046-ATM1A-MC-DG-157 3 J-325 CXR-315 5" X W-55 B-C NSD


Rev.05 6.55MM
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/ATM1A-CONV87


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 03.01.2022
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 3 Min
Source Strength : 11 CU Developing Temp : 5 Min At 20 Deg. C
Film : Kodak MS125 Sensitivity 2%
SFD : 5.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-ATM1A-MC-DG-157
1 Rev.05 3 J-324 CXR-300 5" X 6.55mm W-58 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-ATM1A-MC-DG-157 3 J-327 CXR-301 5" X 6.55mm W-55 B-C NSD


Rev.05
C-A NSD

A-B NSD
JNKI-046-ATM1A-MC-DG-157
3 4 J-424 CXR-302 5" X 6.55mm W-55 B-C NSD
Rev.05
C-A NSD

A-B NSD

4 JNKI-046-ATM1A-MC-DG-157 4 J-427 CXR-303 5" X 6.55mm W-55 B-C NSD


Rev.05
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/ATM1A-CONV86


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 03.01.2022
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 3 Min
Source Strength : 11 CU Developing Temp : 5 Min At 20 Deg. C
Film : Kodak MS125 Sensitivity 2%
SFD : 5.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-ATM1A-MC-DG-157
1 Rev.05 1 J-124 CXR-296 5" x 6.55mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-ATM1A-MC-DG-157 1 J-127 CXR-297 5" x 6.55mm W-33 B-C NSD


Rev.05
C-A NSD

A-B NSD
JNKI-046-ATM1A-MC-DG-157
3 2 J-224 CXR-298 5" x 6.55mm W-33 B-C NSD
Rev.05
C-A NSD

A-B NSD

4 JNKI-046-ATM1A-MC-DG-157 2 J-227 CXR-299 5" x 6.55mm W-33 B-C NSD


Rev.05
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/__________________


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : _______/__________/___20_________
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : _________________________
Source Strength : _____ CU Developing Temp : _________________________
Film : _______________________________ Sensitivity 2%
SFD : ______________________ Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity;
SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot; Dep: Depression

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV74


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 29.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD Acc


JNKI-046-CDU1B-MC-DG-158
1 Rev.04 6 J-608 CXR-253 6" X 7.11mm W-33 B-C NSD Acc
C-A NSD Acc
A-B NSD Acc
2 JNKI-046-CDU1B-MC-DG-158 6 J-609 CXR-254 6" X 7.11mm W-33 B-C NSD Acc
Rev.04
C-A NSD Acc

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV73


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 29.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD Acc


JNKI-046-CDU1B-MC-DG-158
1 Rev.04 4 J-408 CXR-249 6" X 7.11mm W-33 B-C NSD Acc
C-A NSD Acc
A-B NSD Acc
2 JNKI-046-CDU1B-MC-DG-158 4 J-409 CXR-250 6" X 7.11mm W-33 B-C NSD Acc
Rev.04
C-A NSD Acc
A-B NSD Acc
JNKI-046-CDU1B-MC-DG-158
3 5 J-508 CXR-251 6" X 7.11mm W-33 B-C NSD Acc
Rev.04
C-A NSD Acc
A-B NSD Acc
4 JNKI-046-CDU1B-MC-DG-158 5 J-509 CXR-252 6" X 7.11mm W-33 B-C NSD Acc
Rev.04
C-A NSD Acc
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV72


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 29.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD Acc


JNKI-046-CDU1B-MC-DG-158
1 Rev.04 6 J-628 CXR-243 6" X 7.11mm W-55 B-C NSD Acc
C-A NSD Acc
A-B NSD Acc
2 JNKI-046-CDU1B-MC-DG-158 6 J-629 CXR-244 6" X 7.11mm W-55 B-C NSD Acc
Rev.04
C-A NSD Acc
A-B NSD Acc
JNKI-046-CDU1B-MC-DG-158
3 8 J-828 CXR-245 6" X 7.11mm W-45 B-C NSD Acc
Rev.04
C-A NSD Acc
A-B NSD Acc
4 JNKI-046-CDU1B-MC-DG-158 8 J-829 CXR-246 6" X 7.11mm W-45 B-C NSD Acc
Rev.04
C-A NSD Acc
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV71


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 29.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD Acc


JNKI-046-CDU1B-MC-DG-158
1 Rev.04 3 J-328 CXR-239 6" X 7.11mm W-45 B-C NSD Acc
C-A NSD Acc
A-B NSD Acc
2 JNKI-046-CDU1B-MC-DG-158 3 J-329 CXR-240 6" X 7.11mm W-45 B-C NSD Acc
Rev.04
C-A NSD Acc
A-B NSD Acc
JNKI-046-CDU1B-MC-DG-158
3 5 J-528 CXR-241 6" X 7.11mm W-45 B-C NSD Acc
Rev.04
C-A NSD Acc
A-B NSD Acc
4 JNKI-046-CDU1B-MC-DG-158 5 J-529 CXR-242 6" X 7.11mm W-45 B-C NSD Acc
Rev.04
C-A NSD Acc
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV70


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 29.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD Acc


JNKI-046-CDU1B-MC-DG-158
1 Rev.04 1 J-128 CXR-235 6" X 7.11mm W-55 B-C NSD Acc
C-A NSD Acc
A-B NSD Acc
2 JNKI-046-CDU1B-MC-DG-158 1 J-129 CXR-236 6" X 7.11mm W-55 B-C NSD Acc
Rev.04
C-A NSD Acc
A-B NSD Acc
JNKI-046-CDU1B-MC-DG-158
3 2 J-228 CXR-237 6" X 7.11mm W-45 B-C NSD Acc
Rev.04
C-A NSD Acc
A-B NSD Acc
4 JNKI-046-CDU1B-MC-DG-158 2 J-229 CXR-238 6" X 7.11mm W-45 B-C NSD Acc
Rev.04
C-A NSD Acc
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV69


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 27.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1B-MC-DG-158 Rev
1 04 7 J-716 CXR-234 6" X 7.11mm W-55 B-C NSD
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV68


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 27.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1B-MC-DG-158 Rev
1 04 3 J-315 CXR-230 6" X 7.11mm W-55 B-C NSD
C-A NSD
A-B EP/LF

2 JNKI-046-CDU1B-MC-DG-158 Rev 4 J-414 CXR-231 6" X 7.11mm W-33 B-C NSD


04
C-A NSD

A-B NSD
JNKI-046-CDU1B-MC-DG-158 Rev
3 4 J-415 CXR-232 6" X 7.11mm W-33 B-C NSD
04
C-A NSD

A-B NSD

4 JNKI-046-CDU1B-MC-DG-158 Rev 5 J-513 CXR-233 6" X 7.11mm W-12 B-C NSD


04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV67


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 27.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1B-MC-DG-158 Rev
1 04 1 J-109 CXR-226 6" X 7.11mm W-55 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1B-MC-DG-158 Rev 2 J-208 CXR-227 6" X 7.11mm W-55 B-C NSD


04
C-A NSD

A-B NSD
JNKI-046-CDU1B-MC-DG-158 Rev
3 2 J-209 CXR-228 6" X 7.11mm W-55 B-C NSD
04
C-A NSD

A-B NSD

4 JNKI-046-CDU1B-MC-DG-158 Rev 3 J-314 CXR-229 6" X 7.11mm W-55 B-C NSD


04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV66


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 27.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1B-MC-DG-158 Rev
1 04 8 J-823 CXR-222 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1B-MC-DG-158 Rev 1 J-114 CXR-223 6" X 7.11mm W-33 B-C NSD


04
B-C NSD

A-B NSD
JNKI-046-CDU1B-MC-DG-158 Rev
3 1 J-115 CXR-224 6" X 7.11mm W-33 B-C NSD
04
C-A NSD

A-B NSD

4 JNKI-046-CDU1B-MC-DG-158 Rev 1 J-108 CXR-225 6" X 7.11mm W-55 B-C NSD


04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV65


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 27.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1B-MC-DG-158 Rev
1 04 4 J-423 CXR-218 6" X 7.11mm W-55 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1B-MC-DG-158 Rev 7 J-722 CXR-219 6" X 7.11mm W-33 B-C NSD


04
B-C NSD

A-B NSD
JNKI-046-CDU1B-MC-DG-158 Rev
3 7 J-723 CXR-220 6" X 7.11mm W-33 B-C NSD
04
C-A NSD

A-B NSD

4 JNKI-046-CDU1B-MC-DG-158 Rev 8 J-822 CXR-221 6" X 7.11mm W-33 B-C NSD


04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV64


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 27.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1B-MC-DG-158 Rev
1 04 2 J-215 CXR-214 6" X 7.11mm W-55 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1B-MC-DG-158 Rev 3 J-322 CXR-215 6" X 7.11mm W-55 B-C NSD


04
C-A NSD

A-B NSD
JNKI-046-CDU1B-MC-DG-158 Rev
3 3 J-323 CXR-216 6" X 7.11mm W-55 B-C NSD
04
C-A NSD

A-B NSD

4 JNKI-046-CDU1B-MC-DG-158 Rev 4 J-422 CXR-217 6" X 7.11mm W-55 B-C NSD


04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV63


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 27.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1B-MC-DG-158 Rev
1 04 8 J-816 CXR-210 6" X 7.11mm W-55 B-C
C-A
A-B
2 JNKI-046-CDU1B-MC-DG-158 Rev 1 J-122 CXR-211 6" X 7.11mm W-33 B-C
04
C-A
A-B
JNKI-046-CDU1B-MC-DG-158 Rev
3 1 J-123 CXR-212 6" X 7.11mm W-33 B-C
04
C-A
A-B
4 JNKI-046-CDU1B-MC-DG-158 Rev 2 J-214 CXR-213 6" X 7.11mm W-55 B-C
04
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV62


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 27.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD ACC


JNKI-046-CDU1B-MC-DG-158 Rev
1 04 7 J-707 CXR-205 6" X 7.11mm W-33 B-C NSD ACC
C-A NSD ACC
A-B LF REP/REJ

2 JNKI-046-CDU1B-MC-DG-158 Rev 7 J-710 CXR-206 6" X 7.11mm W-33 B-C NSD ACC
04
C-A NSD ACC

A-B NSD ACC


JNKI-046-CDU1B-MC-DG-158 Rev
3 7 J-713 CXR-207 6" X 7.11mm W-12 B-C NSD ACC
04
C-A NSD ACC

A-B NSD ACC

4 JNKI-046-CDU1B-MC-DG-158 Rev 8 J-807 CXR-209 6" X 7.11mm W-12 B-C NSD ACC
04
C-A NSD ACC

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV61


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 27.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD ACC


JNKI-046-CDU1B-MC-DG-158 Rev
1 04 1 J-104 CXR-199 6" X 7.11mm W-55 B-C NSD ACC
C-A NSD ACC
A-B NSD ACC

2 JNKI-046-CDU1B-MC-DG-158 Rev 6 J-607 CXR-202 6" X 7.11mm W-33 B-C NSD ACC
04
C-A NSD ACC

A-B NSD ACC


JNKI-046-CDU1B-MC-DG-158 Rev
3 6 J-610 CXR-203 6" X 7.11mm W-33 B-C NSD ACC
04
C-A NSD ACC

A-B NSD ACC

4 JNKI-046-CDU1B-MC-DG-158 Rev 6 J-613 CXR-204 6" X 7.11mm W-12 B-C NSD ACC
04
C-A NSD ACC

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV60


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 24.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1B-MC-DG-158
1 Rev04 6 J-622 CXR-197 6" X 7.11mm W-55 B-C NSD
C-A NSD
A-B FM

2 JNKI-046-CDU1B-MC-DG-158 6 J-623 CXR-198 6" X 7.11mm W-55 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV59


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 24.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1B-MC-DG-158
1 Rev04 2 J-222 CXR-193 6" X 7.11mm W-55 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1B-MC-DG-158 2 J-223 CXR-194 6" X 7.11mm W-55 B-C NSD


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1B-MC-DG-158
3 5 J-522 CXR-195 6" X 7.11mm W-55 B-C NSD
Rev04
C-A NSD

A-B NSD

4 JNKI-046-CDU1B-MC-DG-158 5 J-523 CXR-196 6" X 7.11mm W-55 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV58


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 24.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1B-MC-DG-158
1 Rev04 8 J-830 CXR-182 6" X 7.11mm W-51 B-C NSD
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV57


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 24.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1B-MC-DG-158
1 Rev04 4 J-416 CXR-182 6" X 7.11mm W-45 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1B-MC-DG-158 5 J-530 CXR-183 6" X 7.11mm W-52 B-C NSD


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1B-MC-DG-158
3 6 J-630 CXR-184 6" X 7.11mm W-52 B-C NSD
Rev04
C-A NSD

A-B NSD

4 JNKI-046-CDU1B-MC-DG-158 8 J-827 CXR-185 6" X 7.11mm W-52 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV56


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 24.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1B-MC-DG-158
1 Rev04 1 J-130 CXR-178 6" X 7.11mm W-52 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1B-MC-DG-158 2 J-230 CXR-179 6" X 7.11mm W-52 B-C NSD


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1B-MC-DG-158
3 3 J-330 CXR-180 6" X 7.11mm W-12 B-C Por
Rev04
C-A NSD

A-B NSD

4 JNKI-046-CDU1B-MC-DG-158 4 J-427 CXR-181 6" X 7.11mm W-52 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV56


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 24.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1B-MC-DG-178
1 Rev04 1 J-130 CXR-178 6" X 7.11mm W-52 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1B-MC-DG-178 2 J-230 CXR-179 6" X 7.11mm W-52 B-C NSD


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1B-MC-DG-178
3 3 J-330 CXR-180 6" X 7.11mm W-12 B-C Por
Rev04
C-A NSD

A-B NSD

4 JNKI-046-CDU1B-MC-DG-178 4 J-427 CXR-181 6" X 7.11mm W-52 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV55


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 24.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158
1 Rev06 7 J-22 CXR-191 6" X 7.11mm W-45 B-C
C-A
A-B
2 JNKI-046-CDU1A-MC-DG-158 7 J-23 CXR-192 6" X 7.11mm W-45 B-C
Rev06
C-A

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV54


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 24.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B
JNKI-046-CDU1A-MC-DG-158
1 Rev06 1 J-28 CXR-187 6" X 7.11mm W-33 B-C
C-A
A-B
2 JNKI-046-CDU1A-MC-DG-158 1 J-29 CXR-188 6" X 7.11mm W-33 B-C
Rev06
C-A
A-B
JNKI-046-CDU1A-MC-DG-158
3 6 J-14 CXR-189 6" X 7.11mm W-33 B-C
Rev06
C-A
A-B
4 JNKI-046-CDU1A-MC-DG-158 6 J-15 CXR-190 6" X 7.11mm W-33 B-C
Rev06
C-A
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV53


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 22.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1B-MC-DG-158
1 Rev04 3 J-313 CXR-173 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1B-MC-DG-158 4 J-413 CXR-174 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1B-MC-DG-158
3 5 J-507 CXR-175 6" X 7.11mm W-33 B-C NSD
Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV52


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 22.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev06 6 J-29 CXR-166 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 9 J-28 CXR-167 6" X 7.11mm W-33 B-C NSD


Rev06
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 8 J-14 CXR-169 6" X 7.11mm W-33 B-C NSD
Rev06
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 8 J-15 CXR-170 6" X 7.11mm W-33 B-C NSD


Rev06
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV51


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 22.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1B-MC-DG-158
1 Rev04 3 J-307 CXR-171 6" X 7.11mm W-52 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1B-MC-DG-158 3 J-310 CXR-172 6" X 7.11mm W-52 B-C NSD


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1B-MC-DG-158
3 5 J-510 CXR-176 6" X 7.11mm W-12 B-C NSD
Rev04
C-A NSD

A-B NSD

4 JNKI-046-CDU1B-MC-DG-158 5 J-516 CXR-177 6" X 7.11mm W-45 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV50


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 22.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev06 3 J-28 CXR-163 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 3 J-29 CXR-164 6" X 7.11mm W-33 B-C NSD


Rev06
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 6 J-28 CXR-165 6" X 7.11mm W-33 B-C NSD
Rev06
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 8 J-29 CXR-168 6" X 7.11mm W-33 B-C NSD


Rev06
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV49


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 21.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev04 5 J-14 CXR-154 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 5 J-15 CXR-155 6" X 7.11mm W-33 B-C NSD


Rev04
C-A PM

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 7 J-14 CXR-156 6" X 7.11mm W-33 B-C NSD
Rev04
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 7 J-15 CXR-157 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV48


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 21.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev04 3 J-14 CXR-150 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 3 J-15 CXR-151 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

A-B GRS
JNKI-046-CDU1A-MC-DG-158
3 4 J-14 CXR-152 6" X 7.11mm W-33 B-C NSD
Rev04
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 4 J-15 CXR-153 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV47


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 21.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev04 1 J-14 CXR-146 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 1 J-15 CXR-147 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 2 J-14 CXR-148 6" X 7.11mm W-33 B-C RT
Rev04
C-A RT

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 2 J-15 CXR-149 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV46


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 21.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1B-MC-DG-158
1 Rev02 8 J-821 CXR-162 6" X 7.11mm W-33 B-C NSD
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV44


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 21.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1B-MC-DG-158
1 Rev02 1 J-116 CXR-158 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1B-MC-DG-158 2 J-216 CXR-159 6" X 7.11mm W-33 B-C NSD


Rev02
C-A NSD

A-B NSD
JNKI-046-CDU1B-MC-DG-158
3 3 J-316 CXR-160 6" X 7.11mm W-33 B-C NSD
Rev02
C-A NSD

A-B NSD

4 JNKI-046-CDU1B-MC-DG-158 7 J-721 CXR-161 6" X 7.11mm W-33 B-C NSD


Rev02
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV44


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 21.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1B-MC-DG-158
1 Rev02 8 J-824 CXR-143 6" X 7.11mm W-52 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1B-MC-DG-158 5 J-524 CXR-144 6" X 7.11mm W-52 B-C NSD


Rev02
C-A NSD

A-B NSD
JNKI-046-CDU1B-MC-DG-158
3 5 J-527 CXR-145 6" X 7.11mm W-52 B-C NSD
Rev02
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-CONV43


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 21.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1B-MC-DG-158
1 Rev02 6 J-624 CXR-139 6" X 7.11mm W-52 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1B-MC-DG-158 6 J-627 CXR-140 6" X 7.11mm W-52 B-C NSD


Rev02
C-A NSD

A-B NSD
JNKI-046-CDU1B-MC-DG-158
3 7 J-724 CXR-141 6" X 7.11mm W-52 B-C NSD
Rev02
C-A NSD

A-B NSD

4 JNKI-046-CDU1B-MC-DG-158 7 J-727 CXR-142 6" X 7.11mm W-52 B-C NSD


Rev02
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV42


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 21.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev04 7 J-08 CXR-135 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 7 J-09 CXR-136 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 4 J-08 CXR-137 6" X 7.11mm W-33 B-C NSD
Rev04
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 4 J-09 CXR-138 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV41


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 21.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev04 8 J-08 CXR-131 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 8 J-09 CXR-132 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 6 J-08 CXR-133 6" X 7.11mm W-33 B-C NSD
Rev04
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 6 J-09 CXR-134 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV40


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 21.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 9 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev04 3 J-08 CXR-127 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 3 J-09 CXR-128 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 5 J-08 CXR-129 6" X 7.11mm W-33 B-C NSD
Rev04
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 5 J-09 CXR-130 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV18


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 14.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev04 1 J-21 CXR-54 6" X 7.11mm W-33 B-C PM, RETAKE
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 1 J-16 CXR-53 6" X 7.11mm W-33 B-C NSD


Rev04
C-A FM

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV17


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 14.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev04 3 J-21 CXR-58 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 3 J-16 CXR-57 6" X 7.11mm W-33 B-C Retake


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 2 J-21 CXR-56 6" X 7.11mm W-33 B-C NSD
Rev04
C-A NSD

A-B CHK SRF

4 JNKI-046-CDU1A-MC-DG-158 2 J-16 CXR-55 6" X 7.11mm W-33 B-C U/C


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV16


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 14.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev04 5 J-21 CXR-62 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 5 J-16 CXR-61 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 4 J-21 CXR-60 6" X 7.11mm W-33 B-C NSD
Rev04
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 4 J-16 CXR-59 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV15


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 14.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev04 4 J-10 CXR-34 6" X 7.11mm W-33 -
-
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 7 J-16 CXR-65 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 6 J-21 CXR-64 6" X 7.11mm W-33 B-C NSD
Rev04
C-A NSD

A-B U/C

4 JNKI-046-CDU1A-MC-DG-158 6 J-16 CXR-63 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV14


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 14.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev04 4 J-13 CXR-40 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 4 J-10 CXR-39 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV13


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 14.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B Reshoot
JNKI-046-CDU1A-MC-DG-158
1 Rev04 6 J-10 CXR-44 6" X 7.11mm W-33 B-C Repair
C-A Reshoot
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 6 J-07 CXR-43 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 5 J-10 CXR-42 6" X 7.11mm W-33 B-C NSD
Rev04
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 5 J-07 CXR-41 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV12


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 14.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev04 7 J-10 CXR-48 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B Por

2 JNKI-046-CDU1A-MC-DG-158 7 J-07 CXR-47 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 5 J-13 CXR-46 6" X 7.11mm W-33 B-C NSD
Rev04
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 6 J-13 CXR-45 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV11


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 14.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev04 8 J-13 CXR-52 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 8 J-10 CXR-51 6" X 7.11mm W-33 B-C FM,Por


Rev04
C-A NSD

A-B Retake
JNKI-046-CDU1A-MC-DG-158
3 8 J-07 CXR-50 6" X 7.11mm W-33 B-C NSD
Rev04
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 7 J-13 CXR-49 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV10


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev04 2 J-10 CXR-31 6" X 7.11mm W-33 B-C FM
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 2 J-13 CXR-32 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 3 J-07 CXR-33 6" X 7.11mm W-33 B-C NSD
Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV09


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev04 1 J-07 CXR-27 6" X 7.11mm W-33 B-C FM
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 1 J-10 CXR-08 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 1 J-13 CXR-29 6" X 7.11mm W-33 B-C NSD
Rev04
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 2 J-07 CXR-30 6" X 7.11mm W-33 B-C NSD


Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV08


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev04 3 J-18 CXR-20 6" X 7.11mm W-33 - -
- -
- -

2 JNKI-046-CDU1A-MC-DG-158 4 J-27 CXR-08 6" X 7.11mm W-45 - -


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 3 J-13 CXR-35 6" X 7.11mm W B-C NSD
Rev04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV07


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 09.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 Rev04 5 J-30 CXR-38 6" X 7.11mm W-12 B-C NSD
C-A RUC
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 2 J-30 XR-37 6" X 7.11mm W-45 B-C NSD


Rev04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 4 J-07 CXR-36 6" X 7.11mm W-33 B-C NSD
Rev04
C-A NSD

-
4 JNKI-046-CDU1A-MC-DG-158 7 J-18 CXR-23 6" X 7.11mm W-33 B-C NSD
Rev04
-
LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV06


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 R04 1 J-18 CXR-25 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 4 J-18 CXR-26 6" X 7.11mm W-33 B-C NSD


R04

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV05


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 R04 5 J-18 CXR-21 6" X 7.11mm W-33 B-C POR
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 6 J-18 CXR-22 6" X 7.11mm W-33 B-C NSD


R04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 7 J-18 CXR-23 6" X 7.11mm W-33 B-C NSD
R04
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 8 J-18 CXR-24 6" X 7.11mm W-33 B-C NSD


R04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV04


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 R04 4 J-30 CXR-13 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 7 J-24 CXR-14 6" X 7.11mm W-33 B-C NSD


R04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 7 J-27 CXR-15 6" X 7.11mm W-33 B-C NSD
R04
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 7 J-30 CXR-16 6" X 7.11mm W-33 B-C NSD


R04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV03


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 06.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 R04 8 J-24 CXR-17 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 8 J-27 CXR-18 6" X 7.11mm W-33 B-C NSD


R04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 2 J-18 CXR-19 6" X 7.11mm W-33 B-C NSD
R04
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 3 J-18 CXR-20 6" X 7.11mm W-33 B-C NSD


R04
C-A FM

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut;
RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV02


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 04.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 R04 2 J-27 CXR-04 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 2 J-24 CXR-03 6" X 7.11mm W-33 B-C NSD


R04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 1 J-27 CXR-02 6" X 7.11mm W-33 B-C NSD
R04
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 1 J-24 CXR-01 6" X 7.11mm W-33 B-C NSD


R04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV02


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 04.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 R04 6 J-27 CXR-12 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 6 J-24 CXR-11 6" X 7.11mm W-33 B-C NSD


R04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 5 J-27 CXR-10 6" X 7.11mm W-33 B-C NSD
R04
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 5 J-24 CXR-09 6" X 7.11mm W-33 B-C NSD


R04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV01


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 04.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 R04 4 J-27 CXR-08 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 4 J-24 CXR-07 6" X 7.11mm W-33 B-C NSD


R04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 3 J-27 CXR-06 6" X 7.11mm W-33 B-C NSD
R04
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 3 J-24 CXR-05 6" X 7.11mm W-33 B-C NSD


R04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1A-CONV01


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 04.12.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD
JNKI-046-CDU1A-MC-DG-158
1 R04 4 J-27 CXR-08 6" X 7.11mm W-33 B-C NSD
C-A NSD
A-B NSD

2 JNKI-046-CDU1A-MC-DG-158 4 J-24 CXR-07 6" X 7.11mm W-33 B-C NSD


R04
C-A NSD

A-B NSD
JNKI-046-CDU1A-MC-DG-158
3 3 J-27 CXR-06 6" X 7.11mm W-33 B-C NSD
R04
C-A NSD

A-B NSD

4 JNKI-046-CDU1A-MC-DG-158 3 J-24 CXR-05 6" X 7.11mm W-33 B-C NSD


R04
C-A NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI.R.RT.WQT-V1


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 26.11.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 5 Mins
Source Strength : 3 CU Developing Temp : 5 Mins
Film : AGFA D7 Sensitivity 2%
SFD : 6." (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1B 11 Acceptance Criteria : ASME SEC IX

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

A-B NSD Acc


JNKI/WQT-07 (BR)
1 JNKI/MUNDRA/WPS-06/ GTAW/ - 6" x 7.11mm W-37 B-C NSD Acc
DHARMENDRA KUMAR YADAV
C-A NSD Acc

A-B NSD Acc


JNKI/WQT-08 (BR)
2 JNKI/MUNDRA/WPS-06/ GTAW/ - 6" x 7.11mm W-38 B-C NSD Acc
BRAJAIL SINGH
C-A NSD Acc

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-02


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 25.11.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

AB NSD
JNKI-046-CDU1B-MC-DG-157 6" Ø X
1 Rev2 01 J-34 XR-05 7.11mm W-30 BC NSD
CA NSD
AB POR

2 JNKI-046-CDU1B-MC-DG-157 01 J-39 XR-06 6" Ø X W-30 BC NSD


Rev2 7.11mm
CA NSD

LEGENDS:
ACC: ACCEPTED; NSD: No Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root
Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark; CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021


JNK INDIA PVT. LTD.
Radiographic Examination Report

Client : PTI - INFRASTRUCTURE DE DESARROLLO, S.A. DE C.V. Report No.: JNKI/R/MUN/COIL/RT/CDU1B-01


Project : DESARROLLO DEL PAQUETE 1 DE LA REFINERIA EN DOS BOCAS Date : 24.11.2021
EPC/PMC: ICA FLOUR Format no. JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021
Source : X -ray / Gamma ray Exposure Time : 7 Min 17 Sec
Source Strength : 4 CU Developing Temp : 15 Min
Film : Kodak MS125 Sensitivity 2%
SFD : 6.625" (inch) Density : 2 to 4
Screen : Lead Technique : DWSI
IQI : ASTM 1A 06 (Wire Type) Acceptance Criteria : ASME B31.3

Sr. ACC ACC


No Line No / Drg No. Pass No. Joint No. XR no. Size /Thk. Welder No. Segment Observation /REJ JNK /REJ TPI Remark

AB NSD
JNKI-046-CDU1B-MC-DG-157 6" Ø X
1 Rev2 01 J-42 XR-01 7.11mm W-30 BC LF
CA LF
AB NSD

2 JNKI-046-CDU1B-MC-DG-157 01 J-47 XR-02 6" Ø X W-30 BC NSD


Rev2 7.11mm
CA NSD

AB NSD
JNKI-046-CDU1B-MC-DG-157 6" Ø X
3 01 J-50 XR-03 W-30 BC NSD
Rev2 7.11mm
CA NSD

AB LF

4 JNKI-046-CDU1B-MC-DG-157 01 J-55 XR-04 6" Ø X W-30 BC LF


Rev2 7.11mm
CA LF

LEGENDS: ACC: ACCEPTED; NSD: No


Significant Discontinuty/Defect ; RT: Retake; POR: Porosity; PM: Process Mark; WM: Water Mark; EP: Excess Penetration; LF: Lack of Fusion; TI: Tungsten Inclusion; RUC: Root Under Cut; RC: Root Concavity; SB: Suck Back; LP: Lack of Penetration; FM: Film Mark;
CS:Check Surface; GRS: Grind and Reshoot; RS: Reshoot

Prepared by JNKI CLIENT

SIGN

NAME

DATE

JNK.FM.MUNDRA.QC.10, ISSUE NO.01, REV.0, Dt. 23/07/2021

You might also like