0% found this document useful (0 votes)
69 views20 pages

SMG-SI-10-DG-002-A3 - SHT 01-20 - Rev.1

The document appears to be an engineering alignment sheet for a 12" pipeline between Boyolali and Pengapon, Indonesia. It shows the pipeline route in 500 meter segments from KP 0+000 to KP 2+000, with kilometer points and elevations labeled along the route. The alignment sheet was prepared for PT Pertamina by the consulting firm PT Surveyor Indonesia.

Uploaded by

aan zulwi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
69 views20 pages

SMG-SI-10-DG-002-A3 - SHT 01-20 - Rev.1

The document appears to be an engineering alignment sheet for a 12" pipeline between Boyolali and Pengapon, Indonesia. It shows the pipeline route in 500 meter segments from KP 0+000 to KP 2+000, with kilometer points and elevations labeled along the route. The alignment sheet was prepared for PT Pertamina by the consulting firm PT Surveyor Indonesia.

Uploaded by

aan zulwi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 20

KP KP KP KP

KP 0+200 0+300 0+400 0+500


0+100

0+ KP
000

TBBM BOYOLALI

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 0+000 TO KP. 0+500

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 1 OF 163 1 A1
KP
0+800
KP KP
0+700 0+900
KP
0+600
KP
0+500 KP
1+00
0

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 0+500 TO KP. 1+000

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 2 OF 163 1 A1
KP KP
KP 1+100 1+200 KP
KP
1+000 1+300
1+400
KP
1+500

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 1+000 TO KP. 1+500

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 3 OF 163 1 A1
KP
1+500

00
KP

2+0 P
K
1+600
KP
1+700
KP KP
1+800 1+900

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 1+500 TO KP. 2+000

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 4 OF 163 1 A1
1+90
KP
KP KP
2+000

0
KP KP 2+500
KP KP 2+400
2+100 2+200 2+300

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 2+000 TO KP. 2+500

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 5 OF 163 1 A1
KP KP KP KP KP
2+500 KP
2+600 2+700 2+800 2+900 3+000

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 2+500 TO KP. 3+000

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 6 OF 163 1 A1
KP
3+500
KP
KP KP KP KP 3+400
3+000 3+100 3+200 3+300

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 3+000 TO KP. 3+500

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 7 OF 163 1 A1
KP
3+500 KP
KP 4+000
3+600 KP
3+700 KP
KP 3+900
3+800

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 3+500 TO KP. 4+000

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 8 OF 163 1 A1
KP
4+200 KP
4+300
KP KP
4+100 4+400
KP
KP 4+500
4+000

REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

HOLD REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 3+000 TO KP. 3+500

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 9 OF 163 1 A1
KP
KP 4+700 KP
4+600 4+800 KP
4+900 KP
KP 5+000
0
4+50

REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

HOLD REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 4+500 TO KP. 5+000

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 10 OF 163 1 A1
KP KP
5+000 5+100 KP
5+200 KP
5+300 KP
5+400 KP
5+500

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 5+000 TO KP. 5+500

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 11 OF 163 1 A1
0
6+10
KP
5+500 KP
KP 6+000
5+600 KP KP
5+700 5+900
KP
5+800

REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

HOLD REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 5+500 TO KP. 6+000

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 12 OF 163 1 A1
KP
KP 6+400 KP
KP 6+300 6+500
KP 6+200
KP
6+000 6+100

REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

HOLD REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 6+000 TO KP. 6+500

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 13 OF 163 1 A1
KP KP KP KP KP
6+500 6+600 6+700 6+800 6+900 KP
7+000

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 6+500 TO KP. 7+000

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 14 OF 163 1 A1
KP KP KP
KP 7+200
7+000 7+100 7+300 KP
7+400 KP
7+500

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 7+000 TO KP. 7+500

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 15 OF 163 1 A1
KP
7+500 KP
7+600 KP
7+700 KP KP
7+800 KP 8+000
7+900

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 7+500 TO KP. 8+000

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 16 OF 163 1 A1
KP
KP 8+400
KP KP 8+300 KP
8+000 KP 8+200 8+500
8+100

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 8+000 TO KP. 8+500

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 17 OF 163 1 A1
KP KP KP KP KP KP
8+500 8+600 8+700 8+800 8+900 9+000

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 8+500 TO KP. 9+000

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 18 OF 163 1 A1
KP KP KP KP KP
9+300 9+400 KP
9+000 9+100 9+200 9+500

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 9+000 TO KP. 9+500

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 19 OF 163 1 A1
KP KP KP
9+500 9+600 9+700 KP KP
9+800 KP
9+900 10+000

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 9+500 TO KP. 10+000

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 20 OF 163 1 A1

You might also like