EAST KIDWAI NAGAR
NEW DELHI, INDIA
AIM OF PROJECT
The redevelopment of an existing being constructed. The shopping
government housing project at East centre, senior secondary school
Kidwai Nagar is partly aimed at and the banquet hall all run
contributing towards lessening New entirely on green energy, via grid-
Delhi’s chronic housing shortage. connected rooftop solar panels.
Among 1.35 million m² of mixed-
use provision in south-central Delhi,
over 4,700 new apartments are
CENTRAL NEW DELHI’S LARGEST RESIDENTIAL
AND OFFICE DEVELOPMENT
www.chapmantaylor.com [email protected]
EAST KIDWAI NAGAR
NEW DELHI, INDIA
The scheme won a 5-star award for urging its adoption as a model for
‘Best Public Service Architecture other regions. East Kidwai Nagar Sectors
Mixed Use, Residential
in India’ at the 2017-18 International has also been included in the Indian
Services
Asia-Pacific Property Awards. government’s ‘Smart City Guidelines’,
Masterplanning, Architecture
and the Indian government’s National
The entire project is designed on a Studios
Buildings Construction Corporation New Delhi
near zero emissions policy. Extensive showcased the project at the
Client
water recycling and the efficient use COP21 climate change conference The National Buildings Construction
of solar energy are a fundamental in Paris in December 2015. Corporation (NBCC India)
element of the scheme. The Indian Includes
government and leading regional 4,700 apartments and 102,000m²
ministers have praised the scheme, of office space, amidst 1.35 million
m² GBA of large-scale, mixed-use
development
Area
35 hectares
Sustainability
A ‘Smart city’ with near zero
emissions
Status
First residences handed over in 2018
CHAPMAN TAYLOR WAS RESPONSIBLE FOR THE
MASTERPLANNING, DESIGN AND IMPLEMENTATION OF THIS
KEY SMART CITY DEVELOPMENT.
www.chapmantaylor.com [email protected]