Sample Report of Loading-2
Sample Report of Loading-2
: 230107163595765R1
INSPECTION REPORT
Report Date: January 08, 2023
Total Cartons
INSPECTION RESULTS
OVERALL CONCLUSION Pending Due to Remark#1,2
REMARKS
1 There are two containers, the actual loading quantity of the 1st container is 364 cartons instead of 298
cartons which doesn’t meet with client’s packing list. please see the packing list for details
2 The actual loading quantity of the 2nd container is 353 cartons instead of 385 cartons which doesn’t meet
with client’s packing list. please see the packing list for details
ATTENTION If there is no sealing to seal the container during loading supervision, it is necessary to report to
the corresponding supervisor or company immediately and remark this problem on the report.
注意 如果监装时如果没有铅封用来封集装箱, 需要立即反馈相应主管或公司, 并备注在报告上.
A. Quantity Conformity
A1 Quantity Conformity
Item P.O. No Order Shipment Presented Qty QTY Not
Number Quantity Qty Packed Qty Packed Units Finished
(pieces/sets) (pieces/set (pieces/sets Cartons Finished (pieces/sets
s) ) (cartons Not Packed )
) (pieces/sets)
The 1st container
CT CSA N/A 6 6 6 6 0 0
DBox3 N/A 38 38 38 38 0 0
DT R 60 N/A 11 11 11 27 0 0
ET60 N/A 9 9 9 23 0 0
MU 4 N/A 2 2 2 11 0 0
MU 6 N/A 3 3 3 23 0 0
MU 7 N/A 1 1 1 9 0 0
OTO 4 N/A 1 1 1 5 0 0
OVIO Operator N/A 52 52 52 43 0 0
Desk
OVIO Supervisor N/A 41 41 41 32 0 0
Desk
PER COR 3 N/A 4 4 4 12 0 0
POUF 40 N/A 1 1 1 1 0 0
POUF 90 N/A 1 1 1 1 0 0
RE CO 300 N/A 1 1 1 2 0 0
SUP STO 2 N/A 86 86 86 86 0 0
Victory 2 Seats N/A 31 31 31 35 0 0
Victory 4 Seats N/A 1 1 1 4 0 0
Victory 5 Seats N/A 1 1 1 5 0 0
Extra Hardware N/A 1 1 1 1 0 0
Box
Total 291 291 291 364 0 0
The 2nd container
OVIO Supervisor N/A 15 15 15 34 0 0
Desk
OVIO Operator N/A 360 360 360 270 0 0
Desk
Triangle Top N/A 90 90 90 32 0 0
Wir Soc N/A 400 400 400 16 0 0
Hardware Box N/A 1 1 1 1 0 0
Total 866 866 866 353 0 0
B. Product Conformity
C1 Loading Condition
D1 Container Condition
E1 Loading Stuffing
Item No. Inspection quantity (cartons) Actual Quantity(cartons) Container No.
CT CSA 6 6
DBox3 38 38
DT R 60 27 27
ET60 23 23
MU 4 11 11
MU 6 23 23
MU 7 9 9
OTO 4 5 5 TXGU7117390
OVIO Operator 43 43
Desk
OVIO Supervisor 32 32
Desk
© www.testcoo.com All rights reserved Email:[email protected] Tel:400-627-8168 Page 23 of 31
The results reflects our findings at time and place of inspection. This report does not relieve seller/manufacturers from their contractual liabilities or prejudice buyers' right for compensation for an
y apparent and/or hidden defects not detected during our random inspection or occuring thereafter. This report does not evidence shipment, Final approval is required by client before releasing sh
ipment.
Report No.: 230107163595765R1
INSPECTION REPORT
Report Date: January 08, 2023
PER COR 3 12 12
POUF 40 1 1
POUF 90 1 1
RE CO 300 2 2
SUP STO 2 86 86
Victory 2 Seats 35 35
Victory 4 Seats 4 4
Victory 5 Seats 5 5
Extra Hardware Box 1 1
OVIO Supervisor 34 34
Desk
OVIO Operator 270 270
Desk
Triangle Top 32 32
Wir Soc 16 16
Hardware Box 1 1 TCNU1805242
OVIO Supervisor 34 34
Desk
OVIO Operator 270 270
Desk
Triangle Top 32 32
Wir Soc 16 16
Hardware Box 1 1
The 1st container
First row 1/4 row
2 Doors Closed
NIL
2 Doors Closed
NIL
F. Sealing Conformity
F1 Sealing Check
G. Special Attention
VALIDATION TEAM
Inspected by Victor Gu
Inspection date January 08 2023
Reviewed by XXXX
Review date XXXX
Approved by XXXX
Approved date XXXX