0% found this document useful (0 votes)
181 views15 pages

CV Ed Dela Cruz Civil

The document provides biographical information about Edgardo D. De La Paz including his contact details, passport information, position applying for, education history, vocational training, work experience, and seminars attended. He has over 20 years of experience as a site superintendent and project inspector for civil engineering projects in Saudi Arabia and the Philippines, most recently working on projects for Saudi Aramco from 2011 to 2013 and 2009 to 2011.

Uploaded by

William Cabrera
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
181 views15 pages

CV Ed Dela Cruz Civil

The document provides biographical information about Edgardo D. De La Paz including his contact details, passport information, position applying for, education history, vocational training, work experience, and seminars attended. He has over 20 years of experience as a site superintendent and project inspector for civil engineering projects in Saudi Arabia and the Philippines, most recently working on projects for Saudi Aramco from 2011 to 2013 and 2009 to 2011.

Uploaded by

William Cabrera
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 15

EDGARDO D.

DE LA PAZ

Address in Phils.: No. 65 Dr. S. Antonio Ave., Brgy. Maybunga, Pasig City, Philippines

Tel. no. : 643-4537 ( in Pasig city, Philippines )

Celphone no. : 09284381088 ( in Philippines )

passport no. : EB2300576

date released : April 29, 2011

date expires : April 28, 2016

issued at : DFA Manila

email address : [email protected]

Position Applied for: Civil Site Superintendent

Personal Attributes: Hard worker, loyal, work well under pressure. Familiar with such
programs as word, excel, power point and outlook.A quick learner and
eager for any type of training in order to work to the best of his ability. A
team player but also work effectively with minimum supervision.

Educational Attainment

Level of education/ Degree Name of School/Address Year Attended

Primary level/Elementary Pasig Catholic College 1965 1971


Dr. S. Antonio
Avenue Brgy. Malinao,
Pasig City

Secondary level/High school Arellano University 1971 1974


Dr. S. Antonio Avenue
Brgy. Caniogan, Pasig City
College level
Bachelor of Science Feati University 1974 1981
in Civil Engineering

Bachelor of Science University of Baguio 1984 1985


in Sanitary Engineering Assumption Road, Baguio City
Philipines
Vocational course :

Meralco Foundation Automotive mechanic course 1989 1989


Ortigas Ave. Pasig City (gas & diesel engine)

Meralco Foundation Plumbing course 1989 1989


Ortigas Ave. Pasig City

Seminars attended
Name of Seminar Attended Seminar Venues Inclusive Dates

New Advance Graphic Estimating MBf Const. Sdn Bhd. June 19-26,1995
Computerized Estimating Software Taman Miharja HQ. Office
Kuala Lumpur, Malaysia

Workshop: Teamwork and Team Kelab Century Park Dec.6 & 17,1994
Building Sponsored by MBf Const. Kuala Lumpur, Malaysia
Sdn. Bhd.

July 16 Earthquake-A year after PECD Hostel U.P. July 26 & 27,1991
Technical Seminar sponsored by Diliman, Quezon City,
ASEP/PEMCI, Inc. and Philippines
PICE –Makati Chapter

Problem Solving & Decision Making MBf Academy Oct. 11 - 12,1994


Sponsored by MBf Const. Sdn Bhd Kuala Lumpur, Malaysia

Const. Project Management Seminar Ateneo de,Manila Feb.15,22, 29 1992

Graduate School
Salcedo, Street
Makati City, Phils.

Lecture Series On Amendments DCIEC Auditorium NIA June 1,1991


to the Implementing Rules and Regu- Edsa, Quezon City
lations (IRR) of PD. NO. 1594 INC Philippines
(PCA)

Goal Setting, Planning & Controlling MBf Academy K.L. Oct. 10, 1994
Sponsored By MBf Const. Sdn Bhd Malaysia

Quality at Work
Sponsored by MBf Const. Sdn Bhd MBf Academy K.L. Dec. 10, 1994
Malaysia

Work History

Name of Company: Al-Hoty Co. Ltd. / SAUDI ARAMCO

Co. address : Al-Khobar, KSA

Position : Site Superintendent (Civil ) SAUDI ARAMCO PMT (Year 2011-


2013)
Inclusive dates : 7/18/2011 to 3/15/2013

Projects Handled : Construction of King Abdullah Petroleum Studies and Research


Center Project in Riyadh, Saudi Arabia. Research and Office
Center bldgs. External works (ancillary bldgs.) underground
utilities, walls, roads and curves, manholes, chambers, structural
bldgs. swales, and pipe laying. Also, concrete works, structural
steel works for Library and ITU bldgs.

Scope of work : Monitor main contractor and their subcontractors daily work
progress. Check if the contractor daily work progress is on
schedule as per their submitted work schedule. Also, to check and
follow- up contractors material, equipment, manpower submitted
schedule were implement on site. Check and review TQ, MTA,
RFI, were according to plans, specification and SAUDI ARAMCO
Standards. Also, check and do inspection works and surveillance
of the ongoing activities at site.
Name of Company: SAUDI CONSULTING SERVICES / SAUDI ARAMCO

Co. address : Al Hamra district , Jeddah, KSA

Position : Site Superintendent (Civil ) SAUDI ARAMCO PMT (Year 2009-


Year 2011)

Inclusive dates : 6/26/2009 to 01/15/2011

Projects Handled : Construction of Island Recreation Center bldg. at King Abdullah


University Science and Technology, Thuwal, Rabigh. This
includes 8 tennis courts,3squash rooms,1 racquet ball, 1family
swimming pool,1kiddies pool men and ladies sauna and jacuzzi,
men and ladies gymnasium, basketball gym, 1 outdoor basketball
court, men and ladies shower rooms with outdoor bleachers for
swimming pool, kitchen and dining room, video, billiards and
snooker rooms, offices, open car park, pump houses, electrical and
mechanical rooms, TER rooms, skateboarding and skating rinks,
landscaping (soft and hardscapes).

Construction of Commercial Receation Center bldg. at King


Abdullah University Science and Technology, Thuwal, Rabigh
This is includes 3 tennis courts,3squash rooms, racquet ball,
bowling alley, 3 swimming pools,offices, wall/rock climbing,café
bar, kitchen, shower rooms, mens and ladies toillets, mens and
ladies sauna and jacuzzis, men and ladies gymnasium, basketball
gym, billiards and snooker and video rooms,bleachers, pump
houses, electrical/mech rooms,car park and landscaping works
(hard and soft).

Scope of work: Evaluates Technical specifications & Scopes of works for


landscapes (soft and hard). Attends weekly communication
meetings, division and department interface meeting with other
utilities Division and Utility contractors.
Follow up scheduled activities to contractors to meet the deadlines.

Position: Sr. Project Inspector ( Civil ) SAUDI ARAMCO PID


( Year 2007 -2009 )
Inclusive dates : May 18, 2007 - May 2009

Projects Handled: Upgrade Wastewater facilities@ Jeddah refinery, Uprade (CDU)


Overhead Condenser Upgrade at Petro Rabigh Refinery, Upgrade
Sanitary Waste Water Treatment Facilities @ Rabigh Community,
Construction of Facilities and Cargo bldgs @ North Jeddah Bulk
Plant Replacement of Sea Water Filters at Jeddah Refinery
Desalination Unit,

Construction of Communication & Data Facility bldg. at Musadia,


Installation of Surge Protection System @ Petro Rabigh Refinery.
Rehabilitation of Navigational Piles ( offshore ) for Petro Rabigh.

Scope of work: Review project proposal and detailed design per SAEP-14 and
SAEP 303.
Do inspection of contractors work at site. Do surveillance, and
Material receiving inspection @ site.Check out if the contractor is
following their con tractor Quality System. Performs inspection of
construction materials for compliance with standards, codes,
and specification, and for possible damage during shipping,
handling, and installation. Check out availability of supplier,
contractor inspection release, inspection records and
recommendations for storage and preservation of time of receipt.
Also ensure that the contractor facility and record outstanding
items on the exception list. Ensure that all open logbook
entries,ncr's and worksheets are resolved or included on the
exemption item list. Reports violation to SAPMT.

Review project proposal , design and specifications, approve TQs ,


change order,.Attend contractor Project management meetings.
Follow up work progress with the contractor and its subcontractors
to complete the work ahead or as per scheduled date.

Name of Company: KEVTON GROUP INC.

Co. address: Suite 309 Chateau Verde Condo VV. 21 E. Rodriguez Ave.
Pasig city

Position : Project -in-charge (site engineer)

Inclusive dates : January 2004 to November 2004

Project Handled : Construction of 6 storey Metro Gaisano Market ! Market!


Shopping Mall

Scope of work : Supervised work for civil works from substructure to super
structure work . Prepares schedule of work , estimates deliveries of
materials, attends coordination meetings,technical meeting with
consultants,designers, owners and other subcons. Coordinates with
engineers for the different t rades at site.
scope of works includes rebars,concreting, formworks, backfilling
and compaction works, excavation works, masonr;y and other
finishing works. Works includes the line and gradefor civil works.

Name of Company: R.M.PINGOL Construction & Dev't. Corporation

Co. address: Suite 2104 The Orient Square, Emerald Ave. Ortigas Center, Pasig
City 1600

Tel. No. 638-4158, 687-0712

Position : Project Engineer

Inclusive dates : October 2003- January 2004

Project Handled : Const. of 2- Three storey buildings at Montalban, Rizal at Erap


city Montalban,

Site development works for the said project.

Scope of work : Do estimates for projects to submit for bidding. Supervised works
at site.
Name of Company: Strongworld Construction Corporation

Co. address: Alabang Muntinlupa , Philippines

Position : Project Manager,Asst.Proj.Mgr.,Site Engineer

Inclusive dates : March 2003 - October 2003

Project Handled : The Column Towers Project

Zuellig Loop, Ayala avenue corner Gil Puyat avenue, Makati


Metro Mla. Philippines

Scope of work : Installation of formworks and scaffolding for substructure works.


Concreting works for substructure and superstructural works for
multi storeys bldg projects.

Steelworks for substructure and superstructure . Excavation and


backfilling works.

Land development works.

Project Handled : The Woodridge Townhouse Projects


Tagaytay Highlands Tagaytay city Philippines

Scope of work : Works as Proj. Mngr. for the Joint venture Ryanix-Primestar
Const. Co.
Under the co. name of Strongworld Const. Co. for the const. of
multimillion 5 storey -Townhouses particularly bldgs. 1 ,2, 5, & 6.

Scope of work : Project. Scope of work : Directly supervised and managed the
construction works for conc.works,rebars & formworks
installation, CHB laying and plastering works.

Works supervision. Prepares billing works do estimates and


attends meetings with MDC staffs.Prepares report and
accomplishments for weekly and daily monitoring.

Name of Company : JE-AN Supreme Builders & Sales Corporation (Philippines)

Co. address : Suite 36,Llanar Bldg. 10th Ave. cor. Boni Serrano, Murphy,
Quezon City Phils.

Office tel. No. : 912-8627 ;9127381

Fax no. : 437-7032

Position : Project Engineer

Inclusive dates : January 21, 2001 to July 21, 2001

Project Handled : Country Waffles Restaurant


Eastwood City, Libis Quezon City , Philippines

Scopes of works: Supervises works at site for the construction


of fifteen million ( P15,000,000.00 ) pesos 3 storey bldg. Project.

Prepares estimates, billing , s-curves, bar charts , minutes of


meeting at site. Attend meetings, follow -up permits and other
construction requirements.
Supervises work at site from the layout of foundation to intallation
fabrication of trusses finishing works etc.

Name of Company: BBR Const. Systems (M) Sdn Bhd

Co. address: No. 32 jln. PJS 11/20 Sunway Tech. Park, Bandar Sunway 46150
Petaling Jaya, Selangor Darul Ehsan Malaysia

Office tel. No. : (03)-736-3270

fax no. : (03) - 736-3285

Position : Site Engineer/Quantity Surveyor

Inclusive dates : 21st July 1997 to 19th Dec. 1998

Project Handled : LRT Phase II , Kuala Lumpur ,Malaysia

Work as site engineer for the project and the scope of works are the ff:

Supervises work at site for the stressing, grouting, installation of


conduits for the tendons installed inside the precast segments.
Attends consultant meetings, and main contractor meetings.
Do the scheduling for the everyday work activities.

Project Handled : LDP I (Cable Stayed Bridge at the Motorola / Bandar Sunway
interchange)

Work as a quantity surveyor for the Joint Venture of GAMUDA


BHD-BBR Const. Systems (M) construction of the 16,226,328.16
ringgit project.

Scope of works : Prepares the claim for the co. to the client. Certifies and prepares
claims of
subcontractors. Certifies / prepares the claims of each joint venture
companies. Prepares the v.o. and insurance claim in the contracts.
Liase with the clients Q.S. Coordinates with the site engineers, site
supervisors and consultants.

Name of Company: Hydrocure Enterprise ( Philippines )

Co. address: Road 4 Pilderas St. Silicon Compound Ninoy Aquino International
Airport Pasay City, Philippines
Office tel. No.: 822-5966

Position : Site Engineer

Inclusive dates : May 1997-July 1997

Project Handled : Waterproofing works and other repair of civil works at Ninoy
Aquino International
Airport, Pasay City , Philippines

Scope of work: to supervise works for the waterproofing of the said project and
other civil work.

Prepares the scheduling of the activities thereat.

Prepares estimates for the proposed projects and takeoffs quantities


of ongoing works.

Name of Company: Le Consultech (Phils.)

Co. address: 3202-C, PSE Center, Exchange Road, Ortigas Center,


Pasig City, Philippines

Office tel. No. : 635-5061 to 64

Fax no. : 635-5396

Position : Project representative

Inclusive dates : January 15,1997 to May 30, 1997

Project Handled : 8th Storey Residential /Commercial Bldg.


of owner Mr. Jose de los Santos at Tirona St. corner
Asuncion St. Binondo, Manila , Philippines

Scope of work : working as a representative for the owner and employee of Le


Consultech a Const. Management Office. Checks out the works
of contractors of different scopes of works. Supervises their works,
attends meetings with the architects, and designers. Do the
approval for V.O. and time extensions for the contractors.

Name of Company: BBR Const. Systems (M) Sdn Bhd

Co. address: No. 32 jln. PJS 11/20 Sunway Tech. Park, Bandar Sunway 46150
Petaling Jaya, Selangor Darul Ehsan Malaysia

Office tel. No. : (03)-736-3270

fax no. : (03) - 736-3285

Position : Site Engineer/Quantity Surveyor

Inclusive dates : 10th December 1996 to 30th Dec. 1996

Project Handled : LRT Phase II , Kuala Lumpur ,Malaysia

Work as site engineer for the project and the scope of works are
the ff:
Supervises work at site for the stressing, grouting, installation of
conduits for the tendons installed inside the precast segments.
Attends consultant meetings, and main contractor meetings.
Do the scheduling for the everyday work activities.

Name of Company: Peter Tan & Associates Landscape Consultants ( Malaysia )

Co. address : Suite 808, 8th Floor Wisma Lim Foo Yong, 86 Jalan Raja Chulan,
50200 Kuala Lumpur, Malaysia

Office tel. No. : (03) - 241-1043

Fax no. : (03) - 241-9723

Position : Resident Engineer/Site engineer

Inclusive dates : July 22, 1996 to Oct. 22, 1996

Project Handled : Damai Laut Golf Resorts & Hotels

Work as a Resident Engineer for the client (PJD) developers for


the construction of the jetty, light house, Club house,
fountains,pathways, parks, swimming pool, hard /soft landscapes
and other civil works.

Scope of works: Checks out the works of the contractors at site. Approves the v.o.
time extensions, schedules of work for the contractors. Certifies
claims for the contractors. Coordinates with the consultants on the
different types of work regarding the changes in the plans and
other changes.Check and supervised work of subcontractors. Like
piling works and all other civil works.
Name of Company: Sri Hartamas Resource Management Sdn Bhd ( Malaysia )

Co. address Level 26 Menara Lion Bldg.


Jalan Ampang, Kuala Lumpur

Office tel. No. : (03)-9822-469

Fax no. : 9864-775

Position : Site Engr/QA/QC

Inclusive dates : December 1995 - July 21, 1996

Project Handled : Port Dickson Marina International Marine


Resorts and Condominiums, P. D. , Negeri Sembilan, Malaysia

Scope of work : Do site inspection and remeasurements at site. Supervised works at


site. At some occassions.
Attends and prepares minutes of meeting with sub-contractors.
Prepares memos and correspondences to clients/consultants and
subcontractors. Make correspondences/memos to consultants and
/or subcontractors involved with the above mentioned projects.
Makes quantity take-off for tendering/ claims purposes.

Name of Company: MBf Construction Sdn Bhd ( Malaysia )

Co. address No. 97, 99, 101, & 103 Taman Miharja Phase 2
Jalan 3/93 off Jalan Lombong Batu 2 1/2 Cheras 55200
Kuala Lumpur, Malaysia

Office tel. No. : (03)-9822-469

Fax no. : 9864-775

Position : Contracts Executive/Quantity Surveyor

Inclusive dates : July 21, 1994 December 1995

Project Handled : Proposed 3 blocks of 13 - Storey block A


17-Storey block B and 19- Storey block C
Condominium on lot 1101, Mukim Batu,
Wilayah Persekutuan for Tetuan Kasturi Sakti
Sdn Bhd. ( Menara Duta Condominiums )
Scope of work : Preparation of valuations for interim certificates for clients and
subcontractors.

Tendering and procurement of contracts (Built-up of tender rate


and pricing.)

Assists the Senior Q.S. In preparing monthly/bimonthly claims for


clients and subcontractors.

Name of Company: Department of Education, Culture and Sports


Regional Office IV ( Philippines )

Co. address : DECSRO-IV Capitol Compound Brgy. Orambo, Pasig City


Philippines

Office tel. No. : 635-6720

Position : Resident Engineer

Inclusive dates : October 1989 to March 1994

Projects handled : (1)-2 storey bldg., (2)-single storey Dagatan, brgy high school
Located at Dagatan, Taysan Batangas city, Philippines

: (1)-2 storey bldg., (2)-single storey Talaibon, brgy high school


Located at Talaibon ,Ibaan, Batangas province, Philippines

: (1)-C type 14 units single storey bldg at Atimonan Zone I


brgy. High school Located at AZIBHS Atimonan,
Quezon province, Philippines

: (1)-C type 14 units single storey bldg at Tagaytay city high school
Located at Tagaytay city , Philippines

: (1)- C type 14 units single storey bldg at Lemery city high school
Located at Lemery city, Batangas province Philippines

: Retaining walls for the protection of the school bldg.


AZIBHS. SEDP project. 60m high by 235m length wall
Located at AZIBHS Atimonan, Quezon province, Philippines

: Water tanks and other water supply systems for the SEDP
projects located at different provinces. Philippines

Scopes of work: Prepares plans and estimates for bidding of newly proposed
schoolbuildings and other structural works.
Prepares contractors claims and v.o., change orders.
Prepares S-curved, PERT/CPM, bar charts, cash-flows.
Supervision on site of contractors scope of works.

Name of Company: C.C. de Castro & Associates International ( Philippines )


Designers, Engineers, Consultants

Co. address : Timog Avenue, Quezon City, Philippines

Position : Site Engineer (apprenticeship)

Inclusive dates : March 1989 to October 1989

Project Handled : Shoe Mart Center Point Shopping Center


Sta Mesa Manila, Philippines

Scope of works : checks out works of main contractor at site. See to it that the works
were being done according to plans. Assists the in-house engineer
in issuing memos do estimates and drafting works for change
orders in plans and v.o. Issues instructions to the construction
management team. Monitoring of site accomplishments.

Name of Company: Department of Public Works & Highways Region I ( Philippines )


Benguet Engineering District
Engineers Hill, Baguio city, Philippines

Position : Site Engineer

Inclusive dates : November 16,1986 to February 1989

Project Handled : 50 km. Kapangan-Benguet Provincial Road


Located at Kapangan, Benguet, Philippines

: Construction of Bailey Bridge


Located at Mankayan, Benguet, Philippines

: 2-storey Balatok Provincial high school


Located at Balatok, Itogon, Benguet Province
Philippines

: Construction of Bailey Bridge at Mankayan


Provincial Road, Mankayan, Benguet Province
Philippines
Scope of works: Supervises works of contractors at site.
Prepares plans and estimates for bidding purposes.
Prepares claims of constractors, do memos and transmittals to
consultants. Attends meetings, prepares weekly accomplishment
reports of contractors.

Name of Company: V.P. Eusebio Construction Inc. ( Philippines )

Co. Address : Armal Bbldg. C. Raymundo Avenue


Maybunga, Pasig City, Philippines

Position : Site Engineer/Asst. Project Engineer

Project handled : Metropolitan Waterworks & Sewerage System PG-28 Project


Water Distribution System Projects
Located at Murphy & Project 4 Quezon City, Philippines

: Bani National Highway


Bani, Pangasinan province, Philippines

Inclusive dates : January 18, 1982 to December 21,1983

Scope of works: Supervises the works at site.


Prepares claims of subcons and company claims.
Prepares v.o. claims, weekly reports of accomplishments
do S-curves, bar charts, cash-flows,PERT/CPM, estimates
plans for biddings and prepares memos and transmittals to
subcons and consultants.

Referrals :
Name Position Name of Co./Gov't. Agencies

Mr. Lim Chin Beng Director BBR Construction Systems


(M) Sdn Bhd

Mr John A. Faulkner Project Manager Gamuda Berhad-BBR Const.


systems Sdn Bhd

Mr. Lim Ban Hoe Sr. Const Manager Gamuda Berhad-BBR Const.
Mr. Safwan Z. Salomy Sr. Site Engineer BBR Construction Systems

Mr Chai Thiam Yew Managing Director Chai Mio Construction

Mr. Tan Director PATI

Engr. Virgilio Fernandez Proj. Manager SWCC / KEVTON GROUP


INC.

Engr. Rufino N. Barinan President RYANYX

Engr. Reynaldo San Gabriel Sr. Vice President RMPCDC

Fawzi Hamed Sr. Project Engineer ARAMCO tel. # 0530530098

Mohammed Salem Project Engineer ARAMCO tel. # 0500081954

Haytham Z. Habis Project Engineer Al Hugayet tel. #


0545343434
Saeed M. Al-Yami Project Engineer ARAMCO KAPSARC

Khalid Al Harbi Site Supt. Mech. JAL

Abdulrahman A.Al-Amer Sr. Project Engr. ARAMCO KAPSARC

Hesham Al Jafaari Project Engineer ARAMCO KAPSARC

Hisham ElChaar Project Engineer ARAMCO KAPSARC

Places visited :
Name of country Year visited Type of visa used Purpose of visit

Malaysia 1994 -1998 work To work


Thailand 1995 tourist Tour of the place
Singapore 1996 tourist Tour of the place
Japan 2003 tourist Vacation trip
KSA 2007-Present work To work

You might also like