CONCRETE PLACEMENT
INSPECTION CHECK LIST
Project.: Description.:
Task Order No.: Location.:
Contractor: Report No.:
Specification.: Inspection Req No.:
Drawing Ref.: Date.:
Inspection Result
Description of Activities
Remarks
Accept Reject N/A
Verify concrete complies with approved
1
design mix
2 Check all field tests have been carried out
3 Check concrete is not re-tempered
Check vibration has been carried out
4
properly.
Check preparation of surface has been
5
carried out properly
Check the placement and free drop conforms
6
with specifications
Check the formed surface have been finished
7
as per specification
REMARK
Description Sub KTR QC Rep. Prime KTR QC Rep Client
Name
Signature
Date