Independent periodic health inspection - TM2500(+)
Turnaround time: Estimated working time is approx. 40 hours
Turnaround time in days of 10 hours each:
  with provision of 1 mechanical engineer: 4 days
  with provision of 2 mechanical engineers: 2 days
Independent periodic health inspections surpass traditional periodic or
borescope inspections:
  Fully independent perspective (especially important with engines
  under warranty)
  Dedicated improved work scope based on extensive VBR expertise &
  experience in:
    optimizing reliability & availability TM engines
    preventing & reducing unscheduled downtime TM engines
    optimizing total lifetime TM engines
    optimizing safe operation environments
  Very cost effective: improved work scope at a competitive pricing
  Tailor-made recommendations based on customer business model &
  operating profile
  All recommendations and reports available 24/7 through your VBR Turbine
  Partners customer portal access (+ full service history upon request)
About VBR
VBR Turbine Partners are independent technical & digital maintenance
experts for LM aeroderivative gas turbines and their control systems.
LM2500+ | LM6000 | TM2500+ | PGT25+ | Speedtronic | Woodward | DECIDE
We support TM operators worldwide to improve their reliability, availability &
maintainability and to reduce their day-to-day operation & maintenance costs
in a sustainable way.
    Contact details                                                                    Independent periodic
    VBR Turbine Partners
    Main office & warehouse
                                                                                       health inspection
    Industrieweg Oost 6
                                                                                                 TM2500(+)
    6662 NE Elst
    The Netherlands
    +31 88 010 9030
    [email protected]    www.vbr-turbinepartners.com                                         version: 1.2
Workscope                                                   TM2500                                                                    TM2500
                                                           SAC   SAC   SAC                                                           SAC   SAC   SAC
                                                                  +     +                                                                   +     +
                                                                       G4                                                                        G4
Borescope inspection                                                         T4.8/T5.4 inspection
High pressure compressor (using electronic turning tool)                     Visual inspection
Combustor and Stage 1 HPT Nozzle                                             Resistance check
High pressure turbine (using electronic turning tool)
                                                                             P4.8/P5.4 visual inspection
Stage 1 mid span damper inspection
                                                                             Hydraulic control unit filter inspection (HCU)
GG/GT visual exterior inspection
                                                                             Sight glasses cleaning
Tubing, hoses and electrical harnesses
Inlet duct and centerbody
Transfer gearbox
                                                                             Igniter visual inspection
Accessory gearbox
Compressor front frame
                                                                             High pressure recoup check (running engine)
Compressor stator and variable vane components
Compressor rear frame                                                        Bearing 7b thrust balance check (running enine)
Turbine mid frame
Power turbine stator case                                                    VSV schedule check (running engine)
Turbine rear frame
Accessories                                                                  Pneumatic/gas starter inspection
GT mounts                                                                    (if applicable for client configuration)
Compressor inlet inspection                                                  Supply and scavenge lube filter inspection
Filter house
Silencers
                                                                             Gas y-strainer inspection
                                                                             (if installed)
Inlet plenum
                                                                             Non-return valve inspection
Engine enclosure inspection                                                  (if applicable for client configuration)
Exhaust inspection                                                           Gas turbine starter oil return line screen inspection
Exhaust duct inspection                                                      (if applicable for client configuration)
PT stage 6 blade inspection
Diffusor inspection
Lube and scavenge pump inspection
L&S pump inlet screens will be inspected
(Magnetic) plug or chip detector inspection
Synthetic lube oil analysis
Fuel system visual inspection
Fuel nozzle visual inspections
Two fuel nozzles will be removed for visual inspection
Tip wear measurements