Civil and Structural BOQ

The document provides a bill of quantities for a 15MW solar power project. It lists 26 items with descriptions, quantities, units, and amounts. The major items include: 1) structure installation and module erection, 2) piling for mounting structures, 3) control room and inverter room buildings, 4) plant boundary fencing, 5) cable trenches, 6) roads, 7) drainage systems, and 8) switchyard structures. The total amount for all items is Rs. 102,840,604.12. Remarks note that quantities may vary according to site conditions and assumptions are tentative.

Uploaded by

Raviraj Thorat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
953 views11 pages

Civil and Structural BOQ

The document provides a bill of quantities for a 15MW solar power project. It lists 26 items with descriptions, quantities, units, and amounts. The major items include: 1) structure installation and module erection, 2) piling for mounting structures, 3) control room and inverter room buildings, 4) plant boundary fencing, 5) cable trenches, 6) roads, 7) drainage systems, and 8) switchyard structures. The total amount for all items is Rs. 102,840,604.12. Remarks note that quantities may vary according to site conditions and assumptions are tentative.

Uploaded by

Raviraj Thorat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 11

Bill of Quantity for 1

Sr. No. Description Quantity Unit

Structure supply and Installation -310Wp


module at 22 degree tilt and 7m pitch, considering
structure length 20.2m, width 3.92m
1 668,874.02 Kg
(accommodating 40 modules on one structure,
2*20 matrix). With 6 Nos of Posts. (Total 1453 no.
of Tables & 460.34 Kg/Table)

Site leveling and Grading- (Nominal Qty.


2 500 Cum
Considered Lumpsum)

Piling for MMS structure -Consider 350mm


3 Diameter Pile Foundation.Total 1453 nos of Table 8,718.00 Nos
& 6 Nos of Posts per Table.
Control Room Building-(Area-171.41 sq.m) RCC
5 Framed Structure With Corrogated Steel Roofing & 171.41 Sqmt
Brick Masoery Work.

(3nos. Inverter) Inverter Room Building-(Size-


6 15.91X5.64) RCC Framed Structure With 89.732 Sqmt
Corrogated Steel Roofing & Brick Masoery Work.

(4nos. Inverter) Inverter Room Building-(Size-


7 15.91X5.64)x2 RCC Framed Structure With 179.464 Sqmt
Corrogated Steel Roofing & Brick Masoery Work.

Security Cabin-(Size-3.3X2.8M) RCC Framed


6 Structure With Corrogated Steel Roofing & Brick 9.24 Sqmt
Masoery Work.

Gate- Providing and fixing in position Structural


7 1 LS
Steel Fabricated As Per Design Drawing Complete.

Plant Boundary Fencing (Pre-cast slab type, 1.8m


8 3,405.00 Rmt
high)
Power Transformer Fencing-Providing & laying
9 P.C.C of 150mm thick with, 19.01 per transformer 133.07 Rmt
(x7 Transformer)
10 Power Transformer Foundation 7 Nos
11 Auxiliary Transformer Foundation 4 Nos
Internal DC & AC Cable Trench in RCC inside
Control Rooms & Invertor Room-Providing &
12 97.39 Rmt
laying RCC Trenches Of Size 1000mm Wide x
1000 Depth.
Internal DC & AC Cable Trench in RCC inside
Control Rooms & Invertor Room-Providing &
13 18.6 Rmt
laying RCC Trenches Of Size 800mm Wide x 1000
Depth.
Internal DC & AC Cable Trench in RCC inside
Control Rooms & Invertor Room-Providing &
14 29.52 Rmt
laying RCC Trenches Of Size 750mm Wide x 1000
Depth.
Internal DC & AC Cable Trench in RCC inside
Control Rooms & Invertor Room-Providing &
15 6.65 Rmt
laying RCC Trenches Of Size 600mm Wide x 1000
Depth.

AC Cable Trench External-Excavation for Cable


Tranches in soft rock, including removing the
excavated material up to a distance of 50 m.
beyond the area & stacking and spreading as
13 1,685.47 Rmt
directed, dewatering, preparing the bed for the
foundation and necessary back filling, ramming,
watering including shoring and strutting etc.
complete.

DC Cable Trench External (smu to Inverter


Cable)-Excavation for Cable Tranches in soft
rock, including removing the excavated material up
to a distance of 50 m. beyond the area & stacking
14 40,302.00 Rmt
and spreading as directed, dewatering, preparing
the bed for the foundation and necessary back
filling, ramming, watering including shoring and
strutting etc. complete.

Periphery Road -Proving & laying 150mm Thick


Layer of Rubble for preparation of base &
Spreading Rolling, Compaction, Watering, etc.
15 11,544.00 Smt
Complete & Finishing it With A Layer Of 25mm
Thk. Bitumunious Road. (4m Width Assumed),2886
total length of periphery road

Internal Roads - Proving & laying 150mm Thick


Layer of Rubble, Rolling, Compaction, Watering,
16 9,200.00 Smt
etc Complete. (4m Width Assumed),2300 total
length of internal road

Overhead Tank-Providing & Fixing 2000 Lits


17 Capacity Syntex water Tank at Control Room 1 LS
including necessary Fixers & fitting etc Complete.

18 Module Cleaning Arrangement 1 LS


19 Plumbing 1 LS
20 Septic Tank 1 LS
Water Drainage System (Brick Drains, 450 Wide &
21 4,310.00 Rmt
600 Deep)
22 Street Light Pole Foundation 80 Nos.
23 LA Foundation 12 Nos.
CCTV Foundation 12 Nos.
24 Switchyard Structure
a) switchyard Structure foundation 6 Nos.
b) switchyard Structure Superstructure 6 Nos.
25 WatchTower 4 Nos.

Total Amount to be filled by contractor (Rs.)

In Words
Bill of Quantity for 15MW
Amount
Unit Rate Tax
With
Amount (Rs.)
(Rs.) ED % CST % VAT % Taxes (Rs.)

75.00 50,165,551.50

300.00 150,000.00

950.00 8,282,100.00

12000.00 2,056,920.00

12000.00 1,076,784.00

12000.00 2,153,568.00

10000.00 92,400.00

75000.00 75,000.00

1312.00 4,467,360.00

1188.00 158,087.16

141417.00 989,919.00
23172.00 92,688.00

8700.00 847,293.00
8000.00 148,800.00

8000.00 236,160.00

7800.00 51,870.00

200.00 337,094.00

200.00 8,060,400.00

900.00 10,389,600.00

472.00 4,342,400.00

20000.00 20,000.00

5000000.00 5,000,000.00
50000.00 50,000.00
20000.00 20,000.00
380.00 1,637,800.00
10422.52 833,801.60
22593.77 271,125.24
12000.00 144,000.00

22593.77 135,562.62
20000.00 120,000.00
108580.00 434,320.00

102,840,604.12
Remark

Quantity May
Vary As Per
Contour
Tentative
Assumption
Sr. No. Description

1 Site leveling and Grading


2 Structure Installation and module erection
3 Piling for MMS structure
5 Control Room Building
6 (3nos. Inverter) Inverter Room Building
7 (4nos. Inverter) Inverter Room Building
6 Security Cabin
7 Main Gate

8 Plant Boundary Fencing -Pre-cast slab type

9 Power Transformer Fencing


10 Power Transformer Foundation
11 Auxiliary Transformer Foundation
Internal DC & AC Cable Trench in RCC inside
Control Rooms & Invertor Room-Providing &
12
laying RCC Trenches Of Size 1000mm Wide x
1000 Depth.
Internal DC & AC Cable Trench in RCC inside
Control Rooms & Invertor Room-Providing &
13
laying RCC Trenches Of Size 800mm Wide x 1000
Depth.
Internal DC & AC Cable Trench in RCC inside
Control Rooms & Invertor Room-Providing &
14
laying RCC Trenches Of Size 750mm Wide x 1000
Depth.
Internal DC & AC Cable Trench in RCC inside
Control Rooms & Invertor Room-Providing &
15
laying RCC Trenches Of Size 600mm Wide x 1000
Depth.
AC Cable Trench External-Excavation for Cable
13
Tranches in soft rock

DC Cable Trench External (smu to Inverter


14
Cable)-Excavation for Cable Tranches in soft rock

15 Periphery Road Asphalt (4m Width Assumed)

16 Internal Roads WBM (4m Width Assumed)


17 Overhead Tank
18 Module Cleaning Arrangement
19 Plumbing
20 Septic Tank
Water Drainage System (Brick Drains, 450 Wide
21
& 600 Deep)
22 Street Light Pole Foundation
23 LA Foundation
24 CCTV Foundation
25 Switchyard Structure
a) switchyard Structure foundation
b) switchyard Structure Superstructure
26 WatchTower

You might also like