REQUISITION N° BD1166A-1221A_03 wood.
Material Requisition for 13- Hairpin HE / E-180, E-712 and E-722 ENTER
Revision E04
Date 26/02/2022 yizzany
Page 18 of 22 Perecocon
APPENDIX 4
BID INFORMATION FORM
for 13-E-150, 13-E-712 and 13-E-722
BIDDER PROPOSAL
N° [REQUIREMENT “A’or*NA' orb" | NOTES AND INFORMATION
(see Note 1)
1 Material Requisition
[BD1166A-1221A 03 - Rev. E01
2 [ob Spec BD1 1664-0989 - Rev.FO2
‘3 [ob Spec BD1166A-10A1- Rev.FO1
“4 [Job Spec BD1166A-1989- Rev.F03
5 [ob Spec BD1166A-21A1 - Rev.FOS
6 Hob Spec BD1166A-40A2- Rev.FO1
7_ hob Spec BD1166A.57A1- Rev.FO1
‘8 [ob Spec BD1166A-82A1- Rev.FOt
(9 Hob Spec BD1166A-83A1- Rev.FO4
10_Wob Spec BD1166A-88A1- Rev.FO2
11 Hob Spec BD1166A-97A1_1 -Rev.FO1
12_hlob Spec BD1166A-Q8A1_1 -Rev.FO1
13_ Hob Spec BD1166A-98A2_1 - Rev. FO3
14 Nessels Engineering Standards
[BD 1166A-00-11- 001 - Rev.F02
45 [Exchanger Engineering Standards
(BD 1166A-00-21-101 -Rev.FO2
“15 Wood Mechanical Data Sheet
[BD1166A-TEC-13-DS-E-150 Rev. E01
+17, Wood Mechanical Data Sheet
[BD1166A-TEC-13-DS-E-712 Rev. £01
{Wood Mechanical Data Sheet
[BD 1166A-TEC-13-DS-E-722 Rev. E01
qq SDC Engineering Standards
IE-106 - Rev.7
]Thermal and hydraulic guarantees Bidder to submit
‘overing the performance required in the
20 [applicable process specification attached
10 Mat Req, as well as vibration free
fesign guarantee
|Thermal calculation performed using a (Bidder fo submit
21 {worldwide recognized computer program
1S per para. 3.9
22, Mechanical design / guarantee [Bidder to submitREQUISITION N° BD1166A-1221A_03
Material Requisition for 13- Hairpin HE / E-150, E-712 and E-722
wood,
ENTER
Revision E04
Date 26/02/2022 yizzany
Page 20 of 22 cee
BIDDER PROPOSAL
N° [REQUIREMENT "A" or*NA orb” | NOTES AND INFORMATION
(s00 Note 1
HTEMA Exchanger datasheet duly filed in,
{complete with:
process data
Performance data (clean/fouled heat
transfer coefficients, margin on
surface, LMTD, pressure drop, shear
stresses, etc.)
material of construction
flow passes arrangement
construction features
mechanical design conditions
23
(Bidder fo submit
(Setting Plan Sketches showing
‘overall dimensions
size and arrangement of nozzles
size and arrangement of saddles
weights (fabricated, empty and
hydrotest conditions)
24 |:
(Bidder fo submit
IMaterial designation (ASTM) for main
-omponents and bundle (plate, forging,
tube and pipe designation)
25
(Bidder to speciy
|Thickness of main components (channel
26 shell, tubesheets, etc.
(Bidder to speciy
27 [Scope of supply as per para 13
28 Litting Devices
(Specify the propased devices, such
fas lugs, trunnions ete
29, Painting as clatified at para. 5.0
[Spare parts for commissioning / start
30 (see para. 9.1,
[Bidder to specify type and quantity
31_Nitrogen Filing for preservation
[Spare parts for two years operation and, it
ny, mandatory spare parts (see para. 1.4,
9.2.9.3& 11.2)
32
[Bidder to submit separate quotation
[Unit price for adaition/deletion of nozzle
lupto 24" for 150#, 300# & 6O0# (see para,
14 & 11.2)
33
[Bidder to submit separate quotation
(Optional Quote for Third Parly Inspection
34 [charges (see para. 1.4 & 11.2)
[Bidder to submit separate quotation
Daily rate for Vendor field supervision (eee
35 para. 1.4 & 11.2)
[Bidder to submit separate quotation
'36 [Other optional quotation as needed
[Bidder to submit separate quotation
Design and Fabrication Codes:
37_|ASME Vil Div.t_, TEMA R, API 663
38 Pesign Code Stamp:
ASME "U" stampREQUISITION N° BD1166A-1221A_03 wood.
Material Requisition for 13- Hairpin HE / E-180, E-712 and E-722 ENTER
Revision E04
Date 26/02/2022 yizzany
Page 21 of 22 Perecocon
BIDDER PROPOSAL
N° [REQUIREMENT "A" or*NA orb” | NOTES AND INFORMATION
(s00 Note 1
jelded tubes-to-tubesheat joinis
39 |Strength welded and expanded for all
items.
JAdoption of allowable stress of the “low
tress" material (see para 4.6)
40
(41 PWHT tor Code I
“42, [Loads on process nozzles (see para. 410)
Front closure as per para. 4.29 for item 13
43 E150
Front closure as per para, 430 for tem 134
IE-712 and 13-E-722
Rear housing as per para. 432 84.33,
[Documentation in accordance with Job
14g. pecifcation BD1 165-0989 and
[8D1166A-1989; manual in English and
lendwuser language
44
Proposed list of sub-suppliers, complete af] Bidder to submit the Het
47 country of origin
“48_[Past Project Reference List [Bidder to submit the fet
Note 1:
"A= compliance with Purchaser requirements with no deviations
NA’ = not applicable
D
deviation, clarification, etc. (please submit the attached deviation form (Appendix 1) duly filed