Case Study - Jeyakumar - 311717251025
Case Study - Jeyakumar - 311717251025
• It comprises of Studios, five star hotels, • The first 13 floors of the residential building
apartmentsand a high-end shopping. is used as a parking garage for both the
• The main skyscraper is about 52 floors buildings and the remaining 19 floors is
203 metre and the residential skyscraper residence
is about 35 floors 142 meters.. • The configurations for the 2.5, 3, 3.5 BHKs
• It is the tallest structure in vicinity. are larger than those in similar projects.
• The first five floors of the main building is
used for a high-end shopping mall and
the remaining 47 floors of the main
building is utilized for a commercial
offices and five star hotel. The main
building is crowned by five star hotel on
top 5 floor.
RETAIL
TRANSFORMER OFFICE
GREEN TOWER
RETAIL VIEWS
TOWER
SERVICE
PARKING
GREEN ROOF
GREEN ROOF
CONCRETE
GLASS ATRIUM
KOHINOOR SQUARE
SHEET NO: 17 || SEM-10 || DESIGN || THESIS 2021-2022
DATE : 03-01-2022 Mohamed Sathak A J Academy of Architecture
CENTRAL CORE CONSISTS OF MATERIAL PROJECT FEATURES 1 FLOOR
2 AIR COOLED
• 3 lobbies of 6 lifts and 1 lobby of 4 lifts • The facade consists of faceted • 30 storeys- freehold, part of 5 acre CHILLERS
• 25 th floor is a lift bank. flashing with led lighting are height terraces
COOLED
CHILLERS
BASEMENT 02
03 FLOOR
• 2 lobbies of 6 lifts serving the upper floors the unique feature and make • Vertical Transmission System with HVAC CHILLER
7 DG UNITS
BASEMENT 03
PLANT
of buildings 25th to 52th floors. it complicated façade design. lifts travelling at the speed of 6 meters
• All the glasses are articulated per second
• 2 staircases are also placed in the core. • Private elevators going right up to
glasses & can sustain design
• 2 services lifts travelling throughout the wind pressure of 4.5 to 5.0 your residences
building. kpa. • Conventional ramp parking with wide
ramps
• The central core is surounded by the office • The building design makes it
• Car lifts and charging points for
spaces environmentally friendly, using electric cars
• There are segregated office space from 6th technologies such as floor- • Private exclusive access to Retail and
to 14 th floor with toilets to each office toceiling insulated glazing to F&B
and common toilets contain heat and maximize
natural light, and an automatic HOTEL LIFT (GF-(45-50F) OFFICE LIFT (GF-45F)
WATER TANK
Commercial Residential
Energy
center
Retail
KOHINOOR SQUARE
SHEET NO: 17 || SEM-10 || DESIGN || THESIS 2021-2022
DATE : 03-01-2022 Mohamed Sathak A J Academy of Architecture
VERTICAL CIRCULATION
PASSAGE TOILET
ELECTRICAL RETAIL
FOOD COURT AHU
WEST ATRIUM WEST ATRIUM CONFERENCE HALL
KOHINOOR SQUARE
SHEET NO: 17 || SEM-10 || DESIGN || THESIS 2021-2022
DATE : 03-01-2022 Mohamed Sathak A J Academy of Architecture
• One of the most unique features of a few limited homes in • 15 double height landscaped sky gardens
and more than double terrace to act as
Altissimo are the extra-large double height terraces and tranquil and refreshing breakout zones. 1.Rain Water Collection
having a width of 10 feet offering fantastic views of the 2. Sky Gardens
• Low flow faucets, dual flush toilets, grey
Clubhouse and the Eastern Sea Front. water systems and storm water and rainwater
3. High Performance Facade
• At 160 feet from the ground in the 35,000 sq. Ft. Clubhouse. management systems- all a part of our 4. High Efficiency Ventilation System
• Indoor Amenities spread across approx. 10,000 sq. ft. commitment to the environment. 5. Daylight Harvesting & Dimming Controls
6. Black & Grey water Reuse
space including Lounge seating, single seater swings, open
7. Environmentally Preferable Material
library, indoor games (carrom, chess, table tennis, etc..),
8. Green Roof
gym, yoga zone, stream room, spa, changing room. 9. Energy Centre
• Outdoor Amenities spread across approx. 25,000 sq. ft. 10.Native Adapted Landscape
space including infinity pool – 30mX7m, pool deck, kids 11.Onsite Waste Water Treatment
pool, Jacuzzi-7 seater, Jogging/ walking tracks, Kids play 12.Recyclable Sorting & Collection
area, Landscape area with approx. 100 trees, party cabana. 13.Natural Ventilation
THE RESIDENCES
• Large spacious homes with VRV Air Conditioning System
for each home
• Walk-in wardrobes in select Master Bedrooms
• Floor to ceiling height of 12 feet
• French windows give a magnificent view of the city and
allow ample sunlight
• DGU glass provides good heat insulation & acoustic value
• Extra-large spacious bathrooms with anti-skid tiles, ventilation
and great views of the city
• The structure comprises a concrete core and VERTICAL CIRCULATION
post- tensioned concrete slab and spandrel PASSAGE TOILET
beams. ELECTRICAL RETAIL
• The average centre to centre distance FOOD COURT AHU
between columns is 9.5 m. CONFERENCE HALL
• The column is of 1.8 x 1.8 m .
• The combined pile raft foundation system is
used .
9.5 m. 9.5
m. TYPICAL 4TH FLOOR
KOHINOOR SQUARE
SHEET NO: 17 || SEM-10 || DESIGN || THESIS 2021-2022
DATE : 03-01-2022 Mohamed Sathak A J Academy of Architecture
100 + stores Hypermarket,
LOCATION : WHITEFIELD, BANGALORE Parking : 1500 cars and 800 bikes
20+ F&B experiences Department Store,
ARCHITECT : RSP GROUP Floor height : 15 FT
600 seater food court FEC Sports Arena,
No. of Floors :5 Type : Horizontal mixed-use
10 screen multiplex Performance Theatre
No. of Shops : 100+ Space : 6,00,000 sqft of retail 272 seat auditorium
Total plot area : 105 acres
The garbage disposal and load transfer to the retail has been transport at
particular time alone.
Except the food court and restaurants, no other spaces has service corridor.
PLANNING
• The shops and other retail spaces has been connected by the atrium
• The space does has totally 6 entries (2 main entries from road +4 entries
from parking floors)
• The main entry has focused to the semi-open oat space, where events has
been held and visitors would spend time to read books, works, eat etc…
• B1+B2 has been designed with service and parking
• LG+UG has been design with office space, retail shops, garbage dispoal
area, STP, sumps, Bio-gas plant, generators etc…
• From 1st-5th floor has retail shops, gallery, theatre and fun zone
• All the space has connected by the central atrium elevator
• The architect has implied to bring natural light by central atrium, where
the space has used as like open retail shop, articraft shops , event
management etc…
WATER SUPPLY
• The main water source is Borewell , in summer time Kaveri water.
• Total Rainwater harvesting capacity 10L(5L+2L+3L), where 2L has been
used as fire tank refill.
• Water is obtained in underground sump and overhead tank
• Purification of water is done by, water from pump is fed into a tank with
sand and aggregated and then passed to tank with carbon and resin. This
is sent to the sump for further purification and the purified water is sent
to the overhead tank
• The STP , the one time treated water is used for gardening, 2 time treated
water has been used for flush.
• The well purified water is used for hand washing, where the water stored
to overhead or sump.
HVAC
• The AC cycle begins when the fans forces air into the duct work leading
to opening in the room. These openings are called outlets and terminals.
The air is directed from the duct work through these outlets and into the
room where the air either heats or cools the space needed.
• The air flows from the room enter the air stream and carried
along with it. The air then flows from the room through the
second outlets or return outlet
• The dust particle are removed from the air by a filter
installed in the ductwork. After the air is cleaned, it is either
heated or cooled depending on the requirements of the
space.
TEMPERATURE
PUBLIC ZONE
SITE PLAN SITE PLAN CIRCULATION PUBLIC ZONE
FUNCTION FLOW PRIVATE ZONE
SEMI-PRIVATE ZONE
OFFICE B
THEATER
TRANSFORMER OFFICE A
RETAIL RETAIL
BUS
TERMINAL
SERVICE
APART. .
RETAIL
SHANGHAI GREENLAND CENTER SHEET NO: 01 DATE : 03-01-2022 || SEM-10 || DESIGN || THESIS 2021-2022
Mohamed Sathak A J Academy of Architecture
• Spaces has zones as public, semi- private, and
private zone.
• Office entrance, retail shop and service
apartments are connected by public
transportation. It generates comfortable within
nature and also ensure the sky light and green
space smoothly merged into activity zone. A roof connecting the human activities and the city
• The three buildings that emerge from the green • 17 floors of service apartments, it has 13 studio apartments in each
landscape- SOHO along with other places floors. The core does have 5 passenger lifts and 2 service lift including
where people congregated such as station 2 fire Staircase in central core of the building.
entrances and exists, are placed separated • Each façade has been designed to encourage people to walk through
from each another and connected with semi changes in the layering of natural ventilation louvers and aluminium
out-door walkways. The slope are designed as small playgrounds, various
shades fins
• The air-conditioner for the walking circulation, activities and gathering
costs zero in Shanghai Greenland Centre. And it BASEMENT PLAN GROUND FLOOR
has made a big contribution on reducing heat
island effects. Curve edges which help to
divert the build direction URBAN LIFT
• 1st-4th and basement 1st and 2nd floor has been CORE-4 URBAN
CORE-3
STAIRCASE
designed with retail shopping mall which URBAN
CORE-1
includes supermarket, textile showrooms, other
tech showrooms etc… and the entrances of core
to public transport. Where the basement does URBAN CORE-
include parking for the public and employee of 2
the SOHO.
• The office (A&B) space does have 6 passenger
lifts and 3 service lift, including 2 fire
staircases of the central core.
17 FLOORS
OF OFFICE OFFICE
SERVICE WIND FLOW GREEN
APARTME -B -A ROOF
R
CIRCULAT
ION NT
ET
AI
BASEMENT
RETAIL
PARKING BASEMENT PARKING
L
A green provides shade, remove heat from the air and reduce temperature of the roof surface and surrounding air. Green roofs in this location, build environment
with limited vegetation can moderate the heat island effect, particularly during the day.
SHANGHAI GREENLAND CENTER SHEET NO: 02 DATE : 03-01-2022 || SEM-10 || DESIGN || THESIS 2021-2022
Mohamed Sathak A J Academy of Architecture
SECOND FLOOR PLAN THIRD FLOOR PLAN
LIFT
STAIRCASE LIFT
CORRIDOR STAIRCASE
COMMON AREA
PARKING
OFFICE/ SERVICE
APARTMENT
METRO
CORE- 1
SHANGHAI GREENLAND CENTER SHEET NO: 04 DATE : 03-01-2022 || SEM-10 || DESIGN || THESIS 2021-2022
Mohamed Sathak A J Academy of Architecture
LOCATION : Chippendale, Sydney, AUSTRALIA
ARCHITECTS : Atelier Jean Nouvel PUBLIC
TOTAL FLOORS : 34 floors ENTRY
BUILDING HEIGHT : 384 ft
BUILDING GFA : 2,750179 sq.ft.
One Central Park was developed as a response to growing
PRIVATE
demand for residential accommodation in downtown Sydney.
ENTRY
The designers wanted to make a powerful and visible green
statement with a tall building that is environmentally responsive
on multiple levels.
• OCP is a mixed used building – Residential and Retail.
• It consist of two main building – East Tower and West
Tower.
• The building consist of 623 apartments.
• 5 floor retail podium PUBLIC
• 5 floor basement with 1200 car parks. ENTRY
• West Tower: 18 storey, 240 apartments.
• East Tower: 34 storey, 383 apartments.
Design Challenges
Two design challenges:
1. New Park presence at urban scale.
2. Lack of direct sunlight – Tall massing along the north
side Providing shadow to the park – Lower and Upper
Tower.
PUBLIC ENTRY
PRIVATE PRIVATE
TOWER PUBLIC TOWER
PRIVA
TEENT
RY
PUBLIC
ENTRY
RETAIL
ENTRY
swimming pool.
Two Residential Towers- East Tower and West Tower.
EAST TOWER : 1bhk bedroom suite and 2 bhk bedroom
RETAIL RETAIL apartments.
38 % houses with high sky garden. The have access to this
garden on 29th level – plunge pool, outside kitchen and
PUBLIC timber seating areas.
ENTRY West Tower: 1 bhk bedroom apartments and 1 bhk dual key
flats.
EAST TOWER
• Service Core: It is placed in the core part and of the building
and rest of the spaces around it.
• 5 lifts and 2 staircases.
PODIUM FLOOR PLAN
RETAIL
STAIRCASE
&
ESCALATOR
RETAIL
ATRIUM
SERVICE
LIFT
FOOD STALL
ENTRY
PUBLIC
ENTRY
FIRE EXIT
STAIRCASE
FOODCOURT
DINING
LIFT FOR
APARTMENT
HOT
WESTERLIES
IN SUMMER
CANTILEVER
SKY GARDEN
PUBLIC
ENTRY
FIRE EXIT
STAIRCASE
LIFT FOR
COLD SOUTH APARTMENT
WESTERLY
WINDS
SUMMER SOUTHERLY BUSTERS
IN LATE WINTER
COLD WINTER SOUTHERLIES
CORE
CORE
PRIMARY STRUCTURE
SECONDARY STRUCTURE
STRUCTURAL GRID
ENTRY
Ozturk. TYPE : Mixed Used.
TOTAL FLOORS : 33 FLOORS
PUBLIC RETAIL
RESIDENTIAL ZONE ZONE
RESIDENCE
COMMERCIAL
CAR PARK
33 FLOORS
FLOOR GAP
STUDIO
STAIRSCASE APARTME
NT
ELEVATOR
12 FLOORS
RETAIL
3 FLOORS
ENTRACE RETAIL
RESIDENCE EXIT
CAR PARK
KUMRU ANKARA
SHEET NO: 13 || SEM-10 || DESIGN || THESIS 2021-2022
DATE : 03-01-2022 Mohamed Sathak A J Academy of Architecture
THE BUILDING IS PLANNED ACCORDING TO THE THREE
BASIC LEVELS.
TOP FLOOR PLAN (DUPLEX) SOCIAL CENTRAL FLOOR (11th ) 3BHK RESIDENTIAL BLOCK
NET CASE STUDY- 3 JEYAKUMAR V S || 311717251025 || 5TH YEAR,
KUMRU ANKARA
SHEET NO: 14 || SEM-10 || DESIGN || THESIS 2021-2022
DATE : 03-01-2022 Mohamed Sathak A J Academy of Architecture
1BHK STUDIO
LIVING
MODULE -1 MODULE -2
2BHK STUDIO
KITCHEN
MODULE -3 MODULE -4
2BHK STUDIO
BEDROOM
MODULE -5 MODULE -6
TOILET SWIMMING
POOL
MODULE -7
NET CASE STUDY- 3 JEYAKUMAR V S || 311717251025 || 5TH YEAR,
KUMRU ANKARA
SHEET NO: 16 || SEM-10 || DESIGN || THESIS 2021-2022
DATE : 03-01-2022 Mohamed Sathak A J Academy of Architecture
INFERENCE
LIVE CASE STUDY -1 LIVE CASE STUDY -2 NET CASE STUDY -1 NET CASE STUDY -2 NET CASE STUDY -3
NAME Dadar mumbai Whitefiled, bangalore Whitefiled, bangalore One central park, sydney Kumru ankara -
LOCATION Dadar mumbai Whitefiled, bangalore Chuanchang road,, shanghai, ,sydney,Aus Ankara, Turkey. The sites has been located in the
china tralia prime of the city, which is the
centre of the city.
ARCHITECTS SSA architects RSP group Nikken sekkei Atelier Jean Nouvel Ali Osman -
SITE AREA 4.6 acres 105 acres 10.96 Acres - 2.6 acres -
BUILD UP AREA 255000 sq.m 55741.8 sq.m 3,04,910 sq.m 255499 56656 sq.m
NO OF FLOORS & BUILDING 52 F, 203m 6F & 25m 22F & 83m 34F & 106 m 33F & 125M All the buildings are comes under
HEIGHT high rise building range, where
min. 22f -52f , it emphasis the
building the height.
TYPE OF DEVELOPMENT Vertical mixed use Horizontal mixed use Tod-horizontal mixed use Vertical mixed use Vertical mixed use Both horizontal and vertical
mixed used development
CATEGORIES Retail, office, studio apart Retail, plaza, office, studio Retail, plaza, office, studio Retail, studio apart Retail, studio apart & hotel Retail is a primary category, of the
and apartment with club apart and apartment with apart and public tranport design and where studio
apartment and ratailare the
club common categories
CORE Central core Corner core Central core Central core Central core For longer stretched
30 passenger lifts with 6 6 Elevators (4 passenger lift 6 elevator with 1 service lift 9 passenger lifts with 2 fire 1 service lift, 5 passenger lift building, cores has been
service lifts + 2 service lift) and 16 (studio apart.) 2 fire staircase staircases with 2 fire staircases designed in corner.
Totally 6 staircase (where 2 escalators 7elevators with 2 service lift Electrical and ahu shafts Electrical and ahu shafts For short range of building,
staircase attached with core) 11 staircase (office) 2 fire staircase cores has been designed in
Electrical and ahu shafts Electrical and ahu shafts Electrical and ahu shafts centre of the building
All the staircases has min.
20m distance from the
staircase to staircase for fire
staircase.
LIVE CASE STUDY -1 LIVE CASE STUDY -2 NET CASE STUDY -1 NET CASE STUDY -2 NET CASE STUDY -3
No of entries 5 entries 6 entries (2 main entries 8 entries (3 private entries + 4 entries 4 entries Min 3 entries are required
(2 service entry+3 main from road +4 entries from 2 bus entries + 3 public (2 public entries + 2 private (2 public entries + 1 private for retail, there has to be
entry) parking floors) entries) entries) entry + 1 service entry) more than 2 entries has to be
designed. Minimum entries
are required for hotels and
studio apartment.
L .
Parking 3200 cars 1500 cars + 800 bikes - 1200car - Acoording to population
park accesss, min 1000cars and
600 bikes are equired
ZONING VERTICAL ZONING HORIZONTAL ZONUNG HORIZONTAL ZONING VERTICAL HORIZONTAL ZONING Zoning has to be considered
ZONING with security basis,
The retail shops can be a
public access, The residential
space has more secured
than the retail spaces
Planning The first five floors of the • 10 screen multiplex, • Spaces has zones as • OCP is a mixed used • This project is built as a
main building is used for a 600 seater food court, public, semi- private, building – Residential mixed project, consists
high-end shopping mall 272 seat Performance and private zone. and Retail. of 164 houses and open
and the remaining 47 floors Theatre, Art Galleries, • Office entrance, retail • The building consist of bazaars.
of the main building is Microbrewery shop and service 623 apartments. • The project construction -
utilized for a commercial • Prominent Brands: apartments are • 5 floor retail podium area of 60,216 square
offices and five star hotel. H&M, LifeStyle, connected by public • West Tower: 18 storey, meters/ 14.87 Acre.
The main building is Reliance Digital, transportation. 240 apartments.
crowned by five star hotel on Reliance Trends, Burger • East Tower: 34 storey,
top 5 floor. King, Crossword, Go 383 apartments
Sport, etc.
Material used Concrete structure with Concrete structure (framed Concrete structure with Concrete structure with Concrete structure (framed Concrete, aluminium frames
green roof + insulated structure) + green roof and green roof + insulated green roof + insulated structure) + green roof and glass are the common
exterior glazing with wall exterior glazing with exterior glazing with material has been used in
aluminium frames aluminium frames aluminium frames + 2888led studies. Plants are one of the
light cantilever common material used.
COMPARATIVE ANALYSIS
SHEET NO: 16 || SEM-10 || DESIGN || THESIS 2021-2022
DATE : 03-01-2022 Mohamed Sathak A J Academy of Architecture
INFERENCE
LIVE CASE STUDY -1 LIVE CASE STUDY -2 NET CASE STUDY -1 NET CASE STUDY -2 NET CASE STUDY -3
Climate tropical, wet and dry climate. tropical savanna climate humid subtropical climate humid subtropical - Indian case studies has
tropical, wet and dry climate
Foregin case studies has
subtropical climate
Types of apartment modules 2,3 and 4 bhk apartments 2,3 bhk apartments 1 bhk apartments 1,2 & 3 bhk 1 &2 bhk apartments 1, 2,3 and 4 bhk apartments
Modules has been deigned
POSITION OF ELECTRICAL ENTRY HAS SEPARTE - - - All the designs does have
TRANSFORMER IN their transformer unit in
BACKSIDE OF SIDE entry of the building
ELECTRICAL, AHU, CENTRAL CORE WITH CENTRAL CORE WITH CENTRAL CORE WITH CENTRAL CORE WITH Electrical ducts has been
MECHANICAL DUCTS 1X1M 1X2M 1X2M 1X2M attached with the core spaces
PLACEMENTS
MEP ROOM AND AHU CENTRAL CORE CENTRAL CORE W CENTRAL CORE CENTRAL CORE WITH Designed with the core spaces
ROOM POSITION 1X2M
Fire staircase distance 30m 25m 20m 30m 25m According to NBC, standard
of 30m has been maintained
in live studies
Sprinklers and extinguisher 3m once sprinkler has been 3m once sprinkler has been 3m once sprinkler has been
used and extinguisher has used and extinguisher has used and extinguisher has
been placed in entry of fire been placed in entry of fire been placed in entry of fire
exit doors and placed every exit doors and placed every - - - exit doors and placed every
mid of corridors of 15m mid of corridors of 15m mid of corridors of 15m
distance. With sand storages distance. With sand storages distance. With sand storages
in vertical circulation corner in vertical circulation corner in vertical circulation corner,
Main pumps has been placed
in the basement of the
building
FIRE SAFETY
SHEET NO: 16 || SEM-10 || DESIGN || THESIS 2021-2022
FROM NBC PART-04 ,2016 DATE : 03-01-2022 Mohamed Sathak A J Academy of Architecture
LITERATURE STUDY JEYAKUMAR V S || 311717251025 || 5TH YEAR,
FIRE SAFETY
SHEET NO: 16 || SEM-10 || DESIGN || THESIS 2021-2022
FROM NBC PART-04 ,2016 DATE : 03-01-2022 Mohamed Sathak A J Academy of Architecture
NOTES
1 MOEFA System shall also include talk-back system and
public address system for the occupancies given in the table
for (d) (I) (iii) under A-5, (a) (I) (iv) and (a) (2) under C-I, and
(a) (2) under D-I to D-5, in all buildings 15 m and above in
height, except for A-3 and A-4 occupancies where these shall
be provided for buildings of height 24 m and above. These
shall also be provided in car parking areas more than 300 m2
and in multi-level car parking irrespective of their areas.
2. Automatic detection and alarm system is not required to
be provided in car parking area. Such detection system shall
however be required in o\ ther areas of car parking such as
electrical rooms, cabins and other areas.
4 Required to be installed in basement, if area of basement
exceeds 200 m2.
5. Required to be provided if basement area exceeds 200
m2
9. Sprinklers shall be fed water from both underground
static water storage tank and terrace tank.
10. Provide required number of sets of pumps each
consisting of one electric and one diesel pump (stand by) of
capacity 2 280 litre/min and one electric pump of capacity
180 litre/min (see Fig. 11)
13. Lower levels in high rise buildings 60 m or above in
height are likely to experience high pressure and
therefore
RAMP
The slope of a ramp shall not exceed 1 in 12 (8
14. Provide required number of sets of pumps each
percent). consisting of one electric and one diesel pump (stand by) of
c) Ramp(s) shall be surfaced with approved slip capacity 1 620 litre/min and one electric pump of capacity
resistant materials that are securely attached. 180 litre/min
d) Any changes in travel direction in ramp shall be 16. Buildings above 30 m in height not to be permitted for
preceded by landings of 1.5 m × 1.5 m size. Group B, Group C, Group D and Group F occupancies.
22. Buildings above 30 m in height not to be permitted for
Group B, Group C, Group D and Group F occupancies.
FIRE SAFETY
SHEET NO: 16 || SEM-10 || DESIGN || THESIS 2021-2022
FROM NBC PART-04 ,2016 DATE : 03-01-2022 Mohamed Sathak A J Academy of Architecture
Biophilic design is a concept used
within the building industry to
increase occupant connectivity to
the natural environment through the
use of direct nature, indirect nature,
and space and place conditions.
BIOPHILIC DESIGN
SHEET NO: 16 || SEM-10 || DESIGN || THESIS 2021-2022
DATE : 03-01-2022 Mohamed Sathak A J Academy of Architecture
Location : Singapore City, Singapore:
ELEVATION:
Theelevation is stacked attwodifferent rates.
ELEVATION
tropical rainforest climate Interiorspaces rise floor byfloor, while
Project Type : Hotel, owned thesky-gardensoccur every fourlevels. This
separationprovidesvisual access to naturefrom
Area : 12,121 ft2 (1,126 m2) allguest roomswhileconsideringthescale of the
Design Team: WOHA growing landscape. Theelevation is also clearly
Biophilic Patterns brokenintozones,groundfloor,parklevel,and
guest rooms.
Visual Connection with Nature FLOORPLAN:
Biomorphic Forms & Patterns Theabove planhighlightstheintegration of two
distinctlanguages.Therectilinear E-plan
Risk/Peril interlockswiththehighlydynamicandresponsive
Complexity & Order biomorphicsky-gardens.Italso providesvisual
access tonaturefor alargerpercentof thefloor
planthanalineardesign.
NATURE IN THE SPACE
[P1] Visual Connection with Nature.
Views of Hong Lim Park or the sky-gardens
are accessible from nearly every guest room;
abundant indoor plantings and water features.
FLOOR PLAN
[P2] Non-Visual Connection with Nature.
Odors from indoor plants; sounds of birds
and insects attracted by native plants.
outside and inside using biodiverse [P6] Dynamic & Diffuse Light. Dappled
light through the tree canopy; light reflected
off the water; natural light indoors; translucent
equatorial plantings on the sky-gardens, curtains in guestrooms, and bird cages.
which are visible through the large windows [P7] Connection with Natural Systems.
Opportunities to observe interactions
of the guest rooms, and indoor greenwalls between birds, insects, and plants.
garden terraces, water features, and infinity [P9] Material Connection with Nature.
Unfinished stone walls, polished granite
walls, unpainted wood surfaces, carpet with
pools. The podium, composed of slabs of natural color palette and varied textures.
creates over 49,000 ft2 of green space, doubling the [P12] Refuge. Cabanas with optional
privacy curtains; secluded wooded
growing potential of the site. The E-shaped plan of the spaces with small water features.
building facilitates the site’s visual connection with [P13] Mystery. Glimpses of greenery
through small open spaces cut in walls.
nature, maximizing the number of guest rooms looking
[P14] Risk/Peril. Cantilevered ‘birdcages’
out on Hong Lim Park, the hotel’s sky-gardens, or both. and open air platforms which overlook
the city from great heights.
PARKROYAL ON PICKERING
SHEET NO: 16 || SEM-10 || DESIGN || THESIS 2021-2022
DATE : 03-01-2022 Mohamed Sathak A J Academy of Architecture
FOR ASSEMBLY OCCUPANCY FOR RESTAURANTS FOR HOTELS FOR HOTELS
(CINEMA THEATERS, MALL ETC) For public Individual guest rooms shall have
For public For male – attached toilets. In addition, the following Wash basin :
For male – wc shall also be For male-
wc For every 50 seats, 1wc has to be provided. 1 for 15 persons
For every 100 persons, 1wc has to be provided, upto 200 seats. For over 200 For residential public staff 2 for 16-35 persons
provided, upto 400 persons. For over 400 seats, add 1 per 100 seats. wc 3 for 36-65 persons
seats, add 1 per 250 persons. Urinals 1 wc per 8 Persons omitting occupants of 4 for 66-100 persons
Urinals One for 50 persons the attached water closet minimum of 2 For female
One for 50 persons For female - if both sexes are Lodged 1 for 1-12 persons
For female - For every 50 seats, 1wc has to be Urinal: NIL 2 for 13-25 persons
For every 100 persons, wc has to be provided, upto 200 seats. For over 200 Wash basin : 1 per 10 per person 3 for 26-40 persons
provided, upto 400 persons. For over 400 seats, add 1 per 100 seats. Bath : 1 per 10 persons 4 for 41-57 persons
seats, add 1 per 250 persons. For staff for 58-77 persons
For staff For male- For Non- residential staff 6 for 78-100 persons
For male- For urinals For male-
For urinals Nil upto 6 persons. For urinals
Nil upto 6 persons. 1 for 7-20 persons. Nil upto 6 persons. FOR SHOPS
2 for 21-45 persons. 1 for 7-20 persons. For public
1 for 7-20 persons.
3 for 46-70 persons. 2 for 21-45 persons. For male –
2 for 21-45 persons.
4 for 71-100 persons. 3 for 46-70 persons. wc
For wc
For wc 4 for 71-100 persons. 1 for every 25 persons, exceeding 15
1 for 15 persons.
1 for 15 persons. For wc (including employees and customers).
2 for 16-35 persons.
2 for 16-35 persons. 1 for 15 persons. Urinals
For female
3 for 36-65 persons. 2 for 16-35 persons. Nil up to 6 persons
For WC:
4 for 66-100 persons. 3 for 36-65 persons. 1 for 7-20 persons
1 per 1-12 persons.
For female 4 for 66-100 persons. 2 for 21-45 persons
2 for 13-25 persons.
1 per 1-12 persons. For female 3 for 40-70 persons
Add 1 per 6 person for above 25 persons
2 for 13-25 persons. 1 per 1-12 persons. 4 for 71-100 persons
3 for 26-40 persons. 2 for 13-25 persons. From 101 to 200 add at the rate of 3%;
Drinking water : One per 100 persons
4 for 41-57 persons. 3 for 26-40 persons. For over 200 persons add at the rate of
Wash basin : One water tap with
5 for 58-77 persons. 4 for 41-57 persons. 2.5%.
draining arrangements shall be provided
6 for 78-100. persons. 5 for 58-77 persons. For female –
for every 50 persons
6 for 78-100. persons. wc
Wash basin : One for every water closet Add 1 per 6 person for above 100 persons For female personnel 1 for every 15
NOTE :
Kitchen and dish washer : One per each NOTE: persons or part thereof, exceeding 10.
Assumed that toilet two thirds of the
numbers are males and one third Kitchen Assumed that toilet two thirds of the
Service sink : One in the restaurant numbers are males and one third Wash basin : 1 for every 25 persons
females.
females.
SANITATION REQUIREMENTS
DATE : 03-01-2022 || SEM-10 || DESIGN || THESIS 2021-2022
Mohamed Sathak A J Academy of Architecture
SHOPPING CENTER/ The car park entrance shall have a height (B) PARKING FOR SPECIAL (PHYSICALLY CHALLENGED) PERSONS
SUPERMARKET/ SHOPS/ MALL clearance of at least 2 600 mm For Buildings having more than 2 floors 10% of the required car/two wheelers
Upto floor area of 75sq,m – no nparking If payment machine is provided, it shall provide parking spaces subject to minimum of 2 car spaces and 2 two-wheeler spaces
is needed all control at the height between 800 mm shall be reserved for the physically handicapped persons near the entrance.
For floor area of above 75 sq.m – 1 car and 1 000 mm
space and 1 two wheeler space for every DRIVEWAY: The driveway width shall be 3.0m for one-way movement and
75 sq.m NUMBER OF DESIGNATED ACCESSIBLE
6.0m for two-way movement.
PARKING SPACES
(A) RESTAURANTS, FAST FOOD I. A minimum of one accessible designated
parking space shall be provided in every (D) WIDTH ENTRY AND EXIT GATES : The width of entry or exit gates
OUTLETS shall be a minimum of 3.0m
parking area;
1 car space for every 100sq.m of floor
II. For up to 10 parking spaces, one designated
area and 1 two wheeler space for every
50sq.m of floor area
accessible parking space shall be provided; (G) RAMPS The minimum clear width of the ramps shall be 3.0 m for one-
III. For up to 25 parking spaces, two designated way movement and 6.0m for two-way movement. Gradient shall not be
accessible parking space shall be provided; steeper than 1 in 8.
(B) STARRED HOTELS, MAJOR IV. For up to 50 parking spaces, three
HOTELS AND LODGES WITH MORE designated accessible parking spaces shall
be provided;
(H) HEADROOM The clear headroom (between floor and beam bottom)
THAN 50 ROOMS IN CMA
V. For up to 100 parking spaces, four shall be minimum 2.2metres
1 car space for every 4-guest rooms and
for the non-room area, designated accessible parking spaces shall AISLE WIDTHS:
1 car space for every 100sq.m of floor be provided; VEHICLE TYPE BREADTH (M) LENGTH (M)
area and 1 two wheeler space for every VI. For up to 200 parking spaces, six designated
accessible parking spaces shall be provided; CAR 2.5 5.0
50sq.m of floor area
VII. For over 200 parking spaces, six designated 2 WHEELER 1.0 1.8
(C) UNSTARRED HOTELS, OTHER accessible parking spaces for 200 parking
LCV 3.5 7.0
spaces and one for each additional 100
HOTELS & LODGES parking spaces shall be provided. LORRY/BUS
1 car space for every 10-guest rooms and 3.5 10.0
for the non-room area, CONTAINER VEHICLES 3.5 16.0
1 car space for every 100sq.m of floor
areaand 1 two wheeler space for every SHOPPING MALL SHOPPING MALL SHOPPING MALL
50sq.m of floor area SMALL SHOPS – 1000 SQ.M THEATER – 5100 SQ.M COFFEE SHOP - 150 SQ.M
13 CARS 13 BIKES 120 CARS 120 BIKES 4 CARS 8 BIKES
CINEMA HALLS LARGE SHOPS – 1720 SQ.M TOTAL
1 car space and 1 two wheeler space for 23 CARS 23 BIKES RESTAURANTS- 300 SQ.M HOTEL 2500 CARS 2200 BIKES
the every 50sq.m of Auditorium/CINEMA SUPER MARKET – 1200 SQ.M 8 CARS 16 BIKES HOTELS –
THEATER /MARRIAGE HALL 16 CARS 16 BIKES FOOD COURT – 750 SQ.M 454 CARS 908 BIKES
18 CARS 36 BIKES RESTAURANTS- 300 SQ.M
7 CARS 14 BIKES
PARKING REQUIREMENTS
DATE : 03-01-2022 || SEM-10 || DESIGN || THESIS 2021-2022
Mohamed Sathak A J Academy of Architecture