0% found this document useful (0 votes)
141 views3 pages

Zahid Business Park Drawing Submittal

This document is a drawing submittal for the Zahid Business Park project headquarters and community center buildings. It includes two drawings - an enlarged plan, elevations and sections of an ablution area, and an enlarged plan, elevations and details of a corridor and another area. The contractor is submitting these drawings for approval by the consultant and notes there is a need for follow up based on the consultant's comments.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
141 views3 pages

Zahid Business Park Drawing Submittal

This document is a drawing submittal for the Zahid Business Park project headquarters and community center buildings. It includes two drawings - an enlarged plan, elevations and sections of an ablution area, and an enlarged plan, elevations and details of a corridor and another area. The contractor is submitting these drawings for approval by the consultant and notes there is a need for follow up based on the consultant's comments.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

PROJECT : ZAHID BUSINESS PARK

DRAWING SUBMITTAL
PURPOSE OF SUBMITTAL

CIVIL STRUCTURAL ARCHITECTURAL MECHANICAL ELECTRICAL OTHERS


PROVIDED DOCUMENTS
CATALOGUES CERTIFICATES SAMPLE TECHNICAL DATA
DRAWING CALCULATIONS SPECIFICATIONS OTHERS
DOC No. Date of Submittal SUBMITTED FOR
New Request
ZBP-V3-ALSAAD-HQ-DWG-SD-AR-0116-REV01 14 November 2020 APPROVAL

Resub. Request YOUR INFO

Contractor's Remarks & Exceptions


DRAWING SUBMITTAL :
No. QTY DRAWING NUMBER / REV TITLE / DESCRIPTION ACTION REMARKS
Zahid Business Park Project - HQ & CC Building

Headquarter MF.35 Enlarged Plan Ablution Area

B
1 1 ZBP/HQ/SD/ID-644-J REV01
Elevations and Sections
ZBP/HQ/SD/ID-644-K REV01 Headquarter Corridor and MF.36 Enlarged Plan,
2 1
Elevations and Details

ATTACHEMENTS

Submitted by Contractor: Received By: V3 M.E. Consultants


Signature: Signature:
Name : Imad Shakhshir Name :

Position : PM Position :
Date : 14 November 2020 Date :
FOLLOW UP IS REQUIRED BY:
Consultant's Comments Remarks

KAOS Comments:
-Refer to drawing comments.

A Approved As Submitted For : V3 Middle East Consultant Company Received By:


Approved As Noted Resubmission not required Signature:
ACTION

B Signature:
ACTION

C Resubmission required Name: Name :


D Disapproved Position: Position:
E No Action Taken Date : Date :

F-V3ME/SUB/ZBP/001- Rev. 00
MARBLE FINISH PROVIDE MOCKUP W01-a FLORIM W02-a FLORIM
PART OF FLOOR GRES
MF.36 AVORIO UNITO (POLISHED) SAMPLE FOR FLOOR GRES BUILDTECH
MARGRAF INDUSTRIAL IVORY BUILD MUD CE
APPROVAL
F02-a WALL TILES WALL TILES
REFER TO CMU WALL
FLORIM FLOOR GRES F02-a FLORIM
DETAILS F02-b
CMU BUILDTECH / BUILD MUD CE FLOOR GRES BUILDTECH
PROVIDED FLORIM FLOOR GRES
INDUSTRIAL PLOMB BUILD MUD CE
FLOOR TILES FLOOR TILES FLORIM FLORIM BUILDTECH
5X5MM GAP PART OF PART OF INDUSTRIAL IVORY BUILD MUD CE
ABLUTION TOILET WALL TILES WALL TILES
PART OF MF.35 MF.34
MF.35 FLORIM
CMU

480
INDUSTRIAL
WALL
IVORY
REFER TO DETAIL
TILES
OF TILES IN THE
CORNERS PART OF PART OF
REFER TO DETAIL

975
ABLUTION TOILET
AS PROVIDED. CONTINUES EQ MF.34
MF.35 TYPICAL COMMENT:
UP TO BOTTOM OF 600 EQ EQ
EQ
CONTRACTOR IS RESPONSIBLE TO INSTALL

200
200
OPENING ABOVE RELOCATE LIGHTS
AS INDICATED THE SANITARY FIXTURES AS PROVIDED IN THE

150
NO SMALL ZBP-SANITARY FIXTURE SCHEDULE AND
PIECE TILE BOTTOM OF WALL OPENING SPECS TO CONTRACTORS SENT
EQ EQ FLORIM BUILDTECH THROUGH ACONEX ON JANUARY 23,2020
BUILD MUD CE TILES
#171 PLATINUM -TILE JOINTS TO MATCH
GROUT COLOR WALL TILE JOINTS.
TYPICAL FOR FLOOR TILES

2690
IN ABLUTION MF.35
SPK SPK OCCUPANCY
SENSOR
AS INDICATED
IN THE CENTER
BETWEEN THE

200
LIGHTS
NOT A GROOVE

EQ EQ SPEAKER
ACCESS DOOR NEED
FD TO BE CONFIRMED
BY THE CONTRACTOR

2690
SPK SPK

EQ EQ
-LOCATION OF THE
200

ABLUTION MIXERS C02-a


500MM TOP OF JANITOR MOP SINK
AS PER THE SECTION. FROM FFL & 900MM FROM CENTER
H=3100
-MIXER TO BE ALIGNED TO FFL HEIGHT OF MIXER
1795

IN THE CENTER OF
THE ABLUTION SEATS
EQ EQ
(TYPICAL)
880

F02-b
FLORIM FLOOR GRES
INDUSTRIAL PLOMB EQ C01-a
(TILES BELOW CABINET) 600 600 H=3200
EQ EQ EQ

SUBMIT SEPARATELY
DETAIL OF CABINET

GYPSUM BOARD
ACOUSTICAL CEILING
PLANE MOISTURE RESISTANT
PERFORATED MOISTURE RESISTANT
PAINTED FINISH COLOR WHITE
AS PER APPROVED
AS PER APPROVED
COLOR & MATERIAL SUBMITTAL
RAL COLOR & MATERIAL SUBMITTAL

AS PER APPROVED
WALL FINISH OF THE OTHER
REFER TO DETAIL PROVIDED SIDE OF THE ROOM.
PROVIDE MOCKUP SAMPLE
FOR APPROVAL (TYPICAL)

WALL TILE JOINTS


DOOR AS PER APPROVED TO MATCH FLOOR JOINTS
#120 IVORY DOOR SCHEDULE AND DETAILS WALL TILE JOINTS (TYPICAL)
GROUT COLOR SHOP DRAWING TO MATCH FLOOR JOINTS PROVIDE
TYPICAL FOR MF.35
(TYPICAL) AS PER APPROVED MATERIAL SUBMITTAL
WALL TILES AND MOCKUP SAMPLES
WINDOW SCHEDULE AND
DETAILS SHOP DRAWINGS. FOR ABLUTION SEATS
AND DETAILS FOR
SUBMIT DETAILS APPROVAL #171 PLATINUM
SEPARATELY GROUT COLOR
TYPICAL FOR INDUSTRIAL MOKA
ABLUTION PARTITION
WALL TILES

ZBP-V3-ALSAAD-HQ-DWG-SD-AR-116-REV01
#171 PLATINUM GROUT COLOR
TYPICAL FOR FLOOR TILES MARBLE THRESHOLD 10X10MM
MARBLE FINISH
IN MF.39 CORRIDOR AS PER APPROVED
AVORIO UNITO (POLISHED)
MATERIAL
MARGRAF

PART OF WOOD FINISH


AS PER APPROVED
SHOE RACK. SUBMIT DETAILS
1800 MATERIAL SUBMITTAL & RAL
COLOR ZERO JOINT SEPARATELY

MF.39

W04-a WOOD FINISH


EQUAL EQUAL TEAK BURMA VENEER.
MARBLE
THRESHOLD AS PER APPROVED
AS PER MATERIAL.
10X10MM GROOVE SUBMIT SEPARATELY
APPROVED
MATERIAL #171 PLATINUM GROUT COLOR SHOE RACK DETAILS
SUBMITTAL TYPICAL FOR FLOOR TILES
IN MF.36 SHOE RACK AREA

BOTTOM OF OPENING PROVIDE SHADOW GAP


MARBLE FINISH (TYPICAL)
AVORIO UNITO (POLISHED)
MARGRAF GYPSUM BOARD PLANE
SUPPLY LINERA
DIFFUSER AS PER APPROVED MATERIAL
AS PER IFC SUBMITTAL & RAL COLOR

RETURN RELOCATE DIFFUSER


LINEAR DIFFUSER IN THE CENTER
AS PER IFC AS INDICATED
CL CL
EQUAL EQUAL
EQUAL EQUAL EQ EQ

EQ
450

EQ

W04-a WOOD FINISH


TEAK BURMA VENEER.
AS PER APPROVED MATERIAL.
ACOUSTICAL CEILING SUBMIT SEPARATELY
PERFORATED MOISTURE RESISTANT SHOE RACK DETAILS
RELOCATE
DIFFUSER
AS PER APPROVED
IN THE CENTER COLOR & MATERIAL SUBMITTAL
AS INDICATED

MARBLE FINISH
AVORIO UNITO (POLISHED)
MARGRAF

PROVIDE MOCKUP
SAMPLE FOR FIXATION
OF MARBLE WALLS
FOR APPROVAL
(TYPICAL)
BOTTOM OF OPENING
MARBLE FINISH
AVORIO UNITO (POLISHED)
MARGRAF
GYPSUM BOARD
SUBMIT SEPARATELY PLANE MOISTURE RESISTANT
DETAILS OF FIXATION & PROVIDE PAINTED FINISH COLOR WHITE
MOCKUP SAMPLE FOR APPROVAL AS PER APPROVED
RAL COLOR & MATERIAL SUBMITTAL

MARBLE FINISH
AVORIO UNITO (POLISHED)
MARBLE FINISH 10X10MM 10X10MM MARBLE FINISH
ZERO JOINT MARGRAF
AS PER APPROVED AVORIO UNITO (POLISHED)
GROOVE AVORIO UNITO (POLISHED)
MATERIAL SUBMITTAL MARGRAF MARGRAF

10X10MM AS PER APPROVED


GROOVE

ZERO
ZERO JOINT ZERO JOINT ZERO JOINT JOINT
ZERO JOINT

10X10MM
GROOVE

900 900 600 900 900 600 900 900 600 900 900

MARBLE FINISH 10X10MM


AVORIO UNITO (POLISHED)
MARGRAF PROVIDE MATERIAL SUBMITTAL ZBP-V3-ALSAAD-HQ-DWG-SD-AR-116-REV01
10X10MM GROOVE AND MOCKUP SAMPLE