0% found this document useful (0 votes)
162 views4 pages

Silt Trap

This document provides calculations for sizing a silt trap for a proposed development project. It first discusses soil conditions and guidelines for silt trap design. It then calculates the required surface area and total volume based on the site's catchment area of 0.161 hectares and a 6-month design storm. The dimensions of the settling and sediment storage zones are determined, with the settling zone width of 5.5m, length of 12m, and depth of 0.6m. However, the initial sediment storage zone dimensions do not meet the minimum depth and volume requirements. The calculations are continued on subsequent pages to determine compliant overall basin dimensions.

Uploaded by

Yamin Nordin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
162 views4 pages

Silt Trap

This document provides calculations for sizing a silt trap for a proposed development project. It first discusses soil conditions and guidelines for silt trap design. It then calculates the required surface area and total volume based on the site's catchment area of 0.161 hectares and a 6-month design storm. The dimensions of the settling and sediment storage zones are determined, with the settling zone width of 5.5m, length of 12m, and depth of 0.6m. However, the initial sediment storage zone dimensions do not meet the minimum depth and volume requirements. The calculations are continued on subsequent pages to determine compliant overall basin dimensions.

Uploaded by

Yamin Nordin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

GHAZALI & ASSOCIATES SDN BHD Project No.

Sheet
No. 2-2 Jalan 25/70A AW1/2022 1 OF 4
Desa Sri Hartamas Section Revision
50480 Kuala Lumpur SILT TRAP
Project CADANGAN TAMBAHAN DAN PERUBAHAN SEBUAH SURAU 2 TINGKAT Date
SEDIADA SERTA TAMBAHAN BANGUNAN 3 TINGKAT BARU DI ATAS LOT 627, 20/12/2022
SEKSYEN 55, MADRASAH GOUTHIYYAH, JALAN SULTAN SAMAD, By
Component MIN
SILT TRAP CALCULATION Checked by

Introduction
The effective design and the operation of the sediment basins depends on the soil condition of the area.
For a dry sediment basin should be used on Type C soils which are characterised by high percentage of coarse
particle. The volume of the settling zone and the sediment storage components should each be half of the total
basin volume.

Calculation

Determination of the overland flow time of concentration (minutes)


From the Equation by Friend,1954,

107 . n . L
1/3
to = ( equation 14.10 )
1/2
S

Provide information,
No. of Segment = 2
Manning's Coefficient, n = 0.020 ( refer Table 14.2 for : bare clay)
Given, ttotal = t1(L1) + t2(L1+L2) - t2(L1)

Segment Number Length Slope n ti ti tadd


m % Ltotal Ltotal-Li
1 100 0.03 0.020 72.3 57.3 14.91
2 100 0.03 0.020 72.3 57.3 14.91
Total 200 29.81
Adopt to = 30 min

Sizing of sediment basin


From Table 39.4, the predominant soil is categorised as type C

Design Storm Adopt to Time Of Concentration Of Basin Catchment ( min )


Parameter
( month ARI ) 30 10 20 30 45 60
2 3 200 333 250 200 158 121
Surface Area (m /ha)
6 400 n/a 500 400 300 250
3 3 240 400 300 240 190 145
Total Volume (m /ha)
6 480 n/a 600 480 360 300
Table 39.5 : Dry Sediment Basin Sizing Guidelines
2
From the table above, the required surface area is 200 m /ha, and the required total volume is
3
240 m /ha
Notes :
1) Settling zone depth = 0.6 m
2) Total volume = half as sediment storage volume and half as settling zone volume.
3) N/a indicates that the removal target of 85% cannot be achieved with a reasonable basin size
for these conditions.
4) For condition of construction time less than 2 years, 3 months ARI is recommended; if the
condition of construction more than 2 years, 6 months is adopted.

D:\SURAU GOTHIYAH\SILT TRAP\[SiltTrap.xlsx]Pre&Post Qpeak


GHAZALI & ASSOCIATES SDN BHD Project No. Sheet
No. 2-2 Jalan 25/70A AW1/2022 2 OF 4
Desa Sri Hartamas Section Revision
50480 Kuala Lumpur SILT TRAP
Project CADANGAN TAMBAHAN DAN PERUBAHAN SEBUAH SURAU 2 TINGKAT Date
SEDIADA SERTA TAMBAHAN BANGUNAN 3 TINGKAT BARU DI ATAS LOT 627, 20/12/2022
SEKSYEN 55, MADRASAH GOUTHIYYAH, JALAN SULTAN SAMAD, By
Component MIN
SILT TRAP CALCULATION Checked by
0

Provide information,

Total Catchment area = 0.40 acres = 0.161 ha


Asume, Design storm = 6 month ARI
2 2
Surface Area (m /ha) = 400 m /ha
3 3
Total Volume (m /ha) = 480 m /ha

Calculation,

2
The Surface area required for the site = 400 x 0.161 = 64 m
3
The total basin volume required for the site = 480 x 0.161 = 77 m

Settling zone :

3
Required volume of settling zone V1 = 39 m ( half the total volume )
Required depth of settling zone y1 = 0.60 m
Settling zone width will be, W1 = 5.5 m

Required settling zone average length, L1 = V1 = 12 m


W1 x y1
2
Average surface area = 12 x 5.5 = 64.264 m OK!! >V1
L1 ratio = 12 = 19 OK!! < 200
Y1 0.60
L1 ratio = 12 = 2.12 OK!! >2
W1 5.5

Sediment storage zone :

2
The required volume of sediment storage, V2 = 39 m

For a side slope Z = 2.0 (H) : 1(V)


The dimensions at the top of the sediment storage zone are,
W2 = W 1 - 2 x d1 x Z = 4 m
2
L2 = L1 - 2 x d1 x Z = 10 m
2
The required depth for the sediment storage zone, which must be at least 0.3m, can be calculated from the
following relationship,
2 3 2
V2 = Z Y2 - ZY2 (W2+L2) + Y2(W2L2)

3 2
39 = 4 Y2 - 29.57 Y2 + 45.08 Y2
Assume,
2
Y2 = 0.4 m , V2 = 14 m

NOT OK!! Due to Y2 < 0.3m and V2 < V2 req

D:\SURAU GOTHIYAH\SILT TRAP\[SiltTrap.xlsx]Pre&Post Qpeak


GHAZALI & ASSOCIATES SDN BHD Project No. Sheet
No. 2-2 Jalan 25/70A AW1/2022 3 OF 4
Desa Sri Hartamas Section Revision
50480 Kuala Lumpur SILT TRAP
Project CADANGAN TAMBAHAN DAN PERUBAHAN SEBUAH SURAU 2 TINGKAT Date
SEDIADA SERTA TAMBAHAN BANGUNAN 3 TINGKAT BARU DI ATAS LOT 627, 20/12/2022
SEKSYEN 55, MADRASAH GOUTHIYYAH, JALAN SULTAN SAMAD, By
Component MIN
SILT TRAP CALCULATION Checked by
0

Overall Basin Dimension:

At top water Level:

WTWL = W1 + 2 x Z x y1 = 7 m
2

LTWL = L1 - 2 + Z x y1 = 13 m
2
Base,

WB = W1 - 2 x Z x y1 + y2 = 3 m
2

LB = L1 - 2 x Z x y1 + y2 = 9 m
2
Depth:

Settling zone, y1 = 0.60 m


Sediment Storage zone, y2 = 0.40 m

Side Slope, Z = 2(H) : 1(V)

Sizing of outlet pipe:

Outlet riser = 300 mm diameter perforated MS pipe.

The pipe is to be provided with sufficient small orifice opening to ensure that the basin will completely drain within
24 hours after filling.
An estimate of the total area of orifice openings required can be obtained by rearranging Equation 19.5 (USMMM)
and using the average surface and total depth of the basin.

2
Average surface area, Aav = ( 7 x 13 )+( 3 x 9 ) = 56 m
2

2Aav . y
1/2 2
Orifice area, Atotal = = 0.000 m
t.Cd. (2g)1/2

Using an orifice size = 10 mm,


2
the area of each orifice is Ao = 0.00008 m
Total number of orifices required = 6

At height increments of 85 mm will give 9 number of orifices.


Hence, give 14.1 rows with 127 nos x 10 mm orifice of each rows evenly space around the pipe.

D:\SURAU GOTHIYAH\SILT TRAP\[SiltTrap.xlsx]Pre&Post Qpeak


GHAZALI & ASSOCIATES SDN BHD Project No. Sheet
No. 2-2 Jalan 25/70A AW1/2022 4 OF 4
Desa Sri Hartamas Section Revision
50480 Kuala Lumpur SILT TRAP
Project CADANGAN TAMBAHAN DAN PERUBAHAN SEBUAH SURAU 2 TINGKAT Date
SEDIADA SERTA TAMBAHAN BANGUNAN 3 TINGKAT BARU DI ATAS LOT 627, 20/12/2022
SEKSYEN 55, MADRASAH GOUTHIYYAH, JALAN SULTAN SAMAD, By
Component MIN
SILT TRAP CALCULATION Checked by
0

Sizing of emergency spillway :


The emergency spillway must be designed for a 10 year ARI flood (see section 39.7.6(c)). The sill level must be
set a minimum 300mm above the basin top water level. To simplify the calculation, the following assumptions
are made :

* assume riser pipe flow is orifice flow through the top of the pipe only
* riser pipe head is 300mm, i.e. The height between the top of the pipe and the spillway crest level

Qspillway = Q10 - Qriser

Provide infomation,
C = 0.90 ( please refer to Calculation Peak Flow Pre Development )
10
I10 = 243 mm/hr
A = 0.397 acre = 0.161 hectare

= C. I10.A
10
Q10
360

Therefore,
3
Q10 = 0.098 m /s

From Equation 20.2 for orifice flow and assuming and orifice discharge coefficient of 0.60,

1/2
Qriser = Co.Ao.( 2gHo)
3
= 0.103 m /s

So,
Qspillway = Q10 - Qriser
3
= -0.005 m /s

1.5
Qspillway = Cscw B Hp
Cscw = H = 0.60 = 0.6 > 0.3
Try, Hc 1.00
B = 3.0 m = refer Design Chart 20.2
H = 0.60 m = 1.84
Cscw = 1.84 refer Design Chart 20.2 (USMM)
3
Qsp = 2.565 m /s > Q10 ; OK!!

Therefore, the total basin depth including the spillway is = 1.90 m