SMARTFREN LTE ROLLOUT PROJECT
Pre DT Hardsplit Report
City : BOGOR
SITE ID : ZBGR_4331
Test Engineer : Jabo FE01
Technology : TDD
Test date : 2022-03-28
Smartfren Radio Network
NPO Team
Optimization Team
REVIEW/ACCEPT BY : REVIEW/ACCEPT BY :
NAME : NAME :
SIGNATURE : VENDOR :
DATE : SIGNATURE :
DATE :
Date : 2022-02-21
Site ID : ZJKT2_6525
Site Information
Azimut
eNB PC Antenna Tilt Alarm
Cell Name TAC h RET Latitude Longitude
ID I Height M/E Status
(Actual)
375331 375331_11 413 1309 38.0 0 0/4 Enabled - -6.57582 -106.63101
375331 375331_12 412 1309 38.0 130 0/4 Enabled - -6.57582 -106.63101
375331 375331_13 411 1309 38.0 260 0/6 Enabled - -6.57582 -106.63101
375331 375331_21 413 1309 38.0 0 0/4 Enabled - -6.57582 -106.63101
375331 375331_22 412 1309 38.0 130 0/4 Enabled - -6.57582 -106.63101
375331 375331_23 411 1309 38.0 260 0/6 Enabled - -6.57582 -106.63101
Site Address
Site Address :- WM63+93 Kebon Cau, Tangerang Regency, Banten, Indonesia
Date : 2022-02-21
RSRP
PCI
Date : 2022-02-21
Summary
Source
SN Test Target PreDT
1 OOKLAspeedtest > 5Mbps (TDD) N/A DT Static
2 Nperfspeedtest > 5Mbps (TDD) N/A DT Static
3 Netvelocity > 5Mbps (TDD) N/A DT Static
4 RRC Connection Success Rate > 99% - DT Mobile
5 ERAB Drop Rate < 1% - DT Mobile
6 Handover Succes Rate > 98.5% N/A DT Mobile
7 Peak Value (Single Sample) TDD 30M>100 Mbps 0 Mbps DT Mobile
8 DL THP > 5 Mbps (%) N/A 60% DT Mobile
9 RSRP > -105 (%) N/A 99.66% DT Mobile
10 SINR > 3 (%) N/A 100% DT Mobile
11 VoLTE Setup Success Rate > 98.5% - DT Mobile
12 VoLTE ERAB Drop Rate < 1.1% - DT Mobile
13 Cross Feeder No No DT Mobile
Date : 2022-02-21