Caticlan Airport Development Project
Summary Cost of the Amount In Details of the Project
Project
Total Budget of the Php.2.506 Billion Implementing Agency
Project Civil Aviation Authority of the Philippines
(CAAP)
Total Cost of the Project Php.1.35 Billion Status of the Project
As of October 2021, construction still stands
54.19% complete.
Procurement Mode
Unsolicited
Phases of the Project
Phase 1A
1. Improvement/ upgrading of existing terminal
2. Upgrading of airport facilities
3. Reducing slope of adjacent hill to 4 degrees
Phase 1B
1. Extension of the runway to 1.95 km
2. Construction of landslide facilities to include new terminal building
3. Installation of navigational and air traffic control aids
Phase 2:
1. Extension of runway towards the sea by 150 m
Status
Phase 1A - completed and operational
Phase 1B and 2 - ongoing construction