0% found this document useful (0 votes)
192 views7 pages

Lightning Arrester Maintenance Guide

This document provides standard maintenance procedures for inspecting and testing lightning arresters on the 150kV GIS and overhead lines at the Hasang Hepp Project. The procedures include preparing tools, de-energizing equipment, performing visual inspections and mechanical tests of the arresters using a megger, surge counter tester, and other equipment. Test results are to be recorded on a report form. Proper safety protocols are to be followed including using personal protective equipment and earthing devices.

Uploaded by

Inghon Silalahi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
192 views7 pages

Lightning Arrester Maintenance Guide

This document provides standard maintenance procedures for inspecting and testing lightning arresters on the 150kV GIS and overhead lines at the Hasang Hepp Project. The procedures include preparing tools, de-energizing equipment, performing visual inspections and mechanical tests of the arresters using a megger, surge counter tester, and other equipment. Test results are to be recorded on a report form. Proper safety protocols are to be followed including using personal protective equipment and earthing devices.

Uploaded by

Inghon Silalahi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 7

Document No.

: PT.HOM-
HASANG HEPP PROJECT
SOP-E01-36
Revision : A
STANDARD MAINTENANCE
TITLE
MANUAL Page : 1

Inspection and testing of Lightning Arrester GIS &


MTR150KV

DATE DESCRIPTION PREPA. CHECK REVIEW APPROVAL


REV. NO.
GROUP PREPARATION CHECK REVIEW APPROVAL

OKA GUNAWAN KIM DOUN KIM YOUNGKUK


A
18/03/2020 18/03/2020 18/03/20 18/03/2020

This DOCUMENT is the property of PT.HOM and BNE. Therefore, it shall not be released to any third party without permission of an
authorized personnel of BNE and PT.HOM
1. General Technical Particular of GIS Lighting Arrester / Overhead Line Side

No Description unit Data

Type

Voltage

Current

Power

Speed

Torque

Number

Wire Red + ; Black -

Brand Name:

Picture 1.1 : Lightning Arrester on the Switchyard

2. This Lightning Arrester has

Lightning Arrester in Switchyard has two section : GIS to Overhead Line and GIS to Main Transformer

2.1. Preparation Before Lightning Arrester Inspection


2.1.1. Tool & Consumable.
No Tool & Consumable Remark
1 Tool Set
2 Megger
3 Multimeter & Clamp Ampere meter
4 Body Harness & Ladder Extend
5 Earthing Stick
6 Surge Impulse Component Tester
2.1.2. Step of Lightning Arrester Test

2.1.2.1. Coordination De-Energized with Operator, all line and Main Transformer need switch off

2.1.2.2. Make sure Power Supply on Display CCR & Switchyard NR Panel is Offline ( P,V & A is Zero )

Picture 1.2. NR Display

2.1.2.3. Closed Earthing Switch ( ES ) to safe work on the filed

Picture 1.3. DS / ES Selector in MIMIC

2.1.2.4. Select to Mimic in BCU/Remote/Mimic Selector Switch in NR Panel & Local Control Panel

Picture 1.4 : Selector Switch BCU / remote /Mimic

2.1.2.5. Switch Off Relevant MCB in side Panel ( Local Control Panel )
2.1.2.6. Do Visual Check Around Lightning Arrester and wait 5 minute to ensure Energy Safety Rule ap-
plied . During this, prepare tools & consumable
2.1.2.7. Disconect HV Wire Each Phase from the Lightning Arrester Connecting Lug on the top side

Picture 1.5 LA in GIS & OHL side

Picture . Lightning Arrester in between GIS and MTR

2.1.2.8. Prepare the Circuit Test ( Megger, Kapasitor Set and Cable )

Picture 1.6. Circuit Test of Lighting Arrester

2.1.2.9. Put Red ( positive ) megger cable to the connecting lug/ line terminal on top Lightning Arrester
and Black cable put on Ground Terminal
Picture 1.7 Megger Cable allocation in LA when Test

2.1.2.10. Switch On the Megger, select to 2500V or 5000V , push Test Button ( Red Button) and hold in 1
minute to getting insulation resistance value and recorded on report form

Picture 1.8. Red Button ( Test Button ) push on 1 minute time

2.1.2.11. To test LA surgering counter , put red cable to mounting bracket of counter and black cable to
ground terminal

Picture 1.9 Megger cable allocation in Surge Counter Monitoring

2.1.2.12. Switch On fastly as Surge to triggering the contact counter, check the counter number and
recorded
Picture 1.9 Counter in Lightning Arrester of OHL

Picture 1.9 Counter in Lightning Arrester of Main Transformer

2.1.2.13. After phase has LA Tested by Circuit Tester, discharge electric shock to ground
2.1.2.14. Connect HV wire on relevant phase with proper tighten in connecting lugs each phase line

Picture 1.11

2.1.2.15. Visual Inspection before Energized and Power Normalization


2.1.2.16. Collect all tools and consumable , clean area properly
2.1.2.17. Coordinate with Operator to Normalization & Energize