Document No.
: PT.HOM-
HASANG HEPP PROJECT
SOP-E01-36
Revision : A
STANDARD MAINTENANCE
TITLE
MANUAL Page : 1
Inspection and testing of Lightning Arrester GIS &
MTR150KV
DATE DESCRIPTION PREPA. CHECK REVIEW APPROVAL
REV. NO.
GROUP PREPARATION CHECK REVIEW APPROVAL
OKA GUNAWAN KIM DOUN KIM YOUNGKUK
A
18/03/2020 18/03/2020 18/03/20 18/03/2020
This DOCUMENT is the property of PT.HOM and BNE. Therefore, it shall not be released to any third party without permission of an
authorized personnel of BNE and PT.HOM
1. General Technical Particular of GIS Lighting Arrester / Overhead Line Side
No Description unit Data
Type
Voltage
Current
Power
Speed
Torque
Number
Wire Red + ; Black -
Brand Name:
Picture 1.1 : Lightning Arrester on the Switchyard
2. This Lightning Arrester has
Lightning Arrester in Switchyard has two section : GIS to Overhead Line and GIS to Main Transformer
2.1. Preparation Before Lightning Arrester Inspection
2.1.1. Tool & Consumable.
No Tool & Consumable Remark
1 Tool Set
2 Megger
3 Multimeter & Clamp Ampere meter
4 Body Harness & Ladder Extend
5 Earthing Stick
6 Surge Impulse Component Tester
2.1.2. Step of Lightning Arrester Test
2.1.2.1. Coordination De-Energized with Operator, all line and Main Transformer need switch off
2.1.2.2. Make sure Power Supply on Display CCR & Switchyard NR Panel is Offline ( P,V & A is Zero )
Picture 1.2. NR Display
2.1.2.3. Closed Earthing Switch ( ES ) to safe work on the filed
Picture 1.3. DS / ES Selector in MIMIC
2.1.2.4. Select to Mimic in BCU/Remote/Mimic Selector Switch in NR Panel & Local Control Panel
Picture 1.4 : Selector Switch BCU / remote /Mimic
2.1.2.5. Switch Off Relevant MCB in side Panel ( Local Control Panel )
2.1.2.6. Do Visual Check Around Lightning Arrester and wait 5 minute to ensure Energy Safety Rule ap-
plied . During this, prepare tools & consumable
2.1.2.7. Disconect HV Wire Each Phase from the Lightning Arrester Connecting Lug on the top side
Picture 1.5 LA in GIS & OHL side
Picture . Lightning Arrester in between GIS and MTR
2.1.2.8. Prepare the Circuit Test ( Megger, Kapasitor Set and Cable )
Picture 1.6. Circuit Test of Lighting Arrester
2.1.2.9. Put Red ( positive ) megger cable to the connecting lug/ line terminal on top Lightning Arrester
and Black cable put on Ground Terminal
Picture 1.7 Megger Cable allocation in LA when Test
2.1.2.10. Switch On the Megger, select to 2500V or 5000V , push Test Button ( Red Button) and hold in 1
minute to getting insulation resistance value and recorded on report form
Picture 1.8. Red Button ( Test Button ) push on 1 minute time
2.1.2.11. To test LA surgering counter , put red cable to mounting bracket of counter and black cable to
ground terminal
Picture 1.9 Megger cable allocation in Surge Counter Monitoring
2.1.2.12. Switch On fastly as Surge to triggering the contact counter, check the counter number and
recorded
Picture 1.9 Counter in Lightning Arrester of OHL
Picture 1.9 Counter in Lightning Arrester of Main Transformer
2.1.2.13. After phase has LA Tested by Circuit Tester, discharge electric shock to ground
2.1.2.14. Connect HV wire on relevant phase with proper tighten in connecting lugs each phase line
Picture 1.11
2.1.2.15. Visual Inspection before Energized and Power Normalization
2.1.2.16. Collect all tools and consumable , clean area properly
2.1.2.17. Coordinate with Operator to Normalization & Energize
Appendix : Illustration for Lighting Arrester Inspection & Test