0% found this document useful (0 votes)
368 views2 pages

Quality Plan

This two-page quality plan document outlines inspection and testing procedures for various manufacturing activities such as receipt of raw materials, cold forging, trimming, and thread rolling. It specifies visual inspections and dimensional, hardness, and material tests to be conducted on samples at different frequencies. Acceptance criteria for each activity are also defined, referencing other documents such as raw material specifications, component drawings, and in-process inspection standards. Records of inspection results must be documented in specified formats and approved by heads of relevant departments.

Uploaded by

vipulsharma655
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
368 views2 pages

Quality Plan

This two-page quality plan document outlines inspection and testing procedures for various manufacturing activities such as receipt of raw materials, cold forging, trimming, and thread rolling. It specifies visual inspections and dimensional, hardness, and material tests to be conducted on samples at different frequencies. Acceptance criteria for each activity are also defined, referencing other documents such as raw material specifications, component drawings, and in-process inspection standards. Records of inspection results must be documented in specified formats and approved by heads of relevant departments.

Uploaded by

vipulsharma655
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

Yathartha Yantra Udyog Doc. No.

QP/01
Rev. No. 00/16.03.2003
Quality Plan Issue No. 01/16.03.2003
Page 1 of 2
Authority for
S.No. Activity Inspection / Test Frequency Sample Plan Acceptance Criteria Recording
Release
01. Receipt of raw Visual inspection Each lot 100% Crack, Dents, Rust, HOD (QA) Yes, in
material Scratches etc. YP/804/F01
Dimensional Each lot As per sampling plan
inspection (Doc. No. SP/01)
Hardness test Each lot As per sampling plan As per Raw Material HOD(QA)
(Doc. No. SP/01) Purchase Specifications
(Recorded in
Format No. YP/703/F01)
Material Test Any one material in n=1, c=0 As per Raw Material HOD(QA) Yes, in the
three months Specifications form of test
(Doc. No. RM/01) certificate
02. Receipt of Job – Visual inspection Each lot As per sampling plan SP/01 Crack, Dents, Rust, HOD(QA) Yes, in
work components Scratches etc. YP/804/F01
Dimensional Insp. Each lot As per sampling plan SP/01 As per component drawing HOD(QA)
Hardness Each lot As per sampling plan SP/01 As per Raw Material HOD(QA)
Purchase Specifications
(Recorded in
Format No. YP/703/F01)
Plating inspection Each lot 100% Visual inspection of White HOD(QA) Yes, in
spots and rusty YP/804/F04
03. Cold Forging Visual inspection 15 Minute One component No crack, damage and Machine No
stamp should be visible operator
Visual inspection 4 hours n=5, c=0 No crack, damage and HOD(QA) Yes, in
stamp should be visible YP/804/F02
In-process 4 hours n=5, c=0 As per in-process inspection HOD (QA)
inspection standard
04 Trimming Visual inspection 15 Minute One component No crack, damage Machine No
operator
Visual inspection 4 hours n=5, c=0 No crack, damage HOD(QA) Yes, in
In-process 4 hours n=5, c=0 As per in-process inspection HOD (QA) YP/804/F02
inspection standard

Issue By Approved By

MR Proprietor
Yathartha Yantra Udyog Doc. No.QP/01
Rev. No. 00/16.03.2003
Quality Plan Issue No. 01/16.03.2003
Page 2 of 2
Authority for
S.No. Activity Inspection / Test Frequency Sample Plan Acceptance Criteria Recording
Release
05. Thread Rolling Visual inspection 15 Minute One component No damage, Misalignment Machine No
operator
Visual inspection 4 hours n=5, c=0 No damage, Misalignment HOD(QA) Yes, in
In-process 4 hours n=5, c=0 As per in-process inspection HOD (QA) YP/804/F02
inspection standard

Issue By Approved By