GUIDE FOR
(1 July 2010) The July 2010 update to this Guide incorporates the latest requirements of IACS UI SC234,
UI LL76, and UI MPC96, regarding initial statutory surveys at new construction. Updates to IACS UR
Z23 are also incorporated.
The effective date of this Guide is 1 January 2008 and it is applicable for vessels contracted for
construction on or after 1 January 2008.
CONTENTS
SECTION 1 Hull Survey for New Construction......................................................5
1 Scope..............................................................................................5
2 Definitions....................................................................................... 5
2.1 Hull Structure..................................................................... 5
2.2 Documents.........................................................................6
2.3 Survey Methods.................................................................6
3 Applications.................................................................................... 6
3.1 Vessel Types......................................................................6
3.2 Statutory Items (1 July 2010).............................................6
3.3 Equipment, Fittings and Appendages................................6
3.4 Installation and Testing...................................................... 6
3.5 Locations of Construction (1 July 2010)............................ 7
4 Qualification and Monitoring of Personnel (1 July 2010)................ 7
5 Survey of the Hull Structure............................................................7
5.1 Items to be Surveyed (1 July 2010)................................... 7
5.2 Evidence of Survey of Materials and Equipment............... 8
6 Review of the Construction Facility*............................................... 8
7 Newbuilding Survey Planning......................................................... 8
7.1 Kick-off Meeting (1 July 2010)........................................... 8
7.2 Administration and Statutory Requirements...................... 8
7.3 Update of Meeting Record (1 July 2010)........................... 8
7.4 Shipbuilding Quality Standards (1 July 2011).................... 8
7.5 Attendance by Other Parties..............................................9
7.6 Series Ship Production (1 July 2010)................................ 9
8 Examination and Test Plan for Newbuilding Activities (1 July
2010)...............................................................................................9
9 Proof of the Consistency of Surveys...............................................9
9.1 Compliance with Newbuilding Survey Planning.................9
9.2 Audit...................................................................................9
10 Ship Construction File.....................................................................9
10.1 Responsibility.....................................................................9
ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION • 2011 iii
10.2 Documents to be Included............................................... 10
11 Initial Statutory Surveys at New Construction (1 July 2010).........42
11.1 Scope*............................................................................. 42
11.2 Definitions Used in the Survey Tables............................. 42
11.3 Application....................................................................... 42
11.4 Interpretation of the Survey Requirements...................... 42
11.5 Qualification and Monitoring of Personnel....................... 43
11.6 Inspection and test plan for new building activities..........43
11.7 Product and Type Approval Certificates.......................... 43
11.8 Proof of the Consistency of Surveys................................43
TABLE 1
(1 July 2011).........................................................................11
1 Scope
The scope of this Guide includes the following:
i) Examination of the parts of the vessel covered by the Rules and by applicable statutory regulations
for hull construction, to obtain appropriate evidence that they have been built in compliance with
the Rules and regulations, taking account of the relevant approved drawings.
ii) Appraisal of the manufacturing, construction, control and qualification procedures, including
welding consumables, weld procedures, weld connections and assemblies, with indication of
relevant approval tests.
iii) Witnessing inspections and tests as required in the Rules applicable for ship construction,
including materials, welding and assembling, specifying the items to be examined and/or tested
and how (e.g., by hydrostatic, hose or leak testing, nondestructive examination, verification of
geometry) and by whom.
Appraisal of materials and equipment used for ship construction and their inspection at works is not
included in this Guide. Details of requirements for hull and machinery steel forgings and castings and for
normal and higher strength hull structural steel are given in Section 2-1-6, Section 2-1-5 and Sections
2-1-2 and 2-1-3, respectively, of the ABS Rules for Materials and Welding (Part 2). Acceptance of these
items is verified through the survey process carried out at the manufacturer’s works and the issuing of the
appropriate certificates.
2 Definitions
2.2 Documents
Reference to documents also includes electronic transmission or storage.
2.3.3 Witness
Witness is attendance of scheduled survey items as defined within the shipbuilding functions.
3 Applications
i) Hatch covers
ii) Doors and ramps integral with the shell and bulkheads
iii) Rudders and rudder stock
iv) All forgings and castings integral to the hull
i) Shipbuilder’s facilities
ii) Subcontractors at the shipbuilder’s facilities
iii) Subcontractors at their own facilities or at other remote locations
(1 July 2010) ABS is to familiarize itself with the yard’s production facilities, management processes, and
safety procedures for consideration in complying with the requirements of 1/10.2 TABLE 1 prior to any
steelwork or construction taking place in the following circumstances:
i) Where ABS has no recent experience at the construction facilities (typically after a one year lapse)
or when significant new infrastructure has been added
ii) Where there has been a significant management or personnel restructuring having an impact on
the ship construction process
iii) Or where the shipbuilder contracts to construct a vessel of a different type or substantially
different in design
The meeting is to take into account the shipbuilder’s construction facilities and vessel type including the
list of proposed subcontractors. A record of the meeting is to be made, based upon the contents of the
Table (the Table can be used as the record with comments made into the appropriate column).
If ABS has nominated a Surveyor for a specific newbuilding project, then the Surveyor is to attend the
kick-off meeting. The builder is to be asked to agree to undertake ad hoc investigations during construction
where areas of concern arise and to keep ABS advised of the progress of any investigation.
of IACS Recommendation No. 47 “Shipbuilding and Repair Quality Standard”, or a recognized fabrication
standard which has been accepted by ABS prior to the commencement of fabrication/construction. The
work is to be carried out in accordance with the Rules and under ABS survey.
i) Proposals for the examination of completed steelwork (generally referred to as the block plan) and
are to include details of joining blocks together at the pre-erection and erection stages or at other
relevant stages
ii) Proposals for fit up examinations where necessary
iii) Proposals for testing of the structure (leak and hydrostatic) as well as for all watertight and
weathertight closing appliances
iv) Proposals for nondestructive examination
v) Any other proposals specific to the vessel type or to the statutory requirements.
The plans and any modifications to them are to be submitted to the Surveyors in sufficient time to allow
review before the relevant survey activity commences.
9.2 Audit
For audit purposes, the information specified in 1/9.1 is to be made available.
10.1 Responsibility
The shipbuilder is to deliver documents for the Ship Construction File. In the event that items have been
provided by another party such as the Owner, and where separate arrangements have been made for
document delivery which excludes the shipbuilder, that party has the responsibility.
i) As-built structural drawings including scantling details, material details, and, as applicable,
wastage allowances, location of butts and seams, cross section details and locations of all partial
and full penetration welds, areas identified for close attention and rudders [Section 7-3-2 of the
ABS Rules for Survey After Construction (Part 7) for Hull Surveys]
ii) Manuals required for classification and statutory requirements (e.g., loading and stability, bow
doors and inner doors and side shell doors and stern doors – operations and maintenance manuals)
[3-2-16/27 of the ABS Rules for Building and Classing Marine Vessels]
iii) Ship structure access manual, as applicable
iv) Copies of certificates of forgings and castings welded into the hull [Sections 2-1-6 and 2-1-5 of
the ABS Rules for Materials and Welding (Part 2)]
v) Details of equipment forming part of the watertight and weathertight integrity of the vessel
vi) Tank testing plan including details of the test requirements [Section 3-7-1 of the ABS Rules for
Building and Classing Marine Vessels]
vii) Corrosion protection specifications [3-2-18/5 of the ABS Rules for Building and Classing Marine
Vessels]
viii) Details for the in-water survey, if applicable, information for divers, clearances measurements
instructions, etc., tank and compartment boundaries [Appendix 7-A1-1 of the ABS Rules for
Survey After Construction (Part 7)]
ix) Docking plan and details of all penetrations normally examined at drydocking [3-1-2/11 and
3-2-2/7 of the ABS Rules for Building and Classing Marine Vessels and Section 7-4-1 of the ABS
Rules for Survey After Construction (Part 7)]
x) Coating Technical File, for vessels subject to compliance with the IMO Coating Performance
Standard (PSPC) as a class requirement under the IACS Common Structural Rules. [Section
7-9-27 of the ABS Rules for Survey After Construction (Part 7)]
TABLE 1
1
(1 July 2011)
Referenc Shipbuilding Survey Survey ABS Rules/ Statutory Documentation Documentation Specific Activities ABS
e Function Requirements Method Guide(1) [IACS Requirements Available to for Ship Proposals
for Required for Reference (2, 3)] and Relevant Classification Construction for the
Classification Classification Reference Surveyor during File Project
Construction
1 Welding
11
1
Section
Referenc Shipbuilding Survey Survey ABS Rules/ Statutory Documentation Documentation Specific Activities ABS
1
e Function Requirements Method Guide(1) [IACS Requirements Available to for Ship Proposals
for Required for Reference (2, 3)] and Relevant Classification Construction for the
Classification Classification Reference Surveyor during File Project
Construction
1.2 Welder Qualified Review of [Recommend- Shipyards records Not required .1 Verify welder
Qualification welders welder ation 47] with individual's qualification
certification identification standard, e.g.,
and patrol class or
recognized
standard
approval
.2 Verify welder
Hull Survey for New Construction
approved for
weld position
.3 Verify validity
of
qualification
12
1
Section
Referenc Shipbuilding Survey Survey ABS Rules/ Statutory Documentation Documentation Specific Activities ABS
1
e Function Requirements Method Guide(1) [IACS Requirements Available to for Ship Proposals
for Required for Reference (2, 3)] and Relevant Classification Construction for the
Classification Classification Reference Surveyor during File Project
Construction
1.3 Welding – All weld joint Review and 2-4-3/5 of the Approved weld Not required .1 Verify weld
Mechanical configurations, patrol Rules for procedure procedures
Properties positions and Materials and specification and records have
(Welding materials to be Welding (Part welding plan been approved
Procedures) covered by weld 2) relevant to the and cover all
procedures [UR W28] vessel project or weld processes
approved by the process and positions
Bureau or by in accordance
Hull Survey for New Construction
13
1
Section
Referenc Shipbuilding Survey Survey ABS Rules/ Statutory Documentation Documentation Specific Activities ABS
1
e Function Requirements Method Guide(1) [IACS Requirements Available to for Ship Proposals
for Required for Reference (2, 3)] and Relevant Classification Construction for the
Classification Classification Reference Surveyor during File Project
Construction
.2 Verify
machines are
calibrated by
appropriate
Hull Survey for New Construction
staff
.3 Verify
calibration
carried out in
accordance
.4 Verify
calibration in
accordance
with
maintenance
schedule
14
1
Section
Referenc Shipbuilding Survey Survey ABS Rules/ Statutory Documentation Documentation Specific Activities ABS
1
e Function Requirements Method Guide(1) [IACS Requirements Available to for Ship Proposals
for Required for Reference (2, 3)] and Relevant Classification Construction for the
Classification Classification Reference Surveyor during File Project
Construction
.2 Confirm
relevant
measures
taken for any
pre or post
Hull Survey for New Construction
heat treatment,
drying of
surfaces prior
to welding
.3 Confirm
15
1
Section
Referenc Shipbuilding Survey Survey ABS Rules/ Statutory Documentation Documentation Specific Activities ABS
1
e Function Requirements Method Guide(1) [IACS Requirements Available to for Ship Proposals
for Required for Reference (2, 3)] and Relevant Classification Construction for the
Classification Classification Reference Surveyor during File Project
Construction
1.4 Welding- Substantially Visual Pub # 14: Shipbuilder’s and Not required .1 Identify
Surface free from examination, Guide for recognized workstations
Discontinuities significant surface Nondestructive standards and where NDE is
indications, detection Inspection Rules as carried out,
satisfactory techniques, [Recommend- applicable, e.g., panel line
profile and size review of ation 20 and welding and NDE butt welds,
documents and 47] plans, NDE castings into
patrol of reports, operator hull structure
Hull Survey for New Construction
operator qualifications
.2 Verify NDE
carried out in
accordance
with approved
plans where
applicable
.4 Verify
operators
suitably
qualified
particularly
where sub-
contractors
have been
employed
16
1
Section
Referenc Shipbuilding Survey Survey ABS Rules/ Statutory Documentation Documentation Specific Activities ABS
1
e Function Requirements Method Guide(1) [IACS Requirements Available to for Ship Proposals
for Required for Reference (2, 3)] and Relevant Classification Construction for the
Classification Classification Reference Surveyor during File Project
Construction
.5 Verify NDE is
carried out
according to
the acceptable
process
.6 Review NDE
records
Hull Survey for New Construction
1.5 Welding – NDE is to be Radiography Pub # 14: Shipbuilder’s and Not required .1 Identify
Embedded carried out by and ultrasonic Guide for recognized workstations
Discontinuities qualified testing, review Nondestructive standards and where NDE is
operators of documents Inspection Rules as carried out,
capable of and patrol of [Recommend- applicable, e.g. panel line
ensuring that operator, ation 20 and welding and NDE butt welds,
.3 Verify
suitability of
NDE methods
17
1
Section
Referenc Shipbuilding Survey Survey ABS Rules/ Statutory Documentation Documentation Specific Activities ABS
1
e Function Requirements Method Guide(1) [IACS Requirements Available to for Ship Proposals
for Required for Reference (2, 3)] and Relevant Classification Construction for the
Classification Classification Reference Surveyor during File Project
Construction
.4 Verify
operators
suitably
qualified
particularly
where sub-
contractors
have been
Hull Survey for New Construction
employed
.5 Verify that
records have
been
completed and
in accordance
18
1
Section
Referenc Shipbuilding Survey Survey ABS Rules/ Statutory Documentation Documentation Specific Activities ABS
1
e Function Requirements Method Guide(1) [IACS Requirements Available to for Ship Proposals
for Required for Reference (2, 3)] and Relevant Classification Construction for the
Classification Classification Reference Surveyor during File Project
Construction
.6 Verify that
reports and
radiographs
have been
evaluated
correctly by
the
shipbuilder.
Hull Survey for New Construction
Systematic
review of
radiographs
carried out by
the Surveyor
.7 Verify
.8 Verify NDE is
carried out
according to
the acceptable
process
19
1
Section
Referenc Shipbuilding Survey Survey ABS Rules/ Statutory Documentation Documentation Specific Activities ABS
1
e Function Requirements Method Guide(1) [IACS Requirements Available to for Ship Proposals
for Required for Reference (2, 3)] and Relevant Classification Construction for the
Classification Classification Reference Surveyor during File Project
Construction
2.1 Surface Traceability and Patrol [Recommend- Material Not required .1 Verify
Preparation, acceptability of ation 47] certificates, stockyard
Marking and material, check shipbuilder's storage
Cutting of steel plates & marking/cutting satisfactory
profiles materials production
.2 Verify material
type, scantling documents at the
traceability,
identification, workstage -
Hull Survey for New Construction
e.g. stamping
testing marks documents
identification
retained at the
against
facility
material
certification,
archiving of
.3 Verify transfer
marking after
treatment line
.4 Verify
standard of
shotblasting
and priming
.5 Verify
suitability of
primer
20
1
Section
Referenc Shipbuilding Survey Survey ABS Rules/ Statutory Documentation Documentation Specific Activities ABS
1
e Function Requirements Method Guide(1) [IACS Requirements Available to for Ship Proposals
for Required for Reference (2, 3)] and Relevant Classification Construction for the
Classification Classification Reference Surveyor during File Project
Construction
.6 Verify that
steel grades
can be
identified
.7 Verify
machinery
adjusted to
maintain
Hull Survey for New Construction
within IACS
or
manufacturer’s
recommend-
ations
.9 Verify storage
of piece parts.
21
1
Section
Referenc Shipbuilding Survey Survey ABS Rules/ Statutory Documentation Documentation Specific Activities ABS
1
e Function Requirements Method Guide(1) [IACS Requirements Available to for Ship Proposals
for Required for Reference (2, 3)] and Relevant Classification Construction for the
Classification Classification Reference Surveyor during File Project
Construction
2.2 Straightening Approval of Patrol and [Recommend- Recognized Not required .1 Verify that
straightening review ation 47] standards, straightening
methods/ approved processes are
procedures procedures approved for
against the grade and
deformation type of steel,
e.g., tmcp, z-
plate.
Hull Survey for New Construction
2. Verify that
plates and
sections are
within
recognized
tolerances
Referenc Shipbuilding Survey Survey ABS Rules/ Statutory Documentation Documentation Specific Activities ABS
1
e Function Requirements Method Guide(1) [IACS Requirements Available to for Ship Proposals
for Required for Reference (2, 3)] and Relevant Classification Construction for the
Classification Classification Reference Surveyor during File Project
Construction
2.3 Forming Maintain Patrol [Recommend- Shipbuilder’s Not required .1 Verify that
material ation 47] procedure for hot temperature
properties. forming control is
Acceptance of exercised by
forming method the operator
against unproper
.2 Verify that
deformations
suitable
methods of
Hull Survey for New Construction
temperature
control are
available when
forming
special steels
and materials
23
1
Section
Referenc Shipbuilding Survey Survey ABS Rules/ Statutory Documentation Documentation Specific Activities ABS
1
e Function Requirements Method Guide(1) [IACS Requirements Available to for Ship Proposals
for Required for Reference (2, 3)] and Relevant Classification Construction for the
Classification Classification Reference Surveyor during File Project
Construction
2.4 Conformity Check Patrol [Recommend- Shipbuilder’s and Not required .1 Verify the
with alignment/ fit ation 47] recognized processes to
Alignment/Fit up/gap against standards and ensure
Up/Gap Criteria reference Rules as satisfactory fit
standards applicable up and
alignment at
all
workstations
Hull Survey for New Construction
.2 Verify that
edge
preparations
are re-instated
where lost
during fitting
.3 Verify
remedial
procedures are
in place to
compensate
for wide gaps
and alignment
deviations
24
1
Section
Referenc Shipbuilding Survey Survey ABS Rules/ Statutory Documentation Documentation Specific Activities ABS
1
e Function Requirements Method Guide(1) [IACS Requirements Available to for Ship Proposals
for Required for Reference (2, 3)] and Relevant Classification Construction for the
Classification Classification Reference Surveyor during File Project
Construction
2.5 Conformity for Check Patrol and [Recommend- Shipbuilder’s and Approved plans .1 Verify that the
Critical Areas alignment/ fit review ation 47] recognized of critical areas information
with up/gap against standards and if applicable relevant to the
Alignment/ Fit approved Rules as latest
Up or Weld drawings applicable, approved
Configuration approved plan or drawings is
standard, builder's available at the
records workstations
Hull Survey for New Construction
.2 Verify the
processes to
ensure
satisfactory fit
up and
alignment at
.3 Verify that
edge
preparations
are re-instated
where lost
during fitting
operations
25
1
Section
Referenc Shipbuilding Survey Survey ABS Rules/ Statutory Documentation Documentation Specific Activities ABS
1
e Function Requirements Method Guide(1) [IACS Requirements Available to for Ship Proposals
for Required for Reference (2, 3)] and Relevant Classification Construction for the
Classification Classification Reference Surveyor during File Project
Construction
.4 Verify
remedial
procedures are
in place to
compensate
for wide gaps
and alignment
deviations
Hull Survey for New Construction
Referenc Shipbuilding Survey Survey ABS Rules/ Statutory Documentation Documentation Specific Activities ABS
1
e Function Requirements Method Guide(1) [IACS Requirements Available to for Ship Proposals
for Required for Reference (2, 3)] and Relevant Classification Construction for the
Classification Classification Reference Surveyor during File Project
Construction
3 Steelwork Compliance with Patrol of the [Recommend- Approved plans, .1 Verify that the
Process, (e.g., approved process and ation 47] shipbuilder’s information
sub assembly, drawings, visual witness of the inspection relevant to the
block, grand examination of completed records, latest
and mega block welding and item Shipbuilder’s and approved
assembly, pre- material, check recognized drawings is
erection and alignment and standards and available at the
erection, deformations Rules as workstations
Hull Survey for New Construction
.3 Verify
.4 Verify that
piece parts are
identifiable
27
1
Section
Referenc Shipbuilding Survey Survey ABS Rules/ Statutory Documentation Documentation Specific Activities ABS
1
e Function Requirements Method Guide(1) [IACS Requirements Available to for Ship Proposals
for Required for Reference (2, 3)] and Relevant Classification Construction for the
Classification Classification Reference Surveyor during File Project
Construction
.6 Verify that
correct
welding
requirements
specified in
reference 1 of
this table have
been adopted
Hull Survey for New Construction
.7 Verify
processes for
closing plates,
etc., are
acceptable
28
1
Section
Referenc Shipbuilding Survey Survey ABS Rules/ Statutory Documentation Documentation Specific Activities ABS
1
e Function Requirements Method Guide(1) [IACS Requirements Available to for Ship Proposals
for Required for Reference (2, 3)] and Relevant Classification Construction for the
Classification Classification Reference Surveyor during File Project
Construction
4 Remedial Work Welding, check Review [Recommend- Permanent record .1 Verify that
and Alteration against records and ation 47] of shipyard records have
deformation, witness surveyable item been
alignment maintained of
significant
deviations
from the
approved
Hull Survey for New Construction
plans, for
situations such
as mis-cut
openings, re-
routing outfit
items
29
1
Section
Referenc Shipbuilding Survey Survey ABS Rules/ Statutory Documentation Documentation Specific Activities ABS
1
e Function Requirements Method Guide(1) [IACS Requirements Available to for Ship Proposals
for Required for Reference (2, 3)] and Relevant Classification Construction for the
Classification Classification Reference Surveyor during File Project
Construction
5 Tightness Absence of leaks Patrol of the Section 3-7-1 of Reg. II-1/11 of Approved tank Approved tank .1 Confirm that
Testing, process and the Rules for SOLAS as testing plan, testing plan tank testing is
including leak witness of the Building and amended shipbuilders carried out in
and hose test Classing inspection records accordance
testing, Marine Vessels with the
hydropneumatic [UR S14] approved plan
testing
.2 Confirm the
methods used
Hull Survey for New Construction
to carry out
leak testing
.3 Confirm that
correct test
pressures
.4 Verify that
adequate
records of the
tank testing
have been
maintained
30
1
Section
Referenc Shipbuilding Survey Survey ABS Rules/ Statutory Documentation Documentation Specific Activities ABS
1
e Function Requirements Method Guide(1) [IACS Requirements Available to for Ship Proposals
for Required for Reference (2, 3)] and Relevant Classification Construction for the
Classification Classification Reference Surveyor during File Project
Construction
6 Structural Structural Witness Section 3-7-1 of Reg. II-1/11 of Approved tank Approved tank .1 Confirm that
Testing adequacy of the testing the Rules for SOLAS as testing plan, testing plan tank testing is
design Building and amended shipbuilders carried out in
Classing inspection records accordance
Marine Vessels with the
[UR S14] approved plan
.2 Confirm that
correct test
Hull Survey for New Construction
pressures
maintained for
testing is
satisfactory
.3 Verify that
31
1
Section
Referenc Shipbuilding Survey Survey ABS Rules/ Statutory Documentation Documentation Specific Activities ABS
1
e Function Requirements Method Guide(1) [IACS Requirements Available to for Ship Proposals
for Required for Reference (2, 3)] and Relevant Classification Construction for the
Classification Classification Reference Surveyor during File Project
Construction
7 (1 July 2010) Salt water ballast Review and 3-2-18/5 of the Reg. II-1/3-2 Manufacturer’s Corrosion .1 Verify that
Corrosion tanks with report on Rules for of SOLAS as and builder’s protection applied
Protection boundaries builder's and Building and amended specification specifications coatings are
Systems (e.g., formed by the manufacturer's Classing approved and
coatings, hull envelope, documentation Marine Vessels review records
cathodic and also bulk [UR Z8 and Z9, of application
protection, carrier hold UI SC122, UR
.2 Verify that
impressed internal surfaces, F1]
adequate
Hull Survey for New Construction
32
1
Section
Referenc Shipbuilding Survey Survey ABS Rules/ Statutory Documentation Documentation Specific Activities ABS
1
e Function Requirements Method Guide(1) [IACS Requirements Available to for Ship Proposals
for Required for Reference (2, 3)] and Relevant Classification Construction for the
Classification Classification Reference Surveyor during File Project
Construction
7.1 Application of Monitor Patrolling and UI SC223, Reg. II-1/3-2 Coating Standard Coating .1 Verify that
(1 July Protective implementation Review PR34 of SOLAS as Technical File applied
2010) Coatings for of the coating amended; coatings are
Dedicated inspection approved and
Seawater requirements. review records
Ballast Tanks in of application
all Types of in accordance
Ships and with Chapter 7
Hull Survey for New Construction
Double-Side of Annex to
Skin Spaces of MSC.215(82).
Bulk Carriers
subject to PSPC
33
1
Section
Referenc Shipbuilding Survey Survey ABS Rules/ Statutory Documentation Documentation Specific Activities ABS
1
e Function Requirements Method Guide(1) [IACS Requirements Available to for Ship Proposals
for Required for Reference (2, 3)] and Relevant Classification Construction for the
Classification Classification Reference Surveyor during File Project
Construction
8.2 Doors and Tightness and Witness Section 3-7-1 of Reg. II-1/16 of Approved tank Details required .1 Confirm leak
Ramps Integral securing the Rules for SOLAS as testing plan, test
with the Shell Building and amended; Reg. shipbuilder’s
.2 Confirm
and Bulkheads Classing 12 and 21 of inspection records
operation and
Marine Vessels ILLC '66
securing test
[UR S14]
.3 Confirm safety
device
Hull Survey for New Construction
operation
.4 Ensure correct
maintenance
logs/manuals
supplied with
the ship
34
1
Section
Referenc Shipbuilding Survey Survey ABS Rules/ Statutory Documentation Documentation Specific Activities ABS
1
e Function Requirements Method Guide(1) [IACS Requirements Available to for Ship Proposals
for Required for Reference (2, 3)] and Relevant Classification Construction for the
Classification Classification Reference Surveyor during File Project
Construction
8.3 Rudders Fitting Witness Section 3-7-1 of Approved plan, Details .1 Confirm
the Rules for shipbuilder’s required, alignment and
Building and inspection records structural mounting and
Classing drawings fitting up to
Marine Vessels the connection
[UR S14] to the tiller
.2 Confirm
function test
Hull Survey for New Construction
.3 Verify fitting
of pintles and
all securing
bolts
35
1
Section
Referenc Shipbuilding Survey Survey ABS Rules/ Statutory Documentation Documentation Specific Activities ABS
1
e Function Requirements Method Guide(1) [IACS Requirements Available to for Ship Proposals
for Required for Reference (2, 3)] and Relevant Classification Construction for the
Classification Classification Reference Surveyor during File Project
Construction
8.4 Forgings and Compliance with Patrol of the Sections 2-1-6 Approved plans, Copies of .1 Verify casting
Castings approved process and and 2-1-5 of the shipbuilder’s certificates of and forgings
drawings, visual witness of the Rules for inspection forgings and against
examination of completed Materials and records, castings material
welding and item Welding (Part Shipbuilder’s and certificate
material, check 2) recognized
.2 Verify that
alignment and [UR W7 and standards and
correct
deformations W8] Rules as
welding and fit
Hull Survey for New Construction
applicable,
up
construction plan
requirements
(steelwork
specified in
subdivision)
reference 1,
2.4 and 2.5 of
this table have
.3 Verify that
material
certificates are
included in the
ship
construction
file
36
1
Section
Referenc Shipbuilding Survey Survey ABS Rules/ Statutory Documentation Documentation Specific Activities ABS
1
e Function Requirements Method Guide(1) [IACS Requirements Available to for Ship Proposals
for Required for Reference (2, 3)] and Relevant Classification Construction for the
Classification Classification Reference Surveyor during File Project
Construction
8.5 Equipment Tightness and Witness Reg. II-1/16-1 Approved tank Details required .1 Verify that
Forming the securing of SOLAS as testing plan, correct
Watertight and amended; Reg. shipbuilder’s welding and fit
Weathertight 17-18-19-20-2 inspection records up
37
1
Section
Referenc Shipbuilding Survey Survey ABS Rules/ Statutory Documentation Documentation Specific Activities ABS
1
e Function Requirements Method Guide(1) [IACS Requirements Available to for Ship Proposals
for Required for Reference (2, 3)] and Relevant Classification Construction for the
Classification Classification Reference Surveyor during File Project
Construction
.2 Verify
compliance
with Load
Line
Convention
1966 as
amended (i.e.,
all fittings in
Hull Survey for New Construction
accordance
with the record
of freeboard
assignment)
.4 Verify material
certificates for
overboard
discharges
where
applicable
38
1
Section
Referenc Shipbuilding Survey Survey ABS Rules/ Statutory Documentation Documentation Specific Activities ABS
1
e Function Requirements Method Guide(1) [IACS Requirements Available to for Ship Proposals
for Required for Reference (2, 3)] and Relevant Classification Construction for the
Classification Classification Reference Surveyor during File Project
Construction
.5 Verify record
of freeboard
assignment
and all
material
certificates
included in the
ship
Hull Survey for New Construction
construction
file
Freeboard Within allowable Witness Appendix 1-1- Reg. 4- 5- 6- 7 Details required .6 Verify
Marks and tolerances and in A1 of the Rules and 8 of ILLC freeboard
Draft Marks accordance with for Conditions '66 marks in
the freeboard of accordance
.7 Verify draft
marks in
accordance
with the
agreed
tolerances
specified by
the builder
unless more
onerous flag
state
requirements
39
1
Section
Referenc Shipbuilding Survey Survey ABS Rules/ Statutory Documentation Documentation Specific Activities ABS
1
e Function Requirements Method Guide(1) [IACS Requirements Available to for Ship Proposals
for Required for Reference (2, 3)] and Relevant Classification Construction for the
Classification Classification Reference Surveyor during File Project
Construction
.9 Verify
Hull Survey for New Construction
dimensions
included in
ship
construction
file
40
1
Section
Notes:
1
1 ABS referenced documents are available from the Rules and Guides Downloads page of www.eagle.org.
2 IACS referenced documents are available from www.iacs.org.uk.
3 IACS Recommendations are not mandatory requirements.
Hull Survey for New Construction
11.1 Scope*
The scope of this section is to define the requirements for the initial statutory surveys at new construction
as detailed in IMO Resolution A.997(25), which are not addressed in UR Z23 for the following as
applicable:
This section only covers the survey activities required and does not cover the technical interpretations of
the statutory requirements or approval of plans, designs and manuals required by the Regulations.
This section does not cover the requirements for type approval or certification at vendor’s works and for
which evidence of acceptance is to be provided as indicated in the survey tables.
Conformity Verification: This verification may consist of an examination of the certificate, a check of the
marks or, for products which require type approval, to verify conformity of the product with the approved
prototype or certification with Flag Administration requirements
Survey During Construction or Installation: Indicates whether the witness by surveyor of construction and
installation on board is required
Tightness Testing: Indicates whether tightness testing is required to be witnessed by the surveyor for
survey item
Survey After Construction or Installation: Indicates whether the survey item is examined by the Surveyor
after completion of its construction and installation on board
Function Test: Indicates whether a survey item or system is to be subjected to a functioning and/or
performance test or trial in the presence of a Surveyor after installation on board
Series of Vessels: As defined in 1-1-4/3.3 of the ABS Rules for Conditions of Classification (Part 1)
Note:
* This section is to be uniformly implemented on ships contracted for construction from 1st July 2010.
11.3 Application
This applies to all vessels for which the statutory certificates listed in 1/11.1 are to be issued at new
construction by ABS.
Specific flag administration requirements, if any, supersede the requirements contained in this section.
1 Description
COLUMN 1 A.997(25) Requirements
COLUMN 5 Conformity Verification This verification may consist of an examination of the certificate, a
check of the marks or, for type approved products, to verify
conformity of the product with the approved prototype or
certification with National Requirements
COLUMN 6 Survey during construction or Indicates whether the witness by surveyor of fabrication and
installation installation on board is required
COLUMN 8 Survey after construction or Indicates whether the survey item is examined by the Surveyor
installation after completion of its installation on board and/or
TABLE 1
1
(EI) 1.1.3.3 Examining the fire fighters’ outfits and Fire Fighters' Outfits (SOLAS 74/00 regs. X X X
emergency escape breathing devices - II-2/10.10, 13.3.4 and
EEBDs - Emergency Escape X X X
EEBDs 13.4.3 FSSC ch.3)
Breathing Devices
(SOLAS 74/88 reg.
II-2/17)
45
A1
Appendix
Requirement
(EI) 1.1.3.4 Checking the operational readiness and Operational Readiness and (SOLAS 74/00 reg. X
maintenance of fire-fighting systems Maintenance of Fire-fighting II2/14) (SOLAS 74/88
System reg.II-2/21)
(EI) 1.1.3.5 Examining the fixed fire-fighting system Fixed Fire fighting systems (SOLAS 74/00 regs. X X X X X
for the machinery, cargo, vehicle, special II-2/10.4, 10.5, 10.7 and
category and ro-ro spaces, as appropriate, 20.6.1, FSSC chs.5 to 7)
and confirming that the installation tests (SOLAS 74/88
have been satisfactorily completed and regs.II-2/7 and 53)
that its means of operation are clearly
(EI) 1.1.3.6 Examining the fire-extinguishing and Remote means of opening and (SOLAS 74/00 regs. X X
special arrangements in the machinery closing of Skylights II-2/5.2, 8.3, 9.5 and
spaces and confirming, as far as 10.5) (SOLAS 74/88
Fire Dampers and Funnel X X X
practicable and as appropriate, the regs. II-2/7 and 11)
opening
operation of the remote means of control
provided for the opening and closing of Closure of power operated and X X X
the skylights, the release of smoke, the other doors
closure of the funnel and ventilation
Survey Tables for Initial Statutory Surveys at New Construction (1 July 2010)
46
A1
Appendix
Requirement
(EI) 1.1.3.7 Examining any fire detection and alarm Fixed Fire Detection System (SOLAS 74/00 regs. X X X X
system and any automatic sprinkler, fire II-2/7.2, 7.3, 7.4, 7.5.1,
Fire Alarm System X X X X
detection and fire alarm system and 7.5.5, 19.3.3 and 20.4;
confirming that installation tests have Automatic Sprinkler FSSC ch.9) (SOLAS X X X X
been satisfactorily completed 74/88 regs. II-2/11, 13,
14, 53 and 54)
(EI) 1.1.3.8 Examining the fire-extinguishing system Spaces containing Paint and/or (SOLAS 74/00 regs. X X
for spaces containing paint and/or flammable liquids: Fire II-2/10.6.3 and 10.6.4;
flammable liquids and deep-fat cooking Extinguishing System FSSC chs.4 to 7)
(EI) 1.1.3.9 Examining the arrangements for remote Remote Closing Valves for: Oil (SOLAS 74/00 reg. X X
closing of valves for oil fuel, lubricating Fuel II-2/4.2.2.3.4) (SOLAS
oil and other flammable oils and 74/88 reg. II-2/15.2.5)
Remote Closing Valves for: X X
confirming, as far as practicable and as
Survey Tables for Initial Statutory Surveys at New Construction (1 July 2010)
Lubricating Oil
appropriate, the operation of the remote
means of closing the valves on the tanks Remote Closing Valves for: X X
that contain oil fuel, lubricating oil and Other Flammable Oils
other flammable oils
47
A1
Appendix
Requirement
(EI) 1.1.3.10 Examining the fire protection Fire Detection and Alarm (SOLAS 74/00 regs. X X X X
arrangements in cargo, vehicle and ro-ro System II-2/10.7, 20.2.1, 20.3
spaces and confirming, as far as and 20.6.2) (SOLAS
Fixed Fire Extinguishing X X
practicable and as appropriate, the 74/88 reg. II-2/53)
System
operation of the means for closing the
various openings Structural Fire Protection X X X
48
A1
Appendix
Requirement
(EI) 1.1.3.11 Examining, when appropriate, the special Water Supply (SOLAS 74/00 reg. X X
arrangements for carrying dangerous II-2/19 (except 19.3.8,
Sources of Ignition X X X
goods, including checking the electrical 19.3.10 and 19.4) FSSC
equipment and wiring, the ventilation, Detection System chs.9 and 10) (SOLAS X X X
the provision of protective clothing and 74/88 reg. II-2/54)
Ventilation X X
portable appliances and the testing of the
water supply, bilge pumping and any Bilge system X X
water spray system
Personnel Protection X X X
(EI) 1.1.3.12 Checking the provision and disposition Survival Craft Provision and (SOLAS 74/88 regs. X X X
of the survival craft, where applicable, Disposition III/11 to 16 and 31;
marine evacuation systems and rescue LSAC section 6.2)
Rescue Boat Provision and X X X
boats
Survey Tables for Initial Statutory Surveys at New Construction (1 July 2010)
Disposition
(EI) 1.1.3.13 Deployment of 50% of the MES after Deployment of Marine (LSAC paragraph X
installation Evacuation Systems 6.2.2.2)
49
A1
Appendix
Requirement
(EI) 1.1.3.14 Examining each survival craft, including Survival Craft Design (SOLAS 74/88 reg. X X
its equipment III/31; LSAC sections
Survival Craft Engine X X
2.5, 3.1 to 3.3 and 4.1 to
Survival Craft Equipment 4.9) X X
(EI) 1.1.3.15 Examining the embarkation Survival Craft Launching and (SOLAS 74/00 regs. X X X
arrangements for each survival craft and Recovery appliances III/11, 12, 13, 16, 31
the testing of each launching appliance, and 33; LSAC section
Survival Craft Embarkation X X X
including overload tests, tests to establish 6.1)
Arrangements
50
A1
Appendix
Requirement
(EI) 1.1.3.16 Examining the embarkation MES Launching and Recovery (SOLAS 74/00 reg. X X X X
arrangements for each marine evacuation appliances III/15; LSAC section
device, where applicable, and the 6.2)
MES Embarkation X X
launching arrangements, including
Arrangements
inspection for lack of side shell opening
between the embarkation station and
waterline, review of distance to the
propeller and other life-saving appliances
and ensuring that the stowed position is
(EI) 1.1.3.17 Examining each rescue boat, including Rescue Boat Design (SOLAS 74/88 reg. X X
its equipment III/31; LSAC sections
Rescue Boat Engine X X X
2.5, 5.1 and 6.1)
Rescue Boat Equipment X X
Survey Tables for Initial Statutory Surveys at New Construction (1 July 2010)
51
A1
Appendix
Requirement
(EI) 1.1.3.18 Examining the embarkation and recovery Rescue Boat Launching and (SOLAS 74/88 regs. X X X
arrangements for each rescue boat and Recovery appliances and III/14, 17 and 31; LSAC
testing each launching and recovery Arrangements section 6.1)
appliance, including overload tests, tests
to establish the lowering and recovery
speeds and ensuring that each rescue boat
can be lowered to the water and
recovered with the ship at its lightest sea-
going draught, launching underway at 5
(EI) 1.1.3.19 Testing that the engine of the rescue Test of engines of lifeboat and (SOLAS 74/00 reg. X
boat(s) and of each lifeboat, when so Rescue Boat III/19)
fitted, start satisfactorily and operate both
ahead and astern
(EI) 1.1.3.20 Confirming that there are posters or signs Posters or Signs (SOLAS 74/88 regs. X
in the vicinity of survival craft and their III/9 and 20)
launching stations and containers,
brackets, racks and other similar stowage
Survey Tables for Initial Statutory Surveys at New Construction (1 July 2010)
52
A1
Appendix
Requirement
(EI) 1.1.3.21 Examining the provision and stowage Two-way VHF radiotelephone (SOLAS 74/88 regs. X X X
and checking the operation of portable on apparatus II-2/12.2 and III/6)
board communications equipment, if
Radar Transponders X X X
provided, and two-way VHF
radiotelephone apparatus and radar
transponders
(EI) 1.1.3.22 Examining the provision and stowage of Distress Flares and Line- (SOLAS 74/00 regs. X X
the distress flares and the line-throwing Throwing Appliances III/6 and 18; LSAC
appliance, checking the provision and sections 3.1, 7.1 and
53
A1
Appendix
Requirement
(EI) 1.1.3.23 Examining the provision, disposition and Lifebuoys (SOLAS 74/00 regs. X X X
stowage of the lifebuoys, including those III/7 and 32 to 37;
Lifebuoys fitted with self- X X X
fitted with self-igniting lights, self- LSAC sections 2.1, 2.5
igniting lights
activating smoke signals and buoyant and 3.3)
lines, lifejackets, and immersion suits Lifebuoys fitted with self- X X X
activating smoke signals
Immersion suits X X X
Anti-exposure suits X X X
Survey Tables for Initial Statutory Surveys at New Construction (1 July 2010)
54
A1
Appendix
Requirement
(EI) 1.1.3.24 Checking the lighting of the muster and Muster and Embarkation (SOLAS 74/88 regs. X X
embarkation stations and the alleyways, Station Lighting II-1/43 and III/11)
stairways and exits giving access to the
Alleyways and Stairways X X
muster and embarkation stations,
Lighting
including when supplied from the
emergency source of power Exits giving Access to the X X
Muster and Embarkation
Stations Lighting
55
A1
Appendix
Requirement
(EI) 1.1.3.25 Examining the provision and positioning Navigation Lights (International X X X X
and checking the operation of, as Regulations for
Shapes and Sounds signalling X X X
appropriate, the navigation lights, shapes Preventing Collisions at
equipment
and sound signalling equipment Sea (COLREG) in
force, regs. 20 to 24, 27
to 30 and 33)
(EI) 1.1.3.26 Checking that the minimum safe Bridge (SOLAS 74/00 regs. X
distances from the steering and standard V/17 and 19)
magnetic compasses for all electrical
(EI) 1.1.3.28.1 The magnetic compass, including Navigation Equipment: (SOLAS 74/00 reg. X X
examining the sighting, movement, Magnetic Compass V/19)
illumination and a pylorus or compass
Navigation Equipment: Pylorus X X
bearing device
or Compass Bearing Device
56
A1
Appendix
Requirement
(EI) 1.1.3.28.2 Nautical charts and nautical publications Navigation Equipment: ECDIS (SOLAS 74/00 reg. X X
necessary for the intended voyage are including back-up arrangements V/19)
available and have been updated, and,
Nautical Charts and Nautical X
where electronic systems are used, the
Publications
electronic charts have been updated and
the required back-up system is provided
and updated
(EI) 1.1.3.28.4 Sound reception system, when bridge is Navigation Equipment: Sound X X
totally enclosed Reception System
Magnetic Compass
57
A1
Appendix
Requirement
(EI) 1.1.3.28.12 Speed and distance measuring devices Navigation Equipment: Speed X X
"through the water"and "over the and Distance measuring Device
ground"
58
A1
Appendix
Requirement
(EI) 1.1.3.29 Checking for the provision and operation VDR - Voyage Data Recorder (SOLAS 74/00 reg. X X
of the voyage data recorder V/20)
(EI) 1.1.3.31 Checking navigation bridge visibility Navigation Bridge Visibility (SOLAS 74/00 reg. X
V/22)
59
A1
Appendix
Requirement
(EI) 1.1.3.32 Checking the provision and, as Pilot ladders and hoists/pilot (SOLAS 74/00 reg. X X X X
appropriate, the deployment or operation transfer arrangements V/23)
of the pilot ladders and hoists/pilot
transfer arrangements
(EI) 1.1.4.1 Checking the deck foam system, Deck Foam System: Foam (SOLAS 74/00 reg. X X
including the supplies of foam Tanks II-2/10.8; FSSC ch.15)
concentrate, and testing that the (SOLAS 74/88 reg.
Deck Foam System: Monitors X X X
minimum number of jets of water at the II-2/61)
required pressure in the fire main is
(EI) 1.1.4.2 Examining the inert gas system and in Cargo Tank Protection: Venting (SOLAS 74/00 reg. X X
particular: II-2/4.5.5; FSSC ch.15)
(SOLAS 74/88 reg.
II-2/62)
Survey Tables for Initial Statutory Surveys at New Construction (1 July 2010)
(EI) 1.1.4.2.1 Examining externally for any sign of gas Signs of Gas or Effluent X X
or effluent leakage Leakage
(EI) 1.1.4.2.2 Confirming the proper operation of both Inert Gas Blowers X
inert gas blowers
(EI) 1.1.4.2.3 Observing the operation of the scrubber- Scrubber Room Ventilation X
room ventilation system
60
A1
Appendix
Requirement
(EI) 1.1.4.2.4 Checking the deck water seal for Deck Water Seal X X
automatic filling and draining
(EI) 1.1.4.2.5 Examining the operation of all remotely Remote or Automatic Control X
operated or automatically controlled Valves
valves and, in particular, the flue gas
Flue Gas Isolating Valve X X
isolating valves
(EI) 1.1.4.2.8.1 High oxygen content of gas in the inert Simulation Test for Alarms and X
Survey Tables for Initial Statutory Surveys at New Construction (1 July 2010)
(EI) 1.1.4.2.8.2 Low gas pressure in the inert gas main Simulation Test for Alarms and X
Safety Devices
(EI) 1.1.4.2.8.3 Low pressure in the supply to the deck Simulation Test for Alarms and X
water seal Safety Devices
61
A1
Appendix
Requirement
(EI) 1.1.4.2.8.4 High temperature of gas in the inert gas Simulation Test for Alarms and X
main Safety Devices
(EI) 1.1.4.2.8.5 Low water pressure or low water-flow Simulation Test for Alarms and X
rate Safety Devices
(EI) 1.1.4.2.8.6 Accuracy of portable and fixed oxygen- Simulation Test for Alarms and X X
measuring equipment by means of Safety Devices
calibration gas
(EI) 1.1.4.2.8.8 Failure of the inert gas blowers Simulation Test for Alarms and X
Safety Devices
(EI) 1.1.4.2.8.9 Failure of the power supply to the Simulation Test for Alarms and X
automatic control system for the gas Safety Devices
regulating valve and to the
instrumentation for continuous indication
and permanent recording of pressure and
Survey Tables for Initial Statutory Surveys at New Construction (1 July 2010)
(EI) 1.1.4.2.8.10 High pressure of gas in the inert gas main Simulation Test for Alarms and X
Safety Devices
(EI) 1.1.4.2.9 Checking the proper operation of the IGS Operating Procedure X
inert gas system on completion of the
checks listed above
62
A1
Appendix
Requirement
(EI) 1.1.4.3 Examining the fixed fire-fighting system Cargo Pump Room Fire (SOLAS 74/00 reg. X X
for the cargo pump room, confirming that Extinguishing II-2/10.9; FSSC chs.5,
the installation tests have been 6, 7 and 8, as
Cargo Pump Room Means of X X
satisfactorily completed and that its applicable)
Closing Various Opening
means of operation are clearly marked
and, when appropriate, checking the
operation of the remote means for
closing the various openings
(EI) 1.1.4.4 Examining the protection of the cargo Temperature sensing devices (SOLAS 74/00 reg. X X X
Bilge monitoring X
(EI) 1.1.5.1 Confirming that the fire control plans are Required Documentations (SOLAS 74/00 reg. X
permanently exhibited or, alternatively, II-2/15.2.4) (SOLAS
emergency booklets have been provided 74/88 reg. II-2/20)
Survey Tables for Initial Statutory Surveys at New Construction (1 July 2010)
(EI) 1.1.5.2 Confirming that maintenance plans have Required Documentations (SOLAS 74/00 regs. X
been provided II-2/14.2.2 and 14.4)
63
A1
Appendix
Requirement
(EI) 1.1.5.3 Confirming that the training manuals and Required Documentations (SOLAS 74/00 regs. X
the fire safety operational booklets have II-2/15.2.3, 16.2 and
been provided 16.3)
(EI) 1.1.5.4 Confirming, where appropriate, that the Required Documentations (SOLAS 74/00 reg. X
ship is provided with a document II-2/19.4) (SOLAS
indicating compliance with the special 74/88 reg. II-2/54(3))
requirement for carrying dangerous
goods
(EI) 1.1.5.6 Confirming that the training manual and Required Documentations (SOLAS 74/00 reg. X
training aids for the lifesaving appliances III/35)
have been provided
Survey Tables for Initial Statutory Surveys at New Construction (1 July 2010)
(EI) 1.1.5.7 Confirming that the instructions for on Required Documentations (SOLAS 74/88 reg. X
board maintenance of the life-saving III/36)
appliances have been provided
64
A1
Appendix
Requirement
(EI) 1.1.5.8 Confirming that a table or curve of Required Documentations (SOLAS 74/00 reg. X
residual deviations for the magnetic V/19)
compass has been provided, and that a
diagram of the radar installations shadow
sectors is displayed
(EI) 1.1.5.9 Checking that operational and, where Required Documentations (SOLAS 74/00 reg. X
appropriate, maintenance manuals for all V/16)
navigational equipment are provided
(EI) 1.1.5.11 Checking that the International Code of Required Document (SOLAS 74/00/02, reg. X
Signals and a copy of Volume III of the V/21)
International Aeronautical and Maritime
Search and Rescue (IAMSAR) Manual
have been provided
Survey Tables for Initial Statutory Surveys at New Construction (1 July 2010)
(EI) 1.1.5.12 Checking that arrangements are provided Required Documents (SOLAS 74/00/03, reg. X
to maintain records of navigational V/28)
activities and daily reporting
(EI) 1.1.5.13 Checking that the life-saving signals to Required Documents (SOLAS 74/00, reg. X
be used by ships, aircraft or persons in V/29)
distress are available
65
A1
Appendix
Requirement
(EI) 1.1.5.14 Confirming that continuous synopsis Required Documents (SOLAS 74/02, reg. X
record is provided XI-1/5)
(EI) 1.1.6.1 Confirming, when appropriate, that the Required Documents (FSSC ch.15 paragraph X
instruction manuals for the inert gas 2.4.4) (SOLAS 74/88,
system have been provided reg. II-2/62.21)
66
A1
Appendix
TABLE 2
1
(LI) 1.1.2 For the load line the survey during construction and after
installation should consist of:
(LI) Confirming that the deck line and load line mark are Positioning of Deck Line and (LLC 66/88 regs. 4 to 9) X X
1.1.2.2 properly positioned Load Line Mark
(LI) Examining the superstructure end bulkheads and the Superstructure End Bulkheads (LLC 66/88 regs. 11 and
1.1.2.4 openings therein 12)
Superstructure Openings X X X X
Survey Tables for Initial Statutory Surveys at New Construction (1 July 2010)
67
A1
Appendix
Requirement
(LI) Examining the means of securing the weather tightness of Freeboard Deck - Means of (LLC 66/88 regs. 13 to X X X X
1.1.2.5 cargo hatchways, other hatchways and other openings on the Securing the weather tightness 18)
freeboard and superstructure decks of Cargo Hatchways
(LI) Examining the ventilators and air pipes, including their Ventilators and air pipes (LLC 66/88 regs. 19 and X X X
1.1.2.6 coamings and closing appliances including their coamings and 20)
closing appliances
68
A1
Appendix
Requirement
(LI) Examining the watertight integrity of the closures to any Closures to any openings in the (LLC 66/88 reg. 21) X X X X X
1.1.2.7 openings in the ship's side below the freeboard deck ship's side below the freeboard
deck
(LI) Examining the scuppers, inlets and discharges Scuppers, Inlets and Discharger (LLC 66/88 reg. 22) X X X
1.1.2.8
(LI) Examining the garbage chutes Garbage chute (LLC 66/88/03, reg. X X X
1.1.2.9 22-1)
(LI) Examining the side scuttles and deadlights Side Scuttles and Deadlights (LLC 66/88 reg. 23) X X X X
1.1.2.11
(LI) Examining the bulwarks including the provision of freeing Bulwarks (LLC 66/88/03 reg. 24, X X
1.1.2.12 ports, special attention being given to any freeing ports 25)
Freeing Ports X X
fitted with shutters
Freeing Ports fitted with X X X
Survey Tables for Initial Statutory Surveys at New Construction (1 July 2010)
shutters
(LI) Examining the guardrails, gangways, walkways and other Guardrails (LLC 66/88/03 reg. 25, X X
1.1.2.13 means provided for the protection of the crew and means for 25-1)
Gangways
safe passage of crew
Walkways
Other means
69
A1
Appendix
Requirement
(LI) Special requirements for ships permitted to sail with type Machinery Casings (LLC 66/88/03 reg. 26, X X X
1.1.2.14 “A” or type “B-minus” freeboards 27)
Gangway and Access
Hatchways
Freeing arrangements
(LI) Checking, when applicable, of the fittings and appliances Uprights (LLC 66/88 regs. 42 to X X
1.1.2.15 for timber deck cargoes 45)
Lashings X X
Protection of Crew X X
(LI) Checking that the loading and ballasting information has Loading and Stability Manual (LLC 66/88 reg. 10) X X
1.1.3.1 been supplied to the master
Survey Tables for Initial Statutory Surveys at New Construction (1 July 2010)
70
A1
Appendix
TABLE 3
1
(OI) Confirming the satisfactory installation and operation of, as oil filtering equipment MARPOL 90/04 Annex X X X X
1.1.3.1 appropriate, oil filtering equipment and when appropriate Automatic Stopping Device I regs. 14 and 15
the operation of the automatic means provided to stop the Alarm
discharge of effluent and the satisfactory operation of the
(OI) Confirming, when applicable, that the oil content meter and Oil Content Meter MARPOL 90/04 Annex X X X
1.1.3.2 its recording device are operable and that there is a I regs. 14 and 15
Recording Device X X X
sufficient supply of consumables for the recording device on
board Consumables X
(OI) testing, where fitted, the automatic stopping device required Stopping Device MARPOL 90/04 Annex X
1.1.3.3 for discharges in Special Areas I reg. 15
(OI) confirming the segregation of the oil fuel and water ballast Segregation of WB and Oil MARPOL 90/04 Annex X X
Survey Tables for Initial Statutory Surveys at New Construction (1 July 2010)
1.1.3.4 system and the non-carriage of oil in forepeak tanks Carriage of Oil in FP Tank I reg. 16
71
A1
Appendix
Requirement
(OI) Confirming that the oily residue (sludge) tank and its Oily residue (sludge) tank MARPOL 90/04 Annex X X
1.1.3.5 discharge arrangements are satisfactory and, when the size I reg. 12
Discharge Arrangement X X
of the sludge tank is approved on the basis of such
installations, confirming the satisfactory operation of Approved Sludge Tank's Size X X
homogenizers, sludge incinerators or other recognised
Incinerators/ Homogenisers X X X X
means for the control of sludge
(OI) Confirming the provision of the standard discharge Standard Discharge Connection MARPOL 90/04 Annex X
1.1.3.6 connection I reg. 13
(OI) Confirming that the arrangements of slop tanks or cargo Slop Tanks MARPOL 90/04 Annex X X
1.1.4.1 tanks designated as slop tanks and associated piping systems I regs. 29 and 34
Cargo Tanks designated as slop X X
are satisfactory
tanks
Survey Tables for Initial Statutory Surveys at New Construction (1 July 2010)
72
A1
Appendix
Requirement
(OI) Confirming the satisfactory installation and operation of the Discharge Monitoring and MARPOL 90/04 Annex X X X X
1.1.4.2 oil discharge monitoring and control system, including any Control System I regs. 31 and 34
audible or visual alarms, the automatic and manual means to
Audible and Visual Alarms X X
stop the discharge of effluent, the starting interlock and the
accuracy of the flow meter and the applicable resolution’s Automatic and manual means X X
requirements for installation survey to stop discharge of Effluent
Starting Interlock X X
(OI) Confirming that the approved oil/water interface detectors Oil/water interface detectors MARPOL 90/04 Annex X X
1.1.4.4 are on board and are operational I reg. 32
(OI) Confirming that the arrangements of pumps, pipes and Segregated Ballast Tanks: MARPOL 90/04 Annex X X
1.1.4.5 valves are in accordance with the requirements for Pumps, Piping and Valves I reg. 18
segregated ballast systems and that there are no cross-
Survey Tables for Initial Statutory Surveys at New Construction (1 July 2010)
73
A1
Appendix
Requirement
(OI) Where a portable spool piece is provided for the emergency Segregated Ballast Tanks: MARPOL 90/04 Annex X X
1.1.4.6 discharge of segregated ballast by connecting the segregated Emergency Discharge I reg. 18
ballast system to a cargo pump, confirming that non-return
valves are fitted on the segregated ballast connections and
that the spool piece is mounted in a conspicuous position in
the pump room with a permanent notice restricting its use
(OI) Testing ballast pipelines that pass through cargo tanks and Pipelines MARPOL 90/04 Annex X X
1.1.4.7 those cargo pipelines that pass through ballast tanks to I reg. 18
ensure there is no cross contamination
(OI) Examining crude oil washing piping, pumps, valves and Piping, Pumps Valves & X
1.1.4.8.1 deck mounted washing machines for signs of leakage and to Anchoring Devices
check that all anchoring devices for crude oil washing
piping are intact and secure;
(OI) Carrying out pressure testing of the crude oil washing Pressure Test X
Survey Tables for Initial Statutory Surveys at New Construction (1 July 2010)
(OI) Confirming in those cases where drive units are not integral Operational Drive Units X
1.1.4.8.3 with the tank washing machines, that the number of
operational drive units specified in the Manual are on board;
74
A1
Appendix
Requirement
(OI) Checking that, when fitted, steam heaters for water washing Steam Heaters X X
1.1.4.8.4 can be properly isolated during crude oil washing
operations, either by double shut-off valves or by clearly
identifiable blanks;
(OI) Confirming that an overpressure relief device (or other Overpressure Relief Device X X
(OI) Verifying that flexible hoses for supply of oil to the washing Flexible Hoses X X
1.1.4.8.7 machines on combination carriers are of an approved type,
are properly stored and are in good condition;
(OI) Verifying the effectiveness of the crude oil washing system COW-Crude Oil Washing: MARPOL 90/04 Annex
1.1.4.9 and, in particular: Effectiveness I reg. 33
(OI) Checking that the crude oil washing machines are operable X X
Survey Tables for Initial Statutory Surveys at New Construction (1 July 2010)
75
A1
Appendix
Requirement
(OI) Confirming that, where there is a crude oil washing system, COW-Crude Oil Washing: X X X
1.1.4.10 an inert gas system has been installed and tested in General
accordance with the requirements of SOLAS 74/88/2000
(see (EI) 1.1.4.2 in Annex 1);
(OI) Confirming, as appropriate, that the arrangements for the Pollution due to Collision or MARPOL 90/04 Annex X X
(OI) Confirming that the piping systems associated with the Pumping, Piping and Discharge MARPOL 90/04 Annex X X
1.1.4.12 discharge of dirty ballast water or oil-contaminated water I reg. 30
are satisfactory
(OI) Confirming that the observation and discharge control Observation and Discharge MARPOL 90/04 Annex X X
1.1.4.13 positions for visually observing the discharge of oil- Control I reg. 30
contaminated water, including the testing of the
Survey Tables for Initial Statutory Surveys at New Construction (1 July 2010)
(OI) Confirming that the means of draining cargo pumps and Means of Draining and MARPOL 90/04 Annex X X
1.1.4.14 cargo lines, including the provision of a stripping device and Stripping I reg. 30
the connections for pumping to the slop or cargo tanks or
Means for pumping ashore/ X X
ashore are satisfactory
slop/ cargo tanks
76
A1
Appendix
Requirement
(OI) Confirming that closing devices installed in the cargo Closing arrangements MARPOL 90/04 Annex X
1.1.4.16 transfer system and cargo piping, as appropriate, are I regs. 23 & 26
satisfactory
(OI) Confirming that the subdivision and stability arrangements, Stability Manual Tank MARPOL 90/04 Annex X X X
1.1.4.17 in addition to the provision of (OI) 1.1.4.16, to prevent Arrangement I regs. 23 & 26
progressive flooding are satisfactory
(OI) Confirming the arrangements for cargo pump-room bottom Tank Arrangements MARPOL 90/04 Annex X X
1.1.4.18 protection (double bottom where required) I reg. 22
(OI) Confirming that certificates for type approval for the oil Type Approval Certificates MARPOL 90/04 Annex X X
1.1.5.1 filtering equipment and oil content meters are available I reg. 14
(OI) Confirming that the Oil Record Book (Part I) has been Oil Record Book MARPOL 90/04 Annex X
1.1.5.2 provided I reg. 17
(OI) Confirming that the shipboard oil pollution emergency plan SOPEP/SMPEP MARPOL 90/04 Annex X X
1.1.5.3 or, in the case of a chemical/product tanker, a shipboard I reg. 37
Survey Tables for Initial Statutory Surveys at New Construction (1 July 2010)
77
A1
Appendix
Requirement
(OI) confirming that, if applicable, a Crude Oil Washing COW-Crude Oil Washing: MARPOL 90/04 Annex X X
1.1.6.2 Operations and Equipment Manual has been provided Operations & Equipment I reg. 35
Manual
(OI) Confirming that an operations manual for the oil discharge ODM Operation Manual MARPOL 90/04 Annex X X
1.1.6.3 monitoring and control system has been provided together I reg. 31
with any other documentation requested by the applicable
resolution
(OI) Confirming that certificates for type approval for the oil Type Approval Certificates MARPOL 90/04 Annex X
(OI) Confirming that an Oil Record Book (Part II) has been Oil Record Book MARPOL 90/04 Annex X
1.1.6.5 provided I reg. 36
(OI) Confirming that the information and data concerning the Loading and Damage Stability MARPOL 90/04 Annex X X
1.1.6.7 loading and damage stability has been provided Data I reg. 28
(OI) Confirming that the shipboard oil pollution emergency plan SOPEP/SMPEP MARPOL 90/04 Annex X X
1.1.6.8 or in the case of a chemical/product tanker a shipboard I reg. 37
Survey Tables for Initial Statutory Surveys at New Construction (1 July 2010)
78
A1
Appendix
Requirement
(OI) Confirming, for oil tankers of 5,000 deadweight and above Stability Information MARPOL 90/04 Annex X X
1.1.6.9 delivered on/after 1 February 2002, that the intact stability I reg. 27
has been approved
(OI) Confirming, for oil tankers of 5,000 deadweight and above, Shore based emergency support MARPOL 90/04 Annex X
1.1.6.10 that arrangements are in place to provide prompt access to arrangements I reg. 37.4
shore-based damage stability and residual structural strength
computerized calculation programmes
79
A1
APPENDIX 2
Shipyard Review Record
_____ Other:
2 Construction Facilities
(Documents such as a brochure of shipyard can be attached in lieu of completing this section.)
Note:
* In case of berth, “Depth” is not applicable.
(4) Fillet welding machine ( Gravity, Automatic ) Percentage of automatization, except gravity: about _____ %
- Line welder ( No, Yes: submerged arc × _____ heads, CO2 × _____ heads )
- Small automatic fillet welding machine ( No, Yes: Name: _______________ × _____ )
- Welding robot ( No, Yes: Portal × _____, Rectangular × _____, Articulated × _____ )
(6) Vertical automatic welding machine ( No, Yes: EG × _____, SEG × _____, ES × _____ )
EG: Electrogas SEG: Simplified Electrogas ES: Electroslag
(4) Final dock ( No, Yes: In-house, Other place of the same company, Use other company )
Note:
Above-mentioned (3) and (4) include the acceptance inspection of subcontracted items.
Note:
(3) NDE subcontractor company’s name and official technical Name _______________
qualifications (approved by) ________
Name _______________
(approved by) ________
Note:
Even if all works are subcontracted, it is recommendable to attach the qualified person(s) who can verify the works.
Note:
- In the case of high-tensile steel, are there means for identifying different grades?
- In the case of (3) and (4) above, are the materials approved by other classes controlled similarly?
Note:
- The standard is to include the description related traceability after shot blasting and primer coating.
- Reference is to be made to IMO Performance Standard for Protective Coatings (PSPC) and its relevant ABS Guide for
Classification Notations Coating Performance Standards (CPS)
Note:
- In the case of (2) and (3) above, check items are to include confirmation of edge preparations free from piercing hole.
Note:
Note:
Note:
(3) Are local air injection tests during sub-assembly works applied to?
(4) If (2) or (3) above is applied to, are the test procedures approved
by the Bureau?
Note: